24

eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 2: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

Trelleborg Offshore

Offshore

Marine Oceanographic Defence Aerospace Composites Industrial

Cable &

Flowline

Thermal

InsulationDrilling

Engineered

ProductsSubseaSeismic Down hole

Fire

Protection

Other markets

15-Feb-17 TRELLEBORG GROUP2

Page 3: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

15-Feb-17 TRELLEBORG GROUP3

Risers

Topside facility

(Platform, floater…)

Subsea arches

Production flowlines

Injection wells

Production wells

Touchdown point Chem. Line (s)

Control umbilicalInjection line

Daisy Chain

Page 4: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

Subsea thermal insulation

15-Feb-17 TRELLEBORG GROUP4

Thermal insulation is an essential component of flow assurance

Improve efficiency and protect against wax and hydrate formation

Why do we insulate?

Maintains

a min temp

during the ’no

touch’ time

Page 5: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

Trends in insulation of subsea structures and pipelines

15-Feb-17 TRELLEBORG GROUP5

But at the same time

" Easy oil" is starting to run out in certain areas

Drive to explore deeper

Drive toward harsher environments

Deeper oil can be hotter and higher pressure

Developments are more expensive and fields fragmented

Concerns about Wax and Arrival Temperature

hydrates came as a surprise to many......

OLGA

Relatiely few suppliers of insulation services

Page 6: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

15-Feb-17 TRELLEBORG GROUP6

Flow assurance is a issue and Thermal

Management becomes a issue.

• More complex completions

• More complex hydrocarbons

• Longer tie-ins and tie-backs

• Deeper water

• Artificial lift starts to be used

• Subsea Processing

• Min. Arrival temperature

Longer transfer runs

Hydrate problems

Wax problems

More extensive use of seabed equipment (trees, manifolds, ...)

Heat loss a growing problem as hot oiling can’t be used

Page 7: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

Subsea insulation of structures and Pipelines

15-Feb-17 TRELLEBORG GROUP7

Page 8: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

Insulation of subsea structures

15-Feb-17 TRELLEBORG GROUP8

• Subsea processing is proposed – Troll Pilot – and seen to work

• S2B concepts with larger levels of autonomous operation are

developed

• High levels of redundancy are required for stable up-time

• Distances become too large for methanol and MEG inhibition due to

size of regeneration plant

• Active heating concepts in combination with wet Insulation

• Flow assurance becomes the main driver for field design

• In-country content is a requirement for success

• Complexity of structures leads to work being performed at client’s

facility

Page 9: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

Insulation of Pipelines

15-Feb-17 TRELLEBORG GROUP9

Multiflow Pipelines have been insulated since late 80’s and today there

is a large selection of systems

• Wet insulation• Polypropylene based systems

• Polyurethane based systems

• Rubber based systems

• Pipe In Pipe• Bonded and unbonded

• Active heating• Direct Electrical Heating

• Heat tracing in PIP

Page 10: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

Thermal Insulation

15-Feb-17 TRELLEBORG GROUP10

Trelleborg Offshore can deliver a wide range of thermal insulation

Products Type of product Temp. Limit

hot/wet

(0C/0F)

Depth Limitation (m/ft)

VikothermTM R2 Rubber 155/311 3.000/9.843

VikothermTM S1 Solid Silicone 135/275 3.000/9.843

VikothermTM E2 Syntactic epoxy 100/212 2.000/6.562

VikothermTM P7 Solid Polyurethane 90/194 7.000/22.966

VikothermTM E1 Syntactic epoxy 90/194 2.000/6.562

VikothermTM PT Polypropylene tape 90/194 2.000/6.562

VikothermTM G3 Syntactic Polyurethane 60/140 1.800/5.905

VikothermTM PP Multi Layer Polypropylene 155/311 7.000/22.966

Vikotherm™

rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP

Page 11: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

Products that can use the Vikotherm™ range

Doghouses

Covers

Half shells

Risers

15-Feb-17 TRELLEBORG GROUP11

Subsea Trees

Manifolds

PLET & PLEM

Flowlines

Spool pipes

Jumpers

Connectors

Vikotherm™ R – Subsea TreeVikotherm™ EVikotherm™ G – Valve Block

Vikotherm™

rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP

Page 12: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

TRELLEBORG GROUP12

Moho Nord – Egersund, Norway

• Installed in 2016

• Water depth 1200m

• Design temp 80 °C

• 6 no. Manifolds

• 2no. Pig Loops

• 213 Tonnes PU applied

Vikotherm™

rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP

Vikotherm™ P

15-Feb-17

Page 13: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

TRELLEBORG GROUP13

Moho Nord – Egersund, Norway

Vikotherm™

rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP

Vikotherm™ P

15-Feb-17

Page 14: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

TRELLEBORG GROUP14

Dalia – Port Klang, Malaysia

• Installed in 2017

• Water depth 1200-1500 m

• Design temp 50°C

• 5 No. PXT’s and MPFM

Vikotherm™

rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP

Vikotherm™ G

15-Feb-17

Page 15: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

TRELLEBORG GROUP15

Erha North Phase II – Lagos, Nigeria

• Installed in 2015

• Water depth 1200m

• Design temp -12 - 115°C

• 28 no. Production jumpers

• FLETs / ITAs

Included S1 to 5LPP Field Joints

Vikotherm™

rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PT

Vikotherm ™ S1

15-Feb-17

Page 16: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

TRELLEBORG GROUP16

Husky White Rose – New Foundland, Canada

• Installed in 2016

• Water depth 130m

• Design temp 110°C

• 6 no. Rigid Production jumpers

Included S1 to Vikotherm™ R2

Vikotherm™

rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP

Vikotherm ™ S1 & R

15-Feb-17

Page 17: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

Bøyla Manifold and PLEM

17 15-Feb-17

Vikotherm™

rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP

Vikotherm ™ R

TRELLEBORG GROUP

Page 18: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

Bonga Flowline Jumpers

Vikotherm™

rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP

Vikotherm ™ R

15-Feb-17 TRELLEBORG GROUP18

Page 19: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

Well & Flowline Jumpers - Kizomba C

Vikotherm™

rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP

Vikotherm ™ R

15-Feb-17 TRELLEBORG GROUP19

Scope: VIV Strakes, Buoyancy, Thermal Insulation

Page 20: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

15-Feb-17 TRELLEBORG GROUP20

Fusion Bonded Epoxy, Adhesive and Flame Spray PP/PE

Will construct a powder application booth with good extraction system to avoid unnessesary

powder in the facility

Will be able to apply FBE and PP/PE adhesive by flocking

Will be able to apply FS-PP/PE up to 5 mm

Vikotherm™

rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP

Vikotherm ™ PP

Page 21: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

15-Feb-17 TRELLEBORG GROUP21

Applying PP

We have invested in one extruder for the IMPP line.

Investing in material transfer system (Accumulators) and mould assembly station.

Vikotherm™

rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP

Vikotherm ™ PP

Page 22: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

15-Feb-17 TRELLEBORG GROUP22

Vikotherm™

rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP

Vikotherm ™ PP

Goosneck and bend Insulation

Page 23: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a

Our thermal insulation heritage, is global

TRELLEBORG GROUP23 15-Feb-17

Vikotherm™

rangeVikotherm™ E Vikotherm™ G Vikotherm™ P Vikotherm™ R Vikotherm™ S Vikotherm™ PP

Page 24: eirik.simonsen@trelleborg - NORWEP · OLGA Relatiely few suppliers of insulation services. 6 15-Feb-17 TRELLEBORG GROUP Flow assurance is a issue and Thermal Management becomes a