Upload
olaf
View
80
Download
0
Tags:
Embed Size (px)
DESCRIPTION
ELAN East Lancashire Accessible Network. Presentation by TRAM Power Ltd. Unit 4 Carraway Road, Liverpool L11 OEE tel. +44 (0)151 548 7040 web : www.trampower.co.uk Prepared by Professor Lewis Lesley - PowerPoint PPT Presentation
Citation preview
ELAN East Lancashire Accessible Network
Presentation by
TRAM Power Ltd.Unit 4Carraway Road,Liverpool L11 OEEtel. +44 (0)151 548 7040web : www.trampower.co.uk
Prepared byProfessor Lewis Lesley
Presentation by TRAM Power Ltd. Unit 4 Carraway Road, Liverpool L11 OEEtel. +44 (0)151 548 7040web : www.trampower.co.uk
Prepared by Professor Lewis Lesley & Lincoln Shields
ELAN : why light rail transit ?
Proven technology Attractive alternative to car commuting Economic capital costs Electrification
– Sustainable and environmentally benign Stimulates urban regeneration Increases property tax base Attracts new investors Increases job market
Why ELAN rail transit ?
*Improve accessibility*Raise civic profile*Affordable option *Quick implementation*Incremental development
and benefits*High public acceptance*Local initiative
ELAN : What is light rail transit ?
Steel wheels on rails Electrically powered, low maintenance Variety of rights of way
– On street, off highway, railway lines– Penetrate to traffic generators
Tracks and electrification– Rapid installation
ELAN : affordable ?
Can be opened in stages Fit available budgetsPart or all can be privately financedwhen underwritten by PSO grant
ELAN : Where?
Demonstration line, to try the conceptAccessing most congested zonesPioneering new development areasCatalyst for environmental
improvements
ELAN : learning from experience ?
UKEuropeUSCanadaAustralia
ELAN : light rail world wide ?
Over 500 systems Growing by 30 new systems pa. Stimulates (re)generation of urban centres Relieves congested M.65.& links roads Reduces urban centre parking Improves air quality. Reduces CO2 emissions
Implementing ELAN rail transit
Wide range of suppliers & contractors Compatible systems Improving technology Reducing real costs now possible New model for procurement ? Save time, save money Affordable projects
(1) Colne Branch: Rose Grove (1) – through to town centre to P + R Site
(2) New line to Padiham regeneration zone(1) (from Rose Grove)
(3) Rose Grove – Todmorden (via Burnley centre)
(4) Rose Grove – Blackburn
(5) Blackburn – Darwen
(6) Blackburn - Clitheroe
(7) Etc.
ELAN : the stages ?
ELAN : other inputs
Transfer of track bed and infrastructure Guarantee PSO annual grant New partnership company owns and operates Free standing operation (freq ~ 4 per hour) Interchanges at Rose Grove, Manchester Rd.
and Blackburn Park and Ride at strategic sites off M.65.
– and Colne north
TRAM Power Ltd offers ELAN:
Innovative tramcars,Low impact tracksStreamlined electrificationCosts up to 50% lowerLocal Manufacture in Blackburn
15 m horizontal track radius100 m vertical curve capableMagnetic emergency brakesMU compatible
ELAN : design factors
New tracks reduce construction impacts and costs
Ri60 LR55
180mm
380mm
10 years trouble free in Sheffield
ELAN : Electrification in place
Over existing tracks Old And new
ELAN : Conclusions
Economic way to improve rail services Private funding to fast track refurbishment Staged development allows heavy rail
accommodation Satisfies local and national policies Environmentally sustainable Supports regeneration And gets motorists from their cars