  • 7/29/2019 Electrical Excel Sheet EIRR-1

    1/17

    Energy Benefits

    Power House 1 20.8 GWh Table 1.4 PROJECT COSTS

    Power House 2

    0.0 GWhPower House 3 0.0 GWh M.Rs.

    Losses 5% 1.0 GWh Local Foreign Total

    24 0.0 GWh Main Power House 5.591 2.396 7.987 7.987 0.7

    365 0.0 GWh Power Channel 3.890 1.667 5.557 5.557 0.7

    Rate Rs./Kwh 3.71 Linining of canals 0.000 0.000 0.000 0.000 0.7

    Net Generated 1 19.7 GWh Tail Race Channel 7.189 3.081 10.270 10.270 0.7

    Net Generated 2&3 0.0 GWh Diversion of Chillian Disty 4.231 1.813 6.044 6.044 0.7

    Dewatering 3.769 1.615 5.3845.384

    0.7

    Sub-Total 24.670 10.573 35.243 35.243

    Electro-Mech Equipment 45.000 105.000 150.000 150.000 0.3

    Transmission Line 0.000 0.000 0.000 0.000 0.5

    Annual Benef i ts 73.204 M.Rs. Sub-Total 69.670 115.573 185.243

    Annual Benef i ts 0.000 M.Rs. Continge/mob/demob 8.309 9.990 18.299

    Res. & offices 7.380 0.000 7.380

    Total 73.204 M.Rs. Sub-Total 85.359 125.562 210.921

    Eng.Services 4.50% 3.841 5.650 9.491

    Total Generated 19.7 GWh Admin Cost 2% 1.707 2.511 4.218

    Years 20 394.63 GWh

    Sub-Total 90.907 133.724 224.631

    Land Acquisition 14.000 0.000 14.000

    Compensation Cost

    Resettlement Cost

    Grand Total 104.907 133.724 238.631

    Local and Foreign Components-power

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    2/17

    scf 0.9 0.95

    Local Foreign

    50% 1 52.5 66.9 47.2 63.5 110.7

    50% 2 52.5 66.9 47.2 63.5 110.7

    0% 3 0.0 0.0 0.0 0.0 0.0

    0% 4 0.0 0.0 0.0 0.0 0.0

    104.907 Total 104.9 133.7 94.4 127.0 221.5

    133.724 O&m 2% 4.429

    Million Rs.

    Benefits CostsYear Power Other Total Capital O&M Total 10 % less 10 % Over Case I Case II Case III Case IV

    1 2006 0.000 0.000 0.000 110.727 110.727 0.000 121.800 -110.727 -110.727 -121.800 -121.800 1

    2 2007 0.000 0.000 0.000 110.727 110.727 0.000 121.800 -110.727 -110.727 -121.800 -121.800 2

    3 2008 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 3

    4 2009 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 4

    5 2010 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 5

    6 2011 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 67 2012 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 7

    8 2013 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 8

    9 2014 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 9

    10 2015 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 10

    11 2016 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 11

    12 2017 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 12

    Table: 10.4 A ECONOMIC CASH FLOW STATEMENT

    Punjab Hydro Power Project

    S.No. Benefits Costs Net Benefits Year

    Table 1.4 Economic Cost

    YearTOTAL COST(M.Rs.) Total

    EconomicCapital Economic

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    3/17

    13 2018 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 13

    14 2019 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 14

    15 2020 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 15

    16 2021 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 16

    17 2022 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 17

    18 2023 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 18

    19 2024 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 19

    20 2025 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 20

    21 2026 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 21

    22 2027 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 22

    23 2028 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 23

    24 2029 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 2425 2030 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 25

    26 2031 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 26

    27 2032 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 27

    28 2033 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 28

    29 2034 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 29

    30 2035 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 30

    31 2036 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 31

    Total 2122.912 0.000 2122.912 221.454 128.443 349.897 1910.621 384.887 1773.015 1560.723 1738.025 1525.734

    Rate of Discount 12% Case I Case II Case III Case IV

    Present Worth of Benefits 468.13 421.32 468.13 421.32

    Present Worth of Costs 215.46 215.46 237.00 237.00Net Present Worth 252.68 205.86 231.13 184.32

    B/C Ratio 2.17 1.96 1.98 1.78

    EIRR 27.30% 24.66% 24.91% 22.45%

    Table: 10.4 B

    SUMMARY OF RESULTS (Rs. 3.71 / KWh)

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    4/17

    Energy Benefits

    Power House 1 20.8 GWh Table 1.4 PROJECT COSTS

    Power House 2 0.0 GWh

    Power House 3 0.0 GWh M.Rs.

    Losses 5% 1.0 GWh Local Foreign Total

    24 0.0 GWh Main Power House 5.591 2.396 7.987 7.987

    365 0.0 GWh Power Channel 3.890 1.667 5.557 5.557

    Rate Rs./Kwh 3.92 Linining of canals 0.000 0.000 0.000 0.000

    Net Generated 1 19.7 GWh Tail Race Channel 7.189 3.081 10.270 10.270

    Net Generated 2&3 0.0 GWh Diversion of Chillian Disty 4.231 1.813 6.044 6.044

    Dewatering 3.769 1.615 5.384 5.384

    Sub-Total 24.670 10.573 35.243 35.243

    Electro-Mech Equipment 45.000 105.000 150.000 150.000

    Transmission Line 0.000 0.000 0.000 0.000

    Annu al Benefi ts 77.347 M.Rs. Sub-Total 69.670 115.573 185.243

    Annu al Benefi ts 0.000 M.Rs. Continge/mob/demob 8.309 9.990 18.299

    Res. & offices 7.380 0.000 7.380

    Total 77.347 M.Rs. Sub-Total 85.359 125.562 210.921

    Eng.Services 4.50% 3.841 5.650 9.491

    Total Generated 19.7 GWh Admin Cost 2% 1.707 2.511 4.218

    Years 20 394.63 GWh

    Sub-Total 90.907 133.724 224.631

    Land Acquisition 14.000 0.000 14.000

    Compensation Cost

    Resettlement Cost

    Grand Total 104.907 133.724 238.631

    Local and Foreign Components-power

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    5/17

    scf 0.9 0.95

    Local Foreign

    50% 1 52.5 66.9 47.2 63.5 110.7

    50% 2 52.5 66.9 47.2 63.5 110.7

    0% 3 0.0 0.0 0.0 0.0 0.0

    0% 4 0.0 0.0 0.0 0.0 0.0

    104.907 Total 104.9 133.7 94.4 127.0 221.5

    133.724 O&m 2% 4.429

    Million Rs.

    Benefits Costs

    Year Power Other Total Capital O&M Total 10 % less 10 % Over Case I Case II Case III Case IV

    1 2006 0.000 0.000 0.000 110.727 110.727 0.000 121.800 -110.727 -110.727 -121.800 -121.800

    2 2007 0.000 0.000 0.000 110.727 110.727 0.000 121.800 -110.727 -110.727 -121.800 -121.800

    3 2008 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    4 2009 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    5 2010 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.7416 2011 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    7 2012 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    8 2013 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    9 2014 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    10 2015 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    11 2016 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    12 2017 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    Costs Net Benefits

    Year

    Table 1.4 Economic Cost

    Economic

    TOTAL COST(M.Rs.)

    Capital

    Total

    Economic

    Table: 10.4 A ECONOMIC CASH FLOW STATEMENT

    Punjab Hydro Power Project

    S.No.Benefits

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    6/17

    13 2018 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    14 2019 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    15 2020 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    16 2021 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    17 2022 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    18 2023 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    19 2024 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    20 2025 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    21 2026 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    22 2027 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    23 2028 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    24 2029 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    25 2030 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    26 2031 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    27 2032 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    28 2033 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    29 2034 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    30 2035 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    31 2036 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741

    Total 2243.077 0.000 2243.077 221.454 128.443 349.897 2018.769 384.887 1893.180 1668.872 1858.190 1633.882

    Rate of Discount 12% Case I Case II Case III Case IV

    Present Worth of Benefits 494.63 445.17 494.63 445.17

    Present Worth of Costs 215.46 215.46 237.00 237.00

    Net Present Worth 279.17 229.71 257.63 208.17

    B/C Ratio 2.30 2.07 2.09 1.88

    EIRR 28.77% 26.01% 26.27% 23.71%

    Table: 10.4 B

    SUMMARY OF RESULTS (Rs. 3.92 / KWh)

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    7/17

    0.7

    0.7

    0.7

    0.7

    0.7

    0.7

    0.3

    0.5

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    8/17

    1

    2

    3

    4

    56

    7

    8

    9

    10

    11

    12

    Year

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    9/17

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    3031

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    10/17

    Energy Benefits

    Power House 1 20.8 GWh Table 1.4 PROJECT COSTS

    Power House 2 0.0 GWh

    Power House 3 0.0 GWh M.Rs.

    Losses 5% 1.0 GWh Local Foreign Total

    24 0.0 GWh Main Power House 5.591 2.396 7.987 7.987 0.7

    365 0.0 GWh Power Channel 3.890 1.667 5.557 5.557 0.7

    Rate Rs./Kwh 4.06 Linining of canals 0.000 0.000 0.000 0.000 0.7

    Net Generated 1 19.7 GWh Tail Race Channel 7.189 3.081 10.270 10.270 0.7

    Net Generated 2&3 0.0 GWh Diversion of Chillian Disty 4.231 1.813 6.044 6.044 0.7

    Dewatering 3.769 1.615 5.384 5.384 0.7

    Sub-Total 24.670 10.573 35.243 35.243

    Electro-Mech Equipment 45.000 105.000 150.000 150.000 0.3

    Transmission Line 0.000 0.000 0.000 0.000 0.5

    Annual Benefi ts 80.110 M.Rs. Sub-Total 69.670 115.573 185.243

    Annual Benefi ts 0.000 M.Rs. Continge/mob/demob 8.309 9.990 18.299

    Res. & offices 7.380 0.000 7.380

    Total 80.110 M.Rs. Sub-Total 85.359 125.562 210.921Eng.Services 4.50% 3.841 5.650 9.491

    Total Generated 19.7 GWh Admin Cost 2% 1.707 2.511 4.218

    Years 20 394.63 GWh

    Sub-Total 90.907 133.724 224.631

    Land Acquisition 14.000 0.000 14.000

    Compensation Cost

    Resettlement Cost

    Grand Total 104.907 133.724 238.631

    Local and Foreign Components-power

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    11/17

    scf 0.9 0.95

    Local Foreign

    50% 1 52.5 66.9 47.2 63.5 110.7

    50% 2 52.5 66.9 47.2 63.5 110.7

    0% 3 0.0 0.0 0.0 0.0 0.0

    0% 4 0.0 0.0 0.0 0.0 0.0

    104.907 Total 104.9 133.7 94.4 127.0 221.5

    133.724 O&m 2% 4.429

    Million Rs.

    Benefits Costs

    Year Power Other Total Capital O&M Total 10 % less 10 % Over Case I Case II Case III Case IV

    1 2006 0.000 0.000 0.000 110.727 110.727 0.000 121.800 -110.727 -110.727 -121.800 -121.800 1

    2 2007 0.000 0.000 0.000 110.727 110.727 0.000 121.800 -110.727 -110.727 -121.800 -121.800 2

    3 2008 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 3

    4 2009 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 4

    5 2010 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 5

    6 2011 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 6

    7 2012 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 7

    8 2013 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 8

    9 2014 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 9

    10 2015 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 10

    11 2016 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 11

    12 2017 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 12

    13 2018 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 13

    14 2019 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 14

    Table: 10.4 A ECONOMIC CASH FLOW STATEMENT

    Punjab Hydro Power Project

    S.No.

    Benefits Costs Net Benefits

    Year

    Table 1.4 Economic Cost

    YearTOTAL COST(M.Rs.) Total

    EconomicCapital Economic

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    12/17

    15 2020 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 15

    16 2021 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 16

    17 2022 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 17

    18 2023 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 18

    19 2024 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 19

    20 2025 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 20

    21 2026 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 21

    22 2027 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 22

    23 2028 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 23

    24 2029 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 24

    25 2030 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 25

    26 2031 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 26

    27 2032 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 27

    28 2033 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 28

    29 2034 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 29

    30 2035 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 30

    31 2036 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 31

    Total 2323.187 0.000 2323.187 221.454 128.443 349.897 2090.868 384.887 1973.289 1740.971 1938.300 1705.981

    Rate of Discount 12% Case I Case II Case III Case IV

    Present Worth of Benefits 512.30 461.07 512.30 461.07

    Present Worth of Costs 215.46 215.46 237.00 237.00

    Net Present Worth 296.84 245.61 275.29 224.06

    B/C Ratio 2.38 2.14 2.16 1.95

    EIRR 29.74% 26.91% 27.17% 24.54%

    Table: 10.4 B

    SUMMARY OF RESULTS (Rs. 4.06/ KWh)

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    13/17

    Power House 1 20.8 GWh Table 1.4 PROJECT COSTS

    Power House 2 0.0 GWh

    Power House 3 0.0 GWh M.Rs.

    Losses 5% 1.0 GWh Local Foreign Total

    24 0.0 GWh Main Power House 5.593 2.397 7.990 7.990 0.7

    365 0.0 GWh Power Channel 3.892 1.668 5.560 5.560 0.7

    Rate Rs./Kwh 3.63 Linining of canals 0.000 0.000 0.000 0.000 0.7

    Net Generated 1 19.7 GWh Tail Race Channel 8.337 3.573 11.910 11.910 0.7

    Net Generated 2&3 0.0 GWh Diversion of Chillian Disty 4.228 1.812 6.040 6.040 0.7

    Dewatering 3.769 1.615 5.384 5.384 0.7

    Electro-Mech Equipment 45.000 105.000 150.000 150.000 0.3

    Transmission Line 8.750 8.750 17.500 17.500 0.5

    Annu al Benefi ts 71.625 M.Rs. Sub-Total 79.569 124.815 204.384

    Annu al Benefi ts 0.000 M.Rs. Continge/mob 20% 15.914 24.963 40.877

    Res. & offices 7.380 0.000 7.380Total 71.625 M.Rs. Sub-Total 102.863 149.778 252.641

    Eng.Services 4.50% 4.629 6.740 11.369

    Total Generated 19.7 GWh Admin Cost 2% 2.057 2.996 5.053

    Years 20 394.63 GWh

    Sub-Total 109.549 159.514 269.062

    Land Acquisition 14.000 0.000 14.000

    Compensation Cost

    Resettlement CostGrand Total 123.549 159.514 283.062

    Local and Foreign Components-power

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    14/17

    scf 0.9 0.95

    Local Foreign

    1 61.8 79.8 55.6 75.8 131.4

    2 61.8 79.8 55.6 75.8 131.4

    3 0.0 0.0 0.0 0.0 0.0

    4 0.0 0.0 0.0 0.0 0.0

    Total 123.5 111.2 151.5 262.7

    159.514 O&m 2% 5.255

    Million Rs.Benefits Costs

    Year Power Other Total Capital O&M Total 10 % less 10 % Over Case I Case II Case III Case IV

    1 2006 0.000 0.000 0.000 131.366 131.366 0.000 144.503 -131.366 -131.366 -144.503 -144.503 1

    2 2007 0.000 0.000 0.000 131.366 131.366 0.000 144.503 -131.366 -131.366 -144.503 -144.503 2

    3 2008 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 3

    4 2009 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 4

    5 2010 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 56 2011 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 6

    7 2012 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 7

    8 2013 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 8

    9 2014 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 9

    10 2015 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 10

    11 2016 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 11

    12 2017 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 12

    Net BenefitsYear

    TOTAL COST(M.Rs.)

    Capital

    Total

    EconomicYear

    Table 1.4 Economic Cost

    Economic

    Table 1.5 ECONOMIC CASH FLOW STATEMENT

    S.No.Benefits Costs

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    15/17

    13 2018 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 13

    14 2019 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 14

    15 2020 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 15

    16 2021 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 16

    17 2022 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 17

    18 2023 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 18

    19 2024 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 19

    20 2025 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 20

    21 2026 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 21

    22 2027 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 2223 2028 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 23

    24 2029 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 24

    25 2030 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 25

    26 2031 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 26

    27 2032 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 27

    28 2033 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 28

    29 2034 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 29

    30 2035 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 3031 2036 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 31

    Total 2077.135 0.000 2077.135 262.732 152.385 415.116 1869.422 456.628 1662.019 1454.305 1620.507 1412.793

    Case I Case II Case III Case IVPresent Worth of Benefits 554.63 499.17 554.63 499.17

    Present Worth of Costs 268.68 268.68 295.55 295.55

    Net Present Worth 285.95 230.49 259.08 203.62

    B/C Ratio 2.06 1.86 1.88 1.69

    EIRR 22.63% 20.36% 20.57% 18.45%

    Table 6. SUMMARY OF RESULTS

    Rate of Discount 10 %

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    16/17

    Power House 1 20.8 GWh Table 1.4 PROJECT COSTS

    Power House 2 0.0 GWh

    Power House 3 0.0 GWh M.Rs.

    Losses 5% 1.0 GWh Local Foreign Total

    24 0.0 GWh Main Power House 5.591 2.396 7.987 7.987 0.7

    365 0.0 GWh Power Channel 3.892 1.668 5.560 5.560 0.7

    Rate Rs./Kwh 4.06 Linining of canals 0.000 0.000 0.000 0.000 0.7

    Net Generated 1 19.7 GWh Tail Race Channel 7.189 3.081 10.270 10.270 0.7Net Generated 2&3 0.0 GWh Diversion of Chillian Disty 4.228 1.812 6.040 6.040 0.7

    Dewatering 3.769 1.615 5.384 5.384 0.7

    Electro-Mech Equipment 45.000 105.000 150.000 150.000 0.3

    Transmission Line 8.750 8.750 17.500 17.500 0.5

    Annu al Benefi ts 80.110 M.Rs. Sub-Total 78.419 124.322 202.741

    Annu al Benefi ts 0.000 M.Rs. Continge/mob 20% 15.684 24.864 40.548

    Res. & offices 7.380 0.000 7.380Total 80.110 M.Rs. Sub-Total 101.482 149.187 250.669

    Eng.Services 4.50% 4.567 6.713 11.280

    Total Generated 19.7 GWh Admin Cost 2% 2.030 2.984 5.013

    Years 20 394.63 GWh

    Sub-Total 108.079 158.884 266.963

    Land Acquisition 14.000 0.000 14.000

    Compensation Cost

    Resettlement CostGrand Total 122.079 158.884 280.963

    Local and Foreign Components-power

  • 7/29/2019 Electrical Excel Sheet EIRR-1

    17/17

    scf 0.9 0.95

    Local Foreign

    1 61.0 79.4 54.9 75.5 130.4

    2 61.0 79.4 54.9 75.5 130.4

    3 0.0 0.0 0.0 0.0 0.0

    4 0.0 0.0 0.0 0.0 0.0

    Total 122.1 109.9 150.9 260.8

    158.884 O&m 2% 5.216

    Million Rs.Benefits Costs

    Year Power Other Total Capital O&M Total 10 % less 10 % Over Case I Case II Case III Case IV

    1 2006 0.000 0.000 0.000 130.405 130.405 0.000 143.446 -130.405 -130.405 -143.446 -143.446 1

    2 2007 0.000 0.000 0.000 130.405 130.405 0.000 143.446 -130.405 -130.405 -143.446 -143.446 2

    3 2008 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 3

    4 2009 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 4

    5 2010 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 56 2011 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 6

    7 2012 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 7

    8 2013 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 8

    9 2014 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 9

    10 2015 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 10

    11 2016 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 11

    12 2017 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 12

    Net BenefitsYear

    TOTAL COST(M.Rs.)

    Capital

    Total

    EconomicYear

    Table 1.4 Economic Cost

    Economic

    Table 1.5 ECONOMIC CASH FLOW STATEMENT

    S.No.Benefits Costs