Health Infrastructure Bulli Aged Care Centre of Excellence Electrical and Communications Infrastructure Management Plan EL-INF-01 R1 | 23 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 246814 Arup Arup Pty Ltd ABN 18 000 966 165 Arup Level 10 201 Kent Street PO Box 76 Millers Point Sydney 2000 Australia www.arup.com

Electrical and Communications Infrastructure Management Plan

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Health Infrastructure

Bulli Aged Care Centre of Excellence

Electrical and Communications Infrastructure Management Plan

EL-INF-01

R1 | 23 August 2016

This report takes into account the particular

instructions and requirements of our client.

It is not intended for and should not be relied

upon by any third party and no responsibility

is undertaken to any third party.

Job number 246814

Arup

Arup Pty Ltd ABN 18 000 966 165

Arup

Level 10 201 Kent Street

PO Box 76 Millers Point

Sydney 2000

Australia

www.arup.com

Health Infrastructure Bulli Aged Care Centre of ExcellenceElectrical and Communications Infrastructure Management Plan

EL-INF-01 | R1 | 23 August 2016 | Arup

\\GLOBAL.ARUP.COM\AUSTRALASIA\SYD\PROJECTS\246000\246814-00 BULLI HOSPITAL\WORK\INTERNAL\DESIGN\BLD SERVICES\ELEC\REPORT\2016-08-15 BULLI ACCE

ELECTRICAL SERVICES INFRASTRUCTURE REPORT.DOCX

Contents

Page

1 Introduction 1

2 Existing Electrical Services 1

3 Existing Telecoms Services 2

4 New Electrical Services 2

5 New Telecommunications Services 2

9 Conclusion 3

Appendix A

Dial Before You Dig

Appendix B

Site Survey

Appendix C

Endeavour Energy Supply Offer

1 Introduction

The proposed facility, Bulli Aged Care Centre of Excellence (ACCoE), is a joint venture between NSW Health Infrastructure and Illawarra Retirement Trust (IRT). The new facility will be located at 22 Hospital Road opposite the existing Bulli Hospital.

The Electrical and Communication Services Infrastructure Plan has been developed using the information provided from A Dial Before You Dig enquiry (refer to Appendix A) and a survey undertaken by Bee & Lethbridge Pty Ltd on 15/12/2015 (refer to Appendix B).

The intent of this document is to highlight any existing utility services located on the site and advise of any works that are required in order to remove or relocate the existing services to allow the development of the ACCoE.

This Infrastructure Plan has been developed with the intent of addressing the relevant SEAR’s requirements. The relevant utility owners have been consulted in the preparation of the infrastructure management plan. This plan will address the utilities’ existing capacity, augmentation requirements and preliminary staging plans to be undertaken as part of the Bulli ACCoE development.

2 Existing Electrical Services

A Dial Before You Dig (DBYD) investigation was carried out to identify the existing utilities located on the proposed development site. The DBYD survey highlighted that there are no underground electrical services within the proposed site boundary.

Furthermore, the site survey that was provided by Bee & Lethbridge did not identify any underground electrical services within the site boundary.

There are existing HV and LV supplies located at high-level along Hospital Road. Refer to the Bee & Lethbridge

There is an existing Endeavour Substation located adjacent to the existing Bulli Hospital as detailed in the DBYD survey.

The only electrical service located on the site is an overhead LV supply from Hospital Road to a Brick and Timber Building located within the site (LV supply not shown on survey). This building and will be demolished as part of the Early Works. The Contractor engaged for the Early Works will be responsible for liaising with Endeavour Energy to ensure that this supply is disconnected and removed.

There are a number of existing power poles located along Hospital Road. It is not currently proposed that these will be removed or altered as part of the new development. However, this is subject to Endeavour Energy approval.

3 Existing Telecoms Services

The survey undertaken by Bee & Lethbridge Pty Ltd identified existing Telstra communications along Hospital Road underneath the footpath at the front of the proposed site.

No existing communications were identified within the site boundary therefore no demolition or diversions are required within the site.

It is not currently proposed that the existing Telstra assets will require relocation as a result of the proposed development.

4 New Electrical Services

A preliminary maximum demand for the Bulli ACCoE has been calculated to establish the new electrical requirements for the proposed development.

The preliminary maximum demand was calculated at 750 kVA for the development based upon the current design GFA.

Based on this preliminary demand calculation, an application was submitted to Endeavour Energy. Endeavour Energy provided a Supply Offer (refer to Appendix C) as follows:

• Provide a supply of 1078 A/phase at 400 V (750 kVA)

• New pad-mount substation to be installed on the development property

• HV linkage point is the 11kV overhead mains along Hospital Road

• Substation shall be located at the front property boundary with unrestricted access

• LV connection point is the LV circuit breaker inside the new substation

The application to Endeavour Energy will be updated and resubmitted if there are

significant changes in the expected maximum demand as the design is progressed.

A proposed Method of Supply will be developed and Endeavour Energy design

approval gained once a Level 3 ASP is engaged.

5 New Telecommunications Services

At least two separate telecommunications connections will be required for the Illawarra Retirement Trust (IRT) and the Illawarra Shoalhaven Local Health District (ISLHD).

The development is within the National Broadband Network (NBN) rollout zone. Therefore it is proposed that the facility be connected to the NBN via fixed line

technology. The development has been registered with nbn co. (Development Reference: ATCA-3E0DEH). Further discussions with nbn co. and relevant telecommunications carriers will occur at the next stage of design.

9 Conclusion

It must be noted that one of the main utility routes for electrical and communications services is located along Hospital Road which runs parallel to the front of the proposed Bulli ACCoE site. It is not envisaged that the proposed works will affect these services at the front of the site, however any access routes into the site will need to be reviewed to ensure they do not affect these service routes.

The existing LV service within the site boundary has been reviewed and where required is to be removed as part of the early works to prepare the existing site for the future development.

New electrical and telecommunications provisions will be provided as required for the new development to allow connection to the utility services. This will include a new pad-mounted substation to facilitate connection to the Endeavour Energy network.

Telecoms lead in infrastructure will be provided from a pit on the site boundary to the main incoming telecoms room within the proposed development to allow incoming telecoms services to be connected into the building once required.

Appendix A

Dial Before You Dig Endeavour Energy Survey

WARNING

• All electrical apparatus shall be regarded as live until proved de-energised. Contact with live electrical apparatus will cause severe injury or death.

• In accordance with the Electricity Supply Act 1995, you are obliged to report any damage to Endeavour Energy Assets immediately by calling 131 003.

• The customer must obtain a new set of plans from Endeavour Energy if work has not been started or completed within twenty (20) working days of the original plan issue date.

• The customer must contact Endeavour Energy if any of the plans provided have blank pages, as some underground asset information may be incomplete.

• Endeavour Energy underground earth grids may exist and their location may not be shown on plans. Persons excavating are expected to exercise all due care, especially in the vicinity of padmount substations, pole mounted substations, pole mounted switches, transmission poles and towers.

• Endeavour Energy plans do not show any underground customer service mains or information relating to service mains within private property.

• Asbestos or asbestos-containing material may be present on or near Endeavour Energy’s underground assets.

• Organo-Chloride Pesticides (OCP) may be present in some sub-transmission trenches.

• All plans must be printed and made available at the worksite where excavation is to be undertaken. Plans must be reviewed and understood by the crew on site prior to commencing excavation.

INFORMATION PROVIDED BY ENDEAVOUR ENERGY

• Any plans provided pursuant to this service are intended to show the approximate location of underground assets relative to road boundaries, property fences and other structures at the time of installation.

• Depth of underground assets may vary significantly from information provided on plans as a result of changes to road, footpath or surface levels subsequent to installation.

• Such plans have been prepared solely for use by Endeavour Energy staff for design, construction and maintenance purposes.

• All enquiry details and results are kept in a register.

DISCLAIMER

Whilst Endeavour Energy has taken all reasonable steps to ensure that the information contained in the plans is as accurate as possible it will accept no liability for inaccuracies in the information shown on such plans.

LEGEND

NOT TO SCALE

DBYD Sequence No.:

Issued Date:

Cadastre: © Land and Property Information 2015, 2016

°

°

°

P P °

°

42159

42159

U69

U69T99

T99

U69T99T99

U69

STJ(U69-U72)

UNK COV

23-07-2010

FB341320

(CONC COVER)

UNKNOWN LOCATION

(CO

NC

CO

VE

R)

STJ(U69-U72)

UNK COV

23-07-2010

FB341320

STJ(U69-U72)

UNK COV

23-07-2010

FB341320

STJ(U69-U72)

UNK COV

23-07-2010

FB341320

STJ(U69-U72)

UNK COV23-07-2010

FB341320

STJ(U69-U72)

UNK COV23-07-2010

FB341320

STJ(U69-U72)

UNK COV23-07-2010

FB341320

STJ(U69-U72)

UNK COV23-07-2010

FB341320

DUMBRELL RDDUMBRELL RDDUMBRELL RDDUMBRELL RDDUMBRELL RDDUMBRELL RDDUMBRELL RDDUMBRELL RDDUMBRELL RD

HOSPITAL RD

HOSPITAL RD

HOSPITAL RD

HOSPITAL RD

HOSPITAL RD

HOSPITAL RD

HOSPITAL RD

HOSPITAL RD

HOSPITAL RD

ORGANS RDORGANS RDORGANS RDORGANS RDORGANS RDORGANS RDORGANS RDORGANS RDORGANS RD

1-6//6793

3-1//330676

12-

41//516202

18-

31//556001

16-32//556001

20-1//21079

28-

A//163071

19-1//157244

32-30//1135668

30-31//1135668

36-

A//162016

34-

B//162016

21-4//156111

9-10//6793

5-7//1055192

11-11//679313-

12//6793

7-9//6793

15-13//6793

31-7//37685

23-31//105543325-

2//156111

22-1//175787

33-

6//37

685

44-

101//816743

40-

3//3768538-

4//37685

35-

5//37685

42-

2//37685

29-811//1172843

27-812//1172843

35-

1//728074

3-

11//76771-

12//7677

17-14//6793

5-

10//7677

25-18//6793

19-15//6793

27-19//6793

29-21//6793

7-

9//7677

29-6//7677

29-7//7677

29-8//7677

29-3//7677

29-2//7677

29-4//7677

29-22//6793

29-1//595930

29-20//6793

29-5//7677

41-

12//633587

46-

2//155336

60-1//228538

43-

11//633587

39-

A//550829

37-

B//550829

48-3//155336

51-

711//827260

53-

1//528811

50-4//155336

22-1//165903

47-601//844661

28-

710//827260

45-10//633587

26-556//749401

49-555//749401

28-

700//809695

32-

2//208857

30-

3//20885724-

600//844661

29-1//7677

29-

1//326181

29-1//83742

57-

2//528811

33-2//385395

33-222//1130028

D

FB12167

FBE12167

D

UNK COV

FBE12167

1

Overvie

w

50861499

16/02/2016

WARNING

• All electrical apparatus shall be regarded as live until proved de-energised. Contact with live electrical apparatus will cause severe injury or death.

• In accordance with the Electricity Supply Act 1995, you are obliged to report any damage to Endeavour Energy Assets immediately by calling 131 003.

• The customer must obtain a new set of plans from Endeavour Energy if work has not been started or completed within twenty (20) working days of the original plan issue date.

• The customer must contact Endeavour Energy if any of the plans provided have blank pages, as some underground asset information may be incomplete.

• Endeavour Energy underground earth grids may exist and their location may not be shown on plans. Persons excavating are expected to exercise all due care, especially in the vicinity of padmount substations, pole mounted substations, pole mounted switches, transmission poles and towers.

• Endeavour Energy plans do not show any underground customer service mains or information relating to service mains within private property.

• Asbestos or asbestos-containing material may be present on or near Endeavour Energy’s underground assets.

• Organo-Chloride Pesticides (OCP) may be present in some sub-transmission trenches.

• All plans must be printed and made available at the worksite where excavation is to be undertaken. Plans must be reviewed and understood by the crew on site prior to commencing excavation.

INFORMATION PROVIDED BY ENDEAVOUR ENERGY

• Any plans provided pursuant to this service are intended to show the approximate location of underground assets relative to road boundaries, property fences and other structures at the time of installation.

• Depth of underground assets may vary significantly from information provided on plans as a result of changes to road, footpath or surface levels subsequent to installation.

• Such plans have been prepared solely for use by Endeavour Energy staff for design, construction and maintenance purposes.

• All enquiry details and results are kept in a register.

DISCLAIMER

Whilst Endeavour Energy has taken all reasonable steps to ensure that the information contained in the plans is as accurate as possible it will accept no liability for inaccuracies in the information shown on such plans.

LEGEND

NOT TO SCALE

DBYD Sequence No.:

Issued Date:

Cadastre: © Land and Property Information 2015, 2016

°

°

PP

°

°

42159

42159

U69

U69T99

T99

U69T99T99

U69

STJ(U69-U72)

UNK COV

23-07-2010

FB341320

(CONC COVER)

UNKNOWN LOCATION

(CO

NC

CO

VE

R)

STJ(U69-U72)

UNK COV

23-07-2010

FB341320

STJ(U69-U72)

UNK COV

23-07-2010

FB341320

STJ(U69-U72)

UNK COV

23-07-2010

FB341320

STJ(U69-U72)

UNK COV

23-07-2010

FB341320

STJ(U69-U72)

UNK COV

23-07-2010

FB341320

STJ(U69-U72)

UNK COV

23-07-2010

FB341320

STJ(U69-U72)

UNK COV

23-07-2010

FB341320

3-

11//7677

5-

10//7677

27-19//6793

29-21//6793

7-

9//7677

29-6//7677

29-7//7677

29-3//7677

29-2//7677

29-4//7677

29-22//6793

29-1//595930

29-20//6793

29-5//7677

29-1//7677

29-1//326181

29-1//83742

D

FB12167

FBE12167

UNK COV

FBE12167

1

50861499

16/02/2016

Appendix B

Site Survey No. 22 Hospital Road, Bulli

Bee & Lethbridge Pty Ltd

SHEET 3

SHEET 2

SITE PLAN

SCALE 1:1500

SHEET 1

(A)

BENCH MARK

P.M. 17166 (STEEL PIN IN BOX)

RL. 40.646 A.H.D

BENCH MARK

CUT ON KERB

RL. 38.67 A.H.D

(A)

(A)

(A) EASEMENT FOR PIPE LINE 6.095 WIDE (G23472)

NOTES:

1) CAUTION: SHOULD ANY DEVELOPMENT OR CONSTRUCTION

BE PLANNED ON OR NEAR THE BOUNDARIES,

THE BOUNDARIES SHOULD BE CLEARLY MARKED ON SITE.

2) ALL AREAS AND DIMENSIONS HAVE BEEN COMPILED

FROM PLANS MADE AVAILABLE AT THE LAND TITLES OFFICE.

3) ORIGIN OF LEVELS ON A.H.D. IS TAKEN FROM

P.M. 17166 RL 40.646 A.H.D.

4) ORIGIN OF M.G.A. COORDINATES IS TAKEN FROM

P.M. 17166, E. 307478.641, N. 6198631.058 &

S.S.M. 13131, E. 307800.042, N. 6198486.888

4) CONTOUR INTERVAL 0.5 METRE.

5) CONTOURS ARE INDICATIVE OF GROUND FORM ONLY.

ONLY SPOT LEVELS SHOULD BE USED FOR CALCULATIONS

OF QUANTITIES WITH CAUTION.

6) TREE SPREADS ARE DIAGRAMMATIC ONLY AND ARE

NOT SYMMETRICAL.

7) UNDERGROUND (NON VISIBLE) SERVICE LINES HAVE BEEN

SHOWN FROM "DIAL BEFORE YOU DIG" SERVICE AUTHORITY

RECORDS & ARE DIAGRAMMATIC ONLY IN REGARD TO THEIR

POSITION & WIDTH UNLESS STATED OTHERWISE.

8) SPOT LEVELS ARE ACCURATE.

9) BEARINGS SHOWN ARE ON M.G.A.-(MAP GRID of AUSTRALIA.)

10) WE RECOMMEND THAT A PLAN OF REDEFINITION OF BOUNDARIES

SUITABLE FOR LODGEMENT AT LAND & PROPERTY INFORMATION BE

PREPARED TO DETERMINE EXACT BOUNDARY LOCATIONS.

INVESTIGATION OF "DIAL BEFORE YOU DIG" UNDERGROUND SERVICESHAS BEEN MADE. DETECTION OF UNDERGROUND SERVICES IS NOTAN INTEGRAL PART OF THIS SURVEY. ALL RELEVANT AUTHORITIESSHOULD BE NOTIFIED PRIOR TO ANY EXCAVATION ON OR NEAR THE SITE

DEVELOPERS & EXCAVATORS MAY BE HELD FINANCIALLYRESPONSIBLE BY THE ASSET OWNERSHOULD THEY DAMAGE UNDERGROUND NETWORKS.

CARELESS DIGGING CAN:- CAUSE DEATH OR SERIOUS INJURY TO WORKERS AND THE GENERAL PUBLIC- INCONVENIENCE USERS OF ELECTRICITY, GAS, WATER AND COMMUNICATIONS- LEAD TO CRIMINAL PROSECUTION AND DAMAGES CLAIMS- CAUSE EXPENSIVE FINANCIAL LOSSES TO BUSINESS- CUT OFF EMERGENCY SERVICES- DELAY PROJECT COMPLETION TIMES WHILE THE DAMAGE IS REPAIRED

MINIMISE YOUR RISK AND DIAL BEFORE YOU DIG.TEL. 1100

PLAN SHOWING BOUNDARIES, RELATIVE HEIGHTS & PHYSICAL

FEATURES OVER PART LOT 1 IN D.P. 165903 & LOT IN D.P. 175787

KNOWN AS No. 22 HOSPITAL ROAD, BULLI.

L.G.A.: WOLLONGONG

No. 22 HOSPITAL ROAD, BULLI

Bee & Lethbridge

Quality Surveying & Development Solutions

Bee & Lethbridge Pty Ltd

Suite 2, 14 Starkey Street,

PO Box. 330, Forestville, NSW 2087

Phone: 9451 6757 Fax: 9975 3535

Email: [email protected]

ABN: 13 003 194 447

www.beeleth.com.au

CLIENT

DATUM

SURVEYED

SCALE

DRAWN

DATE

DWG No.

PROPERTY

REV No.

REF No.

SHEET No.

HEALTH INFRASTRUCTURE

A.H.D.

M.R. R.M.

1:200 @ A1

25/11/2015

19836-01

19836

1 of 3

01

LEGEND

0 2 4 86 10

METRES

20

SCALE 1:200

01 15/12/2015 M.R. R.M. ADDITIONAL WATER COURSE INFORMATION ADDED

No. DATE SURVEYED DRAWN DESCRIPTION

NOTES:

1) CAUTION: SHOULD ANY DEVELOPMENT OR CONSTRUCTION

BE PLANNED ON OR NEAR THE BOUNDARIES,

THE BOUNDARIES SHOULD BE CLEARLY MARKED ON SITE.

2) ALL AREAS AND DIMENSIONS HAVE BEEN COMPILED

FROM PLANS MADE AVAILABLE AT THE LAND TITLES OFFICE.

3) ORIGIN OF LEVELS ON A.H.D. IS TAKEN FROM

P.M. 17166 RL 40.646 A.H.D.

4) ORIGIN OF M.G.A. COORDINATES IS TAKEN FROM

P.M. 17166, E. 307478.641, N. 6198631.058 &

S.S.M. 13131, E. 307800.042, N. 6198486.888

4) CONTOUR INTERVAL 0.5 METRE.

5) CONTOURS ARE INDICATIVE OF GROUND FORM ONLY.

ONLY SPOT LEVELS SHOULD BE USED FOR CALCULATIONS

OF QUANTITIES WITH CAUTION.

6) TREE SPREADS ARE DIAGRAMMATIC ONLY AND ARE

NOT SYMMETRICAL.

7) UNDERGROUND (NON VISIBLE) SERVICE LINES HAVE BEEN

SHOWN FROM "DIAL BEFORE YOU DIG" SERVICE AUTHORITY

RECORDS & ARE DIAGRAMMATIC ONLY IN REGARD TO THEIR

POSITION & WIDTH UNLESS STATED OTHERWISE.

8) SPOT LEVELS ARE ACCURATE.

9) BEARINGS SHOWN ARE ON M.G.A.-(MAP GRID of AUSTRALIA.)

10) WE RECOMMEND THAT A PLAN OF REDEFINITION OF BOUNDARIES

SUITABLE FOR LODGEMENT AT LAND & PROPERTY INFORMATION BE

PREPARED TO DETERMINE EXACT BOUNDARY LOCATIONS.

INVESTIGATION OF "DIAL BEFORE YOU DIG" UNDERGROUND SERVICESHAS BEEN MADE. DETECTION OF UNDERGROUND SERVICES IS NOTAN INTEGRAL PART OF THIS SURVEY. ALL RELEVANT AUTHORITIESSHOULD BE NOTIFIED PRIOR TO ANY EXCAVATION ON OR NEAR THE SITE

DEVELOPERS & EXCAVATORS MAY BE HELD FINANCIALLYRESPONSIBLE BY THE ASSET OWNERSHOULD THEY DAMAGE UNDERGROUND NETWORKS.

CARELESS DIGGING CAN:- CAUSE DEATH OR SERIOUS INJURY TO WORKERS AND THE GENERAL PUBLIC- INCONVENIENCE USERS OF ELECTRICITY, GAS, WATER AND COMMUNICATIONS- LEAD TO CRIMINAL PROSECUTION AND DAMAGES CLAIMS- CAUSE EXPENSIVE FINANCIAL LOSSES TO BUSINESS- CUT OFF EMERGENCY SERVICES- DELAY PROJECT COMPLETION TIMES WHILE THE DAMAGE IS REPAIRED

MINIMISE YOUR RISK AND DIAL BEFORE YOU DIG.TEL. 1100

PLAN SHOWING BOUNDARIES, RELATIVE HEIGHTS & PHYSICAL

FEATURES OVER PART LOT 1 IN D.P. 165903 & LOT IN D.P. 175787

KNOWN AS No. 22 HOSPITAL ROAD, BULLI.

L.G.A.: WOLLONGONG

No. 22 HOSPITAL ROAD, BULLI

Bee & Lethbridge

Quality Surveying & Development Solutions

Bee & Lethbridge Pty Ltd

Suite 2, 14 Starkey Street,

PO Box. 330, Forestville, NSW 2087

Phone: 9451 6757 Fax: 9975 3535

Email: [email protected]

ABN: 13 003 194 447

www.beeleth.com.au

CLIENT

DATUM

SURVEYED

SCALE

DRAWN

DATE

DWG No.

PROPERTY

REV No.

REF No.

SHEET No.

HEALTH INFRASTRUCTURE

A.H.D.

M.R. R.M.

1:200 @ A1

25/11/2015

19836-01

19836

2 of 3

01

0 2 4 86 10

METRES

20

SCALE 1:200

LEGEND

01 15/12/2015 M.R. R.M. ADDITIONAL WATER COURSE INFORMATION ADDED

No. DATE SURVEYED DRAWN DESCRIPTION

NOTES:

1) CAUTION: SHOULD ANY DEVELOPMENT OR CONSTRUCTION

BE PLANNED ON OR NEAR THE BOUNDARIES,

THE BOUNDARIES SHOULD BE CLEARLY MARKED ON SITE.

2) ALL AREAS AND DIMENSIONS HAVE BEEN COMPILED

FROM PLANS MADE AVAILABLE AT THE LAND TITLES OFFICE.

3) ORIGIN OF LEVELS ON A.H.D. IS TAKEN FROM

P.M. 17166 RL 40.646 A.H.D.

4) ORIGIN OF M.G.A. COORDINATES IS TAKEN FROM

P.M. 17166, E. 307478.641, N. 6198631.058 &

S.S.M. 13131, E. 307800.042, N. 6198486.888

4) CONTOUR INTERVAL 0.5 METRE.

5) CONTOURS ARE INDICATIVE OF GROUND FORM ONLY.

ONLY SPOT LEVELS SHOULD BE USED FOR CALCULATIONS

OF QUANTITIES WITH CAUTION.

6) TREE SPREADS ARE DIAGRAMMATIC ONLY AND ARE

NOT SYMMETRICAL.

7) UNDERGROUND (NON VISIBLE) SERVICE LINES HAVE BEEN

SHOWN FROM "DIAL BEFORE YOU DIG" SERVICE AUTHORITY

RECORDS & ARE DIAGRAMMATIC ONLY IN REGARD TO THEIR

POSITION & WIDTH UNLESS STATED OTHERWISE.

8) SPOT LEVELS ARE ACCURATE.

9) BEARINGS SHOWN ARE ON M.G.A.-(MAP GRID of AUSTRALIA.)

10) WE RECOMMEND THAT A PLAN OF REDEFINITION OF BOUNDARIES

SUITABLE FOR LODGEMENT AT LAND & PROPERTY INFORMATION BE

PREPARED TO DETERMINE EXACT BOUNDARY LOCATIONS.

INVESTIGATION OF "DIAL BEFORE YOU DIG" UNDERGROUND SERVICESHAS BEEN MADE. DETECTION OF UNDERGROUND SERVICES IS NOTAN INTEGRAL PART OF THIS SURVEY. ALL RELEVANT AUTHORITIESSHOULD BE NOTIFIED PRIOR TO ANY EXCAVATION ON OR NEAR THE SITE

DEVELOPERS & EXCAVATORS MAY BE HELD FINANCIALLYRESPONSIBLE BY THE ASSET OWNERSHOULD THEY DAMAGE UNDERGROUND NETWORKS.

CARELESS DIGGING CAN:- CAUSE DEATH OR SERIOUS INJURY TO WORKERS AND THE GENERAL PUBLIC- INCONVENIENCE USERS OF ELECTRICITY, GAS, WATER AND COMMUNICATIONS- LEAD TO CRIMINAL PROSECUTION AND DAMAGES CLAIMS- CAUSE EXPENSIVE FINANCIAL LOSSES TO BUSINESS- CUT OFF EMERGENCY SERVICES- DELAY PROJECT COMPLETION TIMES WHILE THE DAMAGE IS REPAIRED

MINIMISE YOUR RISK AND DIAL BEFORE YOU DIG.TEL. 1100

PLAN SHOWING BOUNDARIES, RELATIVE HEIGHTS & PHYSICAL

FEATURES OVER PART LOT 1 IN D.P. 165903 & LOT IN D.P. 175787

KNOWN AS No. 22 HOSPITAL ROAD, BULLI.

L.G.A.: WOLLONGONG

No. 22 HOSPITAL ROAD, BULLI

Bee & Lethbridge

Quality Surveying & Development Solutions

Bee & Lethbridge Pty Ltd

Suite 2, 14 Starkey Street,

PO Box. 330, Forestville, NSW 2087

Phone: 9451 6757 Fax: 9975 3535

Email: [email protected]

ABN: 13 003 194 447

www.beeleth.com.au

CLIENT

DATUM

SURVEYED

SCALE

DRAWN

DATE

DWG No.

PROPERTY

REV No.

REF No.

SHEET No.

HEALTH INFRASTRUCTURE

A.H.D.

M.R. R.M.

1:200 @ A1

25/11/2015

19836-01

19836

3 of 3

01

0 2 4 86 10

METRES

20

SCALE 1:200

LEGEND

01 15/12/2015 M.R. R.M. ADDITIONAL WATER COURSE INFORMATION ADDED

No. DATE SURVEYED DRAWN DESCRIPTION

Appendix C

Endeavour Energy Supply Offer

29 April 2016 Endeavour Energy Ref: UCL8027 – 2016/03330/001 Arup Pty Ltd 201 Kent Street SYDNEY NSW 2000 Attention: Patrick Hoy CONNECTION OFFER – STANDARD CONNECTION SERVICE UCL8027 – LOT 1,1, DP 165903,175787, Connection of Load Application: 22 Hospital Road, BULLI Thank you for your application providing information of the proposed development at the above location. Your application has been registered under the above reference number. Please quote this reference number on all future correspondence. This connection offer is made in accordance with the Terms and Conditions of the Model Standing Offer for a Standard Connection Service available on our website. To accept this offer, please complete the enclosed Notice of Advice form and obtain your Level 3 Accredited Service Provider (ASP) signature on the form prior to returning it to Endeavour Energy. Endeavour Energy has completed a preliminary desk top assessment of the information provided in your application and issued an enclosed Supply Offer. Your next step is to obtain the services of a Level 3 ASP to prepare and provide an electrical design to Endeavour Energy in the form of a Proposed Method of Supply. This activity is customer funded contestable work and you will need to pay for it. An estimate of fees related to review of your design is attached. A list of the Accredited Service Providers is available at the NSW Trade and Investment website: http://www.energy.nsw.gov.au/electricity/network-connections/contestable or can be obtained via phone 13 77 88. Please note under the National Electricity Rules (NER) customer may choose to enter into a negotiated agreement. A negotiation framework describing this process is available on our website. Should you have any enquiries regarding your application please contact the undersigned. Yours faithfully,

J. Lei Jonathan Lei Contestable Works Engineer Ph: 02 9853 7905 Fax: 9853 7925 Email: [email protected]

29 April 2016 Endeavour Energy Ref: UCL8027 – 2016/03330/001 Endeavour Energy PO Box 811 Seven Hills NSW 1730 [email protected] Attention: Contestable Works Administrator

NOTICE OF ADVICE APPOINTMENT OF ACCREDITED DESIGNER FOR THE PROPOSED DEVELOPMENT AT: LOT 1,1, DP 165903,175787, 22 HOSPITAL ROAD, BULLI

* Please complete and return when a Level 3 Service Provider has been nominated* Please accept this letter as notification that I intend to proceed with the development described above. I own or am developing the land and works on the land, (and/or where relevant on public land). I intend to supply this development to Endeavour Energy requirements. By signing this Notice of Advice I am accepting the Terms and Conditions of Endeavour Energy’s Model Standing Offer for a Standard Connection Service. • Electricity Supply to Developments. The Level 3 Service Provider appointed is:….……………………………………… The Fees will be Paid to Endeavour Energy by: ………………………….. ....................................................... ........................................................................ Signature of Level 3 ASP Name of Level 3 ASP ....................................................... ........................................................................ Signature of Applicant/ Applicant’s Representative Name of Applicant/ Applicant’s Representative

....................................................... ........................................................................ Date Company Name The signatory warrants that they are authorised to execute this Application.

APPLICATION NO: UCL8027 DATE: 29 April 2016 SUBJECT: SUPPLY OFFER FOR 22 Hospital Road, BULLI Endeavour Energy has carried out a desk top assessment and has prepared the attached Supply Offer for this development. The supply offer will assist your Level 3 ASP to develop the most efficient solution to meet your needs whilst complying with Endeavour Energy’s standards and with the Terms and Conditions of the Model Standing Offer for a Standard Connection Service. Please find below a list of some requirements that will need to be addressed by your nominated Level 3 ASP. • Field visit to verify physical details • Trench length • Cable length • Length of cable using existing ducts • Length of new ducts required to be installed • Substation location shown on a preliminary sketch and HV switchgear numbers • Types and number of poles to be replaced or installed • Complexity of trenching (ie rock, under-bore, commercial area etc) • Earthing requirements and complexity • Overhead construction and isolation point requirements • Asset Valuation form must be completed including any extraordinary costing

requirements • Environmental issues addressed in a fully documented Environmental Assessment • Generation requirements • Rail Crossing requirements A sketch of the proposed design utilising the GIS as a base must be returned with the above information. This Supply Offer is part of the Connection Offer for a Standard Connection Service and is valid for three (3) months from the date of issue. Where this Connection Offer has lapsed, you or your Level 3 ASP must contact Endeavour Energy with the request to extend the Connection Offer. Endeavour Energy will assess your request and will inform you of the outcome. It must be recognised that the network is being constantly extended/augmented as new customers get connected. This means that for your Connection Offer to be extended, your Supply Offer may require alteration. If this is the case, additional fees to cover administrative costs may apply. The fees applicable to this phase of the project will need to be paid prior to design certification and are outlined in the Network Price List available on the Endeavour Energy website.

29 April 2016 Endeavour Energy Ref: UCL8027 – 2016/03330/001

SUPPLY OFFER (Based on a desktop assessment)

Development Details & Applicant’s Assessed Load: New health care development - Bulli Hospital Aged Care Centre of Excellence ( ACCE) Address: 22 Hospital Road, Bulli Total load = 1078A/ph @ 400V HV/LV Connection Point & Connection Asset Requirements: A new PM substation is required to be installed on the development property to supply the declared load in this application. HV linkage point is the 11kV O/H mains along Hospital Road. LV network connection point is the LV CB inside the new PM substation. Substation shall be located at the front property boundary with unrestricted 24/7 personnel and vehicle access to the substation directly from a public street. Connection Options: Customer is to engage a Level 3 ASP to investigate and submit a proposed Method of Supply (MOS) to Endeavour Energy for further assessment. The scope and works is to be undertaken in accordance with Endeavour Energy Connection Policy and must comply with all the relevant policies, regulations and network standards. All service works are to comply with the requirements of the NSW service and Installations Rules.

29 April 2016 Endeavour Energy Ref: UCL8027 – 2016/03330/001

Initial Funding Arrangements Endeavour Energy Supplied Materials: Transformer Endeavour Energy Funded and Constructed: TBA Endeavour Energy Funded and Level1 ASP Constructed – Reimbursement Paid by Endeavour Energy TBA Reimbursement to be paid to Endeavour Energy by Customer: TBA Customer Funded Monopoly Services: Network switching, commissioning, contract inspection Customer Funded Contestable Works:

TBA

MONOPOLY SERVICES FEE ESTIMATE

(for assessment of the Proposed Method of Supply and approval of the Design)

ABN 59 253 130 878

Applicant (Name) Arup Pty LtdAddress: 201 Kent Street

SYDNEY NSW2000

Proposed Location: Lot 1,1, DP 165903,175787, 22 Hospital Road

BULLI Detailed below is the estimate of the proportion of applicable Ancillary Network Services Fees (GST Inclusive) related to design assessment for your information only. The final fees for this phase of the project will be sent to you with a Design Brief. Ancillary Network Services Fees will also apply for the construction and connection phase of the project (e.g., site establishment fee). These fees will be conveyed to you after the receipt of a signed Letter of Intent indicating that you will proceed with the construction phase of the project. Administration Fee Design Certification Fee Design Information Fee Standard Connection Offer Fee

29-04-2016 29-04-2016 29-04-2016 29-04-2016

$304.29 $813.25 $975.90 $260.85

Total (inc GST) $2354.29

Where Endeavour Energy assets may need to be placed on private property, property easements will be required. Urgent action should be taken to create easements so that timely acquisition and registration with the Land and Property Information (NSW) can be completed. Endeavour Energy will accept a property tenure bond while the property owner is in the process of creating the easement. The property tenure bond will be returned after the easement has been registered. Please do not make any fee payment at this time. Once the design fee amount has been finalised Endeavour Energy will send a request for the fees and property tenure bond payment (if required) to your nominated Level 3 Accredited Service Provider.

CAP No. : UCL8027 File No: 2016/03330/001