Elbert CountyRural Water Supply Study

- Workshop 1 -

February 27, 2017

Elbert CountyRural Water Supply Study

- Workshop 1 -

February 27, 2017

Forsgren Associates Inc.Forsgren Associates Inc.

Page 2: Elbert County Rural Water Supply Study - Workshop 1 County RWS... · Rural Water Supply Study - Workshop 1 - February 27, 2017 Forsgren Associates Inc. Presentation Overview 1. Background

Presentation Overview

1. Background and Development of the

Rural Water Study

2. Progress To Date

3. Future Work Tasks

4. Considerations And Next Steps

Page 3: Elbert County Rural Water Supply Study - Workshop 1 County RWS... · Rural Water Supply Study - Workshop 1 - February 27, 2017 Forsgren Associates Inc. Presentation Overview 1. Background

1. Rural Water Study Background

Initial Consideration By BOCC

Grant Applications

oUSGS Well Monitoring Study (3-Year Project)

oRural Water Supply Study (1-Year Project)

Completion Schedules

oWell Monitoring Study: Feb. 2018

oRural Water Supply Study: August 2017

Page 4: Elbert County Rural Water Supply Study - Workshop 1 County RWS... · Rural Water Supply Study - Workshop 1 - February 27, 2017 Forsgren Associates Inc. Presentation Overview 1. Background

2. Work Progress

Task 1: Planning Projections

oPopulation Growth - 3 Planning Areas

oWater Demands For 2035 and 2050

oAquifer Development and Hydrology

Page 5: Elbert County Rural Water Supply Study - Workshop 1 County RWS... · Rural Water Supply Study - Workshop 1 - February 27, 2017 Forsgren Associates Inc. Presentation Overview 1. Background

2. Work ProgressPlanning Areas For Population Projections

DRAFTINFORMATION

Page 6: Elbert County Rural Water Supply Study - Workshop 1 County RWS... · Rural Water Supply Study - Workshop 1 - February 27, 2017 Forsgren Associates Inc. Presentation Overview 1. Background

2035 and 2050 Population Forecasts

2. Work Progress

Year Elbert County

Elizabeth-Kiowa

Study Area NW Study Area Eastern Study Area

2010 23,107 11,123 7,315 61

2015 25,550 11,982 7,880 66

2035 52,720 26,586 17,485 153

2050 68,375 35,782 23,532 238

Population

DRAFTINFORMATION

Page 7: Elbert County Rural Water Supply Study - Workshop 1 County RWS... · Rural Water Supply Study - Workshop 1 - February 27, 2017 Forsgren Associates Inc. Presentation Overview 1. Background

2035 and 2050 Water Demands (Residential)

2. Work Progress

YEAR 2035

Max. Day

Demand

Peak Hour

Demand

Location Population (MGD) (AFY) MGD MGD

NW Study Area 17,485 2.4 2,644 4.7 8.3

Elizabeth-Kiowa Study Area 26,586 3.6 4,020 7.2 12.6

Eastern Study Area 153 0.02 23 0.04 0.1

Countywide 52,720 7.1 7,972 14.2 24.9

YEAR 2050

Max. Day

Demand

Peak Hour

Demand

Location Population (MGD) (AFY) MGD MGD

NW Study Area 23,532 3.2 3,559 6.4 11.1

Elizabeth-Kiowa Study Area 35,782 4.8 5,411 9.7 16.9

Eastern Study Area 238 0.03 36 0.06 0.1

Countywide 68,375 9.2 10,340 18.5 32.3

Avg. Day Demand

Avg. Day Demand

DRAFTINFORMATION

Page 8: Elbert County Rural Water Supply Study - Workshop 1 County RWS... · Rural Water Supply Study - Workshop 1 - February 27, 2017 Forsgren Associates Inc. Presentation Overview 1. Background

OtherWater Demands

Commercial and Industrial Classes

Livestock and Agricultural

Oil And Gas Development

2. Work Progress

Page 9: Elbert County Rural Water Supply Study - Workshop 1 County RWS... · Rural Water Supply Study - Workshop 1 - February 27, 2017 Forsgren Associates Inc. Presentation Overview 1. Background

2. Work Progress

Task 1: Planning Projections

Task 2: Existing Water Supply

oData Gathering For Existing Water Systems And Water Rights

oReview of Recent Groundwater Studies• 2011 USGS DB Groundwater Modeling Report

• 2012 Baseline Water Quality Review (Elbert County)

• 2011-2013 DB Groundwater Levels (Douglas County)

• Ongoing USGS Well Monitoring Program

oGroundwater Level Database

Page 10: Elbert County Rural Water Supply Study - Workshop 1 County RWS... · Rural Water Supply Study - Workshop 1 - February 27, 2017 Forsgren Associates Inc. Presentation Overview 1. Background

Permitted Wells

2. Work ProgressDRAFT

INFORMATION

Page 11: Elbert County Rural Water Supply Study - Workshop 1 County RWS... · Rural Water Supply Study - Workshop 1 - February 27, 2017 Forsgren Associates Inc. Presentation Overview 1. Background

2. Work Progress

Task 1: Planning Projections

Task 2: Existing Water Supply

Task 3 – Future Water Requirements

o Future Groundwater Drawdown Conditions (Work Underway)

o Identify Future Water Supply Needs (Gap Analysis)

Page 12: Elbert County Rural Water Supply Study - Workshop 1 County RWS... · Rural Water Supply Study - Workshop 1 - February 27, 2017 Forsgren Associates Inc. Presentation Overview 1. Background

3. Upcoming Work Tasks

Task 4: Water Resource Optionso Identify Renewable Water Supply Options To Meet Future

Demands

Task 5: Cost - Benefit AnalysisoDevelop Cost Estimates

o Identify Funding Scenarios

Task 6: Opportunities And Challengeso Identify Recommended Water Policies And Alternatives

o Summarize Water Demands For Varying Growth Scenarios

oDevelop Milestones And Timelines For Existing Water Supplies AndFuture Solutions

Schedule And Conduct Stakeholder Workshops 2 and 3

Page 13: Elbert County Rural Water Supply Study - Workshop 1 County RWS... · Rural Water Supply Study - Workshop 1 - February 27, 2017 Forsgren Associates Inc. Presentation Overview 1. Background

4. Considerations And Next Steps

Ongoing Data Needs:o Have What We Need For Now

o Periodic RFI’s Anticipated

Scheduling:o 5-Month Status Report (March 31)

o Workshop #2 (Early April 2017)

Discussions And Evaluation Of Renewable WaterOptions:o Reuse Systems

o Water Storage

o Regional Initiatives and Projects

o Aquifer Storage And Recovery (ASR)

o Water Efficiency Measures