338
Arab Republic of Egypt Ministry of Electricity and Energy Egyptian Electricity Holding Company East Delta Electricity Production Company El-Ain Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes (Volume- Ill) August 2008 ECG File No. 1312 Prepared by: Engineering Consultants Group (ECG) Bldg. 2, Block 10, El-Safarat District Nasr City 11765, Cairo, Egypt. VOL. 3 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

  • Upload
    lycong

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Page 1: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Arab Republic of Egypt Ministry of Electricity and Energy Egyptian Electricity Holding Company East Delta Electricity Production Company

El-Ain Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT

Environmental and Social Impact Assessment

ANNEXES Consultation Activities & Other Annexes (Volume- Ill)

August 2008 ECG File No. 1312

Prepared by:

Engineering Consultants Group (ECG) Bldg. 2, Block 10, El-Safarat District Nasr City 11765, Cairo, Egypt.

VOL. 3

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Arab Republic of Egypt Ministry of Electricity and Energy

Egyptian Electricity Holding Company East Delta Electricity Production Company

EL-AIN AL-SOKHNA 2x650 MWe GASIOIL

THERMAL POWER PROJECT

Environmental and Social Impact Assessment

ANNEXES Consultation Activities &

Other Annexes (Volume- Ill)

August 2008

Prepared by:

Engineering Consultants Group (ECG) Bldg. 2, Block 10, El-Safarat District

Nasr City 11765, Cairo, Egypt. P.O.Box: 1167. Cairo 1151 1, Egypt.

Page 3: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

El-Ain Al-Sokhna 2x650 MWe GASlOlL THERMAL POWER PROJECT

Environmental and Social lmpact Assessment

CONTENTS

EXECUTIVE TECHNICAL SUMMARY

1. INTRODUCTION

1.1 Background 1.2 Environmental Impact Assessment of the Project

2. POLICY, LEGAL AND ADMINIS'TRATIVE FRAMEWORK

2.1 Permits Required to Construct and Operate the Power Plant 2.2 Relevant Environmental Policy, Legal and Administrative Issues 2.3 Requirement for an EIA 2.4 Scope of the ESlA 2.5 Regional Development Planning 2.6 International and National Environmental Standards1 Guidelines

3. ANALYSIS OF ALTERNATIVES

3.1 Current Situation ("No Action" Option) 3.2 Alternative Technologies and Fuels 3.3 Alternative Designs of the Power Plant 3.4 Alternative Sites

4. DESCRIPTION OF THE PROPOSED PROJECT AND THE EXIS'I'ING FACILITY

Project Infrastructure Design of the El-Ain Al-Sokhna Power Plant Process Description Operational Releases to the Environment Operational Management and Staffing Operational Environmental Health and Safety Construction Activities and Program Description of the Existing Power Plant

Page 4: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

5. DESCRIPTION OF THE ENVIRONMENT

General Setting of the Site Soils, Geology, Hydrogeology, Topography and Seismicity Climate and Meteorology Ambient Air Quality Aquatic Environment Aquatic Ecology Flora and Fauna Ambient Noise Land Use and Landscape Character Traffic and Transport Archaeological, Historic and Cultural Heritage Socio-Economic Environment

6. ENVIRONMENTAL IMPACT ASSESSMENT

6.1 Environmental Impact Process 6.2 Air Quality 6.3 Aquatic Environment 6.4 Noise and Vibration 6.5 Flora and Fauna 6.6 Land Use, Landscape and Visual Impact

Soils, Geology and Hydrogeology Traffic Socio-Economic Effects Archaeological, Historic and Cultural Heritage Natural Disaster Risk Major Accident Hazards Solid and Hazardous Waste Management Public Health Occupational Health and Safety Issues Associated Infrastructure

7. MITIGA'I'ION OF ENVIRONMENTAL IMPACTS

7.1 Introduction 7.2 Mitigation Measures During Design and Construction 7.3 Mitigation Measures During Operation 7.4 Compensation For Affected Parties

8. ENVIRONMENTAL MITIGATION AND MONITORING: ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP)

8.1 Objectives of the Plan 8.2 Environmental Management 8.3 Schedule and Costs for Preparation and Implementation of EHS Plans 8.4 Baseline Monitoring of the Pre-Construction Environment 8.5 Monitoring of Impacts During Power Plant Operation

Page 5: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

9. CONSULTATION AND DISCLOSURE

9.1 Introduction and General Approach 9.2 Consultation Methodology 9.3 Phase I Consultation 9.4 Phase II Consultation and Disclosure 9.5 Ongoing Facility For Public Consultation and Disclosure

REFERENCES

ANNEXES

Annex A: Record of Consultation Undertaken by ECG and EEHCIEDEPC Annex B: Scoping Meeting Annex C: Public & Stakeholder Involvement (Mini-Meetings) Annex D: Public Consultation and Disclosure Activities Annex E: Description of Atmospheric Dispersion Model Annex F: El-Ain Al-Sokhna Power Plant Air Quality Monitoring Program Annex G: Thermal Plume Modeling

Page 6: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 7: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Annex A

RECORDS OF CONSULTATIONS UNDERTAKEN BY ECG AND EDEPC / EEHC

-

ESlA for El-Aln Al-Sokhna Thermal Power Pro~ect No 1312 Annex-A - Page 1 of 5 HB -10 August 2008

Page 8: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

RECORDS OF CONSULTATIONS

The following Table provides a record of consultations undertaken during March - August 2008, in conjunct~on with project preparation and completion of environmental documentation for preparing the EIA study report and local permitting.

ESlA for El-Aln Al-Sokhna Thermal Power Project No 1312 HB -10 August 2008

Organization

Annex-A - Page 2 of 5

Name

Egyptian Electricity Holding Company (EEHC)

Chairman Executive Board Member, Planning, Studies and Engineering Sector Head, Steam Power Plant Projects Sector Head, Gas Power Plant Projects Sector Head, Environmental Management and Studies Sector Head, Design & Research Consultant, Power System Design Sector Head, Network Studies Sector Head, Power Plant Studies

- Dr. Mohamed M. Awad - Dr. Kamel Yassin

- Eng. Ahmed Salah - Eng. Mohamed Abdel Bary - Eng. Maher Aziz

- Dr. Eng. Fathi Tahoun - Dr. Eng. Ms. Nahed Haggi - Eng. Abdel Rahim Ahmed Helmi - Eng.MuradBadie

East Delta Electricity Production Company (EDEPC)

Chairman

Ex-Chairman Head of Oyoun Mousa Power Plant Head of Sectors for Studies & Research Head of Sector, Ettaqa Power Plant General Director for Technical Affairs General Director for Chemistry Director of Technical Affairs

- Eng. Tarek Youssef Ali

- Eng. Mahmoud Soliman Balbaa - Eng. Mahmoud El-Nakib

- Eng. Abdel-Karim Abdel Wahab Ali

- Eng. Sayyed Farag

- Eng. Said El-Sayyed Kotb

- Chemist. Adel Abdel-Moutagalli - Eng. Samouil Makar

Page 9: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

-

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 Annex-A - Page 3 o f 5 HB -10 August 2008

Organization Name

Canal Electricity Distribution Company (CEDC) Chairman

Deputy Chalrman for Networks Executive Assistant for Technical Affairs

- Eng. Mamdouh El-Nahhass

- Eng. Daoud Badr El-Sayyed - Eng. Essam Ed-Din Shafik

Egyptian Environmental Affairs Agency (EEA A) Environmental Management Sector

EEAA- Suez Regional Branch

- Dr. Fatma Abu-Shouk - Dr. Hisham El-Agamawi - Eng. Mahmoud Shawki - Eng. Amany Salah - Dr. Lila El-Khouli

Suez Governorate Governor of Suez Secretary General of Suez Gov. President of Local People's Counc~l of Suez General Director for Civil for Defence General Director for Occupational Health & Safety Director for Environmental Affairs Head of Environmental Commission of Suez Gov. Director of Environmental Health Dept. Information Center

Egyptian General Authority for Shore Chairman Head of General Department for Shore Protection Executive Director Executive Director Supporting Engineering

Egyptian General Petroleum Corporation Director for Operations Assistant Director for Refining & Industrialization Chief Assistant Engineer for Quality Control

- Gen. Mohamed Seif Ed-Din Galal - Mr. Alaa Baddour - Dr. Eng. Mohamed Saad

- Mr. Khaled Bahgat

- Eng. Nazih Bakhoum

- Eng. Hassan Abu Bakr

- Eng. Abu El-Wafa Bashir

- Dr. Ms. Amal Mohamed El-Raie

- Eng. Ms. Effat Baher Soliman

Protection - Eng. Yahya Halaby - Eng. Naguib Adly

- Ms. Waffa Mohamed Hindawi - Ms. Rahab Abdel-Aati Allaam

- Eng. Mahmoud M. Rizk - Eng. Ahmed M. lbrahim - Eng. El-Sayyed Abdel Halim

El-Tohamy

- Chem. Medhat Yousef - Chem. Ahmed Abdallah

- Chem. Mohamed Abdel Moneim

Page 10: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESIA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HB -10 August ZOOS

Organization

Annex-A - Page 4 of 5

Name

Egyptian Natural Gas Holding Company (EGAS)

Head of Division, Planning and Projects Head of Division, Operations

- Eng. lbrahim Ahmed

- Eng. Abdel-Hamid El- Mokaddem

City Gas Company Planning and Assessment Supply Stations Operations Affairs

- Eng. Gamal Amer - Eng. Alaa Abdel Latif - Eng. Mahmoud Sallam

General Organization for Physical Planning Sector Head for Suez Region

General Manager for Planning

- Eng. Ms. Somayyah Abdel-Salam

- Eng. Mohamed El- Husseiny

Suez Gulf Development Organization (SGDO) Chairman I - Eng. Essam Badawi

North Suez Gulf Reconstruction Organization (NSGRO) Chairman I - Mr. Essawi Ahmed

Hydraulics Research lnstitute (HRI) Chairman Hydrothermal Modeling Director, Hydrographic Survey

- Eng. lbrahim El-Desouky - Dr. Yasser Shawky - Eng. Ahmed El-Sayyed

Egypt National lnstitute of Transport (ENlT) Executive Director

Senior Transport Expert Technical Assistants

National Research Center (NRC) Air Pollution Preclusion Unit

Water Quality Unit

- Prof. Dr. Abdallah Wahdan

- Dr. Ms. Enas Bushra Nashed - Eng. Mohamed Hussein - Eng. Nasser Mohamed

- Prof. Dr.Kamal Tamer Hindy

- Eng. Adel Hassan Amer

- Prof. Dr. Osama Ahmed Ali - Prof. Dr. Mohamed lsmail Badawi - Dr. Mohamed Bakr M. lbrahim

Page 11: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

-- - ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 Annex-A - Page 5 of 5 HB -10 August 2008

Organization Name

Ain Shams University, Faculty of Engineering Noise and Vibration Engineering - Prof. Dr. Mansour M. El-Bardisi

Institute of Environmental Studies and

Ecological Studies Department

Suez Local Population Local People's Council of Suez Governorate Local Council of Ettaqa District

NGOs Representatives

Suez Citizens

Al-Watany Political Party

Fishermen

Research, Ain-Shams University

- Dr. Aly Nasser Hassan

- Dr. Mohamed Saad - Mr. Abu El-Wafa Bashir - Mr. Ahmed Mansour - Mr. Ahmed Abboud

- Mr. Gharib Abdel-Mobdiee - Mr. Gamal Abdellah - Mr. Mohamed Rashed - Mr. Ramadan Abu El-Hassan - Ms. lntessar El-Hegazi

- Eng. Ali Saber El-Khatib - Prof. Dr. Mohamed Mahmoud

Sayyed - Chemist. Ms. Nadia Attallah - Eng. Hassan Kamel - Journalist. Yasser El-Buaidi - Dr. Tarek El-Sayyed

- Eng. Ahmed Abu Nazel

- Abu El-Maati Hammoudah - Galal Desouki - Bahgat Ali Mohamed - Hassouna Zeid Ahmed - Bahloul El-Saadawi - El-Sweissi El-Bahari

Page 12: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 13: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Annex B

SCOPING SESSION

-- - ESlA for El-Aln Al-Sokhna Thermal Power Pro~ect No 1312 Annex-8 - Page 1 of 52 HB - 10 August 2008

Page 14: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

SCOPING SESSION

A scoping session was held in the Castellow Hall at the Social Club in Suez District, around 15 minutes driving from the end point of CairoISuez road to the Port Tawfic area, Suez Governorate. The main goal of conducting a scoping session is to assist the East Delta Electricity Production CompanyIEgyptian Electricity Holding Company in obtaining the views of concerned parties, local NGOs and affected groups, and keeping records of meetings and other activities, communications, and comments.

The scoping session is a TOR requisite. This is the first public consultation. A second public consultation will be conducted by the end of the stage of producing the Draft Final Report to present to the same stakeholders the results of the EIA report seeking their comments - if any - to include in the final report.

Records of meetings and other activities, communications and comments will be incorporated in the final report.

Appreciating the importance of the public consultation task, the Consultant moved fast and announced about the meeting in the media (see Appendix I) and held extensive meetings with all the interested and affected parties to explain the event and its importance. Some (173) of the stakeholders attended the session and actively participated in the Questions and Answers session following the project description presentation delivered by PGESCo's General Manager, Dr. Asem El-Gawhary (Project Engineer) and project scope presentation delivered by the ECG's Project Manager, Eng. Hassan El-Banna in cooperation with the EDEPC Power Plant Sector's Manager, Eng. Tarek Youssef Aly and the EEHC's Environmental Manager, Eng. Maher Aziz.

Accompanied by the Agenda of the meeting, a concised leaflet was delivered to the attendees on the registration desk. This leaflet and an Invitation Card were distributed also by ECG, EDEPC and EEHC to their members and many other concerned parties in Suez Governorate for inviting them to the meeting. Appendix II presents the invitation card and Appendix Ill provides with the Agenda and leaflet.

The Targets of the Scoping Session

The Consultant - was assigned to do the Environmental Assessment as an independent party, not biased to any preset ideas of the owner or the designer. The scoping session is a direct consultation of the public, collecting first hand information and reactions from those who might be affected by the construction of the project. Consequently, the session was organized to include the following activities:

- Presentation of the ESIA scope as per the TOR; - Breakdown of the activities to highlight the issues that the attendees might

comment on;

ESIA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Annex-B - Page 2 of 52

Page 15: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

- Explain the environmental issues and invite the participants to raise their concerns about possible negative impacts;

- Conduct the discussions and invite the owner, local authorities and agencies to participate in the discussions;

- Clearly identify the comments and recommendations of the attendees and write all the minutes of the meeting to be attached to the Interim Report.

Attendees

A wide selection of personnel from different orientations attended the scoping session as described hereinafter. A list of names and occupations is attached in Appendix IV.

- Egyptian Electricity Holding Company (EEHC); - West Delta Electricity Production Company (WDEPC); - Al-Sokhna Power Project; - Ettaqa Power Plant; - Oyoun Moussa Power Plant; - Suez Gulf BOOT Power Plant; - National Institute for Transport; - Many Interesting Companies (SEMADCo, Fertilizers Company, Arakas for

Tourism Company; - Petroleum Companies (Nasr Petroleum Company, Petroleum Pipeline

Company); - NGOs (Asdekaa Society, Art Society, Environmental Protection Society,

El-Kheir Society, Society, Red Sea Society); - Institute of Oceanography Sciences; - Ministry of State for Scientific Research; - Ettaqa Indigenous Population; - Representatives of Suez Community; - Consultant team; - Project Engineer (PGESCo) team; and - EEAA branch in Suez.

Meeting Procedure

Introduction

The scoping session started 11.00am in the Castellow Hall at the Social Club adequately equipped to accommodate the attendees, the representatives of the main authorities and the ECG staff in charge of the presentation.

ESIA for El-Aln Al-Sokhna Thermal Power Project No 1312 HB - I0 August 2008

-

Annex-B - Page 3 of 52

Page 16: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

EDEPC Chairman, Eug. Iblahmoud Soliman Balbaa inaugurated the session, welcoming all attendees and giving a short speech on the EEHC/EDEPC message and the significance of the Al-Sokhna power project.

Suez Governor, Mr. Mohmed Seif Ed-Din Galal gave a warm speech considering Al-Sokhna power project a landmark infrastructure urgently needed in the Suez area. ECG Project Manager, Eng. Hassan El-Banna opened the session, welcoming and thanking the attendees and briefing them about the role of the scoping session in the EIA study. He also emphasized the importance of their input of commenting, proposing and highlighting new ideas to enrich the study output.

Project Description

ECG Project Manager invited the General Director of the Project Engineering firm, PGESCo, Dr. Asem El-Gawhary to highlight the El-Ain Al-Sokhna Power Project. Dr. El-Gawhary started with warm welcome giving thanks for the attendees. He explained the purpose of the project and provided them with basic idea about main components of the proposed power plant at the Al- Sokhna site.

Project Scope

The Chairman of EDEPC, Eng. Mahmoud Balbaa invited the ECG's Project Manager, Eng. Hassan El-Banna to present the TOR of the EIA study emphasizing the components of the study as briefed herein after.

Proiect Obiectives

The study goals are to identify the environmental and social impacts of construction and operation of the project. A team of experts in various environmental disciplines will investigate the project area and study the possible impacts.

Study area

The study area will include all aspects that might be affected by construction and operation of the project including the entire infrastructure serving the Power Plant.

Environmental Scope

The study will address all positive and negative as well as direct and indirect impacts and will conduct field measurements of baseline conditions and the contributing effects and compare with the International norms and limits as indicated hereinafter:

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Annex-B - Page 4 of 52

Page 17: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Noise

Noise level will be measured in many locations within the possible affected areas. Using special software, anticipated values for the operational mode of the proposed project would be computed.

Air Pollution

Data will be collected to build a database followed by measuring the background air quality levels. The results will be analyzed and compared with the local and international limits. Additionally, a dispersion modeling exercise will be conducted for predicting maximum concentrations of pollutants and their locations during operation of the power project.

Water Quality

All available information on the available water sources will be collected in terms of quantities and quality. This database will be used for future water use.

Intake and Discharge Structures

A numerical and physical hydraulic modeling studies will be conducted for predicting thermal behaviour of cooling water after discharging to the Suez Gulf. In addition, the modeling studies will investigate best engineering design for intake and discharge structures.

Biological Life

Will study previous reports about all species living in the project area and will try to locate it on the area maps. Will also study the suitability of the environment to the seasonal species coming to the area. Study will cover terrestrial life and birds.

Solid and Hazardous Wastes

Will survey location of solid and hazardous wastes generation that might adversely affect the environment. Will propose the safe ways of its handling and locations of final disposal.

Traffic and Local Roads

Will study the road network, parking areas and pedestrian crossings in the Power Project area as well as the buses network servirlg the Power Plant. Will also study the capacity of these roads to accommodate the future projected expansions as well as the project peak traffic during construction phase.

For studying the impact of the project on the Socio-economic sectors, the Consultant will investigate the following:

- -- -- -

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 Annex-B - Page 5 of 52 HB -10 Augus12008

Page 18: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

- Disturbance in social structure and development plans; - Impact on social health; - The infrastructure; - Increase in job opportunities and increase in the labor force; - Study land uses and project landscape.

All environmental alternatives will be studied to select the optimum solutions. Mitigation measures will be proposed to reduce the impact of the new activities on the environment.

Plan for Mitinatinq Proiect Neaative Impacts

Studying negative and positive impacts will lead to establishing a comprehensive management plan which will identify the mitigation measures to be implemented as part of the envisaged construction contracts and continuous operational conditions.

Institutional Su~por t Requirements

The organization charts will be reviewed and modifications will be recommended. This will enable the electricity authorities to implement the environmental plan.

Develop the Environmental Monitorinn Plan

Prepare a detailed Monitoring Plan for both construction and operation phases, and continue measurements of air and water pollution during the operation phase.

The Final Public Consultation

After completing the EIA Draft Final Report, a public consultation session will be held in Suez area to present the findings of the study. Comments of the attending stakeholders will be incorporated in the Final Report.

Appendix V provides with "Presentation Slides"

Scoping Session Open Discussions

The items discussed covered most of the environmental impacts and demonstrated main concerns. 'The following are the main issues raised during the discussions.

Al-Sokhna Power Proiect

- A landscape area is proposed to be kept inside the Power Plant fence for improving the scenic impact.

ESlA for El-Aln Al-Sokhna Thermal Power Projecl No 13 12 HB -10 August ZOOS

Annex-B - Page 6 of 52

Page 19: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

- The Ettaqa District Council should review the current capacities of services as the number of workers will be increased during the construction of the new project.

Noise

- For model Predication, the condition of the worst case, not the average, should be adopted.

- If the noise level is above the international standards, recommendations such as monitoring the noise level, any other mitigation measures should be adopted.

- With respect to noise generated from ground traffic and equipment, the predication should be superimposed to all noise sources.

- The road network will be carefully studied. Recommendations for mitigating the direct and peak construction impacts will be prepared.

- The traffic count points shall be selected very efficiently.

Power Supplv

- Electric power is available with ample capacity to meet the project requirements;

- The Contractors assigned to build the Power Plant will provide emergency generating sets;

- The generator's fuel will be recommended to be environment friendly.

Solid Waste

- The Power Plan should adopt practices (separation, reuse, ... etc.) of solid and hazardous wastes as per the solid waste integrated management philosophy.

- Coordination between the Ettaqa District Council and the contractors for collection and disposal of solid wastes in anticipated sanitary landfill is recommended.

- The ESlA study should adopt mitigation measures for hazardous wastes generated from the construction and operation of the Power Project.

Water SUPP~V

- Practices of water disinfection and tank cleaning should be adopted in order to improve drinking water quality.

Wastewater Services

- Wastewater from the new Al-Sokhna Power Plant will be disposed of through the plant sewer and the Ettaqa sanitary network in the near future.

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 H B -10 August 2008

Annex-B - Page 7 of 5 2

Page 20: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

- The new Power Project should adopt Pre-treatment for industrial wastewaters produced from the Power Plant before discharging to the discharge facility.

Questions and Answers

The following is a paraphrasing of the questions with the questioner identified and the answer by a member of the presenters.

Mr. Ali Amin, President of Al-Wafd Committee and Member of Local People's Council of Suez Governorate.

Comment: Results from the Ettaqa air quality data has shown that background suspended particulate matters concentrations are higher than expected contribution of the proposed power plant emissions. Therefore, major air quality problems in the area are probably due to background concentrations rather than from the proposed power plant.

Question: What environmental limitations are there at El-Ain Al-Sokhna which could prevent building. 1300 MWe?

Answer: Any limitations to future power plant addition at El-Ain Al-Sokhna cannot be determined until the environmental assessment is completed.

Mr. Fawzv Ahmed Hosnev. Assistant Secretarv of El-Taaamoaa Party

Comment: Gaseous pollution presently in the area should be included in the air quality analysis.

Question: What criteria will be used for atmospheric considerations when selecting El-Ain Al-Sokhna as the site?

Answer: Previous predicting studies for similar units were used to evaluate potential pollutant levels. If additional information is needed about model used in these predictions, it can be provided.

Ms. lntessar El-Heaazy. Secretarv General of the Environment Protection (NGO)

Question: Will this project interfere with the existing environment?

Can cooling water used for the plant affect negatively the Suez Gulf?

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB - 10 August 2008

Annex-B - Page 8 of 52

Page 21: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Answer: The project will not have significant effect on the existing environment.

Utilization of sea water for power plant cooling is non-consumptive. Nevertheless, it is recognized that the power plant project will play an integral part in development of the east bank area and this effect will be addressed in the Environmental Assessment.

Ms. lnsaf Anwar, Member of El-Kheir Society (NGO)

Question: Did you study the effect of the power plant on shoreline and seabed in terms of erosion and sedimentation?

Answer: Complete modeling studies, numerically and physically, will be carried out by the Hydraulics Research lnstitute and their outcomes will be presented to you in the next public consultation meeting.

Dr. Tarek Sami of the Tebbin Institute for Metallurqical Studies (TIMS)

Question: The Al-Sokhna area is subject to flash flooding during specific times along the year. Did you take this into the design considerations and site selection studies?

Answer: Yes, there is a comprehensive study on geology, geomorphology and hydrogeology under implementation today, which will address all risks associated with the project, including flash floods.

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HB -10 A u g u s ~ 2008

Annex-B - Page 9 of 52

Page 22: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS CROUP

Appendix I

Newspaper Advertisement for Scoping Session

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Annex-B - Page 10 of 52

Page 23: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

-

ESlA for El-Aln Al-Sokhna Thermal Power Pro~ect No 1312 Annex-B - Page I I of 52 H E - I0 August 2008

Page 24: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS C R O U P

Appendix II

Invitation Card to Scoping Session

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HE - 10 August 2008

Annex-0 - Page 12 of 52

Page 25: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 I2 HB -10 August 2008

Annex-B - Page 13 of 52

Page 26: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Appendix Ill

Agenda and Leaflet

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 I2 Annex-B - Page 14 of 52 HB -10 August 2008

Page 27: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

-

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 I2 Annex-B - Page 15 of 52 HB -10 August 2008

Page 28: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 29: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HB - 10 August 2008

Annex-B - Page 16 of 52

Page 30: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS CROUP

JAJlsJJ+dl f - f

ESJA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Annex-B - Page 17 of 52

Page 31: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB -10 August ZOO8

Annex-B - Page 18 of 52

Page 32: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Annex-B - Page 19 of 52

Page 33: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Appendix IV

List of lnvitees and List of Attendees

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB - 10 August 2008

Annex-B - Page 20 of 52

Page 34: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

1. List of lnvitees

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB - 10 August 2008

Annex-B - Page 2 1 of 52

Page 35: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

List ofthe Invitees Attending the Preliminary Session

Held on Wednesday 2/7/08, 10 am at The Castello Hall Social Club Suez City

1. 2. 3. 4 5. 6. 7. 8. 9. 10.

17. 1 Dr.lMohamed Tawfik Abou Ghattas ( Head of Medical Syndicate in the Governorate 18. 1 Cap./lbrahim El Kellani 1 Sports Club

Gen/ ~ o h a m e d Seif El Din Galal DriMohamed Mosaad Ibrahim Eng.1 Ahmed Abou Nazel Mr./ Ahmed Soubeh Mr./Abd El Nasr Ahmed Dr./Assem El Ghouhry Dr./Fatma Abou El Shouk

14. 15. 16.

19. 1 Eng. massan Abou Bakr I Environmental coordinate for Companies- Attaka 20. I Dr./Fahim Ahmed Khalifa I Deputy University Dean - Suez

I I. DriMohamed Mahmoud Sayed Deputy Petroleum Eng. Faculty for environ. Head of Fire and Civil Defense

, 13. Mr./ Abou El Wafaa Beshir Head of Environment Committee - People's

Mr./Ramadan Abou El Hassan Gen./Eissawi Ahmed Eng./Assem Badawi

2 1. 1 Mr./Ahmed Mansour I Head of Local People's Assembly-Attaka 22. 1 Dr./Amal M. El Raay I Head of Medical Precaution section

Suez Chief of the Local Council Party General Secretary Shoura Council Member Peoples Assembly Member Pegisco Consultant Oftice Head of Central Dept. for Enviro. Assessment Head of Suez NGOs Head of Habilitation Organization -Suez Head of Suez Gulf Development

Mr./Gharib Abd el Moubdi Eng./Aly Saber El Khatteeb DrJMohamed Mossad

1

Head of Environ. Society- El Arabeen Head of Quarry Dept. in the Governorate Head of People's Council in Suez

-

ESIA for El-Ain Al-Sokhna Thermal Power Project No 1312 Annex-B - Page 22 of 52 HE - 10 August 2008

44. 45.

Mr./Alaa El Din Bedour Mrsllntassar Hegazy

Development General Secretary Deputy Environment Society

Page 36: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 Annex-B - Page 23 of 52 HB -10 August 2008

Page 37: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Local Council - Suez

Local Council - Suez

Local Council - Suez

Local Council - Suez

ESlA for El-Aln Al-Sokhna Thermal Power Project No 1312 HB -10 August 2008

139. 140. 141. 142. 143. 144. 145. 146. 147.

Annex-B - Page 24 of 52

1

Abou El Wafaa Khalil Ali El Sayed Ibrahim Abd Allah Talaat Fahim Hussein El Sayed Mohsen Ahmed

133. 134. 135. 136. 137. 138.

Zeinab El Behadi Samir Abdeen Ahmed El Asraa Sayada Ahmed Laila Moawad Sobhy Mashalli Ahmed Hussein Khalil Salem Gamal Samak

Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez

Page 38: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB - 10 August 2008

Annex-B - Page 2 5 of 5 2

Occupation Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez Local Council - Suez

Ser. 148. 149. 150. 15 1. 152. 153. 154. 155. 156. 157. 158.

Name Talaat Orabi Mostafa Aly Salah Hussein Ahmed Hussein Farag Moharned Shaat AbdAllah Halirna El Gendy Ahmed Abd El Latif Ragab Abd El Nabi Mansour Mohamed lsmail Ahmed

Page 39: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

2. List of Attendees

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB -10 August2008

- -

Annex-B - Page 26 of 52

Page 40: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Scoping Session Environmental Assessment

AI-Sokhna Power Project 2 x 650 MWe

Floor Attendees

1 3 I Mr./Mahrnoud Solirnan Balbaa

Ser.

1 .

2.

1 Head of Shark El Delta Company

1 1 1 Dr./ Laila El Khouly

Name

Gen/ Moharned Seif El Din Galal

DrIMoharned Saad Ibrahirn

1 Head of Environmental Organization -Suez

Occupation

Suez Governor

Suez Chief of the Local Council

I Pegisco Consultant Office 1 6 . 1 Eng.1 Maher Aziz Environmental Head of Electricity Holding Company

I 7 Eng./Hassan El Banna I Project Manager- ECG

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Project Engineer-ECG

Technical Review Committee-ECG

8 Eng.1 Iman Isrnail

10.

Annex-B - Page 27 of 52

9. Eng./Hassan Atta

Dr/Walid Hamdy Infrastructure Expert-ECG

Page 41: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Scoping Session Environmental Assessment

Al-Sokhna Power Project 2 x 650 MWe

Attendees List Date: 2nd of July 2008 Place: Castello Hall-Suez City

Serial 1. 2.

3.

Name Ahmed Abd Allah Radwan Mohamed

5.

Amal AbdEl Fatah

7.

Nasr Petroleum 1 012312883 1

Occupation Deputy Local Council Environmental Affairs Dept.

4 1 Mariam Said

Fawzia Abd Allah

8.

9.

Environmental Inspector

Nasr Petroleum Manager

6. Mohamed Naguib

Mohamed Hafez

CompanyIOthers Nasr Petroleum Suez Governorate

Environmental Affairs Dent.

Environmental Affairs Environmental Affairs Dept Araks for Tourism - Social Citizenship City Council Member City Council Member

Dept.-Media Manager Araks for Tourism

Mohamed Abd El Halim Ragab Hamed

Telephone 1 3334388 33 137 13

Suez Governorate

0122763607

0 12402658 1

0106586965 Lawyer

City Council

10. Ayoub Abd El Moneim

1 1. , Ahmed Khalifa

15. / Motassem Abou El 1 Geologist I Suez Quarry 1 0124601 472

33375 1 5

Suez Governorate

12.

16. 1 Mohamed Basem I Geologist I Suez Quarry 1 0105796744 17. 1 Ezz El Din ( Photographer ( Channel (4) / 0111690029

0127059366

General Manager

Engineer

/ Mohamed 18. ( Mounir Shehata 1 Deputy Suez I Suez Governorate 1 0105545087

I

Local Peoples' Assembly City Council

Fateh Ahmed

13. , Mohamed

Consultant

-- --- -

ESIA for El-Ain Al-Sokhna Thermal Power Project No 1312 Annex-B - Page 28 of 52 HB -10 August 2008

Scientific Consultant Engineering Faculty

19.

2 1 .

22. 23.

0 124386743 1

Member Eyoun Mousa Station

~o;erkorate Deputy Suez Magdi Ahmed

01271695521

Essam Hassan

Ezz El Arab Nagat Aly

Suez Governorate 1 P

0 124942634

Regional Union Board Member District Head Legal Consultant

ember Suez

Suez Suez University

0101845143

0106027750

Page 42: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

1 Serial I Name I Occupation I Company/Others I Telephone 1 24. Ezzat Mohamed I Suez Quarry ) Suez Governorate 1 0 1046 14988 1 1:::

27.

1 28. 1 Mohamed I Chief Engineer I Misr Electricity Co. 1 0168336801 1 I

1 I Mahmoud 1 29. Yehia Mohamed I Engineer I Suez Canal 1 0124849952

I Institute

I I I I Organization I I

Channel 4 0123783546 Suez Governorate 0 122869848 Environment 1 01223622026

Hassan Zaki I Television Broadcast Aly Saber Atta Saad El Din

Quarry Manager Professor

36. 1 Mohsen Hussein I Deputy City Council I City Council 10101933463 37. Talaat Fahim ( Technical Petroleum I City Council )0124003447

, City Council Member City Council Member Local People Assemhlv

30. 3 1 . 32.

33.

34.

35.

1 Hassan I Employee 1 Petroleum 40. / Reda Radwan I Technical Head Suez 1 Suez Petroleum 10101987420

Mohsen Mahmoud Mohamed Hussein Mahmoud Riad

Member of the Regional Federation Member of the Regional Federation Member of the Regional Federation

Abd El Halim Mohamed Mohamed Ahmed

Hamed Hefney

38.

1 39.

- ~ ~ ~ ~ - ~ -

City Council Suez University City Council

1 Distribution Co. 42. ) Mohamed I Engineer I Delta Electricity 10161031393

0105267117 01811465226 0123766489

Regional Federation

Regional Federation

Regional Federation

Hossam El Din Kamal Awad Abou El

4 1.

0 10 17 14 147

7

1 44. Aly Mansee / Journalist I Ahkbar El Yooum 1 0123376946 (

Office City Council Employee City Council

I Petroleum ppp

Hassan el Naggar ) Sector Head

43.

Electricity

City Council-Suez Canal City Council-Suez

Mahmoud Farag Soliman

45.

1 46.

ESIA for El-Ain Al-Sokhna Thermal Power Project No 13 12 Annex-0 - Page 29 of 52 HB - 10 August 2008

0123914072

0 101 684222

47. 48.

49.

50. 5 1.

Public Relation

Intessar El Hegazi

Distribution Co. Nasr Petroleum 10123226755

1 Shadia Ahmed Nadia Atta

Attia Mahmoud

Omar Attia Mansour Gad

Secretary General

Mohamed Tawfik , Medical Sydicate Head General Manager

ppppp

Manager

Secretary General

Secretary City Council Employee

0123730533

Newspaper Environment protection Society

0122958913

Educational Section Environment Section

0 122290993 0122654342

Engineering Syndicate Suez Society City Council

0109231760 0107680150

Page 43: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESIA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Annex-B - Page 30 of 52

Serial 52.

53. 54. 55.

56.

57. 58.

59. 60.

61.

62. 63. 64.

65.

66.

67. 68. 69.

70.

71.

72. 73.

74. Ahmed Mostafa City Council Member

Occupation Environment Expert

City Council Member City Council Member ----- General Manager

Environment Manager

City Council Member

Name Hassan Ahmed

Mahmoud Amin AbouElWafaa lbrahim El Said

Bosina Abd El Moneim Hussein Hassan Hayam Mohamed

1 Ahmed Mohamed Hanaa Kamal

lnsaf Anwar

Tarek Mohamed Gad Amro WafaaAbdEl Razek Mohamed El Kalawi

Essam Gharib

1 Mohamed Hussein I Mohamed Mostafa

Fahim Ahmed

Sobhy Said

Mohamed Mahmoud Seham Hassan Sayed Ahmed

CompanyIOthers Environment Society City Council City Council Anaka :Electrical Station Electrical Company

Nasr Petroleum

Telephone 0105229223

01 04220972 0122777196 0623360025

226 1653 1

0111313713 Environment Manager Eyoon Mossa

Deputy Manager Member in Engineering Society Member in El Kheir Society Delta Co. Translator Technical Manager

Member Society Development Head of Asshab Society Engineer Governor Office City Council Member

City Council Member

Counselor

Environment Manager Technical Manager

Station

Engineering Society

:El Kheir Society

Delta Co.

Suez Station

Society Development Social Affairs

Fertilizers Co. Governor Office City Council Member City Council Member City Council Member Misr Electricity Co. Ghanam Electricity

0 1232935 1 8

0128430112

0182113868 0128084418 0162800626

01033610909

0123882260

0104155268 0124045271 0127486932

0123762440

01 0 1 1301 96 3363706

Page 44: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

1 Serial I Name 1 Occupation I Company/Others ( Telephone 1 86. 1 Mohamed Fahmi I Head Sector I Suez Fertilizers 1 87. Mohamed Ahmed I Safety Manager 1 Shark El Delta ~0109331018

88.

Razak

89. 90. 9 1 .

94. 1 Youssef Saad 95. 1 Saad Ibrahim

lsmail shaaban

Maintenance Manager

Rashad Helal Amal Harb Mohamed Araf

Maintenance Manager Assistance Marine Engineer Manager

1 City Council Member

Gasco Suez

Business Man Coordinator General Manager

Gasco Suez

Electricity Co.

Eyoun Mossa

0121981599

Gasco Suez

3340202 3340400 3361 776

96. 97. 98. 99. 100. 101.

102. 103.

Aly Mohsen Sayed Mahmoud Iman Mohamed Essam Fathy

104. 105.

1 109. 1 Mansour Abou El 1 Dept. Manager 1 East Delta Co. 10107164829 1

Taha Abd El Aziz Magdi Abou El Hassan Osama Mahmoud Karam Allah

106. 107.

1 108.

Project Manager Marine analyst Public Relation Manager

Mohamed Kamal Haky Fayez Ahmed

' 112. 1 Youssif El Sayed I Operational Manager I Suez Co. 1 0127818786 113. 1 Mohamed Radwan ) Telecommunication I Suez Marine 0100524878

Electrical Engineer City Council Member

City Council Member pppp

Shabba Society

Hassan Fouad Mahmoud Abd El Fattah Mohamed Reda

1 10. 1 1 1.

Electrical Station Suez Red Sea Society Suez Governorate Suez Governorate

General Manager General Manager

0105616221 33 16678

Suez Governorate Suez Governorate

Suez Governorate Suez Governorate

Manager Industrial Safety Manager Chemist

Hassan Gharib El Saied Hassan Mohamed

114.

7 Suez Co. Nasr Petroleum

1 15. 116. 1 17.

I Council

0103446077 0124439953

Suez Co Attaka Electrical Station Suez Governorate

Studies Manager Manager

1 Ahmed Gamal

118. 1 19. 120. 121.

ESIA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HB - I0 August 2008

0121233260 Oll35542l5 1 01084791 8 1

Hany Mohamed Hesham Mohamed Fatma Mohamed

Annex-B - Page 3 1 of 52

Suez Governorate Suez Governorate

Manager City Council Member

Hossam Abd Allah Arabi El Taher Awatef Abd El Hay Alia Farid

0125253483

Authority 10100928822

Dept. Manager El Maarif Environment Specialist Media Manager Safety Manager Manager Member of Women

Eyoon Mossa

East Delta for

3302809 01091 1037 0104021049

Electricity Suez Governorate Electrical Station EOC Women Council

0 123772749 0 122285297 01006005400 0104363020

Page 45: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Serial I Name Occupation 122. ( Samah Aly General Org for eldest

I education 123. 1 Wung Kah Sing 1 Manager EOC 124. 1 Mohamed Youssef 1 Expert

[ 125. 1 Mohamed Samir I Architect 126 Taher Salah I Operation Manager 127. Mohamed Hassan ( Human Resources

mana er

Chemist Al El Seidi Go alarathenan Pro'ect Man er

132. Taha Abd El Aziz Mana er -

133. 1 Mahmoud Soliman ( Chairman East Delta 134. ( Assem El Gohary I Egisco Co.

( 135. Mohktar Abd El I Production Manager

1 136. 1 ~ o u d a A ~ ~ E L 1 Manager Maksoud

' 137. Magdi Mostafa General Manager 138. Adel Hamdi General Manager 139. Amani Mohamed Engineer 140. Hatem Abd El Public relation

Moniem 14 1. Ramadan Abou El Regional Society

Hassan Head Tarek Youssef ( Deputy Chairman k k Mohamed Taha 1 Board Member

1 144. Gamal Mohamed Deputy Chairman ) 145. Ragaa Monir Head of Central

I laboratories 146. 1 Maher Aziz I Head of Studies

I Sector 147. 1 Nahed Shalabi 1 General Manager

Central laboratories

Publication

Follow up manager

15 1 . Dalia Noureldin Environmental Specialist

152. Assem Morsi Public relation 1 153. Mohsen Mohamed Technical Affairs

( Responsible 154. 1 Abd El Rahman I Tagammo Secretary

1 I Ibrahim I -

EOC 10122393872

I

Asdekaa Society 10101935470 Suez Gulf Station 0122393871 Suez Gulf Station 01 633 15566

Misr lran

Ismailia ( 01232701 15 10122100522

East Delta 0 122440563

East Delta

East Delta 0122428215 East Delta 0127687055 East Delta

Suez 0123373714

East Delta 10623360620 1 East Delta 10123485151 1 East Delta 1 0122424373 1 Egyptian Co. Electricity Transfer Egyptian Holding Co. for Electricitv Egyptian Co. Electricity Transfer

Eyoun Mossa for 0125654027 Electrici Pgesco 26 185498 .

ESlA for El-Aln Al-Sokhna Thermal Power Project N o 13 12 H B - I0 August 2008

Annex-B - Page 32 of 52

Page 46: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HB - 10 August 2008

Serial 155.

156.

157. 158. 159.

160. 16 1.

162.

163.

Annex-B - Page 33 of 52

Name Fawzi Mohamed

Reda Aly

HusseinMohamed Ahmed Mohamed Abd El Moneim Gharib Osama Aly El Din Tarek Khalil

Mohamed Soliman Said Gad El Moula Mohamed

Occupation Tagammo Secretary General Technical Affairs Manager Chemist Technician Technician

Department Manager Department Manager

Information System Manager General Manager

CompanyIOthers

Attaka Station

Attaka Station Attaka Station Art Society

City Council Electricity Holding Co. Eyoun Mossa for Electricity Attaka Station

Telephone 0107181185

0623363862

0623363862 0623363862 0123707765

0106056440 0 10554605 1

0122843932

0188920049

Page 47: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Appendix V

Presentation Slides 1. Project Description Slides 2. EIA Scoping Slides

-- - ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 Annex-B - Page 34 of 52 H B - 1 0 August 2008

Page 48: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

1. Project Description Slides

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HE -10 August 2008

Annex-B - Page 35 o f 52

Page 49: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

2. EIA Scoping Slides

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 I2 HB -10 August 2008

Annex-B - Page 36 of 52

Page 50: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Appendix VI

SELECTED PHOTOS

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 I2 H B -10 Augusl2008

Annex-B - Page 37 of 52

Page 51: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 I2 HB -10 August 2008

Annex-B - Page 38 of 52

Page 52: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

- -

ESlA for El-Aln Al-Sokhna Thermal Power Project No 1312 HB -10 August 2008

Annex-B - Page 39 of 52

Page 53: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS CROUP

ESIA for El-Ain Al-Sokhna Thermal Power P~oject No 1312 HB -10 August 2008

Annex-B - Page 40 of 52

Page 54: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 55: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESIA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

--

Annex-B - Page 41 of 52

Page 56: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 57: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESLA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Annex-B - Page 42 of 52

Page 58: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 59: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB -10 August 2008

Annex-B - Page 43 of 52

Page 60: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 61: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HB - 10 August 2008

Annex-B - Page 4 4 of 52

Page 62: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 63: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESIA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB -10 August 2008

Annex-B - Page 45 of 52

Page 64: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 65: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESIA for El-Ain Al-Sokhna Thermal Power Project No 13 I? HB -10 August 2008

Annex-B - Page 46 of 52

Page 66: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 67: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB - 10 August 2008

Annex-B - Page 47 of 52

Page 68: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 69: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 Au y t 2008

Annex-B - Page 48 of 52

Page 70: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 71: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROLTP

--

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 Annex-B -Page 49 of 52 HB -10 August 2008

Page 72: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 73: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Eh'GlNEERlNG CONSULTANTS GROUP

ESIA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Annex-B - Page 50 of 52

Page 74: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 75: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Projecr No 1312 HB - 10 August 2008

- - --

Annex-B - Page 5 1 of 52

Page 76: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 77: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESIA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB - I0 August 2008

Annex-B - Page 52 of 52

Page 78: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 79: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Annex C

PUBLIC & STAKEHOLDER INVOLVEMENT

ESlA for El-Aln Al-Sokhna Thermal Power Project No 1312 HB -10 Augusl2008

Annex-C - Page I of 8

Page 80: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

PUBLIC & STAKEHOLDERE INVOLVEMENT

Consultation with Affected Stakeholders

Given it's broad scope, an EIA study potentially involves a large number of stakeholders. The concerns and viewpoints of all parties interested in and affected by the project should be taken into account in reaching a decision on the project. Informed views of diverse segment of the affected population are critically important to the EA process because different groups use, and are familiar with, different parts of the environment and will be affected to different degrees by the project.

Public and stakeholder involvement is particularly important to developing an understanding of the nature and extent of potential socio-cultural impacts, and to assessing the suitability and acceptability of various measures that might be employed to prevent or mitigate impacts, or to compensate affected groups for unavoidable residual effects.

Classification of Stakeholders

Each stakeholder group will have a different interest in being involved in the EA process:

The developer or proponent needs to know where to site a project and how to minimize adverse environmental impacts; and what issues are likely to be of concern to regulators and the affected community.

An investor needs to know how the impacts will affect the viability of the project and what liabilities are incurred.

Regulatory authorities need to know the extent of impacts and whether they are acceptable; and they will use EA study results to decide on their response to specific permit applications.

Government policy makers will want to know the implications of the project for other projects/plans/programs they may wish to promote.

Regional planners need to know how the project might affect or interfere with adjacent developments and land uses.

The local community and its representatives will need to know how the project's impacts will affect their quality of life.

ESIA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB -10 August 2008

Annex-C - Page 2 of 8

Page 81: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Public interest groups (i.e., Non-government organizations or NGO's) may be interested in whether the project is consistent with sound environmental management practices.

Politicians need to know who is affected and in what way, and what issues should be of concern.

Purpose of Stakeholders Consultation

The purpose of taking these viewpoints into account is to improve project viability. The World Bank (1991) has found that where such views are seriously considered and incorporated in the EA process, projects are likely to be more successful. The Bank provides some useful guidance regarding the extent and level of stakeholder involvement in the EA process in its Sourcebooks (World Bank, 1991- Chapter 7).

The purpose of the consultation effort should be:

to inform interested groups and individuals about the proposed development, its potential impacts, and measures which will lessen impacts and protect the environment;

to provide opportunities for timely feedback, (i.e. for the public to voice concerns, comment on proposals and evaluate alternatives);

to identify problems, needs and values;

to minimize misunderstandings about the scope and impacts of the project and increase public confidence in the proposed development;

to ensure decisions have adequately considered the concerns and values of the stakeholders - particularly the affected community(ies);

to seek approaches to problem solving and hopefully resolve conflicts; and

to contribute to an increased awareness and understanding of project plans and activities.

ESlA for El-Aln Al-Sokhna Thermal Power Project No 1312 HB -10 August 2008

Annex-C - Page 3 of 8

Page 82: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

PUBLIC & STAKEHOLDERS INVOLVEMENT

To : File From : Assistant Project Manager Place Ettaqa Fishing Port in Suez Date - Tuesday, 27th ~ u n e 2008

Present for the Egyptian Electricity Holding Company (EEHC) Eng. Maher Aziz Bedrous

Present for ECG Eng. Hassan Atta

Present for Fishermen 1. Abu-El-Maati Hammoudah 2. Galal Desouki 3. Bahgat Ali Mohamed 4. Hassouna Zeid Ahmed 5. Bahloul El-Saadawi 6. El-Seweissi El-Bahari

Subiect Minutes of meeting with group of fishermen.

The principal points discussed in this meeting consisted the following:

1. Where are they fishing? 2. What are the areas of good fishing activity? 3. What about fishing at Al-Sokhna Port area?

Suez Gulf at Al-Sokhna port and the power plant site is not an area for good fishing activity.

No commercial or artisanal fishing is found in this area.

They fish in the northern part of the Suez Gulf and the deep water areas.

Fishing has long historic traditions in Suez area. It represents one of the most important features of the life customs of Suez people, irrespective of its economic value.

ESIA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB - 10 August 2008

Annex-C - Page 4 of 8

Page 83: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

General Authority for Fishery Development is the main body responsible of fishing activities in Egypt. Red Sea Zone for Fish Wealth - a zonal division of the General Authority - is responsible of fishery works in Red Sea, Suez Gulf and South Sinai areas, which include water surfaces extend along about 1,460 km shoreline distances.

Fishing Units licensed by the "Suez Office for Fishery" to do fishing in the Suez Gulf totals 612. Fishing Units licensed by the same Office to do fishing out of the Suez Gulf totals 157 in Suez zone and 172 in the lakes area.

There are about 34 fishing farms in Suez Governorate at Shamandourah and Kabrieet on the lakes. There are, also, 2 fishing societies and one society for fish farming.

Moreover, there is a special port for fishing activities on Suez Gulf near Suez, called At-Ataka Fishing Port, which includes necessary facilities for providing fishing boats with supply materials and fishing tools. It serves, also, as a fish unloading and exporting facility, where fish is transported to many fish markets in the neighboring areas.

Fish yield in 2007 reached about 4,231.4 tons within Suez Gulf areas and about 1,127.8 tons at Al-Ataka port and Shamandourah.

Almost no fishing activities exist in the Suez Gulf waters fronting the Al-Sokhna port shoreline and the BOOT Suez Gulf power plant as well as the El-Ain Al-Sokhna power project site. Industrial and transport activities, including loading and unloading goods, make fishing a not common activity in such an area.

The number of fishermen on the Suez Gulf utilizing the area in question is estimated to about very few or engaged in fishing part time. Traditional practice has shown that the impacts of the warm water from a power plant are highly localized. At the point of discharge the water temperature is about 8 degrees above ambient. 20-50 meters from the discharge point the temperature is 5 degrees above ambient and at 100 meters 3 degrees higher. 300 meters downstream there is no longer any difference in temperature. The fishermen generally utilize a 5km stretch, roughly 2.5km in each direction from the point of discharge.

Most of the fisheries activities in Suez Governorate are concentrated at the northern part of the Suez Gulf and the deep Gulf waters. The effects on the fisheries of warmer water returned to the water body from similar power plants along the coastal zones of Egypt are well known. Experience from about eight other power plants - located on coastal areas of the Mediterranean seas

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HB - I0 August 2008

Annex-C - Page 5 of 8

Page 84: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

and Suez Gulf - that have operated for a number of years indicate that the overall impacts on fisheries of slightly warmer water actually are positive, and consultations with the fishermen indicate that the catches in these areas have increased rather than decreased. Since this is part-time, small-scale fisheries no statistics are available, but after many years the warmer water around the various points of discharge, is clearly perceived by the fishermen to have positive effects.

ESIA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Annex-C - Page 6 of 8

Page 85: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

PUBLIC & STAKEHOLDERS INVOLVEMENT

To :File From : Project Manager Place Egyptian Environmental Affairs Agency, Suez Regional Branch Office Date Wednesday, ~ u n e 2008 Attended by Present for the Egyptian Electricity Holding Company (EEHC)

Eng. Maher Aziz Bedrous

Present for Suez Regional Branch Office, EEAA Dr. Lila El-Kholi Mr. Hussam ed-Din Abdel-Alim Mr. Tamer Moustafa Ms. Halah es-Sayyed

Present for ECG Eng. Hassan El-Banna

Subiect Minutes of meeting with group of Environmentalists at the project area

The principal points discussed in this meeting consisted of the following:

1. NOx emissions of the power plant, under all operational regimes, should be kept within the standards.

2. Combined effect of the Al-Sokhna power project and the Suez Gulf BOOT power plant, in addition to all other industrial facilities in the area must not exceed the upper background air quality limit for the Al-Sokhna area.

3. Type of pollutants emitted to the atmosphere by the power plant shouldn't exceed, when superimposed to existing pollution loads, stipulated regulations.

ESlA for El-Aln Al-Sokhna Thermal Power Project No 1312 HB -10 August 2008

-

Annex-C - Page 7 of 8

Page 86: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

PUBLIC & STAKEHOLDERS INVOLVEMENT

To : File From : Project Manager Place Local People's Council Premises in Suez Date Saturday, 21" June 2008 Attended bv Present for the Egyptian Electricity Holding Company (EEHC)

Eng. Maher Aziz

Present for Local People's Council Dr. Mohamed Saad

(President) Mr. Gaber Hamzawi

(Secretary for industrial affairs) Ms. Omaima Moustafa

(Member)

Present for ECG Eng. Hassan El-Banna Eng. Hassan Atta Ms. lman lsmail

Subiect Minutes of meeting with Local People's Council representatives.

The principal points discussed in this meeting consisted of the following:

1. El-Ain Al-Sokhna Power Project is a big regional, as well as national, project and real benefit shall be earned to the local society as well as the whole nation.

2. Benefit from the project to the Local Community mainly includes new job opportunities for graduate youth. El-Ain Al-Sokhna society is an urban-labour featured. The problem is that the second generation seeks job opportunities and the power project will provide only some of them.

3. Necessary data on socio-economic setting in the project area, including NGOs information and data sheet, will be provided to EIA preparers within one week.

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 Annex-C - Page 8 of 8 HB -10 August 2008

Page 87: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Annex D

PUBLIC CONSULTATION AND DISCLOSURE ACTlVlTl ES

ESlA for El-Aln Al-Sokhna Thermal Power Project No 1312 H E -10 August 2008

Annex-D - Page I of I

Page 88: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 89: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Ministry of Electricity and Energy Egyptian Electricity Holding Company East Delta Electricity Production Company

El-Ain Al-Sokhna 2x650 MWe GASIOIL THERMAL POWER PROJECT

Environmental and Social Impact Assessment

Public Consultation Meeting Report (PCMR)

FINAL REPORT Annex- D

August 2008 ECC File No. 1312

Prepared by:

Engineering Consultants Croup (ECC) Bldg. 2, Block 10, El-Safarat District Nasr City 11765, Cairo, Egypt. P.O.Box: 1167. Cairo 1151 1, Egypt.

Page 90: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP &ZdwdwdW

Public Consultation and Disclosure and

Public Consultation Meeting Report

CONTENTS

Suez Public Consultation Meeting 6th ~ u g u s t 2008: Proceedings

Appendix A : Advert

Appendix B : Invitation Card

Appendix C : Leaflet 1 Agenda

Appendix D : List of Invitees and List of Attendees

Appendix E : Non-Technical Summary

Appendix F : Presentation Slides: 1. Project Description Slides 2. ESIA - Study Slides

Appendix G : Selected Photos

ESIA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Annex-D - Page 2 of 16

Page 91: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Suez Public Consultation Meeting 6th August 2008: Proceedings

ESlA for El-Aln Al-Sokhna Thermal Power Project No 1312 HB -10 August 2008

Annex-D - Page 3 of 16

Page 92: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

INTRODUCTION

PUBLIC CONSULTATION

As part of the WB's and AfDB's public consultation and disclosure requirements, EEHC & EDEPC (or their consultants) must consult and involve primary and secondary stakeholders in the planning, development, construction and operation of the proposed power plant. This includes a requirement to hold a public consultation meeting to inform all interested parties of the proposals and provide an opportunity for representations to be made.

The public consultation meeting for the proposed El-Ain Al-Sokhna Power Plant was held in Suez on 6'h August 2008. This report details the proceedings of the meeting, including the presentations that were made and a record of the Question and Answer session Consultation and disclosure to date has included private meetings, individual and group interviews with stakeholders, advertisement of the proposed plant in a local newspaper and disclosure of the Draft Final ESlA report.

PUBLIC DISCLOSURE

According to the WB's and AfDB's Environmental Impact Assessment Regulations, an ESlA report prepared for the project must be a public document such that the report can be examined by all interested parties. Copies of the report and the non-technical summary, the latter in the native language, i.e. in Arabic, were made available for public inspection in the EEHC offices and its affiliate company, EDEPC in Suez. A notice, indicating disclosure of the ESlA report for public review was published in the Al-Ahram Newspaper in Arabic on Thursday 31'' July 2008 including notice of the public meeting was given (see Appendix A).

PUBLIC CONSULTATION MEETING

INTRODUCTION

The public consultation meeting was held in the Castellow Hall of the Social Club of Suez City.

Invitations in Arabic, along with an Arabic non-technical summary were sent or hand delivered to all primary and secondary stakeholders. The list of guests was gathered in several ways: namely, those who read the newspaper

ESIA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Annex-D - Page 4 of 16

Page 93: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

announcement and contacted the offices in Cairo and Suez, EDEPC guests, and a list of primary and secondary stakeholders prepared during the scoping phase and ESIA. The list of invitees and attendees is given in Appendix D. Dr. Ms. Lila El-Kholi, Head of Suez Regional Branch of the EEAA, on behalf of Dr. Ms. Mawaheb Abu El-Azm, Chief Executive Officer of the EEAA attended the meeting with a delegation from the EIA Central Department of the EEAA.

-The Suez Social Club premises, located at Suez City, before the city Stadium, is well known to the residents of the Governorate of Suez and was easily accessible to all those wishing to attend the meeting.

The meeting commenced with the arrival of Dr. Ms. Lila El-Kholi and the Representative of Dr. Mohamed Saad, President of the Local People's Council of Suez, Mr. Abu El-Wafa Bashir, Head of Environmental Committee of the Local People's Council. The representative of the Governor of Suez, Mr. Alaa Baddour, Secretary General of Suez Governorate gave his apology at the last moment. The meeting was chaired by EDEPC.

The succession of presentations that took place were as follows:

Opening Address (Eng. Tarek Youssef Ali - Chairman, EDEPC).

The EEAA Representative's speech (Dr. Ms. Lila El-Kholi). The Local People's Council Representative's speech (Mr. Abu El-Wafa Bashir). Technical description of the project by PGESCo (Dr. Asem El Gawhary - PGESCo's General Manager). Findings of the ESlA by Engineering Consultants Group (ECG) (Eng. Hassn El-Banna, Manager of El-Ain Al-Sokhna ESlA study project).

Question & Answer session (Conducted by Eng. Maher Aziz Bedrous - Counsellor for Environmental Studies, Egyptian Electricity Holding Company).

Coffee Break.

Each participant was given a leaflet on arrival which outlined the agenda of the meeting, along with some background on EDEPC Company and EEHC's commitment to environmental protection (see Appendix C). Additional copies of the non-technical summary were available as well as the ESlA Draft Report.

The presentations lasted approximately 80 minutes and the Question & Answer session for approximately one hour and was followed by soft drinks and cake. A brief outline of the presentations given by representatives of PGESCo and ECG is given below. 'The slides used in each presentation have been provided in Appendix F. The speeches given by EEAA representative, the Local People's Council Representative and Eng. Tarek Youssef Ali, Chairman of the EDEPC are transcribed below. A record of the proceedings of the Question & Answer session follows.

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB - 10 August 2008

Annex-D - Page 5 of 16

Page 94: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

PRESENTATIONS

Eng. Tarek Youssef Ali (Conducted in Arabic)

Eng. Ali welcomed the audience to the meeting and conveyed greetings of Dr. Mohamed Awad, Chairman of the EEHC, who had an urgent meetiqg, which prevented him from attendance. He explained the role of the EDEPC Company, some key technical and managerial figures, key principles of EDEPC when running electricity generating projects and gave an indication of EDEPC's operation philosophy. He also explained the status of the El-Ain Al- Sokhna super-critical steam power project.

Eng. Ali, then gave the speech of Dr. Mohamed Awad, on behalf of him. He said:

"On behalf of the Ministry of Electricity and Energy, I welcome all of you. It is my pleasure to meet with you regarding the extension of our activities in Suez Governorate, and the execution of one of the most important projects in the southern part of Suez and in Egypt. The power station of El-Ain Al-Sokhna shall supply and cover the electricity needs for new projects in the area and in E ~ Y pt.

With good co-operation between Egypt and the international and regional banks, e.g. World Bank and the African Development Bank, this project has been decided to be executed through several international biddings.

I hope that today we will listen together to the PGESCo and ECG presentations and the good findings of their environmental study of the power plant which has been implemented in deep collaboration with EDEPC and EEHC.

The strategy of the EEHC is to put environmental considerations as the highest priority.

I wish EDEPC and our consultants all success and many thanks to the governor of Suez, Suez People's Counsel, Suez Community & NGOs and all of you".

Dr. Ms. Lila El-Kholi (Conducted in Arabic)

Dr. El-Kholi welcomed the attendees and introduced the EEAA Environmental Protection Strategy. She said that in the commencement of 19901s, the United Nations announced that Environment and Development are not contradicted. They can go hand in hand. Together they represent two faces of the same coin.

She added that without conserving the environment and protecting it against deterioration, development will lack necessary background that receives its outcomes, and without development no progress mankind can achieve for supporting environment preservation. The issue, then, is not to decrease

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB - 10 August 2008

Annex-D - Page 6 of 16

Page 95: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

development for abating pollution, but to continue development in such ways that are effective, clean and sustainable.

Ms. El-Kholi Said: "The Environmental and Social Impact Assessment has become a necessity for incorporating environmental safeguard measures into design of the projects in early phases of implementation".

"Thank you for inviting EEAA. I am actually eager to listen to the outcomes of the ESlA of the El-Sokhna project and see how it considers all necessary aspects for preserving the environment".

2.2.3 Mr. Abu El- Wafa Bashir, Local People's Council's Speech (Conducted in Arabic)

"This meeting raises an important issue and a responsibility that we all must carry in order to balance sustainable development as well as the safeguarding of the environment.

With this important project that will enhance the Suez Region, including Ettaqa, with electricity supply in accordance with international standards, we provide a leading model in development, based on friendly environmental standards.

I would like to thank all of you for coming to this meeting and I am looking forward to seeing interaction between the project's owner, i.e. EDEPC and the audience".

Dr. Asem El-Gawhary (PGESCo) (Conducted in Arabic)

Dr. El-Gawhary outlined the technical specifications of the El-Ain Al-Sokhna super-critical steam power plant. This presentation included the site location and a description of the key features and main characteristics of the power project.

It, Also, included key dates, investment costs, employment opportunities, program, consents and commitments.

Eng. Hassan El-Banna (ECG) (Conducted in Arabic)

Eng. El-Banna presented the findings of the Environmental and Social Impact Assessment. The presentation included a description of the ESlA process, the key findings for each environmental aspect and a description of the Environmental and Social Management Plan.

Dr. Ahmed El-Sayyed, of the Hydraulics Research Institute was invited by Eng. El-Banna to present the preliminary results of the numerical hydraulic modeling study of the CWDS of the power plant project.

-

ESlA for El-Ain Al-Sokhna Thermal Power Projecl No 1312 Annex-D - Page 7 of 16 HB -10 August 2008

Page 96: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

QUESTION AND ANSWER SESSION

The Question and Answer session was conducted in Arabic by Eng. Maher Aziz Bedrous, EEHC's Counsellor for Environmental Management and Studies. The proceedings have been translated as accurately as possible. In order to demonstrate that the issues and concerns have been addressed, where applicable, a reference to the Environmental and Social Impact Assessment Report undertaken for the project has been given, in addition to further clarification, shown in italics.

QUESTION 1 : Mr. Ahmed Mohamed Atawi (Suez Citizen)

How and why did you choose this location for the El-Ain Al-Sokhna Plant?

Eng. Tarek Youssef (EDEPC)

The location for the power plant was selected at El-Ain Al-Sokhna on the same land allocated in 1999 for a Steam Power Generating Facilities near the Suez Gulf shoreline, because the plant uses up to 46 m3 per sec. i.e. 165,600 m3 per hour of water for cooling. Therefore, the farther we are from the water source and from this source of cooling, the more expensive it becomes to transport the water. Consequently, the price per kW would increase due to the need to pump the cooling water larger distances. When choosing the location, we abide by Egyptian laws and regulations, particularly to the guidelines of the Ministry of Water Resources and Irrigation, to those of the Egyptian Environmental Affairs Agency (EEAA), and finally to Environmental Law 411 994.

No need to mention that the location also has the advantage of being near the center of loads. We are certain and confident that there will be no environmental problems.

The site selection was predetermined by EEHC. The site is considered suitable for a number of reasons, including its direct access to the natural gas, the industrial nature of the area, existing infrastructure and proximity to the Suez Gulf. The findings of the ESlA show no significant impact given the implementation of the various mitigation measures. It is considered that the site selected for the power plant is appropriate.

Further details of the site selection process are available in Sections 3&4 of the ESIA.

QUESTION 2: Dr. Mohamed Tawfik Abu Ghattas (Representative of Physicians of Suez Governorate)

Can we use the Suez Gulf at the El-Ain Al-Sokhna project location for other purposes, such as fishing? and what about the cooling water recirculation as

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Annex-D - Page 8 of 16

Page 97: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

the intakes and the discharges of both power plants are so close to each other?

Eng. Maher Aziz (EEHC)

The plant is located in an area reserved for power generation activities. It is also an industrial zone. Therefore, we shall not have any further impacts or influences on the usual activities linked with the Suez Gulf.

As for fishing activity, the area itself is not an area for commercial or artisanal fishing. But the warm mixing zone formed by warm cooling water discharged from the Suez Gulf BOOT power plant has created a good environment for fish growth, and about 6 boats are seen every evening for fishing in the mixing zone. This is a good proof of the positive impact of the power project on fish wealth in the area.

Concerning recirculation of cooling water, PGESCo has designed the intake and discharge of the new power project such as the warm water will be in between both of the power plants, while cool water will enter from the outer sides, which will enhance preventing recirculation.

QUES TlON 3: Dr. Sherif El-Gawhary (NGOs Federation of Suez Governorate)

Wastewater may cause bad effects. Is any regulatory body review the ESlA report?

Eng. Tarek Youssef Ali (EDEPC)

As for wastewater, we have undertaken the ESlA study which will be presented to the EEHC, the concerned competent authority and the Governorate of Suez, the Licensing authority who in turn will send it to the EEAA. The EEAA will review the report and return their comments to the EEHC. These comments will be reviewed by EEHC, EDEPC, ECG and PGESCo and amendments and modifications will be incorporated in the report. Once all this is done, the environmental permit will be issued.

QUESTION 4: Eng. El-Arabi El-Taher (Suez Gulf BOOT power plant)

What about the sewage from the plant?

Eng. Hassan El-Banna (ECG)

The sewage will be discharged to the plant sanitary wastewater treatment system. Treated wastewater will be directed to the plantation irrigation system and the sludge will be transported by licensed contractors to licensed dump

ESlA for El-Ain Al-Sokhna Thermal Power Project N o 13 12 H B -10 August 2008

- -

Annex-D - Page 9 of 16

Page 98: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

sites. When the local sewer network of Ettaqa reachs the area in the future, sewage will be discharged to the local sewer system of the area, i.e. to the local sewer network at Ettaqa. Regarding EDEPC, this is a National Electricity Company, and they consider environmental protection on top of their highest priorities. See Section 8 of the ESIA.

QUESTION 5: Dr. Yousry Abdel Aziz (Suez Canal University)

Many details have been presented on the concentrations of emissions and how they are complying with the standards. It was better if the ESMP was presented in such details.

Eng. Maher Aziz (EEHC)

The outcomes of the ESIA study have been presented in a relatively long time and ESMP tables were also highlighted briefly. It would take much more time if these tables are presented in more details. But the whole volume of the ESIA study and the twelve baseline studies are available at the offices of EDEPC and EEHC for anybody to review.

QUESTION 6: Dr. Yousry Abdel Aziz (Suez Canal University)

If an environmental standard of the EEAA is more stringent than that of the World Bank, which one you will follow?

Eng. Maher Aziz (EEHC)

Certainly we must comply first with the national standards. Actually we comply with both of the EEAA and the World Bank standards whichever more stringent.

QUESTION 7: Eng. Taher Salah El-Shahawy (Egyptian Operating Co. S.A.E)

Don't you think that the stricter standards are much better for the sake of our environment? I believe that the more stringent the standards are the much better the situation is for our country.

Eng. Maher Aziz (EEHC)

It is not a matter of stringent standards. We are concerned about the soundness of the environment but stricter standards may obstacle development. We couldn't be stricter than the World Bank or the US-EPA because the WB and US-EPA with their current standards preserve the environment. We need development as well. We are a developing country and it is not wise to adopt stricter standards that prevent development and say we

ESIA for El-Ain Al-Sokhna Thermal Power Project No 1312 Annex-D - Page 10 of 16 HB -10 August 2008

Page 99: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

preserve environment. I believe that the issue is to achieve the best reconciliation between environment, i.e. stringent standards and the development. We need development but in terms of sustainability.

QUESTION 8: Mr. Hassan Abu Bakr (Suez Citizen)

Why the new Al-Sokhna power project doesn't use closed circuit for cooling the condensers?

Eng. Maher Aziz (EEHC)

There is a huge resource of water near the plant site, the Red Sea. Cooling water required for the condensers is a large quantity of water, almost 165,600m3/hr, but represents only a very small incremental volume of the Red Sea flow at the Al-Sokhna segment. If this quantity of water provided for a closed circuit system, there will be significant impacts, either environmentally or economically.

Also, there is an important consideration for the efficiency of the plant. Closed circuit cooling system decreases the efficiency of the plant with about 4% loss. This considerably affects the fuel consumption, emissions to the air and economics of operation.

Finally, the question is: why you go to use closed circuit whilst you have plentiful water supply and all you do you only bypass this water through the plant and discharge it again to the water body with almost no effect?

QUESTION 9: Dr. Fikry Ashour Mourad (National Institute for Oceanographic Studies & Fishery)

The impact of the power plant on sea organisms, as Eng. Hassan El-Banna has presented, will be very minor or even nothing. I totally contradict with this conclusion. 'The impact of the power plant is very significant on marine organisms and the area should have a biodiversity of organisms in contrary to what has been presented to us.

Also, the power plant is designed and operated in conformance with industrial country's cold waters, but not adapted to national circumstances. Accordingly, the chlorine dosage for destroying algae deposition on the intake screens is not specified to our sea waters' circumstances. This should be reviewed and more-controlled.

Eng. Maher Aziz (EEHC)

The impact of the power plant on marine organisms may be significant in a very localized scale. Thermal plume is discharged from the outlet of the Circulating Water Dischrge System of the power plant at 9.6 OC at the point of discharge, but it is decreased to about 5 OC within a distance 100-1 50 m and

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

- -

Annex-D - Page 1 1 of 16

Page 100: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

continue to fall down to about 3 OC within another 100 m distance, where organisms highly welcome this warm water environment.

Thus, if there is a severe marine environmental conditions against organisms within first 100-1 50 m, these conditions become favorite afterwards, and this is very limited and very localized effect, provided that huge volumes of water are available for normal organisms life beyond the severe short distance from the plant outlet.

As for chlorine dosage for cleaning the intake screen from algae deposition, we very much thank you for your instructive comments and a recommendation is forwarded to PGESCo, the project engineer, for checking chlorine dosage with regard to the warm water characteristics of the localized environment.

QUESTION 10: Dr. Mohamed Tawfik Abu Ghattas (Representative of Physicians of Suez Governorate)

I have two questions:

First, During commissioning period of the Al-Sokhna power plant, there will be intermittent high noise impacts. What are your plans for abating those impacts?

Second, Concerning noise impacts, will the monitoring program include noise measurements during the operation of the plant, e.g. every certain period of time?

Eng. Tarek Youssef Ali (EDEPC)

First, Usually we use noise silencers during power plant commissioning. These silencers will be used for the commissioning of Al-Sokhna power project. Also, there will be an awareness program for the neighboring facilities to take into their consideration noise impacts associated with commissioning.

Second, Monitoring program during construction and operation includes periodic measurements for noise impacts.

QUESTION 11: Mr. Abdel- Hamid Kamal (Writer in Sawasia and El-Ahaly Journals)

There are already many industrial facilities in the area of Al-Sokhna district. The new Al-Sokhna power plant is considered a significant industrial addition in the area. Would this addition have a negative effect on the place? What about wastewater?

As a Suez citizen, I see that all these plants have a negative impact as they emit pollutants to the atmosphere.

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Annex-D - Page 12 of 16

Page 101: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Eng. Tarek Youssef Ali (EDEPC)

Having many industrial facilities in this area is not a problem. The criteria always is that their combined impact shouldn't exceed permissible limits. For example in Cairo North, there are three plants close to each other, and they are not the cause of pollution in north of Cairo. On the contrary, this power plant is essential to the area, as well as Egypt, because of the increasing electricity demand. New developments are growing, therefore importing electricity would be far more expensive for Egypt.

Furthermore, Suez will benefit from the plant because the surplus of electricity can be exported to Jordan or Libya. Please note that when EEHC (previously EEA) built the old Suez power plant there were no comprehensive environmental standards. Today, we are controlled by these standards. Additionally, at EEHC, we refuse investments that do not respect the environment. As for electricity produced by gas firing, it is not a polluting industry like cement or petrochemicals.

Let me insure something concerning wastewater discharge: for the permanent type of wastewater discharge, we have a complete treatment scheme. The EEHC and EDEPC very keen on implementing the same standards in all the new plants, as in the Unified System plants such as Oyoun Moussa, Sidi Krir, Cairo North and Ettaqa.

Finally, this is a very good location for the power plant because there are reasonable infrastructures and the use of Suez Gulf for cooling renders it economically efficient.

QUESTION 12: Mr. Hassan Abu Bakr (Suez Citizen)

I think the project will benefit the area from an infrastructure point of view. I have a number of questions however:

First, will the 9.6 "C temperature difference be at the discharge point, or in the mixing zone?

Second, did you study the water flow and the Suez Gulf currents in the area? Third, by increasing the temperature of the water by few degrees centigrades, will there be an impact on the fauna?

Eng. Hassan El-Banna (ECG)

First, the power plant will be built according to the standards of the Egyptian Environmental Laws. Law 4 of 1994 issued for the protection of the environment states that, the temperature of the water that goes out in the sea should not exceed that of the surface water by 10°C and the maximum surface temperature should not exceed 38°C.

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB - 10 August 2008

Annex-D - Page 13 of 16

Page 102: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

In the mixing zone the temperature of the water will have decreased to 5OC at 100-150 m from the discharge point. We are therefore within the limits of Law 4 of 1994.

The discharged cooling water will be around 9.6OC above the ambient temperature at the point of discharge.

Thermal modeling was undertaken to determine the excess temperature above ambient conditions. This modeling included water flows and Al-Sokhna Suez Gulf segment currents.

A temperature increase will lead to localized impacts on the aquatic fauna and flora, but impacts are not considered significant. See also Section 6.3.3 of the ESlA Report.

QUESTION 13: Mr. Abdel- Hamid Kamal (Writer in Sawasia and El-Ahaly Journals)

It is mentioned that There are no impacts on fisheries, the study states, could you tell us where ECG did the ESlA study? Did they co-operate with the General Authority for Fishery Development (GAFD)?

What about the job opportunities available for the citizens of Suez Governorate, particulary Ettaqa District?

Eng. Maher Aziz (EEHC)

With respect to the fisheries, there will be no significant impacts however, the warm water in the mixing zone may attract fish and provide good conditions for fish growth. This is experienced in Shoubrah El-Kheima and Ettaqa and almost all EEHC's power plants.

Furthermore, the ESlA has conducted a number of studies in the Al-Sokhna location, involving the National Research Center.

Consultations have also been undertaken with GAFD and representatives of fishermen in the area.

Regarding job opportunities, it is true that there will be about 2000-2500 jobs available during the construction phase. There will also be services such as transportation for the workers. Most of the people employed in the plant- as the Chairman of EDEPC said- will be from Suez Governorate.

The GAFD were consulted as part of the public consultation process. Fisheries are discussed in Section 6.3.3 of the ESlA Report.

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Annex-D - Page 14 o f 16

Page 103: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS CROUP

QUESTION 74: Dr. Sherif El-Gawhary (NGOs Federation of Suez Governorate)

I am very pleased with this civilized discussion about the impacts of such a development on the environment. It is a large improvement that the stakeholders take part in this consultation. However, I have some additional comments and questions:

First, the questions asked here should have been written down in advance.

Second, it seems to me that the ESlA does not include anything about seismic issues or earthquakes.

Third, I believe that the plant should have its own fuel combating equipment against spills to protect the water intake.

Fourth, I noticed this is a sensitive environment, in recovery from previous and present pollution due to industrial growth. This is why we need to protect the aquatic life and fisheries and we must set standards for the recovery of these.

Fifth, you said there is almost no aquatic life in the place of the power plant. Is this statement true and confirmed and are there studies?

Eng. Maher Aziz (EEHC)

The plant will have an Emergency Action Plan. This plan identifies all the risks that may occur and how to mitigate them. It is only used in case of emergency and there are precautionary measures, routinely implemented for normal operations.

About earthquakes, CSC Consulting Firm, in collaboration with the National Research Institute of Astronomy and Geophysics, did a simulation study on the intensity and occurrence of earthquakes in the area and presented us with their conclusions. The ESlA takes them into consideration, translates them into codes for planning, designing and constructing buildings. These are called building codes for earthquakes.

The study of the plant also shows a continuous monitoring program for water and air quality at all stages. This is clear from Tables 3 through 6 in the Executive Summary, which show the emission levels during construction and operation and the management of these.

At all stages, I believe that it is a very rigorous plan. About the air quality, the ESlA is based on a sophisticated mathematical dispersion model. The power plant is operated continuously with natural gas and in case of emergency, it will use mazout. However, this nearly never occurs (only about 2% of the time all over the year) and if it does, it will only be for a few hours. This explains the tolerance of pollutants if mazout is used. In addition, in case of continuous operations using natural gas, the emissions will not exceed the Egyptian Standards which are respected as national standards by the World Bank and the African Development Bank.

-- - ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 Annex-D - Page 15 of 16 HB -10 August 2008

Page 104: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

About seismicity, it is evident that different sites have different risks. The Consultant studied those risks and the EEHC took the decision of building the power plant given full knowledge of these risks.

See Section 6.3.3 of the ESlA for details of the Suez Gulf water / aquatic studies that were undertaken for the project.

Eng. Tarek Youssef Ali (EDEPC)

As you know, the area around the power plant site is an industrial area. This shows there are environmental impacts to development, but also economic considerations in the sense that one has to balance the needs for electricity and the protection of the environment.

Mr. Abdel- Hamid Kamal (Writer in Sawasia and El-Ahaly Journals)

We would like to thank you for protecting the environment and complying with Law 411994 standards and guidelines. We all know that the industrial establishments have all contributed to the pollution of Egypt's environment. I hope the Governorate of Suez will impose regulations to treat the different industrial effluents before discharging into the Red Sea. Finally, the people of Suez are supporting the project.

Eng. Tarek Youssef Ali (EDEPC)

If you would like to raise any clarifications on today's discussions, please contact the East Delta Electricity Production Company and PGESCo as the developer of the project and their consultants. Finally, we would like to thank you for attending this public consultation.

THE PUBLIC CONSULTATION MEETING FINISHED AT 2:OOp m.

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HE - 10 August 2008

Annex-D - Page 16 of 16

Page 105: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Appendix A

Advert

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 I2 Appendix-A - Page I of 2 HB -10 August 2008

Page 106: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESIA for El-Ain Al-Sokhna Thermal Power Project No 13 I2 HB -10 August 2008

Appendix-A - Page 2 of 2

Page 107: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Appendix B

Invitation Card

ESlA for El-Aln Al-Sokhna Thermal Power Project N o 1312 Appendix-B - Page 1 of 2 HE - I0 August 2008

Page 108: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Appendix-B - Page 2 of 2

Page 109: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Appendix C

Leaflet I Agenda

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 Appendix-C - Page I of I H B - I0 August 2008

Page 110: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 111: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 112: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 113: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Appendix D

List of lnvitees and List of Attendees

- ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 Append~x-D - Page I of 14 HB -10 August 2008

Page 114: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

I. List of lnvitees

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Appendix-D - Page 2 of 14

Page 115: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

List ofthe In vitees Invited to the Consultation Meeting

Held on Wednesday 6 August 2008, I0 am at The Castellow Hall, Social Club, Suez City

1 2. / Dr. Ms. Fatma Abu Shouk 1 Head of EIA Division (EEAA) 1

Ser.

1.

3 ( Dr. Hirham El-Agamawi General Director of Power Projects, EIA Department, EEAA

Name Dr. Ms. Mawaheb Abu El-Azm

Eng. Mahmoud Shawki ".T -

Occupation Chief Executive Officer, EEAA I

General Director for Industrial Projects, EIA

Managing Director, Egyptian Electrical Utility and Consumer Protection Regulatory Agency

5 .

1 6. 1 Eng. Hassan Nagm

Dr. Eng. Hafez Salmawi

Chairman of Egyptian Electricity Transmission 1 Company (EETC)

1 7. 1 Dr. Eng. Mohamed Awad I Chairman, EEHC

8.

9.

10.

1 I .

12.

( 15. 1 Eng. Mohamed Abdel Bary I Sector Head for Gas Power Projects, EEHC I

-

Dr. Eng. Kamel Yassin

Eng. Ms. Fawziyya Abu-Neima

Acc. Salah Awad

Dr. Eng. Amal Khashab

14.

16. Eng. Ahmed Hassan General Director for Civil Works, EEHC -

18. Ena. Mourad Badie

Executive Board Member for Planning, Research and Service Companies Affairs, EEHC Executive Board Member for Affiliate Companies, EEHC Executive Board Member for Economic, Financial & Administrative Affairs, EEHC Sector Head, Information Department, EEHC

Dr. Ms. Nahed Haggi

( 19. 1 Eng. Mohamed Et-Tablawi I Power Plants Studies, EEHC 1

- --

Consultant, Research & Testing, EEHC 13. 1 Ena. Maher Aziz Bedrous

w

Eng. Ahmed Salah

- -

1 20. 1 Eng. Ms. Dalia Nour Ed-Din / Environmentalist, PGESCo 1

Head of Sector for Environmental Management Studies Sector Head for Steam Power Projects, EEHC

25. I Mr. Gobal I

I Talkha Project Manager, PGESCo

I 2 1.

22.

23.

24.

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 I ? HE -10 August 2008

Eng. Anob Condo

Eng. Sherif Shetta

Eng. Gasser Saber

Eng. Ashraf El-Far

I

Appendix-D - Page 3 of 14

- -

Assistant Eng., PGESCo

Project Eng., PGESCo

Executive Assistant, PGESCo

26. Eng. Ashraf Nassar General Director of Power Projects, PGESCo

Page 116: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

29. 1 Eng. Abdel Rehim Salah I Egyptian General Petroleum Corporation

Ser. 27.

28.

1 30. 1 Chem. Hassan Akl I Egyptian General Petroleum Corporation I

Name Mr. Serage Eddin El-Sayyed

Ms. Amani Selim

" I

33. 1 Eng. Ibrahim Ahmed I Deputy Chairman, EGAS

Occupation Environmental Quality Sector, EGPC

Environmental Quality Sector, EGPC

3 1.

32.

1 34. 1 Eng. Abdel-Hamid El-Mokaddem I Deputy Chairman, EGAS I

Dr. Hamed Korkor

Ene. Sherif Ismail

Technical Expert, EGAS

Chairman, EGAS

35.

36.

37.

1 39. 1 Eng. Attia Ibrahim Omar

38.

I

40. 1 Dr. Ali Abdel-Azim Toailab

Mr. Hemdan Abdel-Sattar

Dr. Al-Sayed Tawfik Moustafa

Dr. Magdi Abbass Saleh

Sector Head, Studies & Research, Egyptian General Authority for Shore Protection Chairman, National Research Institute of

Deputy Chairman, General Authority for Fishery Development (GAFD) Department of Fish Resources (GAFD)

Aqua-culture Specialist (GAFD)

Eng. Farag Mahmoud Yamani Chairman, Egyptian General Authority for Shore Protection

i 42. 1 Dr. Ahmed Badawi I Associate Professor, NRlAG I 41. Dr. Salah El-Hadidi Ali

43.

44.

Astronomy & Geophysics (NRIAG) Associate Professor, NRIAG

45.

46.

47.

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Eng. Ibrahim A. El Desouky

Prof. Dr. Kamal Tamer Hindi

-- ~~~

49.

50.

5 1 .

52.

53.

54.

55.

56.

Appendix-D - Page 4 of 14

Deputy Director, Hydraulics Research Institute

Air Protection from Pollution Unit, National Research Center

Water Quality Unit, National Research Center

Prof Dr. Aleyya Abdel Shakour

Chem. Yasser Hassan Ibrahim

Eng. Adel Hassan Amer

Air Protection from Pollution Unit, National Research Center Air Protection from Pollution Unit, National Research Center Air Protection from Pollution Unit, National Research Center

Prof Dr. Mohamed Anwar El-Dib Water Quality Unit, National Research Center --

Prof Dr. Mohamed M. Al Abdi

Prof Dr. Osama Ahmed Ali

Prof Dr. Mohamed Ismail Badawi

Dr. Mohamed Bakr M. Ibrahim

Prof Dr. Mansour M. El Bardisi

Prof Dr. Abdallah Wahdan

Dr. M. Mahmoud Bassvoni

Water Quality Unit, National Research Center

Water Quality Unit, National Research Center

Water Quality Unit, National Research Center

Noise Engineering, Faculty ofEngineering, Ain Shams University Director, Egypt National Institute of Transport (EN IT) Senior Transport Expert, ENIT

Page 117: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

I Engineering, Cairo University I

58. 1 Prof. Dr. Mohamed Yousry / Transportation & Traffic Planning, Faculty of I Engineering, Al-Azhar University 1

I 59. 1 Dr. Alv Nasser Hassan 1 Ecological Studies Department, Ain Shams

I Occupation Transportation & Traffic Planning, Faculty of

Ser.

57.

Name Dr. Khaled Nabil Helaly

1 60.

I University

Dr. Fathi Bekhit Shenodah ) Head of Acoustics Department, National Institute

6 1.

62,

/ 67. 1 Dr.1Assem El Ghouhry / Pegisco Consultant Office I

63.

64.

65.

66

1 68. 1 Dr./Fatma ~ b o u EI ~ h o u k I Head of Central Dept. for Enviro. Assessment /

Dr. Khalifa Soliman

Genl Mohamed Seif El Din Gala1

1 69. 1 Mr./Ramadan Abou El Hassan I Head of Suez NGOs I

for Standards Central Dept. of Projects, the Egyptian Geological Survey and Mining Authority Suez Governor

DrIMohamed Mosaad Ibrahim

Eng.1 Ahmed Abou Nazel

Mr./ Ahmed Soubeh

Mr.1Abd El Nasr Ahmed

Suez Chief of the Local Council

Party General Secretary

Shoura Council Member

Peoples Assembly Member

1 73. ) Col./Khaled Bahgat I

( Head of Fire and Civil Defense I

70.

7 1 .

72,

Gen.1Eissawi Ahmed

Eng./Assem Badawi

DrIMohamed Mahmoud Sayed

74. Mr./ Abou El Wafaa Beshir

1

) 79. / Cap./lbrahim El Kellani / Sports Club I

Head of Habilitation Organization -Suez

Head of Suez Gulf Development

Deputy Petroleum Eng. Faculty for environ.

Head of Environment Committee - People's Assembly Head of Environ. Society- El Arabeen

- -

T 5 .

1 86. 1 Eng./Nazih Bahom I Head of Safety 1

~ r . / G h a r i b A b d e l ~ o u b d i

80.

8 1.

82.

83.

84.

1

1 89. 1 Mr./Gamal Abd Allah I Bendar Society I

Eng. massan Abou Bakr

Dr./Fahim Ahmed Khalifa

Mr./Ahmed Mansour

Dr./Amal M. El Raay

Chem.1 Nadia Attallah

87.

88,

-

ESlA for El-Ain Al-Sokhna Thermal Power Project N o 13 12 Appendix-D - Page 5 of 14 HB -10 August 2008

77.

78.

Environmental coordinate for Companies- ~ t t a k ;

Deputy University Dean - Suez

Head of Local People's Assembly-Attaka

Head of Medical Precaution section

Head of Environmental Section

, 85. , Eng./Hassan Kamel Head of Housing and Utilities

Dr./Mamdouh Fahmy

Chem.1 Leila el Khouly

Dr./Mohamed Mossad

Dr./Mohamed Tawfik Abou Ghattas

Head of Marine Institute

Head of Suez Environmental office

Head of People's Council in Suez

Head of Medical Syndicate in the Governorate

Page 118: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Am Al-Sokhna Thermal Power Project No 13 12 HB - 1 0 August 2008

Appendix-D - Page 6 of 14

Page 119: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

( r29. ( Eng./Mohamed Agami ( Environmental Affairs 1

1 Occupation

Ports Org. 123. ( Eng./Sayed El Hagaan

125,

126,

127,

17 R

General Manager of Civil Engineering - Red Sea

130.

13 1.

( 138. ( Mohamed Salam ( Member of Youth Development Society 1

Gen./ Ahmed Abd El Aziz

Mr./Mohamed Farah

Mohamed Hamed

Mostafa El Eissawy

136, - 137.

ama ad an Abd El Rehim

Mohsen Ahmed

1 145. 1 Samir Michele 1 Member of Orthodox Society 1

Head of Eng. Dept.- Red Sea Ports Org.

Organization Head- Attaka district

Arbeen Society

Ans Ibn Malek Society

132. Gharib Awad

Insaaf Abd El Rahman

Mohamed Abd El Megid

1

134.

1 35.

1 Member of El Lowaa for Development

Member of Society Development

Member of Assiut Society

Member of Society Development-Shaloofa

Member of El Hussein Society

Member of Aswan Society

T 3 9 7

140.

14 1.

142.

143.

( 150. 1 Ahmed Abd El Aleem 1 Environment Society I

144, Abd El Halim Herigi Member of El Iman Society

~ e h i a ~ o m a a

Mohamed Marzouk

Ragab El Shaat

Mostafa Abd El Fattah

Essam Abd El Azeim

146.

147.

1 48,

149.

1 15 1. Sayed Ghoneim / Suez Youth Society 1

Aly Soliman -- Ahmed El Gamaal

/ 152. / Farag AbelGhany I Local Society 1

Member of Egyptian Red Crescent

Ragab El Shaat

Ramadan Abou El Hassan

Mrsmanaa

Mr. Arabi

1 153. Osama A ~ Y I Local Council - Suez 1

Member of Development Society- Shaloofa

Union Federation

Resaala Society

RehlatySociety

1 156. 1 Adel El Sayed 1 Local Council - Suez 1

154.

155.

I

157. / Osama Ismail / Local Council - Suez

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 H E -10 August ZOO8

Bakry Hassan

Mohamed El Bohariy

Appendix-D - Page 7 of 14

Local Council - Suez

Local Council - Suez

Page 120: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 I 2 HB -10 August 2008

Appendix-D - Page 8 of 14

Local Council - Suez

Local Council - Suez

Local Council - Suez

Local Council - Suez

Local Council - Suez

Local Council - Suez

Local Council - Suez

187.

1 188.

189.

190.

19 1 .

192.

193.

Moharned Saleh

Alia El Nahas

Gamal Attia

Mohamed Ibrahirn

Mohamed Gaber

Mohamed Agamy

Hossam Mohamed

Page 121: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

I

198. 1 Hussein El Sayed / Local Council - Suez -

199. Mohsen Ahmed Local Council - Suez

200, Zeinab El Behadi Local Council - Suez

20 1 . Samir Abdeen Local Council - Suez

202. Ahmed El Asraa Local Council - Suez

203. Sayada Ahmed Local Council - Suez

1

1 204, 1 Laila Moawad I I Local Council - Suez

197. Talaat Fahim Local Council - Suez

Occupation Local Council - Suez

Local Council - Suez

Ser. 194.

195.

I

205. 1 Sobhy Mashalli I Local Council - Suez

Name -- Abou El Wafaa Khalil

Ali El Sayed

) 206. Ahmed Hussein I Local Council - Suez 1

I I

2 1 0 . I Mostafa Aly / Local Council - Suez

1 21 1 , ( Salah Hussein I Local Council - Suez

Local Council - Suez

Local Council - Suez

Local Council - Suez 208.

209.

2 12. 1 Ahmed Hussein ( Local Council - Suez

- 2 0 7 . ~ h x ~ a l e m

Gamal Samak

Talaat Orabi

1 2 18. Mansour Mohamed 1 Local Council - Suez 1

214.

215.

216.

2 17.

1 219. 1 Ismail Ahmed I Local Council - Suez I

ESlA for El-Aln Al-Sokhna Thermal Power Project N o 1312 HB -10 August 2008

Shaat AbdAllah

Halima El Gendy

Ahmed Abd El Latif

Ragab Abd El Nabi

Append~x-D - Page 9 of 14

Local Council - Suez

Local Council - Suez

Local Council - Suez

Local Council - Suez

Page 122: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

2. List of Attendees

ESlA for El-Ain Al-SokhnaThermal Power Project N o 1312 HB -10 August 2008

Appendix-D - Page 10 of 14

Page 123: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

List ofthe Attendees Attending the Consultation Meeting

Held on Wednesday 6 August 2008, 10 am at The Castellow Hall, Social Club, Suez City

ESlA for El-Ain Al-Sokhna Thermal Power Projecr No 13 I2 HB - I0 August 2008

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

-- -

Appendix-D - Page I l of 14

Taha Abd El Aziz

Aziza Aly

Wafaa Abd El Razak

Ezz El Arab

Mohamed El Shaat

Tag Ahmed

Mohamed Abou El G hattas Aly Saber

Atta Saad El Din

Mohamed Mahmoud

Electrical Engineer

District Head

Medical Syndicate Head

Quarry Manager

Professor

Chief Engineer

Suez Governorate

Suez Co.

Suez Co.

Suez

Delta Co.

Delta Co.

Suez Governorate

Environment Institute Misr Electricity Co.

01 06027750

0104614988

01 22869848

01223622026

0168336801

Page 124: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESIA for El-Aln Al-Sokhna Thermal Power Project No 13 I2 HB - I0 August 2008

Appendix-D - Page 12 of 14

Serial

29.

30.

3 1.

32.

33.

34.

35.

36.

37.

38.

39.

40.

4 1.

42.

43.

44.

45.

46.

47.

48.

49.

50.

5 1 .

52.

53.

54.

55.

CornpanylOthers

Suez Canal Organization City Council

Suez University

City Council

Regional Federation Regional Federation Regional Federation City Council

City Council

City Council-Suez Canal City Council-Suez Petroleum Suez Petroleum

Electricity Distribution Co. Delta Electricity Distribution Co. Nasr Petroleum

Ahkbar El Yooum Newspaper Environment protection Society

Educational Section Environment Section Engineering Syndicate Suez Society

City Council

Environment Society City Council

City Council

Attaka Electrical Station

Name

Yehia Mohamed

Mohsen Mahmoud

Mohamed Hussein

Mahmoud Riad

Abd El Halim Mohamed

Mohamed Ahmed

Hamed Hefney

Mohsen Hussein

Talaat Fahim

Hossam El Din Kamal

Awad Abou El Hassan

Reda Radwan

Hassan el Naggar

Mohamed Mahmoud

Farag Soliman

Aly Mansee

Intessar El Hegazi

Moharned Tawfik

Shadia Ahmed

Nadia Atta

Attia Mahmoud

Omar Attia

Mansour Gad

Hassan Ahmed

Mahmoud Amin

Abou El Wafaa

Ibrahim El Said

Telephone

0124849952

0105267117

0 18 1 1465226

0 123766489

0101714147

10101933463

Occupation

Engineer

City Council Member

City Council Member

Local People Assembly

Member of the Regional Federation Member of the Regional Federation Member of the Regional Federation Deputy City Council I Technical Petroleum Office City Council Employee

City Council Employee

Technical Head Suez Petroleum Sector Head

Engineer

Public Relation I Journalist

Secretary General

Medical Syndicate Head

General Manager

Manager

Secretary General

Secretary

City Council Employee

Environment Expert

City Council Member

City Council Member

General Manager

Page 125: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HB - I0 August 2008

Appendix-D - Page 13 of' 14

Telephone

012454 1295

CompanyIOthers

Electrical Company Nasr Petroleum

Eyoon Mossa Electrical Station Transport Co.

Engineering Society El Kheir Society

Delta Co.

Suez Station

Society Development Social Affairs

Central lab chemist

Social Researcher

Sea Science

Suez Governorate

Suez Governorate

Suez Governorate -

~ u e z Co.

Suez Governorate

Suez Governorate

Pegisco

Suez Society

Pegisco

Chemist

Occupation

Environment Manager

City Council Member

Environment Manager

Deputy Manager

Member in Engineering Society Member in El Kheir Society Delta Co.

Translator

Technical Manager

Member Society Development Head of Asshab Society

Technical Manager

City Council Member

City Council Member

Researcher

Technical Manager

Pegisco Co.

Deputy City Council

Researcher

Pegisco Co.

City Council Member

City Council Member

Shabba Society

General Manager

City Council Member

City Council Member

Serial

56.

57.

58.

59.

60,

61.

62.

63.

64.

65.

66.

67.

68,

69.

70.

7 1.

72.

73.

74.

75.

76.

77.

78.

79.

80.

8 1 .

82.

83.

84.

85.

8 6 ,

87.

88.

Name

Bosina Abd El Moneim

Hussein Hassan

Hayam Mohamed

Ahmed Mohamed

Hanaa Kamal

lnsaf Anwar

Tarek Mohamed

Gad Amro

Wafaa Abd El Razek

Mohamed El Kalawi I

Essam Gharib

Sayed Ahmed

Ahmed Mostafa

Aly Mohamed

Fekry Rashwan

Sayed Ahmed

Arabi Mohamed

Abd El Aziz Amar

Maisa abd El Kadar

Farag Nyazi

Youssry Abd El Aziz

Yossry Abd El Aziz

Ahmed Odaa

Magdi Abou El Hassan

Osama Mahmoud

Karam Allah Mohamed

Kamal Haky

Magdi Abou El Hassan

Osama Mahmoud

Magd El Seidi

Amro Attia

Asen Ely

Mohamed Ahmed Kandil

Page 126: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Serial

89.

90.

9 1.

92.

93.

94.

95.

96.

97.

98.

99.

100.

101.

102.

103.

104.

105.

Append~x-D - Page 14 of 14

Name

Hatem abd el Moneim

Omar Sadek Abd El Karim Khaled Helmy

Ahmed El Nemar

Mahmoud abd El Fattah

Mahmoud Hassan

Hossam Ibrahim

Reda Hussein

Seham Ehamad

Abd El Hamid

Kamal Hefney

Magdi Mariee

Mohamed Abedel Hakim

Lobna El Khouly

Maher Aziz

Hassan Elbanna

Fatma Helaly

Occupation

General Manager

Journalist

City Council

General Manager

Security

Manager

Head of Studies Sector

Project Manager for the study Socialist specialist

Company/Others

Public Relations

Public Relations

Public Relations

Electricity Station

Industrial Safety

EOC

KSB

EEHC

EEHC

EL Ahaly

East Delta

Environmental Manager Egyptian Holding Co, for Electricity Engineering Consultants Group Engineering Consultants Group

Telephone

0 123689795

0101716679

02-22744740

Page 127: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Appendix E

Non-Technical Summary

ESlA for El-Aln Al-Sokhna Thermal Power Project No 1312 HE -10 August 2008

Appendix-E - Page 1 of 1

Page 128: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 129: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 130: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

' 7 .............................................................................................................. Wl~1\&1;J! + . f

\ Y ......................................... &I\ i r ~ ~ b ~ + > i)dJU\ \ - t

Y ................................................. U &$I LI&I + g k Y - t

\ Y ............................................................... &$I &!dl & T-t

\, t ....................................................... &GI9 +s;Ul +Id\ f - t

\ t .................................................... &&.all &+I &$I 0-t

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB -281712008

N.T.S - Page 2 of 28

Page 131: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESTA for El-Ain Al-Sokhna Thermal Power.Project No 13 12 HB -28/7/2008

N.T.S - Page 3 of 28

Page 132: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP &/"iWdWA>b

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB -281712008

N.T.S. - Page 4 of 28

Page 133: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -28/7/2008

N.T.S. - Page 5 of 28

Page 134: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP & Z J ~ ~ W A ~

&llP it. di)95;j super-critical Gj+l Gib tjl; i j s 2 &I; LJJ ~9 3s; L a

&A\ 9 3 b & l > b , L o y o * x Y bjl& ,?A ~ l h y l & G J 1 G &j& &$

;~L+j+l ;lr!hdl &u dFg . ~ b g a l l & d l ~ ~ ~ & i l I c(?! & -19 GI-> rjI+YI relL j (ir>jLdl) & i l l J9$I J ~ $ I &I jLlL -12 ij-L &I;) i b & i b> &I ~ J J L &L JX & bjL LJUI &I jLll

ESlA for El-Ain Al-Sokhna Thermal Power Projecl No 13 12 HE -281712008

N.T.S. - Page 6 of 28

Page 135: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

&j~ L k I+ ( Y ) & L+ ' +dl $41 ( Y ) ' ( \ ) h3

.&-I Ul @go

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB -281712008

N.T.S - Page 7 of 28

Page 136: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -281712008

- - - -

N.T.S. -Page 8 of 28

Page 137: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

-

ESlA for El-Aln Al-Sokhna Thermal Power Pro~ect No 1312 N T.S - Page 9 of 28 HB -281712008

Page 138: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

-- - - - - - -

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB -281712008

N.T.S. - Page 10 of 28

Page 139: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB -281712008

N.T.S. - Page I l of 28

Page 140: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -281712008

N T.S - Page 12 of 28

Page 141: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 H B -2817!2008

N.T.S. -Page 13 of 28

Page 142: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

~ ~ l g & i 4 j U 1 f - t

L a \ &yg \ 9 9 t " d k 2 " ij$u &.!s 'G$u\g WI . -

&!I LL&~ x ~ 9 '(Y a a 0) LUI + * UI oh +i ++ &A+ dg ( \ 770)

S J ~ I ~ I abI>YI &K OJIL! & tg>l d g '&jvl wl G g >>dl :t9@& i&LIQII Wl ijli q1;Il SGJl f

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -281712008

N.T.S. - Page 14 of 2 8

Page 143: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB -281712008

N.T.S - Page 15 of 28

Page 144: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -281712008

N.T.S. -Page 16 of 28

Page 145: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESIA for El-Ain Al-Sokhna Thermal Power.Project No 1312 HB -281712008

N.T.S. - Page 17 of 28

4i;n dud

&Ad\ &iUI j % \ . ' & J

'k - Y o \ . . 3Y)

p o x ) &,gl + ~ i (SOz) -+I d i jl;

(PM) QJJI JI+I

&&Ad\ c jL ! i \

(%\ . . ;,jL.- % \ . . &) (&+dl '&.%I1 'j.JI 'j. YoY &. &Y)

(NOx) & , S l +Ki

(SO2) -41 d i ~ l ;

(PM) JI+\

& J ~ I & L s . w • a &\ 4 9 . - w l jUl GP ~ k )

p o x ) +,SI +Ki

LL \ L+ L L Y f L+

J+ A+ (SO*) Q+I +i ~ l ;

LL \ L+ L L Y t L+

J+ ibY+ (PM 10)

k L y f L+

is+ Lj;

awl cjlrjal

(pH) &,>I, *Wl J+L

(BOD) 4 1 6 4 1 d i i 1

r ~ 9 ,pWI

+A LLJI

,=$I> LN-?~

(TSS) i;lw~ 4\41 .-;;I' &'I

(OC) JIdl GJ-l > LJ&>I

u p d l &lj,s$l Ol,&

i ; iJ I@eJ&+

yUYIl*ihu, Lrvn k " J

r?/ ,> ryl F ,> r d F O . >

r,=/ e r * .>

r ? / e y . . . >

r ? / F O e >

r,=/,=lJ+~& r r t , ~ 4

r,=/plJ+~& \ r v , f 4

~,=/?IJ+J& t 0 8 A y

r?/?!J+,&(l'\ysty

r d r l ~ ~ & ( ' ) v s r ~

rd+~,& (') s , q 7

r?/?l>,& ( y ) f 1 Y

y?/rlJ+,& "' 1 7 3 1 f

9 -1

$/? l a >

jJ/? a ,o>

Jqe , # O >

J/F \ > A/? \ >

A/? \ * > jJ/e o . >

A/? * , y>

- ihi; Jk P 9 , 1 >

&C P o , "41 a&) I+ \ o .

(+ r. . - U l

Jd\ W I

rr / e I-7 - r ? / e - y . . .

I - ? /? O .

e y . . .

I-?/ F O '

-

r d ? l ~ ~ & \ o

r?/rlJ+~& 1 a . -

'?/c'wJ& \ o *

rrIrb+~J4. A

r ? / ? ' 3 J & \

rd?lJ+,& o .

9 -1 -

$ 1 ~ e V o

A+- avo

A- \ \

A? \ . jJ/e o .

( r ' J / e - , Y

ai. GL Jk ?Or (1) M I

4 4 1 %'-'I

0) r r / +r. a

r , = / ? y " . .

r ? / ~

0 ) r? / +- r . . r?/ F y o . .

r?/ ?+

' r / & f

(')r,=/pl~J& \ O *

-

r?/?\J+,&ro.

r ? / f l ~ , & \ 0

r d p l ~ , & 7 . r?/?l*~&

-

9-1

$I? 1.

J/e \ $I? ' 8

JIJ/y \ l o

$ 1 ~ A? ) O

A? 1. -

? O \ ' > "41 UZ ~k

Page 146: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP &dwdwA&b

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -281712008

JJAI L?L;n 2h

&J V e

&+J V .

N T.S. - Page 18 of 28

. NO, &,+I +Si j G LhJ+ .L NOx &,&I1 +KY $+I * W l ( ) ) ct;j; L ~i '7. . A ;,dl d,il~ $41 LL&I G, L$I 4 &+I air L I ~ J ~ ;, g t& 41 .ir ( Y )

. 5% J& Y 4 @ a i r + i b v l l

U.+ i J j - jJ9 i)?j&lI UL. riL+ ? l G l JL 6 ( j iLnL ;)& 6 ' dj3yI i-" (r) j+ vsrY d c j?;L ;U &j jJ/? Y d &,All i L j l l j . U l &&+A i+l L C I ~ I

.(jJ/rY.,Yi)+-jl~kL\IiLJ;IJ)kLYi &L j i p + $ Y 21 -I GL L= 5 j3G ~ ~ I A I b j ~ j i~&j ;, ++I 2 4 +$I b~+ & j i +- ~i -+ (i) J,dl Ul aL +* GF > -1 bb j& L&, 4 -1, L& b k ! d i i Y l @

. Gul a i r Jx; j iL ij;L LzJ+J + dl i~ j@i' L&c c &+&I Lii & + ! iiL jI+ Udtlki +Li, " &,J, ' -1 cL,A.I L_).DJl au ifr;JL "qc d&L - +L w l&.* )!I & (0)

. J,d1 &I *W WL "+j&

& & M ~ I

I L Y Y U - I V -

&J 1.

u,dn GI>> &I,,&

&.A &I e,;. &

uu"lwh, 4 u l l

ILYYU-I O h , l >

ILYYU-I o h , \ >

4ii11‘jbi

("1 ,&&J\

( +>I d l ) &i ( +>I d l ) MI &i

Page 147: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Aln AI-Sokhna Thermal Power Project No 13 12 HB -281712008

N.T.S. -Page 19 of 28

Page 148: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB -281712008

N.T.S. - Page 20 of 28

Page 149: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS C R O U P

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -281712008

N.T.S. - Page 21 01'28

Page 150: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

i& >k G* i~+41 AUI JS dg +IA 2 ~ ~ - ALQ L +;YI 'ji +> "u &+s L Gliu. LL~ &hid\ 31 j&Yl 2 l j i i i Ij! 3y3 iL+ G* u &&I &Id1 'jg &I+ i b ~ ; L ' j U l lie j $&dl jl+I 3r614

.&IA kL 'j&

? L +I i3j c u i i+ i$ JX A+ di @+ J3>~ &I$! JUI $I3 L ~ q p i ~ -3 ? L J j Y \ JLI +.% hi ePi3 . T b \ T - T

& l c L b3 '@I igJL i$ JX Lii ;1; LjF &l>kl\ hie 'ji +3 AhdJ

cjlclH! 'ji & , 1 5 5 \ j & &I Sp3 j3plI & 4LdlJSJI $kll 'j$ 'i3,11I

.&+I1 &l&Il j& J L I J&l iig! ~ j * $fill lie

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HB -281712008

N.T.S. - Page 22 of 28

Page 151: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -281712008

N.T.S. -Page 23 of 28

Page 152: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESIA for El-Ain Al-Sokhna Thermal Power Project No 131 2 HB -28/7/2008

N.T.S. - Page 24 of 28

Page 153: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

/& j * i .&.A o . ++ ~ $ 1 +Ill 2141 MI & &+I &dl &LA tjr UJ! ((P q * x y c j+ / Je) 1s J l i l q * UJ~POJJ J & J ~ J I L ~ J O b *

2+.3~> +Ji &&I k J I Jl+l di +!L3 . U l &I GI& L t3+ i$\d\ c3J+1 d-1 2141 Mk & i - y dlp J& .d.d y y * ++ -&&m\&J*- b w $ l / & d l & A & .d.d y y * * .d.d Y Y . + L A Y 1 &Y- L i)a +S$ L+ switching station AS; & i d d l &$I @J& +u $1 .&.&I 0 * * * $l&l L $ d M&J * JkaJ di3

.d.d Y Y . / o * * ++&&I1 UJ!L&l U l &I L

/ + U I i $ l d l c3~+7 JU\ 2141 -I$ & A S &JI &LA JAS3

u- &! (+ i . X I &i 'c3+ / J+J) I+ ~li l i . J& O J L I ~ &+I -1 .switching station & d l

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 H B -281712008

NT.S - Page 25 of 28

Page 154: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 155: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -281712008

Page 156: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESIA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HI3 -281712008

N T.S. - Page 28 of 28

Page 157: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Appendix F

Presentation Slides 1. Project Description Slides 2. EIA Scoping Slides

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 Appendix-F - Page I of 3 HB -10 August 2008

Page 158: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

1. Project Description Slides

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Appendix-F - Page 2 o f 3

Page 159: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

MINISTRY OF ELECTRICITY AND ENERGY EGYPTIAN ELECTRICITY HOLDING COMPANY (EEHC) EAST DELTA ELECTRICITY PRODUCTION COMPANY (EDEPC)

Associated Environmental Impact Hearing EL AIN EL SOKHNA 2x650 MW

THERMAL SUPERCRITICAL POWER PLANT PROJECT

August 06,2008

Power Generation Engineering and Services Company

Page 160: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 161: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 162: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 163: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Egyptian Electricity Holding Company

Chairman Dr. Mohamed Awad

Director for Financial

and Economical Affairs

Mr. Saiah Awad

I Generation Companies I Cairo Eng. Ahmed Emam

Chairman

East Delta Eng. Tarek Youssef Chairman

West Delta Eng. Mahmoud Baibaa Chairman I

Middle Delta Eng. Awad Mohamed Fathy Chairman

I Upper Egypt Eng. Shaaban Khalaf Chairman

Hydro Plants Eng. Mohamed Mohamed Faragallah Chairman I

Director for Studies,

Projects and Services Companies Affairs

Dr. Kamel

Egyptian Electricity Transmission Co.

Chairman Eng. Hassan Negm Vice Chairman

Eng. Galal Halawa Vice Chairman

Eng. Ismail Teleb

Director for Regulated

Companies Affairs

Eng. Fawzia Abou Neama I Distribution Companies ,

North Cairo Eng. Mohamed Ashour Chairman

South Cairo Eng. Mahmoud Sami Sultan Chairman

I Alexandria Eng. Ibrahiem Mady Chairman

El Behiera Eng. Ahmed Khalil Chairman.

North Delta Eng. Mohamed Bakr tan

South El Delta Eng. Fawzy El Serby

Canal Eng. Mamdouh El Nahas Chairman

Middle Egypt Eng. AM El Sattar Abou Ras Chairman

Upper Egypt Eng. Mohamed Hassan El Ezzklany Chairman

Page 164: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

EEHC Generation Expansion Plan ( 2002 12012 )

Location

Zafarana

Suez Gulf (l&2)

Port Said East (1&2)

Cairo North I

Nubaria I

Nubaria II

Cairo North I1

Talkha

El Kuriemat I1

Naga Hamadi

Mini & Small Hydro Units

El Kureimat

El Kureimat I11

El Tebbin

Nubaria III

Cairo West 7&8

Sidi Krir

El Atf

Abu Qir

Nweibaa

El Ain El Sokhna

Total Capacity

Type

Wind Farm

Steam Turblnes

Steam Turbines

Comb~ned Cycle

Combined Cycle

Combined Cycle

Combined Cycle

Combined Cycle

Combined Cycle

Hydro Power plant

Hydro Poaer plants

Solar 1 Thermal

Comblned Cycle

Steam Turbines

Combined Cycle

Steam Turbines

Combined Cycle

Comblned Cycle

Steam Turblnes

Combined Cycle

Steam Turbines

01103

0

682

682

06104

30

682

250

x

962

OA105

47

150

250

547

Estimated

05/06

43

250

250

500

500

1,543

Award

06/07

42

250

250

500

500

x

x

x

x

1,542

(x) and

07/08

80

150

1.50

?<O

64

x

x

894

Operation

08/09

90

500

500

250

250

x

x

1,590

Dates with

09/10

440

150

250

700

250

350

500

500

x

3,140

plant size,

1W1

500

350

850

MW

11112

500

650

500

1,650

12/13

500

650

250

650

2,050

3,636 MW

4,500 MW

214 MW

7,100 MW

15,450 MW

Page 165: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

EEHC Generation Expansion PIan (2013 12027)

Location

Zafarana

Mini &Small H~dro Lnik

El Kureimat

Abu Qir

El Ain El Sokhna *

Thermal Power Plank 650 MW

Combined Cycle Plank 750 MW

Nuclear

'I'obd

Type

Wind Farm

Hydro Power plank

Solar I Thermal

Steam Turbines

Steam Turbines

5,980 MW

32 MW

1,950 MW '

34,250 MW

5,000 MW

47,212MW

26/27

100

3 x 650

1x250

1,000

3,300

25t26

100

3 x 650

5x250

3,300

24/25

100

3 x 650

4x250

1,000

4,050

2U22

100

3 x 650

4x250

3,050

20/21

600

5x250

1,000

2,850

12/13

580

650

650

1 x 650

4x250

3330

22/23

100

2 x 650

5x250

1,000

3,650

13/14

600

650

4x250

2@0

23Pt4

100

1 x 650

6x250

4,200

14/15

600

32

2 x 650

3x250

2,682

15/16

600

2 x 651

3x250

2,654

16/17

600

2 x 650

3x250

2,650

19/20

600

3 x 650

3x250

3,300

17/18

600

5x250

1

2,850

18/19

600

2x650

4x250

2900

Page 166: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 167: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 168: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 169: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 170: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 171: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 172: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Plant Cooling System Once Through Cooling System design Considerations

Design Considerations el300 MW

Water Flow Requirement, m3ls

Temperature Rise Across the Condenser, o C

e45 Preliminary

el0 Max

Page 173: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 174: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 175: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 176: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 177: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

2. ESIA-Study Slides

ESlA for El-Aln Al-Sokhna Thermal Power Project No 1312 HB -10 August 2008

Appendtx-F - Page 3 o f 3

Page 178: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 179: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

El-Ain Al-Sokhna Site Plan and the Selected Monitoring Locations

Page 180: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 181: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 182: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

rn F -I

2

a cn 0

A

O I P 0

h) C13 0

a cn 0

5 . - m (D h 7 9) N

A

03 iu

A

P

4

01 ru P

P P "

m

8 9)

a A

P

4

" 01 A

" 01 03

Cn (D O

" A

P

" A 01

" 4 03

ru 4 A

- % (D P I -

a 5 I 0 V) u Fi: 9) -

03 CD in

P 4

A " 4

" 0 01

m - m 5 s 9) 9) -. (D 3

P CD in

4 03

P " CD

CD a 03

IT1 9) V) -. 9) -

ru

in

P 0 "

"

N 0 3 CD

V, 0

P = = A NO

- I % 'II

s s

h) P 5 3 B < CD 3 -

Page 183: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Stack Emissions for Firing with Natural Gas, mg/Nm3 [Ceiling Values of both the Egyptian & the W.B. Standards]

World Bank Guideline

Emission Type

NOx

so2

"MI o

Particulate Matter (all size): TSP

Emission Concentration

Estimate Value

- < 300 mglNm3

Negligible

< 50 mglNm3

< mg/Nm3 -

Egyptian Requirement

300 mglm3

Not Specified

-

200 mglm3

- c 320 mglNm3

Not Specified

-

50 mglNm3

Page 184: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Stack Emissions for Firing with Heavy Fuel Oil, mg/Nm3 [Ceiling Values of both the Egyptian & the W.B. Standards]

Emission Type

NOx

So*

PM1O

Particulate Matter (all size): TSP

Emission Concentration

World Bank Guideline (2)9(3)

- < 460 mg/Nm3

2000 mg/Nm3 2.0 t/d /MWe for the first 500 MWe

Plus 0.1 t/d /MWe additional over 500 MWe

50 mg/Nm3

Estimate Value

- < 300 mg/Nm3

< 2000 mg/Nm3 -

< 50 mgINm3

, 200 mglNm3 -

Egyptian Requirement

300 mg/m3

3600 mg/m3

200 mg/m3

Page 185: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Localization Map Used for Dispersion Modeling

Page 186: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 187: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Receptor Map Used in Air Quality Modeling (MM5 Nested Areas)

[The modeling domain covers the area between Longitudes 230-400 E and Latitudes 220-350 N]

Page 188: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Estimated Maximum Average Concentrations of Nitrogen Dioxide, pg/m3 [Two Al-Sokhna Units (2x650 MWe) Burning Natural Gas and Running as of BAU Scenario]

[Stack Height = 150ml

1

2

3

4

5

6

7 .

8

9

10

Annual

Max. Annual Ave.

Y

-658.8

-888.6

-438.7

-1 108.7

-888.6

-658.8

-1 108.7

-888.6

- 1338.8

-658.8

I -hr

Max. Hourly Ave.

x

-141.5

1 18.6

888.4

888.4

888.4

-141.5

368.5

888.4

628.7

1 148.6

NO2

38.8

32.2

28.8

25.3

23.1

21.6

20.4

19.7

19.6

19.2

24-hrs

Max. 24-Hours Ave.

NO2

266.5

265.1

256.9

255.8

251.4

247.4

246.4

246.1

243.7

243.3

Dis.

669.4

896.5

454.4

1115.1

962.0

754.9

1 168.4

899.8

1344.0

673.8

Y

461.2

-888.6

461.2

-218.8

231.4

-438.7

-888.6

11.3

-438.7

231.4

Dis.

779.7

669.9

691.6

695.8

806.4

918.1

482.4

888.5

896.5

61 1.6

x

-141.5

118.6

888.4

888.4

888.4

-141.5

368.5

888.4

628.7

1148.6

NO2

130.0

125.5

124.5

122.3

1 18.5

1 17.5

1.13.4

1 12.8

109.2

107.0

x

628.7

628.7

118.6

-141.5

-661.5

888.4

.-141.5

888.4

118.6

-401.7

Dis.

482.4

896.5

1001.0

91 5.0

918.1

461 .O

962.0

888.5

766.6

1171.7

Y

461.2

231.4

681.3

681.3

461.2

231.4

461.2

11.3

-888.6

461.2

Page 189: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Estimated Maximum Average Concentrations of Nitrogen Dioxide, pglm3 [Two Al-Sokhna Units (2x650 MWe) and Two Suez Gulf Units (2~340.25 MWe)

Burning Natural Gas and Running as of BAU Scenario] (tack Height = 15Om)

1

2

3

4

5

6

7

8

9

10

Max. Hourly Ave.

NO2

322.1

316.6

312.0

31 1.2

295.7

288.1

288.1

284.9

282.1

279.3

Max. 24-Hours Ave.

Dis.

482.4

896.5

611.6

695.8

779.7

975.2

899.8

11 15.1

669.4

806.4

NO2

130.0

127.6

125.5

122.9

122.4

121.7

120.8

1 19.4

115.9

115.6

Max. Annual Ave.

x

-141.5

1 18.6

-401.7

-141.5

628.7

-401.7

-141.5

118.6

1 18.6

-661.5

Y

-658.8

-888.6

-1 108.7

-888.6

-438.7

-1 108.7

-1 338.8

-658.8

-1 338.8

-888.6

NO2

44.8

43.7

34.7

30.2

28.0

27.9

27.2

24.5

23.8

23.2

Y

461.2

-888.6

461.2

681.3

461.2

-888.6

-888.6

-1 108.7

-658.8

461.2

Y

231.4

11.3

-658.8

-658.8

-438.7

231.4

-888.6

231.4

-1 338.8

-1338.8

Dis.

271.2

888.5

91 0.6

673.8

766.6

918.1

1088.5

1171.7

1344.0

1388.6

x

-141.5

888.4

628.7

-141.5

628.7

888.4

628.7

1 148.6

1 18.6

368.5

Dis.

669.4

896.5

11 15.1

962.0

454.4

1 168.4

1344.0

754.9

1388.6

899.8

x

-141.5

888.4

628.7

-141.5

628.7

888.4

628.7

1 148.6

1 18.6

368.5

Page 190: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Commulative Effect of the Proposed ACSokhna Gas-Fired Power Project and the Existing Suez Gulf Gas- Fired Power Plant (Air Dispersion Modeling Results),

in addition to the Background levels in the Background Atmosphere (Stack Height = 750 m)

NO2

Annual

44.8 (-141.5m, -658.8m)

1.02

45.82

NIA

100

NO2

24-hr

1 30 (-141.5m, 231.4m)

7.49

137.49

150

150

Pollutant

Averaging Period, pg/m3

First Maximum, pg/m3

Background Level (measured by NRC)

Total, pg/m3

Egyptian Limit, pg/m3

World Bank Guideline, pg/m3

NO2

1 hr

322.1 (-141 .5m, 461.2113)

12.69

334.79

400

No Limit

Page 191: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

NO,-Maximum Annual Combined Mean Concentrations in pg/m3 [Two Al-Sokhna Units (2x650 MWe) and Two Suez Gulf Units

(2~340.25 MWe) Burning Natural Gas and Running as of BAU Scenario)

Page 192: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 193: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

NO,-Maximum 7 Hr (Hourly) Combined Mean Concentrations in pg/m3 [Two Al-Sokhna Units (2x650 MWe) and Two Suez Gulf Units

(2~340.25 MWe) Burning Natural Gas and Running as of BAU Scenario)

Page 194: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 195: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 196: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

k 4

$4

b e n

v r

'L 4

$4

6 - "k- t;' h 3

Page 197: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 198: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 199: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 200: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Bathymetry in the Northern Gulf of Suez (Source: Sedimentological Expertise Study" Completed on behalf of EDF,

Using SHOM Map No. 6878 Scale 111 75000, Suez Gulf Power SAE studies, 2000)

Page 201: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 202: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Selected Current Measurements Carried out at Location of Point No. 1 ( E : 43751 2.8443, N: 3275232.627)

Velocity Point

Temperature Conductivity Pressure Direction Date & Time Depth

r

1 Degree C I mmholcm 1 kglcm2 I Degree 1 cmlsec I m

Page 203: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Tidal Heights at Suez and Al-Sokhna

LLWL

-0.10

0.00

020

-0.08

0.45

-0.09

Location

Suez (all year)

Suez (July)

Suez (February to March)

Al-Sokhna measured levels (July 1998)

Al-Sokhna measured levels excluding meteorological set-up (February-March 1999)

Al-Sokhna SUMED Jetty (October-November 1998

MSL

1.04

0.81

1.12

0.70

1.30

1 . I4

MLWL

0.52

0.36

0.60

0.25

-0.48

HHWL

2.00

1.60

2.00

1.55

2.05

2.21

MHWL

1.53

1.38

1.63

1.12

1.79

Page 204: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Current Speed and Direction Adjacent to the Project Site

Minimum Speed 2.3

2.7

0

0

1.8

2.2

2.3

3.1

3.6

4.4

2.9

2.9

6.8

3.5

5.4

7.4

Maximum Speed (cmls) 14.7

13.6

23.8

16.8

8.0

9.4

10.1

8.3

9.5

11.7

15.0

18.3

24.9

16.2

22.3

22.3

Location Oyoun Moussa

West Suez Gulf Power Plant

West Suez Gulf Power Plant

Site A (2.5km from shore)

B (1.5km from shore)

A

B

A (At mid-depth, approximalely 81-17)

6 (Approximatelyl0.5m)

C (At mid-depth, approximately 10m)

A

B

C

A (vertical profile)

6 (vertical profile)

C (vertical profile)

A (vertical profile)

B (vertical profile)

C (vertical profile)

Date 3017195

12/8/95

211 1 198

1011 1198

211 1/98

1011 1198

Page 205: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Location of Sampling Points for Sea Water Quality Analysis

Page 206: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Water Quality at the Project Location Physico-chemical Analysis of Water Samples at the Project Location

(Samples Delivery Date: 29 june 2008)

Parameters

PH

Water Temperature

Electrical Conductivity

Transparency

Total Dissolved Solids

Suspended Solids

Total Solids

Total Alkalinity (as CaCO,)

Chloride(C1-)

Sulfate (SO,--)

Nitrate (NO,-N)

Sodium (Na+)

Potassium (K+)

Manganese

Calcium (Ca+)

Magnesium (Mg++)

Unit

-

OC

pmholcm

cm

mgll

mgll

mgll

mgll

mgll

mgll

mgll

mgll

mgll

~ g l l

mgll

mgll

Site (5)

7.8

26

60500

90

39084

8.9

39092.9

116

24000

438

0.01

10223

613

0.1 1

60 1

1581

Site (4)

8.0

24

59200

90

38889

10

38899

128

25000

432

0.01

10987

684

0.65

56 1

1654

Concentration

Site (3)

8.0

25

62000

90

38795

10.6

38791.6

124

25000

439

0.01

1091 2

692

0.27

56 1

1605

Site (1)

8.0

23

61 150

90

39503

8.6

3951 1.6

120

25000

421 .

0.02

1 1 502

753

Nil

56 1

1703

Site (2)

7.9

24.5

59800

90

39557

9.5

39566.5

122

25000

41 2

0.01

10842

731

0.02

64 1

1654

Page 207: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Water Quality at the Project Location Organic Analysis of Water Samples at the Project Location

(Samples Delivery Date: 29 June 2008)

Parameters

COD

BOD

Oil& Grease

Phenol

Polycyclic Aromatic Hydrocarbons

Total Hydrocarbons

Chlorinated Hydrocarbons

Polychlorinated Biphenyles (PCBs)

Unit

mg0211

mgO,/l

mgll

mgll

~911

~ g l l

P ~ I I

Concentration

Site (5)

30

24.9

16.0

NID

0.0375

84.3

0.062

0.68

Site (4)

28

7.8

16.5

NID

0.038

85.7

0.047

0.76

Site (1

32

16.2

14.8

N/D(2)

0.041

78.6

0.034

0.67

Site (2)

28

16.5

15.1

NID

0.039

79.2

0.049

0.87

Site (3)

32

18

15.3

N/D

0.037

81.6

0.053

0.85

Page 208: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Heavy Metals Analysis of Water Samples (Samples Delivery Date: 29 June 2008)

Parameters Detection

Limits

0.005

0.002

0.02

0.05

0.02

Zinc

Cadmium

Chromium

Lead

Nickel

Unit

mg/l

mg/l

mg/l

mg/l

mg/l

Concentration

Site (5)

N/D

0.14

0.093

1.051

0.674

Site (4)

N/D

0.142

0.092

1.052

0.672

Site (1)

N/Do

0.162

0.096

1.063

0.676

Site (2)

N/D

0.1 58

0.089

1.034

0.669

Site (3)

N/D

0.151

0.091

1.048

0.668

Page 209: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

2 '-

go" 5 2 $ 0 q 1 - a rn n 0 as cn m s 0 a 3 m a m

Page 210: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 211: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Organic Analysis of Sediment Samples (Samples Delivery Date: 29 June 2008)

Parameters

Oil & Grease

Polycylic Aromatic Hydrocarbons

Total Hydrocarbons

Chlorinated Hydrocarbons

Polychlorinated Biphenyles .

(PCBs)

Unit

mg/kg

~ g / k g

~ g / k g

~ g l k g

Concentration

Site (5)

287.6

15.7

568.7

4.46

23.96 .

Site (4)

282.42

13.5

537.6

4.38

24.31

Site (3)

291.02

16.83

403.12

4.01

21.54

Site (1

31 2.4

12.51

423.8

3.02

17.02

Site (2)

278.3

15.13

386.4

3.68

20.01

Page 212: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Heavy Metals Analysis of Sediment Samples (Samples Delivery Date: 29 June 2008)

Detection Limits@) Parameters Unit

Zinc

Cadmium

Chromium

Lead

Nickel

Concentration

mglkg

mg/kg

mg/kg

mg/kg

mg/kg

Site (5)

8.52

2.8

7.3

0.5

4

Site (4)

Site (1

8.42

2.79

7.2

0.48

3.8 -

Site (2)

Site (3)

8.43

2.78

7. I

0.47

3.9

8.72

2.83

7.4

0.46

3.7

8.75

2.84

7.5

0.45

3.8

-

0.002

-

-

-

Page 213: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Concentration of Process Chemicals in Combined Effluent Discharged to Mediterranean Sea

Pollutant Predicted Egyptian World Bank

Concentrations Standards Guidelines (msl-l) (ms 1-I1 (msr )

Biological Oxygen Demand (BOD)

Chlorine (Free)

l ron

Oil and Grease

Suspended Solids (Total)

Zinc

pH

Page 214: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 215: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

By: Dr. Ahmed Sayed Mohamed Ahmed

Associate Professor

Hydraulics Research Institute National Water Research Center

Ministry of Water Resources and Irrigation

Page 216: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 217: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 218: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 219: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 220: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Current Speed (cm/s) e l -

Current Direction ON f P O P ? ' +

0 P g O $ O O O O O \ h ) W P O O \ - - N U W

0O:O 800Zl6Zl£

0O:O 800Zl I £I£ -

0O:O 8OOZIZIP -

0O:O 8OOZlPlP -

$ 0010 8OOZl9lP - R (P

ei 3 0O:O 800Z/81P -

(P

0O:O 8OOZ/O I/P -

0O:O 8OOZ/ZI/P -

0O:O 8OOZ/PI/P -

00:O 800Z19 IIP

0 0 ~ 0 0 0 0 ~ 0 0 0 0 0 0 0 I 1 1 1 1 -.--- L J

am.

i i

me

Page 221: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 222: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 223: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Dat a Analysis and Model Result

Page 224: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 225: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 226: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 227: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 228: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 229: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 230: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 231: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 232: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 233: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 234: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 235: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 236: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Spectrum Graph of Values of Sound Levels for Each Third Octave Band

Location 1 Location 10

(Locations 1, 10, 15 & 20)

Location 15 Location 20

16 3 1 3 61 1 8 20 m lm) HD rm A L W z I Uq I UFY- I LVYn

C- HZ w-477m umprmem L V Y , P S Z ~

. , , , , , . , ,

, . , ,

l r r s I w r I w v l " - M > H I ~ q . ~ s m - ~ m unr~rmsm

Page 237: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 238: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 239: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 240: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Individual Point Sources of a Significant Amount of Noise in the Power Plant [Main Sources Inside the Power Plant (2D view)]

Page 241: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Predicted Operational Noise Levels

Receptor

.

Predicted Level

(dB(A))

58.1

< 55

Fence of the Power Plant at the Suez Gulf BOOT power plant Northern Edge

100 m away from the Fence of the Power Plant

Egyptian Standard (dB(A))

World Bank Guideline (dB(A))

Day-time

70

70

Day-time

70

70

Nig ht-time

60

60

Night-time

70

70

Page 242: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Noise Fiiied Contours for El-Ain A/-Sokhna Power Plant in L,,

Page 243: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Noise Filled Contours for El-Ain Al-Sokhna Power Plant at Night

Page 244: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 245: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 246: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 247: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

l 34

'I,

Page 248: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

An Example of Salt Marshes within the Study Area

Page 249: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Typical Vegetated Coastal Desert Plain of the Study Area

Page 250: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Parts of the Site Showing no Plant Growth (A), while Others Support Patchy Vegetation (B)

Page 251: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 252: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 253: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Geographical Distribution of Fishermen in the Red Sea

Fishermen

Number

Yo

El-Tour

831

5

Gulf of Suez

13,376

75

Hurghada

2,022

11

El-Qusseyr

1,227

7

Page 254: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Clean Sandy Beach along the Whole Study Area

Page 255: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 256: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 257: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 258: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 259: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 260: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 261: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 262: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 263: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 264: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 265: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 266: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Main Access Roads to the Power Plant Site

Page 267: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Average Annual Daily Traffic (AADT) for Suez /Zaafrana Road during Period (2000 - 2007)

Year

Page 268: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

1 Traffic Volume (Veh.lday) I

Page 269: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Locations of Traffic Count Points Fronting Al-Sokhna Power Plant Site

Page 270: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

00 (D 9) cn =' 5 E V, I E ( 0

N

0

C " R

10

10 0

3

0 0 a

10

h

B (D

w a

CO

E

D O (D 9) F ='

T % C

2 2 0

P

10

10 0

3

0 0 n

10

h

< (D

w a

C O W $

D c

0

3 3

0 0 n

3 3 3 3 3 3 h

< F i w

g

0 E.

a x a x a

0

10 a 3

o o o o o o 0 0 n

a

h

Q 5 5 8 8 9 5 w a

8 Iu a

P C cn 5: D T iT

)<

4 - 1 2 0

D c

P

P 0

3

0 0 n

10

h

5 w a

a 0,

f:

0 @.

P

P 0

3

0 0 n

P\)

h

c (D n w

a cn f:

V, 0 0 9) x =. g E 9) 2 n 3

-i 0

E 3

" 0

x 3 3 a,

0

P z

< b 0 0 a

r\>

9 h

9 < (D a w

a 0 a

;II

n

0 -. 5 =. 0

o 3

r z ? S 0,

s n hg

0 0 0 9)

28 -* 3 e, S n

V, 5 0 r, n C 2 2 5

3 49) z x 25

f

o -4

0 % E. a

W

P

Y

< b 0 0 a

h,

9 " Q B (D a w

a 0 CO

IV,

r E (P3k 9) n 9)

I

d I 0

3 a, a a,

10

5

o 0

8

Y n u a, c (D a

-4 cn cn

-I

u, c R

10

3

0 0

8

Y 3 9) c (D a w

2 0

Page 271: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 272: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 273: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Volume-to-Capacity Ratios for Suez/Hurghada Road

Road Volume-to-

Capacity Ratio (VIC)

0.27

0.18

Capacity (C)

1100

1100

Coming From Hurghada to Suez

Coming From Suez to Hurghada

Peak Hour Volume (V)

292

199

Page 274: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Traffic Volume for Suez/Hurghada Road with and without the New Power Plant (in Vehicledhr)

1 . Expected traffic volume in year 2009

2. Expected traffic Volume in year 2010

To Suez

To Hurgada

Morning Peak Hour

To Suez

To Hurgada

Without Power Plant

240

307

Evening Peak Hour

Evening Peak Hour

During Construction

293

354

Without Power Plant

493

346

Without Power Plant

543

381

~ o r n i n ~ Peak Hour '

During Construction

51 5

368

During Construction

565

403

Without Power Plant

271

338

During Construction

318

385

Page 275: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Traffic Volume for Suez/Hurghada Road with and without the New Power Plant (in Vehicledhr)

3. Expected traffic Volume in year 201 1

4. Expected traffic Volume in year 201 2

To Suez

To Hurgada

5. Expected traffic Volume in year 201 3

Evening Peak Hour

To Suez

To Hurgada

Without Power Plant

598

420

Morning Peak Hour

During Construction

620

442

Without Power Plant

299

372

To Suez

To Hurgada

During Construction

346

419

Morning Peak Hour Evening Peak Hour

Without Power Plant

329

410.

Without Power Plant

658

- 462

During Operation

376

457

Morning Peak Hour

During Operation

680

484

Evening Peak Hour

Without Power Plant

362

451

Without Power Plant

724

509

During Operation

406

495

During Operation

768

553

Page 276: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 277: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Traffic Volumes for Related Regional Roads with and without the New Power Plant (in vehicle/hour/direction)

Road Section

Cairol Alex. Desert Highway

Cairol Alex. Agr. Highway

CairolSuez Desert Highway

CairolAin Sokhna Freeway

2009 201 3

Without Const

32969

133244

9606

8064

Without Const.

43956

207425

257 19

12689

During Const

33063

133338

19700

81 58

Post Const.

44043

2075 12

25806

12776

2012 2010

Without Const.

40907

185698

24032

11330

Without Const.

35428

148834

20983

9032

201 1

During Const.

41001

185792

24126

1 1424

During Const.

35522

148928

21077

9126

Without Const.

38069

166247

22456

10116

During Const.

38 1 63

166341

22550

10210

Page 278: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Summary of Generated Operational Traffic

Type Vehicle

HGV

CarILGV

Total

Peak Period

6

81

87

Daily

12

162

174

Page 279: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

4 t

1 7 3 d

'a, '3 od

'"5 $3 4 ~3 'Ir, t 9% 9 7; .qu C

==5 a

S rn

Page 280: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 281: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 282: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 283: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 284: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Spatial Locations of Major Basic Economic Activities in Suez Governorate (Source: EEAA, DANIDA, GOS: The Environmental Profile of the Governorate of Sues, 2004)

Page 285: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 286: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 287: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

'a, 3 % 9 > % 4 3

3 C U

5 C

r), C

%I

3 ,as '1 C

1 4' 9 9

Page 288: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 289: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

~3 'a,

Page 290: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 291: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 292: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 293: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 294: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Seismicity Map of Egypt and Surrounding Areas in the Period : 1900 - 1996 (Compiled from Different Authors)

C A

YUM

Page 295: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 296: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 297: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 298: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Google Spot Image Showing the Location of the Existing 7 Dams Constructed alongwith the Main Tributaries of

Wadi Gh weibba Drainage System

Page 299: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 300: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 301: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 302: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 303: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 304: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 305: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 306: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 307: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 308: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

E

":.

k L

m c c st" 4

4 n 4

Page 309: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 310: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 311: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

\ "a, 3;4

Page 312: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 313: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 314: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 315: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 316: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 317: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 318: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

-9 @r

b d

& ~ l &I iJA4

W d i_??lw &+

U l j L k i j w U j L td4~idl

ow

(discharge plume)

f@4) @JC &&

LA& jfl &~II oli &vul -Jl 2 9 Jkj Li.pj ( ( 3 j ~ l U + 6 2 o J J

LjJdill

4& &'t J&J alj! .9&Jl&

khJ + dl C S I & ~ ~ ~ I

gi L~~IAI

. p~ $ ~ W I

(COD m L l LTSS ml iSSfl-l rl+13

& ~ d l s ~e.+Jls ~HJIJ uP;.1! & d l ~ 9 1 s L+J~

L-l wl twAI3 (BOD . DO ~ 9 l g (TOC

. &$91 csI:&dlJ iJ&l (j'kdl

&A fq &I&?( uu\ . dl

9 ~ 9 1

hidl 9y: "!G

~9 J b o+l

&.+I

(I)&&!

+!dl3 Gyl

(2) &-dl &&+I

Page 319: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 320: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes
Page 321: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

Appendix G

SELECTED PHOTOS

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 Appendix -G- Page 1 of 16 HB -10 August 2008

Page 322: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

~~~~~ -- -- --

ESIA for El-Ain Al-Sokhna Thermal Power Project No 13 12 Appendix -G- Page 2 of 16 HB -10 August 2008

Page 323: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB -10 August 2008

Appendix -G- Page 3 of 16

Page 324: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

A for El-Ain Al-Sokhna Thermal Power Project No 1312 -10 August 2008

Appendix -C- Page 4 of 16

Page 325: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain At-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Appendix -G- Page 5 of 16

Page 326: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESI HB

A for El-Ain Al-Sokhna Thermal Power Project No 13 I 2 -10 August 2008

Append~x -G- Page 6 o f 16

Page 327: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP &JL~J,~~WA&~

ESIA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 Augus; 2008

Appendix -G- Page 7 of 16

Page 328: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB - I0 August 2008

Append~x -G- Page 8 of 16

Page 329: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB -10 August 2008

Appendix -G- Page 9 of 16

Page 330: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP &~wdLs-/dhb

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB -10 August 2008

Appendix -G- Page 10 of 16

Page 331: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB - I0 August 2008

- -

Append~x -G- Page 1 1 of 16

Page 332: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

:NGINEERING CONSULTANTS GROUP & J ! & k&

p~

ESIA for El-Ain Al-Sokhna Thermal Power Project No 1312 Appendix -G- Page 12 of 16 HB -10 August 2008

Page 333: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP &dwdwah'Le

- -- - -

ESlA for El-Aln Al-Sokhna rhermal Power Pro~eci No 1312 Append~x -G- Page 1 3 of 16 HB -10 August 2008

Page 334: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP &dwdts-/Abb

ESlA for El-Ain Al-Sokhna Thermal Power Project No 13 12 HB -10 August 2008

Appendix -G- Page 14 of 16

Page 335: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS CROUP

ESlA for El-Ain Al-Sokhna Thermal Power Project No 1312 HB - I0 August 2008

Appendlx -G- Page 15 of 16

Page 336: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

ENGINEERING CONSULTANTS GROUP &JW&~&&V

- --- -- - -

ESlA for El-Aln Al-Sokhna Thermal Power Project No 13 12 Appendlx -C- Page 16 of 16 HB - I0 August 2008

Page 337: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

Annex E

THERMAL PLUME MODELING

Page 338: El-Ain Al-Sokhna 2x650 MWe GAS/OIL PROJECT Al-Sokhna 2x650 MWe GAS/OIL THERMAL POWER PROJECT Environmental and Social Impact Assessment ANNEXES Consultation Activities & Other Annexes

The Study of the Hydraulics Research Institute will Follow