Energy Benefits
Power House 1 20.8 GWh Table 1.4 PROJECT COSTS
Power House 2
0.0 GWhPower House 3 0.0 GWh M.Rs.
Losses 5% 1.0 GWh Local Foreign Total
24 0.0 GWh Main Power House 5.591 2.396 7.987 7.987 0.7
365 0.0 GWh Power Channel 3.890 1.667 5.557 5.557 0.7
Rate Rs./Kwh 3.71 Linining of canals 0.000 0.000 0.000 0.000 0.7
Net Generated 1 19.7 GWh Tail Race Channel 7.189 3.081 10.270 10.270 0.7
Net Generated 2&3 0.0 GWh Diversion of Chillian Disty 4.231 1.813 6.044 6.044 0.7
Dewatering 3.769 1.615 5.3845.384
0.7
Sub-Total 24.670 10.573 35.243 35.243
Electro-Mech Equipment 45.000 105.000 150.000 150.000 0.3
Transmission Line 0.000 0.000 0.000 0.000 0.5
Annual Benef i ts 73.204 M.Rs. Sub-Total 69.670 115.573 185.243
Annual Benef i ts 0.000 M.Rs. Continge/mob/demob 8.309 9.990 18.299
Res. & offices 7.380 0.000 7.380
Total 73.204 M.Rs. Sub-Total 85.359 125.562 210.921
Eng.Services 4.50% 3.841 5.650 9.491
Total Generated 19.7 GWh Admin Cost 2% 1.707 2.511 4.218
Years 20 394.63 GWh
Sub-Total 90.907 133.724 224.631
Land Acquisition 14.000 0.000 14.000
Compensation Cost
Resettlement Cost
Grand Total 104.907 133.724 238.631
Local and Foreign Components-power
7/29/2019 Electrical Excel Sheet EIRR-1
2/17
scf 0.9 0.95
Local Foreign
50% 1 52.5 66.9 47.2 63.5 110.7
50% 2 52.5 66.9 47.2 63.5 110.7
0% 3 0.0 0.0 0.0 0.0 0.0
0% 4 0.0 0.0 0.0 0.0 0.0
104.907 Total 104.9 133.7 94.4 127.0 221.5
133.724 O&m 2% 4.429
Million Rs.
Benefits CostsYear Power Other Total Capital O&M Total 10 % less 10 % Over Case I Case II Case III Case IV
1 2006 0.000 0.000 0.000 110.727 110.727 0.000 121.800 -110.727 -110.727 -121.800 -121.800 1
2 2007 0.000 0.000 0.000 110.727 110.727 0.000 121.800 -110.727 -110.727 -121.800 -121.800 2
3 2008 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 3
4 2009 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 4
5 2010 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 5
6 2011 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 67 2012 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 7
8 2013 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 8
9 2014 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 9
10 2015 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 10
11 2016 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 11
12 2017 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 12
Table: 10.4 A ECONOMIC CASH FLOW STATEMENT
Punjab Hydro Power Project
S.No. Benefits Costs Net Benefits Year
Table 1.4 Economic Cost
YearTOTAL COST(M.Rs.) Total
EconomicCapital Economic
7/29/2019 Electrical Excel Sheet EIRR-1
3/17
13 2018 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 13
14 2019 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 14
15 2020 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 15
16 2021 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 16
17 2022 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 17
18 2023 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 18
19 2024 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 19
20 2025 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 20
21 2026 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 21
22 2027 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 22
23 2028 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 23
24 2029 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 2425 2030 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 25
26 2031 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 26
27 2032 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 27
28 2033 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 28
29 2034 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 29
30 2035 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 30
31 2036 73.204 0.000 73.204 0.000 4.429 4.429 65.883 4.872 68.775 61.454 68.332 61.011 31
Total 2122.912 0.000 2122.912 221.454 128.443 349.897 1910.621 384.887 1773.015 1560.723 1738.025 1525.734
Rate of Discount 12% Case I Case II Case III Case IV
Present Worth of Benefits 468.13 421.32 468.13 421.32
Present Worth of Costs 215.46 215.46 237.00 237.00Net Present Worth 252.68 205.86 231.13 184.32
B/C Ratio 2.17 1.96 1.98 1.78
EIRR 27.30% 24.66% 24.91% 22.45%
Table: 10.4 B
SUMMARY OF RESULTS (Rs. 3.71 / KWh)
7/29/2019 Electrical Excel Sheet EIRR-1
4/17
Energy Benefits
Power House 1 20.8 GWh Table 1.4 PROJECT COSTS
Power House 2 0.0 GWh
Power House 3 0.0 GWh M.Rs.
Losses 5% 1.0 GWh Local Foreign Total
24 0.0 GWh Main Power House 5.591 2.396 7.987 7.987
365 0.0 GWh Power Channel 3.890 1.667 5.557 5.557
Rate Rs./Kwh 3.92 Linining of canals 0.000 0.000 0.000 0.000
Net Generated 1 19.7 GWh Tail Race Channel 7.189 3.081 10.270 10.270
Net Generated 2&3 0.0 GWh Diversion of Chillian Disty 4.231 1.813 6.044 6.044
Dewatering 3.769 1.615 5.384 5.384
Sub-Total 24.670 10.573 35.243 35.243
Electro-Mech Equipment 45.000 105.000 150.000 150.000
Transmission Line 0.000 0.000 0.000 0.000
Annu al Benefi ts 77.347 M.Rs. Sub-Total 69.670 115.573 185.243
Annu al Benefi ts 0.000 M.Rs. Continge/mob/demob 8.309 9.990 18.299
Res. & offices 7.380 0.000 7.380
Total 77.347 M.Rs. Sub-Total 85.359 125.562 210.921
Eng.Services 4.50% 3.841 5.650 9.491
Total Generated 19.7 GWh Admin Cost 2% 1.707 2.511 4.218
Years 20 394.63 GWh
Sub-Total 90.907 133.724 224.631
Land Acquisition 14.000 0.000 14.000
Compensation Cost
Resettlement Cost
Grand Total 104.907 133.724 238.631
Local and Foreign Components-power
7/29/2019 Electrical Excel Sheet EIRR-1
5/17
scf 0.9 0.95
Local Foreign
50% 1 52.5 66.9 47.2 63.5 110.7
50% 2 52.5 66.9 47.2 63.5 110.7
0% 3 0.0 0.0 0.0 0.0 0.0
0% 4 0.0 0.0 0.0 0.0 0.0
104.907 Total 104.9 133.7 94.4 127.0 221.5
133.724 O&m 2% 4.429
Million Rs.
Benefits Costs
Year Power Other Total Capital O&M Total 10 % less 10 % Over Case I Case II Case III Case IV
1 2006 0.000 0.000 0.000 110.727 110.727 0.000 121.800 -110.727 -110.727 -121.800 -121.800
2 2007 0.000 0.000 0.000 110.727 110.727 0.000 121.800 -110.727 -110.727 -121.800 -121.800
3 2008 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
4 2009 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
5 2010 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.7416 2011 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
7 2012 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
8 2013 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
9 2014 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
10 2015 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
11 2016 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
12 2017 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
Costs Net Benefits
Year
Table 1.4 Economic Cost
Economic
TOTAL COST(M.Rs.)
Capital
Total
Economic
Table: 10.4 A ECONOMIC CASH FLOW STATEMENT
Punjab Hydro Power Project
S.No.Benefits
7/29/2019 Electrical Excel Sheet EIRR-1
6/17
13 2018 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
14 2019 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
15 2020 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
16 2021 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
17 2022 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
18 2023 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
19 2024 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
20 2025 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
21 2026 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
22 2027 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
23 2028 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
24 2029 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
25 2030 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
26 2031 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
27 2032 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
28 2033 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
29 2034 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
30 2035 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
31 2036 77.347 0.000 77.347 0.000 4.429 4.429 69.613 4.872 72.918 65.184 72.475 64.741
Total 2243.077 0.000 2243.077 221.454 128.443 349.897 2018.769 384.887 1893.180 1668.872 1858.190 1633.882
Rate of Discount 12% Case I Case II Case III Case IV
Present Worth of Benefits 494.63 445.17 494.63 445.17
Present Worth of Costs 215.46 215.46 237.00 237.00
Net Present Worth 279.17 229.71 257.63 208.17
B/C Ratio 2.30 2.07 2.09 1.88
EIRR 28.77% 26.01% 26.27% 23.71%
Table: 10.4 B
SUMMARY OF RESULTS (Rs. 3.92 / KWh)
7/29/2019 Electrical Excel Sheet EIRR-1
7/17
0.7
0.7
0.7
0.7
0.7
0.7
0.3
0.5
7/29/2019 Electrical Excel Sheet EIRR-1
8/17
1
2
3
4
56
7
8
9
10
11
12
Year
7/29/2019 Electrical Excel Sheet EIRR-1
9/17
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
3031
7/29/2019 Electrical Excel Sheet EIRR-1
10/17
Energy Benefits
Power House 1 20.8 GWh Table 1.4 PROJECT COSTS
Power House 2 0.0 GWh
Power House 3 0.0 GWh M.Rs.
Losses 5% 1.0 GWh Local Foreign Total
24 0.0 GWh Main Power House 5.591 2.396 7.987 7.987 0.7
365 0.0 GWh Power Channel 3.890 1.667 5.557 5.557 0.7
Rate Rs./Kwh 4.06 Linining of canals 0.000 0.000 0.000 0.000 0.7
Net Generated 1 19.7 GWh Tail Race Channel 7.189 3.081 10.270 10.270 0.7
Net Generated 2&3 0.0 GWh Diversion of Chillian Disty 4.231 1.813 6.044 6.044 0.7
Dewatering 3.769 1.615 5.384 5.384 0.7
Sub-Total 24.670 10.573 35.243 35.243
Electro-Mech Equipment 45.000 105.000 150.000 150.000 0.3
Transmission Line 0.000 0.000 0.000 0.000 0.5
Annual Benefi ts 80.110 M.Rs. Sub-Total 69.670 115.573 185.243
Annual Benefi ts 0.000 M.Rs. Continge/mob/demob 8.309 9.990 18.299
Res. & offices 7.380 0.000 7.380
Total 80.110 M.Rs. Sub-Total 85.359 125.562 210.921Eng.Services 4.50% 3.841 5.650 9.491
Total Generated 19.7 GWh Admin Cost 2% 1.707 2.511 4.218
Years 20 394.63 GWh
Sub-Total 90.907 133.724 224.631
Land Acquisition 14.000 0.000 14.000
Compensation Cost
Resettlement Cost
Grand Total 104.907 133.724 238.631
Local and Foreign Components-power
7/29/2019 Electrical Excel Sheet EIRR-1
11/17
scf 0.9 0.95
Local Foreign
50% 1 52.5 66.9 47.2 63.5 110.7
50% 2 52.5 66.9 47.2 63.5 110.7
0% 3 0.0 0.0 0.0 0.0 0.0
0% 4 0.0 0.0 0.0 0.0 0.0
104.907 Total 104.9 133.7 94.4 127.0 221.5
133.724 O&m 2% 4.429
Million Rs.
Benefits Costs
Year Power Other Total Capital O&M Total 10 % less 10 % Over Case I Case II Case III Case IV
1 2006 0.000 0.000 0.000 110.727 110.727 0.000 121.800 -110.727 -110.727 -121.800 -121.800 1
2 2007 0.000 0.000 0.000 110.727 110.727 0.000 121.800 -110.727 -110.727 -121.800 -121.800 2
3 2008 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 3
4 2009 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 4
5 2010 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 5
6 2011 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 6
7 2012 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 7
8 2013 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 8
9 2014 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 9
10 2015 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 10
11 2016 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 11
12 2017 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 12
13 2018 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 13
14 2019 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 14
Table: 10.4 A ECONOMIC CASH FLOW STATEMENT
Punjab Hydro Power Project
S.No.
Benefits Costs Net Benefits
Year
Table 1.4 Economic Cost
YearTOTAL COST(M.Rs.) Total
EconomicCapital Economic
7/29/2019 Electrical Excel Sheet EIRR-1
12/17
15 2020 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 15
16 2021 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 16
17 2022 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 17
18 2023 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 18
19 2024 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 19
20 2025 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 20
21 2026 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 21
22 2027 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 22
23 2028 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 23
24 2029 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 24
25 2030 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 25
26 2031 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 26
27 2032 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 27
28 2033 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 28
29 2034 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 29
30 2035 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 30
31 2036 80.110 0.000 80.110 0.000 4.429 4.429 72.099 4.872 75.681 67.670 75.238 67.227 31
Total 2323.187 0.000 2323.187 221.454 128.443 349.897 2090.868 384.887 1973.289 1740.971 1938.300 1705.981
Rate of Discount 12% Case I Case II Case III Case IV
Present Worth of Benefits 512.30 461.07 512.30 461.07
Present Worth of Costs 215.46 215.46 237.00 237.00
Net Present Worth 296.84 245.61 275.29 224.06
B/C Ratio 2.38 2.14 2.16 1.95
EIRR 29.74% 26.91% 27.17% 24.54%
Table: 10.4 B
SUMMARY OF RESULTS (Rs. 4.06/ KWh)
7/29/2019 Electrical Excel Sheet EIRR-1
13/17
Power House 1 20.8 GWh Table 1.4 PROJECT COSTS
Power House 2 0.0 GWh
Power House 3 0.0 GWh M.Rs.
Losses 5% 1.0 GWh Local Foreign Total
24 0.0 GWh Main Power House 5.593 2.397 7.990 7.990 0.7
365 0.0 GWh Power Channel 3.892 1.668 5.560 5.560 0.7
Rate Rs./Kwh 3.63 Linining of canals 0.000 0.000 0.000 0.000 0.7
Net Generated 1 19.7 GWh Tail Race Channel 8.337 3.573 11.910 11.910 0.7
Net Generated 2&3 0.0 GWh Diversion of Chillian Disty 4.228 1.812 6.040 6.040 0.7
Dewatering 3.769 1.615 5.384 5.384 0.7
Electro-Mech Equipment 45.000 105.000 150.000 150.000 0.3
Transmission Line 8.750 8.750 17.500 17.500 0.5
Annu al Benefi ts 71.625 M.Rs. Sub-Total 79.569 124.815 204.384
Annu al Benefi ts 0.000 M.Rs. Continge/mob 20% 15.914 24.963 40.877
Res. & offices 7.380 0.000 7.380Total 71.625 M.Rs. Sub-Total 102.863 149.778 252.641
Eng.Services 4.50% 4.629 6.740 11.369
Total Generated 19.7 GWh Admin Cost 2% 2.057 2.996 5.053
Years 20 394.63 GWh
Sub-Total 109.549 159.514 269.062
Land Acquisition 14.000 0.000 14.000
Compensation Cost
Resettlement CostGrand Total 123.549 159.514 283.062
Local and Foreign Components-power
7/29/2019 Electrical Excel Sheet EIRR-1
14/17
scf 0.9 0.95
Local Foreign
1 61.8 79.8 55.6 75.8 131.4
2 61.8 79.8 55.6 75.8 131.4
3 0.0 0.0 0.0 0.0 0.0
4 0.0 0.0 0.0 0.0 0.0
Total 123.5 111.2 151.5 262.7
159.514 O&m 2% 5.255
Million Rs.Benefits Costs
Year Power Other Total Capital O&M Total 10 % less 10 % Over Case I Case II Case III Case IV
1 2006 0.000 0.000 0.000 131.366 131.366 0.000 144.503 -131.366 -131.366 -144.503 -144.503 1
2 2007 0.000 0.000 0.000 131.366 131.366 0.000 144.503 -131.366 -131.366 -144.503 -144.503 2
3 2008 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 3
4 2009 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 4
5 2010 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 56 2011 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 6
7 2012 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 7
8 2013 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 8
9 2014 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 9
10 2015 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 10
11 2016 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 11
12 2017 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 12
Net BenefitsYear
TOTAL COST(M.Rs.)
Capital
Total
EconomicYear
Table 1.4 Economic Cost
Economic
Table 1.5 ECONOMIC CASH FLOW STATEMENT
S.No.Benefits Costs
7/29/2019 Electrical Excel Sheet EIRR-1
15/17
13 2018 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 13
14 2019 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 14
15 2020 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 15
16 2021 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 16
17 2022 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 17
18 2023 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 18
19 2024 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 19
20 2025 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 20
21 2026 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 21
22 2027 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 2223 2028 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 23
24 2029 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 24
25 2030 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 25
26 2031 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 26
27 2032 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 27
28 2033 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 28
29 2034 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 29
30 2035 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 3031 2036 71.625 0.000 71.625 0.000 5.255 5.255 64.463 5.780 66.371 59.208 65.845 58.683 31
Total 2077.135 0.000 2077.135 262.732 152.385 415.116 1869.422 456.628 1662.019 1454.305 1620.507 1412.793
Case I Case II Case III Case IVPresent Worth of Benefits 554.63 499.17 554.63 499.17
Present Worth of Costs 268.68 268.68 295.55 295.55
Net Present Worth 285.95 230.49 259.08 203.62
B/C Ratio 2.06 1.86 1.88 1.69
EIRR 22.63% 20.36% 20.57% 18.45%
Table 6. SUMMARY OF RESULTS
Rate of Discount 10 %
7/29/2019 Electrical Excel Sheet EIRR-1
16/17
Power House 1 20.8 GWh Table 1.4 PROJECT COSTS
Power House 2 0.0 GWh
Power House 3 0.0 GWh M.Rs.
Losses 5% 1.0 GWh Local Foreign Total
24 0.0 GWh Main Power House 5.591 2.396 7.987 7.987 0.7
365 0.0 GWh Power Channel 3.892 1.668 5.560 5.560 0.7
Rate Rs./Kwh 4.06 Linining of canals 0.000 0.000 0.000 0.000 0.7
Net Generated 1 19.7 GWh Tail Race Channel 7.189 3.081 10.270 10.270 0.7Net Generated 2&3 0.0 GWh Diversion of Chillian Disty 4.228 1.812 6.040 6.040 0.7
Dewatering 3.769 1.615 5.384 5.384 0.7
Electro-Mech Equipment 45.000 105.000 150.000 150.000 0.3
Transmission Line 8.750 8.750 17.500 17.500 0.5
Annu al Benefi ts 80.110 M.Rs. Sub-Total 78.419 124.322 202.741
Annu al Benefi ts 0.000 M.Rs. Continge/mob 20% 15.684 24.864 40.548
Res. & offices 7.380 0.000 7.380Total 80.110 M.Rs. Sub-Total 101.482 149.187 250.669
Eng.Services 4.50% 4.567 6.713 11.280
Total Generated 19.7 GWh Admin Cost 2% 2.030 2.984 5.013
Years 20 394.63 GWh
Sub-Total 108.079 158.884 266.963
Land Acquisition 14.000 0.000 14.000
Compensation Cost
Resettlement CostGrand Total 122.079 158.884 280.963
Local and Foreign Components-power
7/29/2019 Electrical Excel Sheet EIRR-1
17/17
scf 0.9 0.95
Local Foreign
1 61.0 79.4 54.9 75.5 130.4
2 61.0 79.4 54.9 75.5 130.4
3 0.0 0.0 0.0 0.0 0.0
4 0.0 0.0 0.0 0.0 0.0
Total 122.1 109.9 150.9 260.8
158.884 O&m 2% 5.216
Million Rs.Benefits Costs
Year Power Other Total Capital O&M Total 10 % less 10 % Over Case I Case II Case III Case IV
1 2006 0.000 0.000 0.000 130.405 130.405 0.000 143.446 -130.405 -130.405 -143.446 -143.446 1
2 2007 0.000 0.000 0.000 130.405 130.405 0.000 143.446 -130.405 -130.405 -143.446 -143.446 2
3 2008 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 3
4 2009 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 4
5 2010 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 56 2011 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 6
7 2012 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 7
8 2013 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 8
9 2014 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 9
10 2015 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 10
11 2016 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 11
12 2017 80.110 0.000 80.110 0.000 5.216 5.216 72.099 5.738 74.894 66.883 74.372 66.361 12
Net BenefitsYear
TOTAL COST(M.Rs.)
Capital
Total
EconomicYear
Table 1.4 Economic Cost
Economic
Table 1.5 ECONOMIC CASH FLOW STATEMENT
S.No.Benefits Costs