Sunday, April 24, 2022 Fady El Hindawy_Gasco 1 1 ENGINEERING & TECHNICAL SUPPORT ENGINEERING & TECHNICAL SUPPORT DIVISION DIVISION ON-LINE & OFF-LINE CONDITION ON-LINE & OFF-LINE CONDITION MONITORING MONITORING FOT ELECTRICAL MACHINES FOT ELECTRICAL MACHINES January 2010 January 2010

Electrical Monitoring System & Services_backup

  • Upload
    3319826

  • View
    19

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 11

ENGINEERING & TECHNICAL SUPPORT ENGINEERING & TECHNICAL SUPPORT DIVISIONDIVISION

ON-LINE & OFF-LINE CONDITION MONITORINGON-LINE & OFF-LINE CONDITION MONITORING

FOT ELECTRICAL MACHINESFOT ELECTRICAL MACHINES

January 2010January 2010

Page 2: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 2

Thermal Electrical Ambient (Environmental) Mechanical

On-Line & Off-Line PDA System

Page 3: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 3

On-Line & Off-Line PDA System

Partial discharges are plasma processes which take place generally in a gas. Whenever the electrical field in a gas space exceeds the inception field of the gas, partial discharges are created: on the surface of an insulator, due to conductive contamination, in air inclusions of the insulation as a result of mechanical forces. The gas plasma accelerates ageing and corrosive substances as ozoneand NO2 are created. However the mechanical wear or a surface contamination is usually more harmful than the partial discharge action. As the presence of partial discharges cannot be avoided in rotating machines insulation, mica is applied as a partial discharge resistant medium.By-products of the partial discharge are commonly white powders which can be found in many locations of the machines.

Page 4: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 4

On-Line & Off-Line PDA System

Typical Partial Discharge Phenomena in Rotating Machines

• Loose wedges/bar vibration/slot discharges• Cracked and broken conductors• End winding surface contamination• Damage and corrosion of the corona suppression system• Connection ring external discharge due to vibration• Inter-phase discharge• Insulation degradation• Collector ring, brush sparking• Faults in generator high voltage accessories

Page 5: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 55

Avoid unnecessary rewinds on older machines by maximizing the operating hours from a stator winding

Avoid unexpected in-service failures of the stator winding Find a problem and correct it before failure Find problems on new machines which may still be under

warranty Assess the quality of maintenance repairs and/or rewinds with

before and after readings Compare results from similar machines to focus maintenance

on those with higher levels of PD Identify specific failure mechanisms in the stator winding to

allow for corrective action prior to an outage Improve the overall reliability of motors & generators

On-Line & Off-Line PDA System

Page 6: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 6

Gasco’s PDA policy/process is govern

By the following: Maintenance & Inspection policy

IEC 60505: Evaluation and Qualification of Electrical

Insulation Systems

IEC 60505.pdf

On-Line & Off-Line PDA System

Page 7: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 7

It is to be noted that in the past On-Line PDA systems were supplied and installed by:New Oilfield Services: (2001) OEM being IRIS (CANADA) and the scope of work executed as follows:3 Generators ASAB, 3 Generators BUHASA, 3 Generators RUWAIS, 4 Generators BAB as well as 10 Motors RUWAIS and 5 Motors BAB.

PD Tech Gmbh: (2003) As OEM (SWISS) and the scope of work executed as follows:6 Motors ASAB and 2 Motors BUHASA

On-Line & Off-Line PDA System

Page 8: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 8

Scope of Work: Inspection report for GE 26V-101 unit.pdf

- Executing service of lead out cables

- Executing service of the RTD connection to the control system.

- Re-location of generator space heater to avoid fuming problem.

- Cryogenic cleaning due to dust and oily contaminations.

- GAC bus bars re-insulation & Stator re-wedging.

- PD system minor enhancement for increased system accuracy.

- Testing, Pre-commissioning and commissioning.

Bidders: Kanoo Group, New Oilfield Services , Cegelec, Oilfield

Equipment & Services, Gulf Industrial Services & IDC

On-Line & Off-Line PDA System

Page 9: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 9

Scope of Work:

On-line PDA System implementation – HABSHAN

- 3 units Fr 5 GE generators & 5 motors (Habshan)

- One motors (Bab)

On-line & Off-line PDA test for all GASCO’s plants (Long term agreement)

SCHEDULE OF CHARGES.pdf

Bidders: Kanoo Group, PD Tech Gmbh, New Oilfield Services, Omeir Bin Yousef and Sons & Electro Mechanical Company

On-Line & Off-Line PDA System

Page 10: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 10

Scope of Work:

- Executing service of lead out cables

- Executing service of the RTD connection to the control system.

- Re-location of generator space heater to avoid fuming problem.

- Cryogenic cleaning due to dust and oily contaminations.

- GAC bus bars re-insulation & Stator re-wedging.

- PD system minor enhancement for increased system accuracy.

- Testing, Pre-commissioning and commissioning.

Bidders: Emirates Holdings/GE, MJB & Cegelec OES_35_05_ Bid tabulation.pdf

On-Line & Off-Line PDA System

Page 11: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 11

Scope of Work:

- Executing service of lead out cables

- PD system minor enhancement for increased system accuracy.

- Testing, Pre-commissioning and commissioning.

Bidders: Quartzelec (ex. Cegelec)

On-Line & Off-Line PDA System

Page 12: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 12

Scope of Work:

On-Line PDA system implementation – PHASE II

- 11 motors

On-Line PDA system implementation – PHASE III

- 7 motors for HABSHAN ph III

- 2 GE Fr VI generators

Bidders: Target, Kanoo Group, New Oilfield Services & Cegelec,

On-Line & Off-Line PDA System

Page 13: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 13

Scope of Work:

- Executing service of lead out cables

- Executing service of the RTD connection to the control system.

- Re-location of generator space heater to avoid fuming problem.

- Cryogenic cleaning due to dust and oily contaminations.

- GAC bus bars re-insulation & Stator re-wedging.

- PD system minor enhancement for increased system accuracy.

- Testing, Pre-commissioning and commissioning.

Bidders: MJB & ADYARD

On-Line & Off-Line PDA System

Page 14: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 14

Scope of Work: SCOPE OF SERVICES.pdfOn-line & Off-line PDA consultancy services comprising the following- Data collection for each machine at site.- Report generation for each measurement for each machine.- Standard tests- Extra tests PDA consultancy services for the following machines:- 18 Generation units - 37 MotorsBidders: Target, MJB & Golden Falcon Petroleum Services, Kanoo Group & Yam Al Khaleej General Contracting Company

On-Line & Off-Line PDA System

Page 15: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 15

On-Line & Off-Line PDA System

Page 16: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 16

GASCO MAINTENANCE AND INSPECTION POLICYCHAPTER 7 - ELECTRICAL MAINTENANCE

Generators Inspection:

Special attention shall be given to the HV generators windings.In order to assess their condition on-line PDA should be performed regularly with a recommended interval of 6 months to 1 year. Data may be sent to Vendor's specialist for detailed analysis in case of abnormal data collected.

For the emergency generators which are not PDA tested a thorough visual inspection, insulation resistance check and polarization index measurement should be done on a regular basis with maximum interval of three years.

On-Line & Off-Line PDA System

Page 17: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 17

Electrical Monitoring & Inspection (By Gasco’s Staff)

Batteries Conditions (Cell Impedance Test)

PDA for HV & LV Switchgear (EA Tech devices)

Thermal Inspection for HV & LV Switchgear (Infrared Camera)

Motor Circuit Analyzer (MCA)

Electrical Cables Insulation conditions (EA Tech devices)

Other Electrical Monitoring System

Page 18: Electrical Monitoring System & Services_backup

Tuesday, April 11, 2023 Fady El Hindawy_Gasco 18

On-Line & Off-Line PDA System