EL TORO WATER DISTRICTBUDGET 2015/2016
“District of Distinction”Serving the Public –
Respecting the Environment
Lake Oroville
EL TORO WATER DISTRICT
BOARD OF DIRECTORS 2015-2016
M. SCOTT GOLDMAN, PRESIDENT WILLIAM H. KAHN, VICE-PRESIDENT
JOSE F. VERGARA, TREASURER FREDERICK J. ADJARIAN, DIRECTOR
MARK MONIN, DIRECTOR
OFFICERS
ROBERT R. HILL, GENERAL MANAGER MICHAEL P. GRANDY, CFO
EL TORO WATER DISTRICT TABLE OF CONTENTS
ANNUAL BUDGET
2015-16 Page Numbers OVERVIEW
Mission Statement 1 Financial Objectives 2
Budget Assumptions 3-6 Sources and Uses of Funds 7-8
OPERATIONS Organization Chart 9 Labor/Benefit Comparison 10 Income Statement 11 Expense Detail 12-20
Non-Operating Income and Expense 21 CAPITAL REPLACEMENT & REFURBISHMENT PROGRAM Five-Year Capital Replacement & Refurbishment
Program (2015/16 – 2019/20) 22-27 2015/2016 Capital Replacement & Refurbishment Program 28 2015/2016 Capital Replacement & Refurbishment Program – Project Descriptions (> $20,000) 29-41
Community Outreach
BudgetOverview
MISSION STATEMENT
The mission of the El Toro Water District is to plan and invest appropriately to provide its customers a safe, adequate and reliable supply of water, wastewater and recycled water service in an environmentally and economically responsible way.
1
FINANCIAL OBJECTIVES
Fiscal 2015-16 Establish a revenue cash flow plan that is sufficient to fund the operating budget
including the capital replacement & refurbishment program. Establish a reliable, stable and predictable rate adjustment strategy that minimizes
impact to customers Maintain a minimum reserve level sufficient to fund legal, board mandated and
working capital requirements. Employ cost containment and reduction strategies and practices as appropriate to
cost effectively maintain reliable service levels.
2
BUDGET ASSUMPTIONS
FISCAL YEAR 2015-16
Revenue:
WATER SALES is based on the purchase of 7,650 acre-feet (af) of water and delivery of 7,350 af to customers. This is in line with state mandates and MWDOC allocations which, among other things require the implementation of a Drought Factor as a part of the Cost of Service Study.
WATER USEAGE CHARGE to cover purchasing water from Metropolitan Water District through Municipal Water District of Orange County has been increased effective July 1, 2015 to match the costs charged to the District for that water. The local water use charge, which covers the District’s costs to deliver water, has not increased; however, effective July 1, 2010 the amount was integrated into the overall water usage charge in connection with the Water Budget-Based Tiered Conservation Rate Structure. The allocation of costs within the various budget tiers has been further refined as explained in the most recent independently prepared Cost of Service Study.
WATER SERVICE CHARGE (Water System Operations & Maintenance “O & M”) has not increased since July 1, 2014 and is supported by an
independent Cost of Service Study.
RECYCLED WATER SALES are projected on the average annual sales to the Golden Rain Foundation and the initial sales generated by the Recycled Water Expansion Project. The rate for tertiary disinfected recycled water has been set based on the Cost of Service Study and is approximately 90% of the then current Tier II portable water rate.
NON-RATE REVENUE reflects shared maintenance of joint facilities with neighboring agencies, communication site leases and other
miscellaneous revenues.
PROPERTY TAX REVENUE represents our share of the 1% general property taxes paid to the State.
SEWER USAGE AND FIXED RATE the Sewer Usage and Fixed Rate has been increased effective July 1, 2015 to reflect the current cost of maintaining the system and is supported by an independent Cost of Service Study.
INTEREST INCOME is expected to decrease as a result of reduced reserves.
CAPITAL REPLACEMENT & REFURBISHMENT WATER AND SEWER CHARGE is designed to assist in covering the cost of water and
sewer capital R&R during the year. No changes to this rate are contemplated.
3
BUDGET ASSUMPTIONS
FISCAL YEAR 2015-16
Revenue (continued):
Rate increases will comply with all applicable state constitutional and statutory mandates.
4
BUDGET ASSUMPTIONS
FISCAL YEAR 2015-16
Expenses:
PURCHASED WATER costs are affected by the anticipated reduction in water sales along with increased rates charged by
Metropolitan Water District of Southern California and Municipal Water District of Orange County. ENERGY (electrical power) costs have been increased based on expected system operations and information provided by
electrical power providers.
SOCWA OPERATIONS costs for regional bio-solids and effluent treatment disposal have decreased slightly.
LABOR/BENEFITS COST are projected to increase. The increase is driven by continued implementation of the succession plan, increases in medical premiums, the District’s contributions to the retirement savings plan (401k), the “On-Call” premium along with administration of a Performance Based Merit Program. The proposed increases are partially offset by increased employee contributions to medical benefits.
OPERATING COSTS exclusive of purchased water and labor are increasing compared to previous year’s budget.
5
BUDGET ASSUMPTIONS
FISCAL YEAR 2015-16 CAPITAL REPLACEMENT & REFURBISHMENT PROGRAM: Five-Year Capital Replacement & Refurbishment Program Staff continues to evaluate and update the on-going five-year Water and Sewer Capital Replacement & Refurbishment Plan (CR&R) to preserve its water and sewer infrastructure investment, meet regulatory requirements and ensure a continuous high level of service. CR&R expenditures for fiscal year 2015/16 total $3,798,527. The 2015/16 CR&R costs will be funded by 1) revenue generated by the CR&R charge, 2) loan proceeds and 3) Tier III & IV restricted reserves.
RESERVES: The District maintains two categories of reserves: (1) those legally required to be held as the result of contractual agreement (2) Board Mandated reserves. Board Mandated reserves include (1) Capital Replacement & Refurbishment Program reserves for projects approved by the Board of Directors, (2) rate stabilization reserves, (3) operating reserves and (4) working capital. The current minimum reserve level for Board Mandated reserves, established by Board policy, is $8.5 million. The District’s fiscal year 2015-16 Budget includes a provision to utilize reserves to fund a portion of the five-year Capital Replacement & Refurbishment Plan.
6
Water Sales $11,996,805Sewer Services 7,275,000Capital R & R Charge 3,000,000Taxes & Other 2,454,873Reserves 3,531,443
$28,258,121
EL TORO WATER DISTRICT
Where The Money Comes From
Water Sales 42%
Sewer Services 26%
Capital R & R Charge 11%
Taxes & Other 9%
Reserves 12%
2015/16 Budget
7
Purchased Water $7,997,953Labor 7,077,652Operating Expense 4,066,509G & A Expense 1,766,000Interest Expense 1,138,577Principal Payments 2,412,903Capital Replacement & Refurbishment Program 3,798,527
$28,258,121
EL TORO WATER DISTRICT
Where The Money Goes
Purchased Water28%Labor
25%
Operating Expense
14%
G & A Expense6%
Interest Expense4%
Principal Payments
9%
Capital Replacement & Refurbishment
Program14%
2015/16 Budget
8
Collections TV Van
Operations
EL TORO WATER DISTRICTORGANIZATION CHART 2015 - 2016
Positions PositionsDepartment DepartmentAdministrative Services Transmission & Distribution CrewGeneral Manager 1 Foreman 1Chief Financial Officer/Assist GM 1 Crew Chief 2Director of Operations & Eng 1 Maintenance Man III 1Public Relations/EP Admin 1 Maintenance Man I 4Human Resources Manager 1 Total 8Exec.Assistant to BOD & GM 1Office Assistant 1
Total 7 Pumping CrewForeman 1
Information Systems Crew Chief 1Information Technology Manager 1 Maintenance Man III 3
Total 1 Maintenance Man II 3Electrical Sys/SCADA Supv 1
Accounting Total 9Controller 1Accountant 2Supervisor Accounting 1 Treatment Plant Total 4 Chief Plant Operator 1
Truck Driver 2Purchasing/Receiving Waste Water Operator III 3Purchasing Agent 1 Waste Water Operator II 1
Total 1 Lab Supervisor 1Lab Technician II 1
Customer Service - Office Total 9C.S. Admin. Coordinator 1C.S. Office Rep. II / Senior 2Billing Clerk II 1 Collections & Transmissions
Total 4 Industrial Waste Inspector 1Crew Chief 1
Customer Service - Field Maintenance Man III 1Crew Chief 1 Maintenance Man I 2C.S. Field Rep. I 1 Total 5C.S. Field Rep. II 1
Total 3AutomotiveSenior Mechanic 1
Engineering Total 1Engineer Associate 1Project Engineer 1 Open 1Recycled Water Coordinator 1 Total 1Compliance Program Coordinator 1
Total 4Total Positions 57
9
Budget Budget Budget2013/14 2014/15 2015/16 Change
Labor $4,635,358 $4,906,930 $5,089,587 $182,657
Benefits 1,572,525 1,681,856 1,841,099 $159,243
Workers Compensationand Unemployment Ins. 144,223 140,303 146,966 $6,663
$6,352,106 $6,729,089 $7,077,652 $348,563
Benefits as % of Labor 24.76% 24.99% 26.01%
EL TORO WATER DISTRICT
LABOR / BENEFITS COMPARISON2015-16
10
EL TORO WATER DISTRICT
BUDGET COMPARISON - Income Statement
Fiscal Years Ending June 30Budget Budget Budget2013/14 2014/15 2015/16
Operating RevenueWater $12,163,009 $12,834,906 $11,996,805Sewer 6,260,029 6,790,000 7,275,000Capital Facilities Charge 3,000,000 3,000,000 3,000,000Tertiary 0 0 1,171,873
Total Operating Revenue 21,423,038 22,624,906 23,443,678
Operating ExpenseLabor 6,352,106 6,729,089 7,077,652Source of Supply 996,954 1,019,427 1,027,474Purchased Water 8,342,158 8,701,171 7,997,953Pumping Expense 497,984 501,895 609,428Treatment Expense 819,620 890,119 925,150Tertiary Treatment Expense 0 0 120,900Trans. & Dist. Expense 699,306 718,738 738,198Operating Support 513,704 528,807 644,859Customer Accounts Expense 37,500 8,500 500General & Administrative 1,552,122 1,668,800 1,766,000Depreciation & Amortization 2,906,850 2,906,845 2,906,845
Total Operating Expense 22,718,304 23,673,392 23,814,959
Operating Income (1,295,266) (1,048,486) (371,281)
Non Operating Revenue 1,341,874 1,575,244 1,283,000Non Operating Expense (461,990) (137,000) (1,138,577)Internal Resources 2,454,713 910,513 3,531,443
Total Non Operating 3,334,597 2,348,757 3,675,866
Excess of Revenues and Cash Flows Over Expense 2,039,331$ 1,300,271$ 3,304,585$
11
EL TORO WATER DISTRICT
BUDGET COMPARISON - Operating Expenses
Fiscal Years Ending June 30
Budget Budget Budget2013/14 2014/15 2015/16
Operating Expense
Labor $6,352,106 $6,729,089 $7,077,652
Purchased Water 8,342,158 8,701,171 8,370,953
Source of Supply 996,954 1,019,427 1,027,474
Pumping Expense 497,984 501,895 609,428
Treatment Expense 819,620 890,119 925,150
Trans. & Dist. Expense 699,306 718,738 738,198
Operating Support 513,703 528,806 644,859
Customer Accounts Expense 37,500 8,500 500
General & Administrative 1,552,122 1,668,800 1,766,000
Depreciation & Amortization 2,906,850 2,906,845 2,906,845Total Operating Expense $22,718,303 $23,673,391 $24,067,059
12
EL TORO WATER DISTRICT
BUDGET COMPARISON - Source of Supply
Fiscal Years Ending June 30
Budget Budget Budget2013/14 2014/15 2015/16
SOCWA $895,745 $926,468 $920,000
Sources of Supply 101,209 92,959 107,474
Source of Supply $996,954 $1,019,427 $1,027,474
Purchased Water $8,342,158 $8,701,171 $7,997,953
13
EL TORO WATER DISTRICT
BUDGET COMPARISON - Pumping
Fiscal Years Ending June 30
Budget Budget Budget2013/14 2014/15 2015/16
Fuel & Power $292,500 $311,761 $348,100
Operating & Maintenance Exp. 205,484 190,134 261,328
$497,984 $501,895 $609,428
14
EL TORO WATER DISTRICT
BUDGET COMPARISON - Treatment
Fiscal Years Ending June 30
Budget Budget Budget2013/14 2014/15 2015/16
Fuel & Power $577,200 $613,219 $695,200
Operating & Maintenance Exp. 242,420 276,900 229,950
$819,620 $890,119 $925,150
15
EL TORO WATER DISTRICT
BUDGET COMPARISON - Tertiary Treatment
Fiscal Years Ending June 30
Budget Budget Budget2013/14 2014/15 2015/16
Fuel & Power $0 $0 $87,400
Operating & Maintenance Exp. 0 0 33,500
$0 $0 $120,900
16
EL TORO WATER DISTRICT
BUDGET COMPARISON - Transmission & Distribution
Fiscal Years Ending June 30
Budget Budget Budget2013/14 2014/15 2015/16
Operating & Maintenance Exp. $699,306 $718,738 $738,198
$699,306 $718,738 $738,198
17
EL TORO WATER DISTRICT
BUDGET COMPARISON - Operations Support
Fiscal Years Ending June 30
Budget Budget Budget2013/14 2014/15 2015/16
Vehicle Maintenance $305,390 $303,893 $344,845
Warehouse & Facilities 208,314 224,914 300,014
$513,704 $528,807 $644,859
18
EL TORO WATER DISTRICT
BUDGET COMPARISON - Customer Accounts
Fiscal Years Ending June 30
Budget Budget Budget2013/14 2014/15 2015/16
Conservation Programs $37,500 $8,500 $500
Total Customer Accounts $37,500 $8,500 $500
19
EL TORO WATER DISTRICT
BUDGET COMPARISON - General & Adminstration
Fiscal Years Ending June 30Budget Budget Budget2013/14 2014/15 2015/16
Insurance & Damages $439,000 $408,500 $400,000Director's Fees 100,000 100,000 100,000Meetings & Conventions 35,000 35,000 55,000Legal Fees 100,000 125,000 150,000Public Relations 113,000 152,000 202,500General Plant Maintenance 63,322 86,000 116,000Utilities, Building Security, Janitorial 78,700 88,800 102,300Auditing Fee 29,000 30,000 30,000Dues and Memberships 76,000 78,000 80,000Voice and Data Communications 70,000 70,000 70,000Publications and Subscriptions 3,000 3,000 3,000Printing and Reproduction 25,000 25,000 25,000Equipment Rental 15,000 10,000 11,000Other Employee Costs 25,000 25,000 25,000Bank and Paycheck Services 39,600 44,000 48,000Bad Debts 30,000 30,000 30,000Employee Events, Education, and Service Awards 14,500 14,500 14,700Temporary Help 25,000 25,000 25,000Computer Supplies 75,000 75,000 75,000Office Supplies 18,000 18,000 20,500Property Taxes 3,000 6,000 6,000Elections/Other 0 45,000 0Outside Contractors and Consultants 165,000 165,000 166,500Postage 10,000 10,000 10,500Total General & Administrative $1,552,122 $1,668,800 $1,766,000
Depreciation & Amortization $2,906,850 $2,906,845 $2,906,845
20
EL TORO WATER DISTRICT
BUDGET COMPARISON - Non-Operating Income & Expense
Fiscal Years Ending June 30
Budget Budget Budget2013/14 2014/15 2015/16
Tax Revenue $700,000 $740,000 $740,000
Interest Income 84,000 80,000 50,000
Other Revenue 557,874 755,244 493,000
Total Non-Operating Revenue $1,341,874 $1,575,244 $1,283,000
Interest Expense $461,990 $137,000 $1,138,577
Total Non-Operating Expense $461,990 $137,000 $1,138,577
21
Tertiary Treatment Plant
5 – Year Capital R & R Program
EL TORO WATER DISTRICTFIVE YEAR CAPITAL IMPROVEMENT PLAN
PROJECTSF.Y. 2015/16 - 2019/2020
ITEM # DESCRIPTION 2015/16 2016/17 2017/18 2018/19 2019/20 TOTAL WATER SEWERSource of Supply / Storage
1 R-2 Reservoir Interior Recoating (E/C) 250,000 250,000 250,0002 R-2 Reservoir Exterior Recoating (E/C) 75,000 75,000 75,0003 Replace R-6 Sodium Hypochlorite Tanks 200,000 200,000 200,0004 R-1 / R-2 Reservoir Management System (C) 500,000 500,000 500,000
4a R-1 / R-2 Reservoir Management System Budget Carryover (500,000) (500,000) (500,000)5 JRWSS Capital Budget 24,562 139,702 4,800 390 169,454 169,454
Total Source of Supply 24,562 139,702 204,800 325,390 0 694,454 694,454 0
Recycled Water1 Recycled Water Expansion Project Retrofits 3,000,000 3,000,000 3,000,000
1a Recycled Water Expansion Project Funding - Restricted Reserves (2,400,000) (2,400,000) (2,400,000)1b Recycled Water Expansion Project Funding - MWD Rebates (600,000) (600,000) (600,000)2 Recycled Water Phase II Fuding Consultant Assistance 100,000 100,000 100,0003 ETWD / MNWD Recycled Water Master Plan 50,000 50,000 50,000
Total Treatment (Water) 150,000 0 0 0 0 150,000 150,000 0
Pumping (Water)1 P-3 New MCC with TS, Nema 3R Main & Generator Installation. 320,000 320,000 320,0002 Water Stations PLC Upgrade to Control Logix 20,000 25,000 25,000 25,000 25,000 120,000 120,000
2a Water Stations PLC Upgrade to Control Logix Budget Carryover (20,000) (20,000) (20,000)3 Baker Pump Station 950,390 950,390 950,390
3a Baker Pump Station Budget Carryover (775,390) (775,390) (775,390)Total Pumping (Water) 175,000 25,000 345,000 25,000 25,000 595,000 595,000 0
Pumping (Sanitation)1 Oso Improvement Projct 1,500,000 1,500,000 1,500,000
1a Oso Improvement Projct Budget Carryover (656,000) (656,000) (656,000)2 Aliso Creek Lift Station Skid Pump and Piping 200,000 200,000 200,0003 Also Creek Lift Station Spare Grinder 45,000 45,000 45,0004 Sewer Stations PLC Upgrade to Control Logix 26,000 25,000 25,000 25,000 25,000 126,000 126,0005 Sewer Stations PLC Upgrade to Control Logix Budget Carryover (26,000) (26,000) (26,000)6 4920 Siphon Stabilization 150,000 150,000 150,000
Total Pumping (Sanitation) 844,000 25,000 70,000 175,000 225,000 1,339,000 0 1,339,000
22
EL TORO WATER DISTRICTFIVE YEAR CAPITAL IMPROVEMENT PLAN
PROJECTSF.Y. 2015/16 - 2019/2020
ITEM # DESCRIPTION 2015/16 2016/17 2017/18 2018/19 2019/20 TOTAL WATER SEWERTreatment (Sanitation)
1 WRP Main Electrical Power Breaker Upgrade 35,000 35,000 35,0002 Grit Chamber Rehab/Re-Coating 85,000 85,000 85,0003 New Scum Station for Clarifiers #3 & #4 35,000 35,000 35,0004 Turbo Blower for the Aeration System 300,000 300,000 300,0005 Secondary Clarifier Component Replacement 150,000 150,000 300,000 300,0006 New MCC S-D Elecrical Cabinet & Breakers (DAF Unit #1) 30,000 30,000 30,0007 Reconstruct (west side) Drainage Swayle at the Holding Pond 65,000 65,000 65,0008 WAC Cleaning (Grit Removal) 55,000 55,000 55,0009 HACH (WIMS) Maint. Job Cal Database Management Software System 10,500 10,500 10,500
0 0Total Treatment (Sanitation) 300,000 65,000 225,500 55,000 270,000 915,500 0 915,500
Outside Treatment (SOCWA)1 PC-17 ( R ) 1,757,437 351,989 114,212 510,598 357,586 3,091,822 3,091,822
1a PC-17 ( R ) Budget Carryover (235,822) (235,822) (235,822)2 PC-21 212,500 236,900 500,000 949,400 949,4003 PC-24 8,150 12,970 21,120 21,120
Total Treatment (SOCWA) 1,742,265 588,889 627,182 510,598 357,586 3,826,520 0 3,826,520
Transmission & Distribution1 Gate 11 Hydraulic Improvement Project 180,000 180,000 180,0002 Automated Meter Reading 20,000 20,000 20,000
Total Mainline 20,000 0 0 0 180,000 200,000 200,000
General Building1 Master Plan Update 200,000 200,000 100,000 100,0002 Main Office Demonstration Garden 250,000 250,000 125,000 125,000
2a Main Office Demonstration Garden Budget Carryover (125,000) (125,000) (62,500) (62,500)3 Field Ops - Carpeting, Window Coverings 30,000 30,000 15,000 15,000
Total General Building 125,000 30,000 0 0 200,000 355,000 177,500 177,500
23
EL TORO WATER DISTRICTFIVE YEAR CAPITAL IMPROVEMENT PLAN
PROJECTSF.Y. 2015/16 - 2019/2020
ITEM # DESCRIPTION 2015/16 2016/17 2017/18 2018/19 2019/20 TOTAL WATER SEWERContingency
1 Contingency 50,000 100,000 250,000 325,000 550,000 1,275,000 637,500 637,5002 Inflation @ 5% 7,250 44,126 31,973 52,093 135,442 67,721 67,721
Total Contingency 50,000 107,250 294,126 356,973 602,093 1,410,442 705,221 705,221
Total Capital Projects 3,430,827 980,841 1,766,608 1,447,961 1,859,679 9,485,916 2,522,175 6,963,741
WATER 457,062 233,327 696,863 528,876 606,047 2,522,175 2,522,175SEWER 2,973,765 747,514 1,069,745 919,085 1,253,632 6,963,741 6,963,741
Total Capital Projects 3,430,827 980,841 1,766,608 1,447,961 1,859,679 9,485,916 2,522,175 6,963,741
Total Capital Equipment 367,700 1,428,775 549,963 1,028,247 638,023 4,012,708 1,672,154 2,340,554
Total Capital Budget 3,798,527 2,409,616 2,316,571 2,476,208 2,497,702 13,498,624 4,194,329 9,304,295
WATER 597,062 779,965 936,844 960,400 920,058 4,194,329 4,194,329SEWER 3,201,465 1,629,652 1,379,726 1,515,808 1,577,644 9,304,295 9,304,295
24
EL TORO WATER DISTRICTFIVE YEAR CAPITAL IMPROVEMENT PLAN
EQUIPMENTF.Y. 2015/16 - 2019/2020
ITEM # DESCRIPTION 2015/16 2016/17 2017/18 2018/19 2019/20 TOTAL WATER SEWER
Pumping (Water) Equipment1 Chlorine Injection Trailer Replacement 20,000 20,000 20,000
Total Pumping (Water) 0 0 20,000 20,000 20,000 0
Pumping (Sanitation) Equipment1 4920 Generator 5,000 5,000 5,000
Total Pumping (Sanitation) 0 0 5,000 0 0 5,000 0 5,000
Treatment (Sanitation) Equipment1 Aeration Basin Diffusers 9,200 9,200 18,400 18,4002 RAS Pumps Upgrade 25,000 25,000 50,000 50,0003 One Set of Stairs/Handrails to be Installed at each Biofilter 10,000 10,000 10,0004 OOPS Butterfly Valves 10,000 10,000 10,0005 Rotostrainer Drum Replacement 30,000 30,000 30,0006 Effluent Pump Station Pump Replacements 100,000 100,000 100,0007 Convert EQ Basin Influent Gates to MOV Control 15,000 15,000 15,0008 Kubota Utility Vehicle for the Plant 10,500 10,500 10,5009 MCC-GB2 (1,200) AMP Breaker Replacement 16,500 16,500 16,50010 Portable Trailer Mounted 6.0 inch Pump with Suction & Discharge Hose 40,000 40,000 40,00011 Air Cleaning System for the Aeration Basin's Dissolved Oxygen Sensors 15,000 15,000 15,000
Total Treatment (Sanitation) 55,700 50,500 75,000 109,200 25,000 315,400 0 315,400
Laboratory1 Laboratory Refrigerator 10,000 10,000 10,0002 Laboratory Autoclave 12,000 12,000 12,0003 Ion Chromatography System 30,000 30,000 30,000
Total Laboratory 22,000 30,000 0 52,000 0 52,000
25
EL TORO WATER DISTRICTFIVE YEAR CAPITAL IMPROVEMENT PLAN
EQUIPMENTF.Y. 2015/16 - 2019/2020
ITEM # DESCRIPTION 2015/16 2016/17 2017/18 2018/19 2019/20 TOTAL WATER SEWERCollection Equipment
1 P332 Flexiprobe Inspection System - CUES 20,000 20,000 20,0002 P350 Flexiprobe Inspection System - CUES 46,000 46,000 46,0003 24" Smart Covers Manhole Covers 10,000 10,000 10,000 10,000 10,000 50,000 50,0004 Backup Tractor & TV Camera 45,000 45,000 45,0005 Portable Motorized Hydro Jetter 70,000 70,000 70,0006 Arrow Board Trailer 15,000 15,000 15,000
Total Collection 10,000 115,000 10,000 56,000 55,000 246,000 0 246,000
Earthquake / Emergency Preparedness1 Yard Generator Enclosure 65,000 65,000 32,500 32,500
Total Earthquake/Emerg. Preparedness 0 65,000 0 0 0 65,000 32,500 32,500
Vehicles/Vehicle Equipment1 Vehicle Replacement 65,000 100,000 75,000 75,000 75,000 390,000 195,000 195,0002 WRP Tractor 175,000 175,000 175,0003 Dump Truck Replacement (Unit 50) 165,000 165,000 82,500 82,5004 Hydro Excavator 450,000 450,000 225,000 225,0005 Warehouse Forklift 50,000 50,000 25,000 25,0006 Portable Building 10,000 10,000 5,000 5,0007 1991 Small Dump Truck (Unit 4) 50,000 50,000 25,000 25,0008 2001 F-450 Hydrant and Valve Truck (Unit 60) 70,000 70,000 70,0009 Mechanics Service Truck (Unit 91) 110,000 110,000 55,000 55,000
Total Vehicles / Vehicle Equipment 65,000 660,000 75,000 525,000 145,000 1,470,000 682,500 787,500
Construction/Mechanical/Electical Equipment1 Backhoe 160,000 160,000 80,000 80,0002 Valve Turning Machine Trailer or Skid Mounted 35,000 35,000 35,000
Total Consruction Equipment 0 195,000 0 0 0 195,000 115,000 80,000
Office Equipment/Furniture1 GIS / IMS 150,000 150,000 100,000 0 0 400,000 200,000 200,0002 Field Ops - Ice Machine and enclosure 15,000 15,000 7,500 7,500
Total Office Equipment / Furniture 165,000 150,000 100,000 0 0 415,000 207,500 207,500
26
EL TORO WATER DISTRICTFIVE YEAR CAPITAL IMPROVEMENT PLAN
EQUIPMENTF.Y. 2015/16 - 2019/2020
ITEM # DESCRIPTION 2015/16 2016/17 2017/18 2018/19 2019/20 TOTAL WATER SEWERContingency
1 Contingency 50,000 100,000 250,000 300,000 400,000 1,100,000 550,000 550,0002 Inflation @ 5% 63,275 14,963 38,047 13,023 129,308 64,654 64,654
Total Miscellaneous 50,000 163,275 264,963 338,047 413,023 1,229,308 614,654 614,654
Total Capital Equipment $367,700 $1,428,775 $549,963 $1,028,247 $638,023 $4,012,708 1,672,154 2,340,554
WATER 140,000 546,638 239,981 431,524 314,012 1,672,154 1,672,154SEWER 227,700 882,138 309,981 596,724 324,012 2,340,554 2,340,554
Total Capital Equipment $367,700 $1,428,775 $549,963 $1,028,247 $638,023 $4,012,708 1,672,154 2,340,554
Total Capital Projects $3,430,827 $980,841 $1,766,608 $1,447,961 $1,859,679 $9,485,916 2,522,175 6,963,741
Total Capital Budget $3,798,527 $2,409,616 $2,316,571 $2,476,208 $2,497,702 $13,498,624 4,194,329 9,304,295
WATER 597,062 779,965 936,844 960,400 920,058 4,194,329SEWER 3,201,465 1,629,652 1,379,726 1,515,808 1,577,644 9,304,295
27
Recycled Water Pumps and Discharge Piping
2015/2016Capital Replacement andRefurbishment Program
2014/15 CAPITAL REPLACEMENT & REFURBISHMENT PROGRAM
Projects EquipmentSource of Supply / Storage
1 R-1 / R-2 Reservoir Management System (C) 500,000 Treatment (Sanitation) Equipment1a R-1 / R-2 Reservoir Management System Budget Carryover (500,000) 1 Aeration Basin Diffusers 9,2002 JRWSS Capital Budget 24,562 2 Convert EQ Basin Influent Gates to MOV Control 15,000
Total Source of Supply 24,562 3 MCC-GB2 (1,200) AMP Breaker Replacement 16,5004 Air Cleaning System for Aeration Basin DO Sensors 15,000
Recycled Water Total Treatment (Sanitation) 55,7003 Recycled Water Retrofits 3,000,000
3a Recycled Water Retrofits Funding - Restricted Reserves (2,400,000) Laboratory3b Recycled Water Retrofits Funding - MWD Rebates (600,000) 5 Laboratory Refrigerator 10,0004 Recycled Water Phase II Fuding Consultant Assistance 100,000 6 Laboratory Autoclave 12,0005 ETWD / MNWD Recycled Water Master Plan 50,000 Total Laboratory 22,000
Total Recycled Water 150,000Collection Equipment
Pumping (Water) 7 24" Smart Covers Manhole Covers 10,0006 Water Stations PLC Upgrade 20,000 Total Collection 10,000
6a Water Stations PLC Upgrade Budget Carryover (20,000)7 Baker Pump Station 950,390 Vehicles/Vehicle Equipment
7a Baker Pump Station Budget Carryover (775,390) 8 Vehicle Replacement 65,000Total Pumping (Water) 175,000 Total Vehicles / Vehicle Equipment 65,000
Pumping (Sanitation) Office Equipment/Furniture8 Oso Improvement Projct 1,500,000 9 GIS / IMS 150,000
8a Oso Improvement Projct Budget Carryover (656,000) 10 Field Ops - Ice Machine and enclosure 15,0009 Sewer Stations PLC Upgrade 26,000 Total Office Equipment / Furniture 165,000
9a Sewer Stations PLC Upgrade Carryover (26,000)Total Pumping (Sanitation) 844,000 Contingency
11 Short Term Contingency 50,000Treatment (Sanitation) Total Miscellaneous 50,000
10 Turbo Blower for the Aeration System 300,000Total Treatment (Sanitation) 300,000
Total Capital Equipment $367,700
Outside Treatment (SOCWA)11 PC-17 ( R ) 1,757,437
11a PC-17 ( R ) Budget Carryover (235,822)12 PC-21 212,500 Total Capital Projects 3,430,82713 PC-24 8,150
Total Treatment (SOCWA) 1,742,265 Total Capital Equipment 367,700
Transmission & Distribution Total Capital Budget 3,798,52714 Automated Meter Reading 20,000
Total Mainline 20,000 LEGENDWATER
General Building SEWER15 Main Office Demonstration Garden 250,000 BOTH
15a Main Office Demonstration Garden Budget Carryover (125,000)Total General Building 125,000
Contingency16 Short Term Contingency 50,000
Total Contingency 50,000
Total Capital Projects $3,430,827
28
Baker Water Treatment Plant Project
2015/2016Capital Facility ProjectDescriptions > $20,000
29
PROJECT TITLE: R-1/R-2 RESERVOIR MANAGEMENT SYSTEM
CAPITAL PLAN SOURCE OF SUPPLY / STORAGE - WATER CLASSIFICATION: (PROJECT #1) LOCATION: R-1 & R-2 RESERVOIR SITE PROJECT BASIS: Water Quality; Reliability; Safety; Regulatory Compliance DESCRIPTION: Over the last several years the District has installed reservoir
management systems in three of its five storage tanks in an effort to preserve critical chlorine residuals as well as mitigate the development of Nitrites and disinfection by-products in the stored water. The R-1 and R-2 Reservoirs are the only remaining tanks lacking the RMS technology. These two tanks continue to experience subpar chlorine residuals as well as numerous nitrite issues. The discharge of the water then carries the water quality problems throughout the local distribution network. The proposed system will preserve water quality in the tanks and in the local distribution system as well as maximize the benefit of reservoir management systems in the downstream tanks and help position the District for continued compliance with the recent Stage 2 Disinfection Byproducts Rule. The project design is complete. The 2015/16 budget has been carried over from a previous budget year to fund construction of the project.
PROJECT BUDGET: $500,000 (Carryover from 2014/15 Capital Budget) BASIS OF COST ESTIMATE: Cost estimate developed during project design.
30
PROJECT TITLE: JOINT REGIONAL WATER SUPPLY SYSTEM CAPITAL PLAN SOURCE OF SUPPLY / STORAGE CLASSIFICATION: (PROJECT #5) LOCATION: JOINT TRANSMISSION MAIN – REACH 2 PROJECT BASIS: End of Useful Life; Reliability DESCRIPTION: The El Toro Water District owns 2 cfs capacity in the Joint
Regional Water Supply System operated by the South Coast Water District. The District’s capital obligation associated with the Joint Regional Water Supply System and the Joint Transmission Main is based on capacity ownership in the specific reaches of the system. The primary projects driving the ETWD share of the JRWSS capital cost in the 2015/16 fiscal year are associated with Reach 2 of the Joint Transmission Main per the JRWSS capital budget.
PROJECT BUDGET: $24,562 BASIS OF COST ESTIMATE: JRWSS Budget
31
PROJECT TITLE: RECYCLED WATER RETROFITS
CAPITAL PLAN RECYCLED WATER CLASSIFICATION: (PROJECT #3/3a/3B) LOCATION: SYSTEM WIDE PROJECT BASIS: Water Supply Reliability DESCRIPTION: Construction of the Recycled Water Tertiary Treatment Plant and
Distribution System is complete. The effort to convert over 200 dedicated irrigation meters to recycled water is currently underway. The estimated total project cost for the on-site conversion costs is $3,000,000.
PROJECT BUDGET: $3,000,000 (funded by Restricted Reserves and MWD Rebates) BASIS OF COST ESTIMATE: Staff estimate
32
PROJECT TITLE: RECYCLED WATER PHASE II CONSULTANT FUNDING ASSISTANCE
CAPITAL PLAN RECYCLED WATER CLASSIFICATION: (PROJECT #4) LOCATION: SYSTEM WIDE PROJECT BASIS: Water Supply Reliability DESCRIPTION: It is anticipated that funding opportunities for the future expansion
of the Recycled Water Distribution System may develop based on existing funding sources as well as possible funding decisions made to deal with the on-going drought conditions. The subject project will provide consulting assistance to help the District obtain funding for the Recycled Water Phase II project.
PROJECT BUDGET: $100,000 BASIS OF COST ESTIMATE: Staff estimate
33
PROJECT TITLE: ETWD / MNWD RECYCLED WATER MASTER PLAN
CAPITAL PLAN RECYCLED WATER CLASSIFICATION: (PROJECT #5) LOCATION: VARIOUS LOCATIONS PROJECT BASIS: Water Supply Reliability DESCRIPTION: The El Toro Water District, along with most of the other water
purveyors in South Orange County, is continuing to seek new opportunities to enhance water supply reliability. There is a keen interest in evaluating regional projects that might enhance the supply of recycled water to the benefit of all concerned. Moulton Niguel Water District is planning to perform a Recycled Water Master Plan. The subject project will provide funding for the District’s participation in the MNWD effort in order to identify potential mutually beneficial projects including recycled water seasonal storage and expansion of the District’s recycled water distribution system.
PROJECT BUDGET: $50,000 BASIS OF COST ESTIMATE: Staff estimate.
34
PROJECT TITLE: BAKER PUMP STATION
CAPITAL PLAN PUMPING WATER CLASSIFICATION: (PROJECT #7) LOCATION: SECOND STREET / EL TORO ROAD, LAKE FOREST PROJECT BASIS: Reliability DESCRIPTION: After considering a number of alternatives it was determined the
optimum conveyance system alternative for Baker Water Treatment Plant product water is an interconnection between the IRWD distribution system and the District’s R-6 pressure zone. The District has previously entered into and Interconnection Agreement with IRWD in which Baker WTP product water will be conveyed through the IRWD distribution system to a new interconnection/pump station located in the R-6 pressure zone near the intersection of El Toro Road and 2nd Street in Lake Forest. The Interconnection will require ETWD design and construct improvements to the pump station as well as construction pipeline improvements within the ETWD system. Design of the project is underway. The 2015/16 budget will carry over and supplement the 2014/15 budget to complete both design and construction of the project.
PROJECT BUDGET: $175,000 (2015/16 Additional Budget)
$775,390 (Carryover from 2014/15) $950,390 (Total 2015/16 Budget)
BASIS OF COST ESTIMATE: Staff Estimate based on consultant estimate.
35
PROJECT TITLE: OSO LIFT STATION IMPROVEMENT PROJECT
CAPITAL PLAN PUMPING - SEWER CLASSIFICATION: (PROJECT #8) LOCATION: OSO LIFT STATION PROJECT BASIS: End of Useful Life; Protect Facilities; Reliability; Safety; Energy Efficiency; Environmental Protection DESCRIPTION: The Oso Lift Station conveys raw wastewater from the western
edge of the District’s service area. The pumps are over 25 years old while the motors are over 30 years old. Both are worn out and inefficient. The current configuration utilizes an extended driveshaft between the motors on the upper level and the pumps on the lower level. The lower level is extremely small making maintenance of these pumps both difficult and hazardous. The safety of the maintenance of this facility will be significantly enhanced by the proposed project. The proposed project will replace the existing worn-out pumps with new submersible pumps. The project also contemplates the negotiation with the Moulton Niguel Water District for the addition of an emergency overflow connection to a nearby MNWD lift station to enhance reliability. The elimination of the extended driveshaft and the replacement of the aged pumps with new submersible pumps will make the Oso Lift Station consistent with other ETWD sewer pumping facilities. An engineering evaluation is currently underway. The 2015/16 budget will carry over and supplement the 2014/15 budget to complete both design and construction of the project.
PROJECT BUDGET: $200,000 (2015/16 Additional Budget)
$656,000 (Carryover from 2014/15) $856,000 (Total 2015/16 Budget)
BASIS OF COST ESTIMATE: Staff Estimate.
36
PROJECT TITLE: SEWER STATIONS PLC UPGRADE TO CONTROL LOGIX
CAPITAL PLAN TREATMENT - SEWER CLASSIFICATION: (PROJECT #9) LOCATION: VARIOUS LOCATIONS PROJECT BASIS: End of Useful Life; Reliability; Environmental Protection DESCRIPTION: The District’s remote sewer facilities are controlled at the site by
programmable logic controllers (PLC). The PLCs provide local control, communication to Central and are fully capable of controlling and operating the facility in the event of a communication failure. The existing PLCs are from the Allen Bradley PLC5 family of controllers. Allen Bradley has stopped manufacturing and supporting the PLC5s. The technology is over 20 years old and spare parts are no longer available. The latest Allen Bradley PLC technology is the Control Logix 6.1L which the District has migrated to at several sites. The systematic replacement of the PLC5s and migration to the Control Logix PLCs is an essential, critical element for the continued reliability and operation of all of the District water and sewer stations. The project budget has been carried over from the 2014/15 Capital Budget.
PROJECT BUDGET: $26,000 (Carryover from 2014/15 Capital Budget) BASIS OF COST ESTIMATE: Staff Estimate based on similar previous projects.
37
PROJECT TITLE: TURBO BLOWER FOR THE AERATION SYSTEM
CAPITAL PLAN TREATMENT - SEWER CLASSIFICATION: (PROJECT #10) LOCATION: WATER RECYCLING PLANT PROJECT BASIS: Increase Life Expectancy of Process Equipment: Reliability of
Facilities; Electrical Efficiency DESCRIPTION: This project will replace one of the three existing, inefficient 300
HP Centrifugal Aeration Basin Blowers with a new efficient high speed Turbo Blower. The new Turbo Blower would become the main work load blower, while the remaining two centrifugal blowers would serve as back-up equipment. A new Turbo Blower would provide the needed turn down at times when the demand for dissolved oxygen is lower. The existing blowers have only limited turn down capability without surging and tripping out. The new technology of the Turbo Blowers would provide power consumption savings at the WRP. This project is expected to qualify for an SCE incentive, the amount of which has yet to be determined. The scope of work for this project will include the purchase of a new Turbo Blower, the mechanical installation of the new blower, the repair of an air leak to the Blower Building’s main discharge header, and the electrical installation of the new blower.
PROJECT BUDGET: $300,000 BASIS OF COST ESTIMATE: Staff estimate based on previous quotes, similar previous work and
verbal discussion with vendors, contractors and SCE.
38
PROJECT TITLE: SOCWA
CAPITAL PLAN OUTSIDE TREATMENT - SOCWA CLASSIFICATION: (PROJECT #11) LOCATION: SOCWA PROJECT BASIS: End of Useful Life; Reliability; Environmental Protection;
Regulatory Compliance DESCRIPTION: The District contribution to support the South Orange County
Wastewater Authority capital budget is based on capacity ownership in the various Project Committees. SOCWA collects funding to support the capital improvements on a cash flow basis. The funds collected are intended to support actual costs rather than project budgets. The primary project driving the ETWD share of the SOCWA capital cost in the 2015/16 fiscal year is the construction of the Cogeneration Engine replacement at the Regional Treatment Plant. The ETWD share of this project is nearly $1.8 million. SOCWA will also be performing repairs to the Effluent Transmission Main for which the District share is $212,500. The 2015/16 budget will carry over and supplement the 2014/15 budget to fund the District’s SOCWA capital obligations.
PROJECT BUDGET: $1,742,265 (2015/16 Additional Budget)
$235,822 (Carryover from 2014/15) $1,978,087 (Total 2015/16 Budget)
BASIS OF COST ESTIMATE: SOCWA Budget
39
PROJECT TITLE: MAIN OFFICE DEMONSTRATION GARDEN (PHASE II & III)
CAPITAL PLAN GENERAL BUILDING CLASSIFICATION: (PROJECT #15) LOCATION: MAIN ADIMINSTRATION OFFICE PROJECT BASIS: End of Useful Life; Reliability; Environmental Protection DESCRIPTION: The District has been working with a landscape architect to
develop a California Friendly and drought tolerant landscape. The project will rehabilitate the front landscaping on the east and west sides of the Main Office driveway entrance along the frontage turf area for the entire length of the property adjacent to Los Alisos Boulevard. In keeping with the District’s objective to promote the efficient use of water in its service area the landscaping will be designed as a demonstration garden that will include colorful drought tolerant California friendly and native species. The project will also incorporate other features including boulders, dry creek bed concepts, mulch and synthetic turf. The irrigation system will include a weather based irrigation timer and water saving irrigation system. The Project was designed and bid during the 2014/15 fiscal year. Unfortunately, only one bid was received and the bid amount was twice the landscape architects construction estimate. Staff plans to initiate a Value Engineering effort with the landscape architect and a landscape contractor to establish a project scope that will accomplish our objective at a reasonable and affordable cost.
District staff is working to obtain any available grant/rebate funding through MET, MWDOC and/or State/Federal programs for the project.
PROJECT BUDGET: $125,000 (2015/16 Additional Budget)
$125,000 (Carryover from 2014/15) $250,000 (Total 2015/16 Budget)
BASIS OF COST ESTIMATE: Staff Estimate
40
PROJECT TITLE: VEHICLE REPLACEMENTS
CAPITAL PLAN VEHICLES / VEHICLE EQUIPMENT CLASSIFICATION: (EQUIPMENT #8) PROJECT BASIS: End of Useful Life DESCRIPTION: The El Toro Water District fleet includes 50 vehicles ranging from
small pickup trucks to large crew trucks and dump trucks. The District’s Senior Mechanic does an excellent job preserving and extending the useful life of each vehicle to the maximum extent possible. As vehicles age and accumulate significant mileage they are replaced or rotated to less intensive duty to further extend their usefulness. The proposed budget contemplates the purchase of three new Ford pick-up trucks.
PROJECT BUDGET: $65,000 BASIS OF COST ESTIMATE: The cost estimate was developed by the ETWD Mechanic and is
inclusive of vehicle purchase costs, tax and license fees as well as associated costs to outfit the vehicles for District service.
41
PROJECT TITLE: GIS / IMS
HON
MO
U LTO
N
GR ANITE
LA CADENA
PACIFICO
ALCALDE
DR.
DEL
L AG O
DR .
PERA
LTA
DR
VISTA GR.
POI NT
DR.
AVE.DE
CARLOTA
LA
C OMM. CTR.DR.
V ER D
UGO
VIA PUERTA
M AR IPOSA
SEVI
LLA
V IA MARIPOSA
RONDA GRANADA
DE
VALENCIA
AVE.
MO ULTON
PKWY.EL
TORO
RD.
CADIZ
VIAIGLESIA
ESTR
A DA
V IA
ARAG
ON
MA JORCA
RON
DA
SEVI
LLA
AVE.
MEN
DOSA
VIA ALHAMBRA
SEVILLA
SUNS
ET P
L.
A CAC
I A
BALBOA
H ENDON
CAR
MEL
BECKENH AM
ASH LAND
C LARIN
GTON
W EYBURN
JORIE
KIM
PAI GE
SARA LN.
GE ORGIA
SUE
DR.
CAROL LN.
KATIE
CHRISTINA
CT.
C REEKVIEW
DR .
LOS
AL ISOS
CARLOTA
C ABALLEROS
MAJORCA
VALENCIA
H EAL
THC TR
.
LOUISA
DE LA
CAL.
MAGDELENA
PLATA
DE LA
PASEO
RED ROB IN
BUCKLAND
CONDOR D
R.
GOWDY
WHITEDOVE DR.
DEVONSHIRE
DURYEA
ROC KFIELD
BLVD.
BIRDRO CK
CAVANAUGH
RD.
DUN E MEAR
EL TORO
RD.
RAYM
OND
PACKER
FLOE
WH ISLER
BRIDGER
RD.
HIGHPIN E
P ALMEK
LANDI
SVI E
W A
VE.S IL VE
RBAY
C IR.
PEN
GE MW'D F IELD
A NK ERTON
DR.
LAR KW
OOD
ROCKFIELD
BELGREEN
L ANDI
S VIEW
ORANGEAVE.
LIMB
S T.
PLAN
T
TREEAVE.
L INDL
EY S
T .
AVE.
C LASSIC D R.
RO MA
ADON IS DELPHI
SABINA
AVE.
GRAS
S A
V E.
BRANCH AVE.
B ARK
ST.
F OR D
V IEW
STEM TWIG
ST.
ARCADIANPARTHENO N AVE.
A RGONAUT
CHARLINDA
APHE
N AA VE.
SP ARTAN ST.
LYSAN DA
AUG UST
INST.
SATU
RNA
DR
.
MAXIMUS RHEA D
R.EL
OI SA
DR.
DORI
A
GLORI OSA DR.
SPAR
TAN
S T.
DARD
ANIA
AVE.
MINOA
TROY ST.
AUR ORA WY.
M INOS
PERICLES ST.
P YLOS
ACROPOL IS DR.
D AP HNE
OLYMPUS DR .
REG INAST .
APPIAN
ORAN GE
OLIVE
AVE.
CH ERRY AVE.
JERO NIMO RD.
J ERONIMO RD.
SPR INGW ATER
ESROSE CT.
MIN A C T.
2N D
ST.
SKY DR.
LAURE LWOODDR.
W ILLOW WD.
CORAL W' D
DE STRY W'D
BUCKW ' D
ASHBRK
BRIAR CFT
BROAD LEAF
CEDARSP RING
BRO OKMON T
CHERRY
HAZELWOOD
BROOK
AVE .
GREENH ILL
B ROOK
HAV EN
CHERRY
A VE.
FALLBR OOK
LN.
MANALASTAS
AUDOBON W
Y.
DESTRY LN.
SALLY DR.
LO RRI DR .
MA URICE CT.
PARKM 'T CIR.
LITTLE
V INTA
G E
WOOD
SUMM ER
SUNL IG
HT
EL TO
RO R
D.
DR.
BRA N
DYW
INE
FORE
ST
M
EA.
ELOISE
RIPPL INGS
BRK.
CRK .
SA NDY CK.
S P RI NGW 'D
PEBBLE CRK.
C IR .
WY.
S UMM CK.
NORMANDA LE
VALLEYM'T DR.
CK.
LARC
H MONT
CURRANT
SUNLIGHT
CRAN
BR.
CK.
KARI
D R.
COACH
CRIPPLE CK.
ASHTON CIR.
BRK.
MAN DR.
SHANE DR.HEATHER BRK.
WHEATON
HAMPTON
ALAMO CIR.
T ER
.
DR.
GRAN
DE C
I R.
G LENMEADO WS
TER.
SUNDOW
NERS
BOW
LAREDO
EASTR'G
BROK
E N
D R.
DR.
RA INT RE
E
SHE
DR.
WY.
CRAN
BROOK
N. HAMPTO
N
NA N
I - 5 FREEWAY
ALISO
MUIR LAN DS
DOAH
ASH WD
I - 5 FREEWAY
VIEJO V
ILL.
EL TO RO R
D.
ALSCOT
CR E
EKDR
.
M I LL
CREE K DR .
MIL L
SER ANA N.
VIA
SEREN
A S.
V IA
VI STA
VI A
ORA
SO N
CAL
LE
SON
ORA
PACIFICOCAM
DR
VITT
ORIA
DR
ST
AVE
TARANTO
PALERMO
TER AMO
COLONNAMAR
SALA
BARBERA
MARIA
PARK DR .
SANTA
SOL
DEL
SAN T
A
VITT
ORIA
D ESP ACI O
AVE
DUENAS
BRO
MIEM
BRAZO
C ANTA
N TE
AVE
VI STA
A LT A
BL ANCA
BAH IA
LAGO
D ELPAS
L AGO
D EL
PAS
CAR RIZO
V IA
ALTA
PUNTA
AZUL
ALTA
PUNTA
BL ANCA
BAHIA
AMAD
EO
SANSOS IE
GA
AVE
SAN AM ADEO
VIA LA MESA
DICH
A
VIA
S OLD E
L
LUZ
TOR
APO
R
VIA
SOL
DEL
RAYO
EL T
ORO R OAD
TR I - CITIES PIPE LINE
RID GE R OUTE
RAI LROA D
PASE
O
C ALLE AVE.SOSIEG
A
VISTA
VI A
PESA
RO
RID GE
ROUTE DR.
TRIT
ON W
Y.
CALLE
AVE DE LA CARLOTA
BRIDGER RD.
JULIE
AL ANW OOD S T.
ALICIA PKWY.
ARG US D R.MUIRLANDS
L A P AZ
RD.
CORNELIUS
ORANGE TREE
FRONT
LO S ALISO S BLVD.
EL TORO
RD .
GREENBANK
GLENHURST
VIA PERA
VIA
PIM
ENTO
LOS ALI SOS BLVD.
V AL LEJO
LA G LORIE TA
LOS VIVER OS
LAS FLORES
ALICI A PKWY.
TRABUCO RD.
TRABUCO RD.
EL TO RO R
D.
C R E E K
S I D E
BRIDGMO NT RD.
SANTA
MARGAR ITA PK W
Y.
TURF
4
4
8
6
4
4 4
8
4
8 1 2 12
84
44
4 4 4
8
8
8
8
8
8
68
88 1 2
8
8
1 2128
8
12
8
1 0
8
8
8
8 8
128612
4
46
6
8 6
12
8
12
6
8
61 2
8 4
8
4
64 4
4
4
4
6
8
6
8
8
6
8 646 4
1 6
6
6
124
86
104
10
10
12
12
8
1 2
8
12 8
8
12
8
8
8
1 08
8
8
8
8
6
4
8
812
8
6
10
8
6
8
10
8
4
88
8
12
6
6
8
8
8
12
8
8
6
8
8
8
8
10
8
12
6
8
8
12
6
12
8
8
8
8
8
8
6
8
4
8
6
4
4
46
4
4
8
8
6
4 8
84
6 64
12
4
12
4
6 4
8
6 4
8
12
6
64
8
8
8
8
8
8
10
12
10
10
8
6
8
8
6
8
8
6
6
6
6
6
8
8
8
810
4
6
8
8
6
8
8
4
6
6
6
8
6
8
8
6
8
1010
1 0
108
6
8 8
1 6
16
12
8
12
8
6
8
6
8
6
6
8 8
12
6
410
6
88
12
10
12 8
4
10
8
6
8
12
10128
6
6
10
12
8
6
6
8
8
6
12
8
4
8
8
8
6
6 6
8
8
6
8
8
6
8
4
8
106
8 84
6 6
8 86
8
8
8
8
10
6
8 8
8
8
8
10
10
6
8
8
6
8
106
10
8
8
8
8
8
8
10
12
16
10
8
8
8
6
8
8
86
8
6
4
8
6
6 10
10
88
6
8
8
68
6
10
8
88
6
8
8
88
4
8
8
8
8
6
8
4
24
8
10
1 0
10
1010
10
8
8
8
8
8
8
8
8
8
88
8
10
8
6
10
10
12
121
0
8
8
10
8
8
8
8
16
1 6
8
8
12
10
8
10
8
12
8
8
8
8
8
16
8
8
8
8
6
8
10
8
68
10
6
4
10
8
8
10
8
8
10
8
8
4
8
10
4
8
6
8
6
6
8
6
8
6
6
6
6
8
6
8
8
6
8
6
8
10
1 2
8
8
6
8
6
1216
10
6
21
8
21
4
8
6
4
6
1 0
6
6
8
812
8
8
6
8
8
6
4
8108
10
6
12
6
8
8
8
8
8
8
8
6
8
8
8
8
6
4
8
88
6
8
8
8
6 12
8
86
88
8
6
1 2
8
8
8
1 2
8
8
81 2
6
1 2
8
8
8
8
8
6
8
6
4
6
4
6
6
6
6
8
6
6
8
8
6
6
6
6
8
6
6
6
8
8 8
12
8
16
16
21
10
10
8
4
4
8
8
8
8
4
10
8
8
16
12
12
6
12
12
12
8
8
6
8
66
6
1 6
6
6
8
8
8
16
8
8
8
18
10
4
8
4
6
44
1 2
12
8
8
8
8
8
16
8
8
8
10
8
6
6
8
8
12
12
12
12
6
8
6
6
6
8
12
6
8
6
12
6
4
6
6
8
8
8
12
12
4
4
4
8
8
4
8
16
4
6
1 2
12
12
6
12
8
1 2
1 2
12
8
8
12 6
66
6
12
12
6
4
12
4
4
12
8
8
8
8
8
12
6
88
810
10
1 2
4
1212
8
6
8
8
8
8
8
8
8
8
44
8
8
8
4
8
10
24
6
4
4
4 88
6
16
4
16
10
16
8
8 4
8
8
4
10
8
8
10 8
8
8
4
4
10
4
4
10 4
84
6
648
8
4
8
10
4
8
8
10
8
86
6
10
8
1 2
8
8
66
8
12
8
8
12
8
12
8
8
8
4
12
8
88
12
84
84
4
4
8
4
6
4
8
8
8
4
8
8
8
4
8
4
8
4
12
10
8
2 4
8
2 4
12
8
4
4
4
8
8
8
48
6
108
8
6
8
12
12
10
8
8
10
8
8
6
24
8
10
20
8
8
16
8
6
4
6
6
4
6
4
10
6
4
6
4
6
4
8
6
88
4
64
8
4
4
8
10
6
8
8
8
8
6
4
6
4
6
6
4
4
1 0
10
1 0
6
8
4
6
6
8
46
46
6
4
4
6
6
6
10
10
10
8
8
8
8
44
4 8
6
4
8
8
4
8
84
4
6
6
6
4
4
8
4
8
24
1 2
8
21
8
2 4
8
810
1 0
16
10
10
8
8
8
4
6
6
6
10
108
8
8
8
8
8
8
8
12
8
8
16
8
8
8
6
1 0
8
6
4
8
4
8
8
1 0
8
10
8
24
8
24
8
6
4
8
10
6
4
8
10
6
12
8
24
18
8
6
8
8
8
8
12
8
6
1 2
4 4
12
10
6
6
8108 88
16
6
6
12
8
10
68
8
12
4 8
8
8
8
8 8
8
8
8
8
8
6
88
4
8
8
8
6
4
8
88
6
4
88
1 2
86
88
8
8
6 12
8
8
88
6 6 6
86
88
4
8
8
6
1 2
4
8
6
8
12
8
8
8
8
8
88 6
1 26 8
1 2
8
8
88
8
108
8
8
8
6
6
6
8
8
8
6
6
8
4
6
64
8
6
6
6
6
8
8
8
8
8
6
6
6
6
6
8
8
6
6
6
8
8
8
6
6
6
6
66
8
6
6
6
8
8
8 86
6
8
8
8
16
21
8
10
10
10
8
8
4
4
4
6
8
8
8
4
8
4
12
12
8
8
12
8
12
8
4
16
8
16
8
12
12
6
1212
8
8
10
86
8
6
4
64
6
4
1 6
6
6
6
6
8
6
6
8
8
8
1 6
8 12
6
6
6
16
12
12
8
4
8
4
8
16
4
4
4
4
8
1 28
8
10
8
8
8
8
88
8
8
1016
6
10
8
6
10
8
12
12
8
12
8
4
8
8
88
66
12
4
8
86
6
12
12
12
8
8
4
6
6
88
8 6
8
6
8
8
12
12
8
8
8
6
8
6 4
10
6
46
8
6
12
6
4
6
8
6
8
4
12
12
16
6 4
4
4
8
8
8
8
6
8
4
8
6
16
6
4
6
8
1 2
12
88
8
6
8
12
8
1 012
10
6
1212
1 212
1 0
12
10
16
16
8
6
12
8
12
12
8
8
6
10
8
12
8
12
16
8
21
8
8
8
8
6
8
8
8
12
8
8
8
6
4
8
88
1 2
6
6
4
6
6
164
4
4
6
6
8
6
8
8
6
6
8
8
8
8
8
8
6
6
8
101 0
8
6
46
4
4
4
4
8
8
8
8
8
16
8
10
8
8
8
6
8
8
12
8
8
8
88
6
6
6
10
8
8
4
10
8
8
10
1 2
8
10
6
8
10
4
8
4
8
8
8
8
8
10
8
4
6
10
4
4
12
10
8
10
6
6
8
10
6
12
10
8
12
6
4
8
6
12
4
8
6
8
6
8
8
6
8
8
8
1 2
12
4
8
6
6
4
16
88
12
4
4
4
12
8
86
8
8
8
8
8
6
6
4
8
6
8
8
4
8
8
24
4
6
4
10
4
6
8
4
8 4
4
8
8
24
24
21
12
8
12
8
16
8
8
8
16
12
16
6
8
16
8
8
8
45
60
48
54
5 4
54
10
8
12
8
8
8
8
8
8
12
24
24
24
4
6
4
8
4
4
8
4
12
4
4
10
6
6
8
8
4
8
8
6
6
610
8
6
6
8
6 4
8
8
8
6
6
8
4
8
8
8
8
86
6
4
4
6
8
6
88
6
4
8
4
4
8
4
8
6
8
8
8
88
8
8
16
16
8
8
6
6
8
46
6
64
4
44
44
8
8
44
66
8
8
1610
8
8
1 0
6
8
8
8
10
16
8
88
12
16
16
10
8 8
88
8
EL
SO .
DR.
VIA
MAR
IPOS
AW
.
E.
VIA
VIA CAMPO
VER DE MOULTON
AVE.
CARMEL
CALLEARAGON
PKWY
CORTEZ
AVE.
A V E.
CASTI LLA
CAL.
SEVILL A
VIA
DR.
AVE.
GUINEA D
R .
DE
GRAYSTON
AV E.
DR .
PL.
RE SPIT
BLUERIDGERD.
BU NBUR Y
DR.
MUIRLANDS
CORTA
CR ESTA
DR.
BLACK
FOOT
DR.
COSTA
BELLA
LOUMONT
COLEFORDCAL.
EL TO RO
GR.
DUN
E MEAR
CAVANAUGH
EL TORO R
D.
RD .
ST .
LN.
PL.
A VE.
LA R
OSA
P ALM
EK
ARROWOO D ST .
BRUSSLES AVE.
BRASILIA
SPRIG
ST .
BO UGH
AVE.
W'DST
ONE
COPENHAGEN
SOF IA
PO
ADR IANA ST.
MUIR LAN DS
ST.
ST.
AVE.
ARTE
MA
WY.
S PARTAN
S .
DR.
16
LAKE FOREST D RIVE
R IDGE ROUTE
I - 5 F REEW AY
I - 5 FREEWAY
TRI - CITIES
PI PELINE
Mc COY RD .
ELROND LN.
OSP REY ST.
B .S.
PR-11
DR.
LN.
TRI-CITIES TIE-I N
PR17
PR 26
SRV6
WILLOW
T REE
CH 3
SRV-1
SRV
C H 1
PR-3PR -4
S.B.H OSP
PR-2
L.H . MALL
ALISO
CR E E K
PRADO
APTS
OAKBROOK
VILLAGE
BL
LOS
ALI S
OSETWD ADM IN.
& YARD
ALIC
I A T OW
NEPL
A ZA
ALIS
O
CREEK
PRI
VILLA VAL
EL TOR O
COMMMU NITY
PA RK
EL TORO RD.
R - 5
SMWDTI E - IN
FUTIRWDTIE - IN
FILTERPLANT
PROTHER O
PR 19
CLEARWELL
C HER RYBS
24
8
12PR-18
24
24
24
12
8
12
18
OC-76
8
1218
18
248
10
24
3 0 18
OC -77
24
2 4
24
2 4
24
20
8
24
8
888
8
8
24
LAWD TIE- IN
SMWD TIE-IN
24
8
8
EL TOROMOBILE HOME PAR K
LOS ALI SOSIN TE R - SCHOOL
LA TIERR ASCH OOL
D EL C ERROSCHOOL
ALICIA
SHOP CTR
SMI TH 'SMKT.
MNWD
TIE-IN
CA LLE CORTA
R3
R4
TOWERS
TO WERS
PR-9
BARBERA SCHOOL
SAN R EMO
MOU
LTON
PLA
ZA
PR -15PR-12
PR-16
PR -6
PR- 8
SRV-
4
S RV -16
CH5PR 5
ALISOSC HOOL
OLI VEWOODSC HOOL
LAWD
IN TER-T IE
TOROC ENTER
IRWD
TIE -IN
TWIN
PK S
BELLTOWER
P LAZA
P L
P ROTH
ERO
MOBI L
E HO
ME P
A RK
KI MBE RLYGARDE NS
GATESSCH OOLSWARTZ
PLAZA
S A DDLE B AC
K
V A LL E Y
P LAZ A
L W GOLF COUR SE
MOBILE
P ARK
CH6
BS
HOME
PLAZ
A
PT
WRPSRV-3
CH 4
K MART C TR.
L. H . PLAZA
C ANY ON WOOD
APTS
S ADDLE
B ACK RA NCH
MNWDTIE - I
N
BS
ETWD LAKE
36 OUTLET18 I NLET
12 DRAI N LI NE
AP T'S
PR-20
PR-21
S5
U-15R-15
D-15
U-14
R-14
D -14
S-8
S-8
S-9
S-9
S-12 S-6
U-13
R-13
D-13
U-10
R-10
D-10
D-11
R-11U-11
U-9
R-9
D -9
D -8
R-8U-8
U-7
R -7
D-7
U-6
R -6
D-6
R -5
D-5S-4
U-5
S-2
S-1
D-4
R -4
U-4
U-2
R-2
D-2
U-3R-3
D-3
S-3
U-1
D -1
R-1
U-17
R-17 D-17
D-16
R -16
U-16
U-19
R -19
D-19
D-18
R -18
U-18
S-5
U -12
R-12D-12
R-20
R-20
P R 14
A.M.P.
A.M.P .
ALISO CR EEK
OC-80
ALISO CREEK
SHEN ANDOAH B.S.
ALI S
O CR EE
K
CH-2
T
T
R-1
R 2
1 6"
10"
T
T
N
R-1
R 2
N
N
T
T
N
NN
12
12
T
T
LAKE FOREST
LAGUNA HILLS
MISSION VIEJO
T T
T
T
T
T
T
T
N
N
LAGUNA HILLS
LAGUNA WOODS
ALISO VIEJO
S-13
El Toro Water District
JN10-100381.PLT RYW 04/17/02 W8GZ
Automated Mapping Water Composite
T
N
FIRE HYDRANT W/ VALVE
VALVE
REDUCER
P.R. STATION
CHECK VALVE
SYMBOL LEGEND
GRAVITY570
SHENANDOAH894
CHERRY770-815
LOW 1484
LOW 2465
LOW 3409
SPARTAN620-710
REDUCED HIGH537
HIGH645-720
MID630
ULTRA HIGH800-920
REDUCED MID517
R-6620
PRESSURE ZONE LEGEND
SAMPLE POINT
SAMPLING POINTSDEDICATED WATER QUALITYEL TORO WATER DISTRICT
X
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SpecialTTHMQualityPhysical
BactiZonePressure
AddressPageAtlas
NUMBERI.D.
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Reduced Mid
Low 2
Gravity
Low 3
Gravity
Shenandoah
Cherry Boosted
R-6
Spartan
Gravity
Gravity
Gravity
Gravity
Low 1
Reduced High
Ultra High
High
Gravity
Gravity
Mid
22176 Sunlight Creek (Across St.)26382 Pebble Creek (on Sunlight Creek)26421 Sandy Creek (on Sunlight Creek)
MPR
Across f rom 5320-A Bahia Blanca East3450 Bahia Blanca West5339 Bahia Blanca East
Between 5120 & 5121 BrazoAvenida Del SolOn Miembro next to 5255 Avenida Del Sol
22906 Bassano WestAcross f rom 22901 Bassano East22942 Santa Vittoria
2304 Via Puerta2161 Via Puerta2264-B Via Puerta
Pheasant Creek Apartments (N.E. of Bldg. 28)Pheasant Creek Apartments (N.W. of Bldg. 12)Pheasant Creek Apartments (E. of Bldg. 12)
22935 Hazelwood (Across St.)Cherry St. (E. of Cedarspring)22962 Hazelwood
24636 Doria Ave.24741 Doria Ave. (Across St reet)24662 Doria Ave. (at. Gloriosa)
24021 Larkwood Lane24751 Belgreen Place
24771 Belgreen Place
24226 Mc Coy (Across Street )24282 Mc Coy (Across Street )24252 Mc Coy (Across Street )
24381 Ave. De La Carlota (E. of Bldg.)24351 Ave. De La Carlota (S. of Bldg. 'N')24381 Ave. De La Carlota (S.W. of Bldg.)
24742 Wayburn Dr. (at Jori Ct.)24692 Clarington (S/O Weyburn)24702 Clarington (at Weyburn)
570 C. Ave. Sevilla601 C. Ave. Sevilla596 C. Ave. Sevilla
24796 Via Iglesia23515 Via Iglesia23455 Via Iglesia
4016 Calle Sonora (W. of Bldg.)4023 Calle Sonora (S.W. of Bldg.)4018 Calle Sonora
On Calle Sonora (E. of B ldg. 4001)24300 El Toro Rd. (On Calle Sonora)24441 Calle Sonora
23015 Del Lago (S.E. of Bldg.)23016 Del Lago (S.E. of Bldg.)23015 Del Lago (S.E. of Bldg.)
On Mill Creek Dr., N. of Ridge Route Dr.23291 Mill Creek Dr. (N.W. of Fire Hyd.)23382 Mill Creek Dr.
Bahia Blanca W. & N.W. of Bldg. 3512Bahia Blanca W. & Ave. SosiegaBahia Blanca W. & Via Dicha
LT-507
LZ-485LZ-483LZ-484
LY-485LX-485LX-485
LT-487LT-488LT-487
LX-493LY-495LY-494
LI-516LI-515LI-515
LP-509LQ-508LQ-509
LU-504LT-505
LT-505
MC-505MD-504MD-505
LZ-500LZ-501LZ-500
LW-497LW-498LW-498
MB-499MB-498MB-499
MD-500MD-500MD-500
MF-497ME-496
ME-496
MD-493ME-493ME-493
MC-489ME-489MD-489
MC-489MB-489MB-489
LU-490LU-491LU-491
LW-489LV-488LV-489
MC-485MC-485MC-484
R-20
U-19D-19R-19
U-18D-18R-18
U-17D-17R-17
U-16D-16R-16
U-15D-15R-15
U-14D-14R-14
U-13D-13R-13
U-12D-12R-12
U-11D-11R-11
U-10D-10R-10
U-9D-9R-9
U-8D-8R-8
U-7D-7R-7
U-6D-6R-6
U-5D-5R-5
U-4D-4R-4
U-3D-3R-3
U-2D-2R-2
U-1D-1R-1
S-12: (AT OC-80) 23392 LA GLORIETA, MISSION VIEJO
S-9: (AT 0C-77) 26081 VIA PERA , MISSION VIEJO
S-8: (AT OC-76) 22692 CHERRY AVE., LAKE FOREST
S-6: (AT R-6) 23392 LA GLORIETA, MISSION VIEJO
S-5: (AT R-5) 20732 EL TORO ROAD, LAKE FOREST
S-4: (AT R-4) 24988 CAL. SONORA ESTE, LAGUNA HILLS
S-3: (AT R-3) 21561 BAHIA BLANCA W., LAGUNA HILLS
S-2: (AT R-2) 24141 MOULTON PARKWAY, LAGUNA HILLS
S-1: (AT R-1) 24141 MOULTON PARKWAY, LAGUNA HILLS
SOURCE SAMPLING LOCATIONS
EL TORO RD .
JER ONIMO RD.
JERONIMO RD.
ORANGE A VE.
SANTA M ARGAR
ITA P KWY.
EL TORO RD.
TRABUCO RD.
RID GE
DR.
ROUTE
88
8
8
6
8
8
6
8
8
8
8
15
8
8
8
8
88
8
8
8
8
8
8 8
8
15
15
8
8
8
24
8
10
8
8
8
8
8
8
8
8
88
8
8
8
8
6
8
6
8
8
8
8
8
8
6
6 FM
8
8
88
8
8
8
8
8
8
8
8
8
88
8
8
6
6
6
15
8
8
8
8
8
8
8
8
8
8
8
6
8
8
6
6
6
8
6
6
6
6 8
8
6
8
6
6 8
8
6
8
8
8
88
8
8
6
10
6
6
6
8
8
8
6
6
8
8
8
6
6
88
8
8
8
8
8
8
8
8
8
8
88
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
88
8
8
8 6
24
8
8
8
8
8
8
6
6
8
6
8
8
6
8
6
8
6
8
6
8
8
6
8
8 10
8
8
8
8
6
6
8
8
6
10
8
6
6
8
6 68
6
6
8
6
8
8
8
8
6 FM
8
6
8
8
8
8
6
8
8
8
10
8
8
88
8
8
8
8
8
8
8
8
8
8
6
8
8
8
8
8
6
6
8
6
8
66
8
8
8
12
21
8
8
15
8
8
8
8
8
8
8
8
88
8
8
8
8
8
8
86
6
8
8
8
8
8
8
8
8
8
8 8
8
8
8
8
8
8
8
88
8
88
8
8
8
8
8
8
8
8
8
8
6
8
8
8
8
8
8
12
8
8
6
8
8
15
8
6
18
18
21
8
8
8
8
8
8
8
8
6
12
8
8
PL.
DR.
MUIRLANDS
CRES TA
DR.
FOOT
DR.
COSTA
BELLA
LOUMONT
C OLEFO RDCAL.
EL TORO
GR.
D UNEMEARCAVANAUGH
EL TORO
RD .
RD .
ST.
L N.
PL .
A VE.
LA R
OSA
P ALM
EK
ARROWOOD ST.
BRUSSLES AVE.
BRASILIA
SPRIG
S T.
BOUGH
AV E.
W'D
S TONE
CO PENHAGEN SOFIA
PO
AD RIANA ST.
ST.
ST.
AVE.
ARTE
MA
WY.
S.
DR.
D R.
L N.
C REEK
PI NEWOODAPTS
BL
LOS
ALI S
OSETWD AD MI N.& YARD
A LIC IA TOWNEP LAZA
ALISO
CR EEK
EL TORO
8
8
8
EL TOR OMOBILE H OME PAR K
LOS ALI SOSINTER - SCHOOL
LA TI ERRASC HOOL
DEL C ERROS CHOOL
ALIC IA SH OP CTR
SHOP.C TR .
ALI SOSCH OOL
PLAZA
PROTHERO MOBILE
KI MBE RLYGARD ENS
GATESSCH OOL
C ANYONWOODA PTS
SA DDLE
BACK RANC H
ETWD RESERVOIR
A PT'S
A LISO CREEK
ALISO CREEK
A LI SO C
REEK
4
8
6
8
6
8
68
6
6
8
8
8
8
8
8
8
10
8
8
8
8
1512
8
8
8
FLOW SPLIT
15
15
15
8
8
6
MISSION VIEJO
GLENHUR ST
LAGUNA HILLS
LAKE FOREST
TURF
GRE ENBANK
FR ONT ST.
OR ANGE
CORNEL IUS
MU IRLA NDS
ARGUS DR.
A LICIA PKWY.
ALANWOOD ST.
JUL IE
RAI LROA D
AL SCOT
EL TORO
RD .
VIEJ O
I - 5 FREEWAY
MU IR LAN DS
AV E.
CHE RRYBROOKHA VEN
G REEN HILL
AVE .
BR OOK
HAZELWOOD
BRO OKMO NT
CE DARSPR ING
BROADLEAF
BRIARCROFT
ASHBRK
BUCKW'D
CORAL W'DWILLOW WD.
LA UREL WD SKY DR .
ST.
2NDMIN A CT.ESRO SE CT.
SPR INGWATE R
CHERRY AVE.
AVE.
OLIVE
APPIAN
ST.
REG INA
OLYMP US DR.DA PHNE
ACROPOLIS D R
.
P YLOS
PERICLES ST.
MINOS
AURO RA WY.
TRO Y ST.M INOA
AVE.
DARD
ANIA
ST.
SPA
RTAN
GLORI OSA DR.
D ORI A
DR.
ELOI
SARHEA D
R.MAXIMUS
SATU
RNA
DR
.
S T.
AUGUSTINLYSA NDA
SPARTAN S T.
AVE.
APH EN
A
CHARLIND A
ARGONAUT
PARTH ENON AVE.
ARCAD IAN
ST.
TWIG
STEM
F ORD
VIEW
ST.
AVE.
SABINA
DELPHI
ADONIS
ROM A
D R.C LASSI C AVE.
LIND
LEY S
T.
AVE.
TREE
LANDI
SVIEW
BELGREEN
ROCKFIELD
LARK
WOO
DD R.
ANKERTON
FIELD
PEN
CIR .
LAND
IS V IEW
AV E.
PALMEK
RD.
WHISLER
RAY MON D
C ARLOTA
ALISOS
DR.
CRE EKVIEW
CT.
CHRISTINA
KATIE
CAROL LN.
DR.
SUE
GEORGIA
SARA LN.
PAIG E
KIM
J ORI E
WEYB URN
C LARIN
G TON
ASHLAND
B ECKENHAM
CARM
EL
HEN DON
BALBOA
A CAC
I A
SUNS
ET P
L.
HO N
BRIDGMONT RD.
SIDECREEK
LA P
A Z RD.
SHEN
ANDO
AH
N. HAMPTON
BROO K
CRAN
WY.
DR.
RAINTR
EE
DR.
DR.
B ROK
EN
EASTR'G
LAREDO
BOW
SUND OWNERS
TER.
GLEN MEADOWS
GR AN
DE C
I R.
T ER.
ALAMO CIR .
HAMPTON
WHE ATON
HEATH ER BRK.
SHANE DR.
MAN DR.
BRK.
ASHTON CIR.
CRIPPLE C
K.
COACH
DR.
KARI
CK.
CRA NB
R.
SUN LIGHT
C URR ANT
LAR
CHM O
NT
CK.
VALL EYM'T DR.
NO RMANDALE
SUMME R CK.
WY.
CIR.
PEBBL E CRK .
SPRINGW'D
SANDY CK.
CRK
.
R IPPLINGS
ELOISE
FORE
ST
M
EAD OW
BRAN
DYW
INE
DR.
EL T
O RO R
D.
SUNLIGHT
SUMMERWO OD
VINTA
GE
LITTLE
PARKM'T CIR.
MA URICE CT.
LOR RI D R.
SALLY DR.
D ESTRY LN.
AUDUBON W
Y.
MANALASTAS
LN.
FA LLBROOK
PACIFICA
LA PAZL.S.
M. N.W.D. TIE-I N
6
108
1 2 FM
10
12
6
12 FM
B AR K
GRA
SS
A VE.
12
18
DR .
6
CHERRY
8
18
8
WY .
VINT
AGE
ALISO CKVILLAS
6
8
8
10
8
DE LTAL. S.
8
18
8
12 F M
FRE EWAYL.S.
CREE
KDR
.
MILL
SERANA
VIA
SERENA S.
VIA
VISTA
VI A
SON ORA
C ALL
E
SONO
RA
TAR ANTO
PALE RMOC OLONNA
BARB ERA
MARIA
SANTA
S OL
DEL
SANT
AV I
TTO
R IA
DUENAS
BRAZO
AVE
VISTA
ALTA
LAGO
DEL
PASEO
LAGO
DEL
PASE
O
CAR RIZO
VIA
ALTA
P UNTA
ALTA
P UNTA
HERMOSA
MONTE
SAN
SOS IE
G A
AVE
E L
DR.
SOSI
EGA
T RIT
ON
WY.
8
8
8
88
14 FM
8
1015
8
15
88
8
88
6 8
6
8
6 8
6
6
8
8
8
6
8
8
6
8
6
6
8
6
8
6
6
8
8
8
8
8
8
6
8
8
8
8
8
8
8
8
6
6
8
8
6
8
6
8
8
6
6
8
6
8
6
8
6
8
8
8
8
6
8
8
6
6
6
8
8
6
6
8
6
8
8
6
6
12
8
6
8
66
6
8
6 6
6
8
6
8
1 210
8
6
8
8
6
8
6
6
6
6
10
8
8
8
6
8
6
8
6 8
6
66
6
6
6
8
8
6
8
10
10
108
6
8
8
10
1 2 F
M
6
621
8
10
12
8
6
16 F
M
6
21
8
8
8
6
8
6
8
8
8
21
6
1212
10
8
8
8
8 8
8
8
21
10
10
10
8
24
12
6
6
8
8
12 FM
1 8
8
18
1 0
24
8
8
6
8
8
8
8
12
8
8
6
8
8
24
8 8
8
12
6 6
10
6
6
6
8
8
10
8
8
8
8
66
8
6
6
6
8
2 4
6
8
8
8
6
6
10
6
8
8
6
8 8
6
8
8
6
8
8
6
8
6 8
15
8
6
8
8
15
8
2 1
8
8
21
8
10
8
6
8
6
12
8
6
8
8
8
8
6
8
6
6
8
6
6
12 FM
8
8
8 8
6
8
8
6
8
6
8
6
8
8
8
8
8
8
6
8
6
8
8
6
6
6
8
8 8
8
8 FM
SO. D R.
VIA
MAR
IPO
SA
VI A CAMPO
VERDE
MOULTON
24
LAKE FORES T DRI VE
WILLOWTREE
P LAZA
CALLE CORTA
TO WERS
BARBER A SCH OOL
MOU
LTO
N PL
AZA
BAHIA
C H5
L W GOLF COUR SE
MOBILE
PAR K
C H6
HOME
POIN
TE
PLAZ
A
WRP
LAGUNA WOODS
LAGUNA HILLS
ROUTE
EL TORO
PKWY.
VER D
U GO
POINT
VISTA GRA NDE
PER
ALTA
LAG
ODE
L
ALCALDE
CAD ENA
LA
GR ANITE
MO
U LT O
N
8
8
8
8
6
6
6
6
8
86
66
66
6
8
8
6
6
6
8
6
6
8
6
AVE
8
6
6
6
8 6
6
68
6
6
6
6
8
8
6
6
6
6
6
C ALLE 6
8
6
6
66
10
8
6
8
88
6
8
8
8
6
6
8
8
6
8
15
158
10
15
1 5
8
12
12
12
8
1 2
8
66
6
6
8
6
812
12
8
8
10
1 2
12
1 0
SANTA
8
8
6
6
6
6
BLANCA
8
86 6
68
8
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
8
86
6
8
B AHI
A B
L ANC
A
8
66
8
66
6
8
10
15
IRVI NEL.S.
(ABAN D.)
IRVINE CENTER DRIVE
15
LAKE
C HUR CHHILLS
LAKE
PLAZAHI LLS
N OR THLINEL.S.
6
6
6
6
AMAD
EO
8
8
6
8 8 FM
6
8
68
8
8
10 G
OLF
COU
RSE
IRR.
6
6
8
8
8
6
8
6
8
8
8
6
818
8
8
8
88
8
8
8
8
8
8
8
8
8
8
10
8
8
6
8
8
8
8
6
6
6
8
8
8
8
8
8
8
8
10
6
8
8
8
6
8
8
8
8
18
8
8
8
8
10
6
8
6
6
6
10
8
8
8
8
8
8
8
8
8
10
10
12
12
8
8
1 0
6
8
10
8
8
8
8
8
8
8
8
88
8
88
12
8
8
6
6
86
10
8
6
6
8
6
6 6
8
8
8
8
8
8
18
8
21
12
10
10
12
10
8
1 0
8
8
14 FM
8
8
6
6
8
10
8
6
10
10
8
6
21
8
8
1 0
18
8
8
8
8
8
88
8
8
8
8
8
8
8
8
8
8
10
6
18
8
8
8
8
8
8
8
8
8
6
VI A
CAL LE
ARAGON
PKWY
CORTEZ
AVE.
CA S
TILL
A
C ALLE
SEVILLA
GUINEA
GRAYSTON
RIDGE ROUTE D
RIVE
I - 5 FREEWAY
ELROND
AWM
A 24"R EAC
H B- C
C H3
C H 1
S.B .HOSP
L.H . MALL
TORO C TR
BRIDGER
AVE DE L A CARLOTA
CALLE
PASE
O
I - 5 FREEWAY
CAVANAUGH
DURYEA
GOWDY
GONDOR
BUCKLAND LN.
PA SEO
MA GDELEN A
CALLE
LOUIS A
HEA
LTH
V ALE NCI A
SEVI LLA
AVE.
MAJORCA
ARAGON
VIA
ESTR
ADA
IGLESIA
CADIZ
AVE .
VALENCIA
DE
GR.R ON DA
MA RIPOSAVI A
MARIPOSA E .
PU ERTA
VI A
D R.CTR.
C OMM.
8
8
88
8
8
21
6
10
8
8
8
8
8
8
88 8
8
88
8
8
8
15
8
8
8
8
12 10
121 5
12
10
8
8
8
8
8
10 8
8
8
6
8
8
8
8
6
8
8
8
8
8
8
8
8
8
8
8
8
8
15
15 6
6
8
6
8
6
8
6
8
6
6 6
8
6
8
10
8 8
6
8
8
8
8
8
DE
AVE.AVE.
MAJORCA
AVE.
8
6
ALISOCREEKL.S.
4 FM
8
6
6
6
6
6
6
6 6
6
10
6
66
6
6 6 6
6
6
66
6
6
6
8
8
18 18
1 8
6
1 0
4920L.S.
REAC H D
18
8
8
8
8
8
8
8
10
8
8
8
8
8
8
8
10
8
8
8
6
6
6
6
8
8
6
8
8
8
8
8
8
8
8
6
6
8
8
8
8
10
6
6
6
8
8 F M
6
8
8
8
8
10
8
8
10
8
8
8
18
8
8
8
VIA
RESPIT
BLUERIDGERD .
BUNB URY
CO RTABLACK
OSPRE Y
ALISO
OAKB ROOKVILLAGE
VILLA VALENCI A
OLIVEWOODS CHOOL
L. F.CENTER
TWINPEAKS
SWAR TZPLAZA
PLAZA
K MART
L. H.
18
66
6
6
GEMW'DSILVER
BAY
HIGHPINE
BRIDGER
D UNEMEAR
MAJORCA
CABALLEROS
LOS
VIA ALHAMBRA
MEN
DOS A
ROND
A SE VIL LA
MATHIS
10
10
8
OSO L.S.
8
6
6
6
6
SA NREMO
2 1
8
8
CAM JALISCOVEEHL.S.
8
8
8
8
WESTLI NEL.S. RI DGE
14 EFF FM
HOLD POND
24
8
8
AWMA
18
12
REACH A DR.
6
8
AVEN
IDA
8
6
8
ROAD
18
AVE
18
8
CH 2
8
AVE DE LA CARLOTA
8 8
8FM
8
6
6 68
6
27 AWMA
MAR IA
BLVD .
TORO
R OAD
8
8
8
8
NORT HCREST DR.
8
8
8
12
8
8
8
8
8
8
1 0
10
10
10
6
ALISO PAR K DR .
8
TRA BUCO R D.
8
GLENAC RES
AS HWOOD
8
18
8
EL TOR O RD.
VILLAGE
8
8
8
8
STELLADESER T W
OOD
8
LOS ALISOS B
LVD .
C OMMMUNI TY PA RK
818
21
ORANGE AVE.
8
8
8
8
8
10
10
VIS TA
PLAZA 8
8
8
8
810
CHARLINDA
1 2
BRANCH
ALTHEA
8
8
10
8
P LAN T
8
8
8
8
8
BUDA PE S T
6
8
10
10
8
8
L. S.
8
88
68
8 6
MOU LTO N
PKW
Y
VIA1 4FM
10
10
18
8 6
181 2F
M15
15
14FM8
8
8
8
V IAIGLESIA
8
CTR
D R.
8
AVENIDA CARMEL
8
C ALLE D
E LA P
LATA
12
6
18
8
8
8 8
6
8
8
8
SEV
ILLA
6
8 68
8
8
PLAZA
18
8
HOME PARK
15
MUIRLANDS
BLVD.
TR EEP LAZA
VALLEYSADD LEBAC K
BELL TOWE R
PLAZA
C ENTER
BIRDRO CK
DUN E MEAR
EA GLEMO NT
18
DR.DURYEA
8
8
6
8
8
8
6
8 6
8
6
8
8
6
8
1 2
8
6
RED ROBIN
8
8
8
8
WHITEDOVE
ROCKFIELD
BLVD.
DEVENSHIRE
8 8 8
MC COY
RD.
8
8
8
PACKER
15
ORANGE
A VE.
21
21
MUIR LAND S
8
8
6
8
8
8
8
8
8
8
RAILRO AD
AVEN IDA DE LA CARLOTA6
8
88
21
BASSAN O W . BASSA NO E.
8CAM PACIFICO
8
SANTA VI TTORIA
12 FM
1212 FM
WAY
8
8
MILL S CREEK DR.
P KW
Y.
EL PAC IFICO
15
6
6
15
8
P UBLI CS TORAGE
CANT AN
TE15
12
8
8
AVE. DE SPA CIO
6
BARBER A
PESA
RO
8
6
8
8
6
12
M IEMBRO
12
6
8
8
10
10
8
10
AVE. SO SIEG A
6
6
8 6
6
BAHIA
BLANCA
6
8
8
10
6
8
8
8
8
8
DIC
HA
VIA
LUZ
DEL
SOL
VIA
PO R
T ORA
RAYO
SOL
DE L
AMADEO
SAN
10
888 8
8
10
8
8
810
10
8
VIA LA M
ESA
12
8
8
8
8
6
6
8
8
8
8
6
8
6
8
8
8
8
15
6
10
88
10
15
12
8
6
8
88
8
18
8
8
10
8
12
8
6
8
8
10
6
8
15
1 0
10
10
8
8
10 8
8
8
8
8
8
8
8
8
6
6
8
48
15
8
8
8 8
8
6
8
8
2410
BRK.
8
6
6
8
6
6
6
ALISO VIEJO
8
8
El Toro Water District
JN10-100381.PLT JM S8GZ 02/07/03
Automated Mapping Sewer Composite
VEEH P.S. (II)
100
200
300
400
500
600
W.W.R.P.
2-10 H.P. UNITSSUCT. ELEV. 221DISCH. ELEV. 237
VEEH P.S. (I)2-30 H.P. UNITSSUCT. ELEV. 230DISCH. ELEV. 288
DELTA ST. P.S.2-20 H.P. UNITSSUCT. ELEV. 402DISCH. ELEV. 492
LA PAZ P.S.2-10 H.P. UNITSSUCT. ELEV. 388DISCH. ELEV. 448
WESTLINE P.S.3-40 H.P. UNITSSUCT. ELEV. 271DISCH. ELEV. 370
NORTHLINE P.S.3-50 H.P. UNITSSUCT. ELEV. 272DISCH. ELEV. 307
FREEWAY P.S.3-30 H.P. UNITSSUCT. ELEV. 337DISCH. ELEV. 375
OSO P.S.2-75 H.P. UNITSSUCT. ELEV. 358DISCH. ELEV. 500
ALISO CREEK P.S.2-200 H.P. UNITSSUCT. ELEV. 283DISCH. ELEV. 380
4920 P.S.2-3.5 H.P. UNITSSUCT. ELEV. 274DISCH. ELEV. 301
MATHIS P.S.3-10 H.P. UNITSSUCT. ELEV. 304DISCH. ELEV. 336
FORCE MAINGRAVITY MAIN
OSO
WESTLINE
ALISO CREEK
VEEH
4920
MATHIS
NORTHLINE
DELTA
FREEWAY
LA PAZ
GRAVITY
MNWD
Drop Manhole
Lift Station
Clean-Out
Flow Split
Vault
Manhole Sewer Pipe
Forced Main (FM)
IRWD Pipe
Recycled Water Pipe
AWMA Sewer Pipe
GISGIS
CAPITAL PLAN OFFICE EQUIPMENT / FURNITURE CLASSIFICATION: (EQUIPMENT #15) LOCATION: MAIN OFFICE PROJECT BASIS: Operational Efficiency, Maintenance Efficiency DESCRIPTION: The proposed project continues the implementation phase of an
integrated Geographical Information System (GIS) and Computer Maintenance/Asset Management System. `The project contemplates the further development of certain applications.
As the District expands and improves its GIS, budget will be necessary to meet staff goals. Data updates, updated aerial photography, the yearly ESRI SUELA and the Spatial Wave ELA payments will all be necessary in the upcoming budget and well as additional workflow application development and additional hardware for the field personnel. Water Conservation Data from Eagle Aerial will be explored for relevance and usability as well as initial implementation stages of a full CMMS.
PROJECT BUDGET: $150,000 BASIS OF COST ESTIMATE: Staff Estimate