Upload
lyphuc
View
214
Download
0
Embed Size (px)
Citation preview
EirGrid - Gate 3 Liaison Group
Aidan Corcoran, Grid25 Programme Manager
Presentation to Gate 3 Liaison Group, 22nd February 2010
2,200 km Upgrades
1,150 km New Build
€4 billion
€4 bn
Developing the Grid - Grid25
Challenge
Getting the Balance Right:
• Reliability
• Cost
• Impact
Public Acceptability
The Playing Pitch
Grid25 Implementation
• Grid25 – Workstreams– EirGrid Structural Change
– Planning/Environmental Issues
– Stakeholder Management• Stakeholder Interaction
• National Engagement
• Regional Engagement
– Strategic Consultation/Policy Development
– Network Plans
– Ongoing Projects
• Support from Stakeholders
EirGrid Structural Change
SE/Dublin
Region
Projects
SW Region
Projects
North Region
Projects
Transmission
Maintenance +
EngineeringE/W Project
• Significant growth in programme
• Importance of regional knowledge + relationships
• Build/Enhance in-house competencies
• Programme Management
• Wayleave Management
Grid25
Programme
Office
Project Support Functions (Public Planning,
Wayleaving, Contract Management, Training, QA)
EirGrid
Structure
Programme Level
FunctionRegion 1
Manager &
PM Team
Region 2
Manager &
PM Team
Region 3
Manager &
PM Team
Transmission Maintenance + Engineering
TSE, Client Engineers, Asset Management, H&S
Other GDC
Network Planning, Customer Relations
Operations
Operational specifications, Outage Management, Commissioning
Corporate Resources
HR, Finance, Regulatory, IT Support, Facilities
LEGAL
Project Support Functions
Wayleave Services, Planning, Contract Management, Training, QA
Core Team
Supplementary Skills
GDC - Other
Operational Skills
Corporate Resources
Manager
PR
Manager
TME
Head of
Legal
Relevant
GDC mgr.
Relevant
Ops mgr.
Relevant
Managers
PR PR PR
Planning Environmental Policy
• Setting up the space to facilitate the submission of a robust planning application and the grant of permission– Input into Planning and Development (amendment)
Bill
– Input in new NSS/NDP as appropriate
– Input to Regional Planning Guidelines – ongoing• Three drafts published (West, Mid West, Greater Dublin)
• Balance awaited
– Input to County Development Plans - ongoing
– Preparation of SEA for Grid25 Implementation -ongoing
SEA for Grid 25• EirGrid is carrying out SEA on Grid25
– In accordance with European Directive – 2001/42/EC
– Best Practice, CSR to carry out SEA on plans/programmes
– Reinforces EirGrid’s commitment to environment
• Recent engagement with EPA - Consultation Process for SEA
defined
– Scoping with 3 prescribed bodies – EPA, DCENR, DOEHLG
– Wider formal consultation to follow – Public Participation
– Synergy with Sustainable Energy Ireland SEA on Offshore Renewables
• Outputs:
– Environmental Report (including mitigation measures/guidelines)
– SEA Statement
Stakeholder Management
• Ongoing Briefings (In association with Chambers Ireland)– Grid25 briefings given in 10 locations (Donegal, Kerry, Waterford etc)
• Conferences
• Regular briefing of politicians, media e.g.– Fine Gael Parliamentary Party briefing last week
– Invitation to other Parties to brief
• Maintaining and developing links e.g.– Business and industry (IBEC, IDA, Enterprise Ireland)
– NPWS
– An Taisce
• Opportunities for Informational Programme (Including Education)– Green Schools
– Ploughing Championships 2010
– Young Scientists 2011
– Engineers Ireland Week of Wonder
– Dublin City of Science 2012
GRID 25
• Current Work Streams
• Planning for Regional and Project launch
• Scheme Development
• Project Strategy
Strategy Prior to Public Consultation on
a Scheme
• Continue to Build Awareness
• Continue strategic input to RPGs etc
• Complete SEA Process
• National Stakeholder Forum
– Develop National/EirGrid Policy Guidelines
• Regional Stakeholder Forum
• Regional Consultation
• Commence Consultation of Schemes
Policy Issues
• Landscape and visual amenity (Holford Rules)
• Options for undergrounding
• EMF
• Noise
• Public Planning Guidelines
• Habitats Directive / Cultural Heritage
• Community Gain / Compensation
National Stakeholder Forum
The objectives of the national stakeholder forum would
be as follows:
•To build consensus and promote a common understanding among
stakeholders about the need for infrastructure build
•To advise on and influence National/EirGrid policy on the development of
electricity networks.
•To provide/generate support for Regional Advisory Forums
•Set framework for regional forum participants
Participants: Industry, Business, National Planning Groups etc
Regional Stakeholder Forum
• To promote a common understanding among stakeholders about the need
for infrastructure build, and solutions
• To advise EirGrid on local issues including planning and proposed
development within a region.
• To advise on local business requirements including future need for energy.
• To express support for Transmission development.
Development of a “Scheme”
Consult on
Route
Alternatives
Consult on
Study Area
Consult
on
Proposed
Route
Corridor
*
Primary Corridors for
Reinforcement
Major Regional Projects
• North West
– RIDP
– Mayo to East
• South East
– Cork to Dublin
• South West
– Tarbert to Cork
• North East
– 400kV development
Ongoing Projects with Planning Permission
• Flagford - Srananagh 220kV Line
• 110kV Loops into Newbridge 110kV Station
• Lodgewood 220kV Development
• 110kV Loops into Cashla 220kV station
• Cushaling – Thornsberry 110kV Project
• Arva – Shankill 110kV Project
• Binbane – Letterkenny 110kV Project
• Gorman - Navan 3 110kV project
• Gorman – Meath Hill 110kV Project
• Banogue 110kV project
• Athy 110kV loops
• Tarbert - Tralee 2 110kV project
Example Projects in Public/Pre Application
Consultation Process (with EirGrid capital
approval)
• Loughteeogue 400/110kV project
• Athlone Shannonbridge 110kV project
• Mullingar – Cushaling/Derryiron 110kV
Project
• Aghada Raffeen development
• Moneypoint Tarbert 400kV Cable
• South West developments
GH
COOKSTOWN
MACETOWNRB
275kV
CATHALEEN'S
FALL CLIFF
SLIGO
TAWNAGHMORE
MOY
CASTLEBAR
PLATIN
NAVAN
MULLINGAR
ATHLONE
CASHLA
GALWAY
ENNIS
DALLOW
TURLOUGH
HILL
ARKLOWSHELTON
ABBEYCARLOW
KILKENNY
THURLES
CAHIR
DOON
ANNERBALLYDINE
GREAT ISLAND
BARRYMORE
MALLOW
CHARLEVILLE
BANDON
DUNMANWAY
MACROOM
KNOCKEARAGH
RATHKEALE
MONEYPOINT
TARBERT
CARRICK
-ON-
SHANNON
LANESBORO
BRINNY
THORNSBERRY
KELLIS
TO TANDRAGEE
TO STRABANE
BUTLERSTOWN
DUNGARVAN
DRYBRIDGE
BLAKE
SHANKILL
LISDRUM
LOUTH
DUNDALK
BELLACORICK
TULLABRACK
MUNGRET
MONETEEN
GRANGE
MAYNOOTH
FASSAROE
AUGHINISH
POLLAPHUCA
CLOON
TO ENNISKILLEN
KNOCKRAHA
KILBARRY
SOMERSET
RAFFEEN
AGHADA
GOLAGH
WATERFORD
GILRA
IKERRIN
NORTHERN
IRELAND
NORTH WALL
POOLBEG
SHELLYBANKS
KILTEEL
LISHEEN
GORTAWEE
OUGHTRAGH
CUSHALING
ARVA
MULLAGHARLIN
SHANNONBRIDGE
ARIGNA
TRILLICK
IRISHTOWN
CARRIGADROHID
COOLROE
TRABEG
INNISCARRA
MARINA
DUNFIRTH
STRATFORD
KINNEGAD
BALLYLICKEY
DALTON
CORRACLASSY
OLDSTREET
CLASHAVOON
BALLYBEG
CUNGHILL
KILLOTERANCULLENAGH
TIPPERARY
HUNTSTOWN
GLENLARA
ARDNACRUSHA
KILMORE
FINGLASCOLLEGE
PARKDERRYIRON
SEE
DUBLIN
AREA
TRALEE
TRIEN
PROSPECT
DRUMLINE
GLASMORE
AHANE
WOODLAND
CASTLEFARM
SEALROCK
CORDERRY
BALLYWATER
GORMAN
DERRYBRIEN
AGANNYGAL
CLONKEEN
COOMAGEARLAHY
BOOLTIAGH
SORNE
HILL
RATRUSSAN
GLANLEE
Transmission System400 kV, 220 kV and 110 kV
January 2008
BARODANEWBRIDGE
MONREAD
CORDUFF
CRANE
KILTOY
LETTERKENNY
MEENTYCAT
DRUMKEEN
BINBANE
TYNAGH
LIMERICK
PORTLAOISE
DUNSTOWN
RINAWADE
INCHICORE
CARRICKMINES
WEXFORD
KILLONAN
KNOCKUMBER
MEATH
HILLTONROE
FLAGFORD
RICHMOND
WHITEGATE
Existing Network South West
GH
COOKSTOWN
MACETOWNRB
275kV
CATHALEEN'S
FALL CLIFF
SLIGO
TAWNAGHMORE
MOY
CASTLEBAR
PLATIN
NAVAN
MULLINGAR
ATHLONE
CASHLA
GALWAY
ENNIS
DALLOW
TURLOUGH
HILL
ARKLOWSHELTON
ABBEYCARLOW
KILKENNY
THURLES
CAHIR
DOON
ANNERBALLYDINE
GREAT ISLAND
BARRYMORE
MALLOW
CHARLEVILLE
BANDON
DUNMANWAY
MACROOM
KNOCKEARAGH
RATHKEALE
MONEYPOINT
TARBERT
CARRICK
-ON-
SHANNON
LANESBORO
BRINNY
THORNSBERRY
KELLIS
TO TANDRAGEE
TO STRABANE
BUTLERSTOWN
DUNGARVAN
DRYBRIDGE
BLAKE
SHANKILL
LISDRUM
LOUTH
DUNDALK
BELLACORICK
TULLABRACK
MUNGRET
MONETEEN
GRANGE
MAYNOOTH
FASSAROE
AUGHINISH
POLLAPHUCA
CLOON
TO ENNISKILLEN
KNOCKRAHA
KILBARRY
SOMERSET
RAFFEEN
AGHADA
GOLAGH
WATERFORD
GILRA
IKERRIN
NORTHERN
IRELAND
NORTH WALL
POOLBEG
SHELLYBANKS
KILTEEL
LISHEEN
GORTAWEE
OUGHTRAGH
CUSHALING
ARVA
MULLAGHARLIN
SHANNONBRIDGE
ARIGNA
TRILLICK
IRISHTOWN
CARRIGADROHID
COOLROE
TRABEG
INNISCARRA
MARINA
DUNFIRTH
STRATFORD
KINNEGAD
BALLYLICKEY
DALTON
CORRACLASSY
OLDSTREET
CLASHAVOON
BALLYBEG
CUNGHILL
KILLOTERANCULLENAGH
TIPPERARY
HUNTSTOWN
GLENLARA
ARDNACRUSHA
KILMORE
FINGLASCOLLEGE
PARKDERRYIRON
SEE
DUBLIN
AREA
TRALEE
TRIEN
PROSPECT
DRUMLINE
GLASMORE
AHANE
WOODLAND
CASTLEFARM
SEALROCK
CORDERRY
BALLYWATER
GORMAN
DERRYBRIEN
AGANNYGAL
CLONKEEN
COOMAGEARLAHY
BOOLTIAGH
SORNE
HILL
RATRUSSAN
GLANLEE
Transmission System400 kV, 220 kV and 110 kV
January 2008
BARODANEWBRIDGE
MONREAD
CORDUFF
CRANE
KILTOY
LETTERKENNY
MEENTYCAT
DRUMKEEN
BINBANE
TYNAGH
LIMERICK
PORTLAOISE
DUNSTOWN
RINAWADE
INCHICORE
CARRICKMINES
WEXFORD
KILLONAN
KNOCKUMBER
MEATH
HILLTONROE
FLAGFORD
RICHMOND
WHITEGATE
Ballyvouskil
Kishkeam
Knockanure
CORDAL
KNOCKACUMMER
GARROW
KILGARVAN
KERRY
CLAHANE
BARNADEVINE
CLOUGHBOOLA
ATHEA
KIPPALOCK
TOEM
BOGGERAGH
700MW
305MW
520MW
280MW
DROMADA
Kilpaddogue
GRID25 Network Development South West
Strategy/Support
• Long term Strategy
• Support requested
– Media
– Political
– Meath - Tyrone 400kV Development
• Project submitted to An Bord Pleanála 18th
December
• Submissions to ABP by March 12th
– Flagford – Srananagh 220kV Line
Questions