Trelleborg Offshore
Offshore
Marine Oceanographic Defence Aerospace Composites Industrial
Cable &
Flowline
Thermal
InsulationDrilling
Engineered
ProductsSubseaSeismic Down hole
Fire
Protection
Other markets
15-Feb-17 TRELLEBORG GROUP2
15-Feb-17 TRELLEBORG GROUP3
Risers
Topside facility
(Platform, floater…)
Subsea arches
Production flowlines
Injection wells
Production wells
Touchdown point Chem. Line (s)
Control umbilicalInjection line
Daisy Chain
Subsea thermal insulation
15-Feb-17 TRELLEBORG GROUP4
Thermal insulation is an essential component of flow assurance
Improve efficiency and protect against wax and hydrate formation
Why do we insulate?
Maintains
a min temp
during the ’no
touch’ time
Trends in insulation of subsea structures and pipelines
15-Feb-17 TRELLEBORG GROUP5
But at the same time
" Easy oil" is starting to run out in certain areas
Drive to explore deeper
Drive toward harsher environments
Deeper oil can be hotter and higher pressure
Developments are more expensive and fields fragmented
Concerns about Wax and Arrival Temperature
hydrates came as a surprise to many......
OLGA
Relatiely few suppliers of insulation services
15-Feb-17 TRELLEBORG GROUP6
Flow assurance is a issue and Thermal
Management becomes a issue.
• More complex completions
• More complex hydrocarbons
• Longer tie-ins and tie-backs
• Deeper water
• Artificial lift starts to be used
• Subsea Processing
• Min. Arrival temperature
Longer transfer runs
Hydrate problems
Wax problems
More extensive use of seabed equipment (trees, manifolds, ...)
Heat loss a growing problem as hot oiling can’t be used
Subsea insulation of structures and Pipelines
15-Feb-17 TRELLEBORG GROUP7
Insulation of subsea structures
15-Feb-17 TRELLEBORG GROUP8
• Subsea processing is proposed – Troll Pilot – and seen to work
• S2B concepts with larger levels of autonomous operation are
developed
• High levels of redundancy are required for stable up-time
• Distances become too large for methanol and MEG inhibition due to
size of regeneration plant
• Active heating concepts in combination with wet Insulation
• Flow assurance becomes the main driver for field design
• In-country content is a requirement for success
• Complexity of structures leads to work being performed at client’s
facility
Insulation of Pipelines
15-Feb-17 TRELLEBORG GROUP9
Multiflow Pipelines have been insulated since late 80’s and today there
is a large selection of systems
• Wet insulation• Polypropylene based systems
• Polyurethane based systems
• Rubber based systems
• Pipe In Pipe• Bonded and unbonded
• Active heating• Direct Electrical Heating
• Heat tracing in PIP
Thermal Insulation
15-Feb-17 TRELLEBORG GROUP10
Trelleborg Offshore can deliver a wide range of thermal insulation
Products Type of product Temp. Limit
hot/wet
(0C/0F)
Depth Limitation (m/ft)
VikothermTM R2 Rubber 155/311 3.000/9.843
VikothermTM S1 Solid Silicone 135/275 3.000/9.843
VikothermTM E2 Syntactic epoxy 100/212 2.000/6.562
VikothermTM P7 Solid Polyurethane 90/194 7.000/22.966
VikothermTM E1 Syntactic epoxy 90/194 2.000/6.562
VikothermTM PT Polypropylene tape 90/194 2.000/6.562
VikothermTM G3 Syntactic Polyurethane 60/140 1.800/5.905
VikothermTM PP Multi Layer Polypropylene 155/311 7.000/22.966
Vikotherm™
rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP
Products that can use the Vikotherm™ range
Doghouses
Covers
Half shells
Risers
15-Feb-17 TRELLEBORG GROUP11
Subsea Trees
Manifolds
PLET & PLEM
Flowlines
Spool pipes
Jumpers
Connectors
Vikotherm™ R – Subsea TreeVikotherm™ EVikotherm™ G – Valve Block
Vikotherm™
rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP
TRELLEBORG GROUP12
Moho Nord – Egersund, Norway
• Installed in 2016
• Water depth 1200m
• Design temp 80 °C
• 6 no. Manifolds
• 2no. Pig Loops
• 213 Tonnes PU applied
Vikotherm™
rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP
Vikotherm™ P
15-Feb-17
TRELLEBORG GROUP13
Moho Nord – Egersund, Norway
Vikotherm™
rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP
Vikotherm™ P
15-Feb-17
TRELLEBORG GROUP14
Dalia – Port Klang, Malaysia
• Installed in 2017
• Water depth 1200-1500 m
• Design temp 50°C
• 5 No. PXT’s and MPFM
Vikotherm™
rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP
Vikotherm™ G
15-Feb-17
TRELLEBORG GROUP15
Erha North Phase II – Lagos, Nigeria
• Installed in 2015
• Water depth 1200m
• Design temp -12 - 115°C
• 28 no. Production jumpers
• FLETs / ITAs
Included S1 to 5LPP Field Joints
Vikotherm™
rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PT
Vikotherm ™ S1
15-Feb-17
TRELLEBORG GROUP16
Husky White Rose – New Foundland, Canada
• Installed in 2016
• Water depth 130m
• Design temp 110°C
• 6 no. Rigid Production jumpers
Included S1 to Vikotherm™ R2
Vikotherm™
rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP
Vikotherm ™ S1 & R
15-Feb-17
Bøyla Manifold and PLEM
17 15-Feb-17
Vikotherm™
rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP
Vikotherm ™ R
TRELLEBORG GROUP
Bonga Flowline Jumpers
Vikotherm™
rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP
Vikotherm ™ R
15-Feb-17 TRELLEBORG GROUP18
Well & Flowline Jumpers - Kizomba C
Vikotherm™
rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP
Vikotherm ™ R
15-Feb-17 TRELLEBORG GROUP19
Scope: VIV Strakes, Buoyancy, Thermal Insulation
15-Feb-17 TRELLEBORG GROUP20
Fusion Bonded Epoxy, Adhesive and Flame Spray PP/PE
Will construct a powder application booth with good extraction system to avoid unnessesary
powder in the facility
Will be able to apply FBE and PP/PE adhesive by flocking
Will be able to apply FS-PP/PE up to 5 mm
Vikotherm™
rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP
Vikotherm ™ PP
15-Feb-17 TRELLEBORG GROUP21
Applying PP
We have invested in one extruder for the IMPP line.
Investing in material transfer system (Accumulators) and mould assembly station.
Vikotherm™
rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP
Vikotherm ™ PP
15-Feb-17 TRELLEBORG GROUP22
Vikotherm™
rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP
Vikotherm ™ PP
Goosneck and bend Insulation
Our thermal insulation heritage, is global
TRELLEBORG GROUP23 15-Feb-17
Vikotherm™