    FLM Duty Roaster

    BSS & TXN Duty Roaster

    Area Manager & Team Leads Roaster

    NOC Duty Roaster

    Vehicle Availability for CM activity

    Fueling & Security Plan Escalation Level For North-II Region

    Step Taken to ensure smooth Network Services During Eid Festiv

  • 8/10/2019 EID Radiness Plan for 2014, North-II--.pptx

    3/13

    ZTE - Telenor - HNL

    EID Readiness - Resources Availability Roaster

  • 8/10/2019 EID Radiness Plan for 2014, North-II--.pptx

    4/13

    Management, AM Team Lead & Duty Roaster :-

    Availability of HNL staff for EID

    Inam Khan (Available for follow up) Regional Manager (North-II)

    0345-8293184/0514431783

    Skype ID :inamkhan29

    Adnan Ali (Available for follow up) Assistant RM0346-4417031

    Skype ID: engr.adnan58

    Naseeb Ullah (Available for follow up) Back Office Manager 0345-5858099

    Zeeshan Aman(Available for follow up) NOC Manager0345-8408112 :

    Skype ID: fastian_24

    Raheel Wahab(Available for follow up) AM Peshawar0346-4417074

    Skype ID: raheel.khan602

    Saeed/Mushtaq(Available for follow up) AM Mardan 3459323334/03420199638

    Hilal/Munnawar(Available for follow up) AM Abbottabad 3444459722

    Mushtaq Ahmad(Available for follow up) AM D.I.Khan 3444459606

  • 8/10/2019 EID Radiness Plan for 2014, North-II--.pptx

    5/13

    NOC Duty Roaster:

    24/7 Helpdesk

    N-II HNL NOC:

    3464417070,3464417069,03355708006NOC Skype ID: NOC-HITECH

    Deportment Sub Region Name Designation Contact Num

    BO Peshawar Naseeb Ullah BO Team lead 34558580

    NOC Peshawar Zeeshan Aman NOC TL 34584081

    NOC Peshawar Adil Ahmad NOC

    03464417070/034

    NOC Peshawar Jehanzeb NOC

    NOC Peshawar Rizwan NOC

    NOC Peshawar Faheem NOC

    NOC Peshawar Wali NOC

    NOC Peshawar Aqib NOC

  • 8/10/2019 EID Radiness Plan for 2014, North-II--.pptx

    6/13

    ZTE - Telenor

    EID Readiness - Fueling & Security Plan

  • 8/10/2019 EID Radiness Plan for 2014, North-II--.pptx

    7/13

    EID Readiness For Fueling Fuel is maintained up to 300 liter's on All DWDM/MHUB & HIR Sites.

    Special move plan to cater outages during Eid is planned and will start from 26thJuly.

    Emergency Fueling team will be on call in all sub-region for smooth fueling services.

    LGL Eid Roster

    NOC NII

    Day1/Night1 Day2/Night2 Day3/Night3 Day4/Night4

    Sohail/Imdad Waqar/Imdad Sohail/waqar imdad/waqartpn

    03239282582/03470957981 03239288662/03470957981 03239282582/03239288662 3470957981/03239288662

    BackupShabir Ahmad Shabir Ahmad Shabir Ahmad Shabir Ahmad Sha

    03453695556/03339995947 03453695556/03339995947 03453695556/03339995947 03453695556/03339995947

    mailto:[email protected];
  • 8/10/2019 EID Radiness Plan for 2014, North-II--.pptx

    8/13

    Salary Disbursement starting from today 24thJuly and will be completed before 28thJuly Eid for smooth

    Operation.

    ZTE NS representative will be available at ZIMS helpdesk to ensure smooth access at all sites.

    A special team of guards will be deployed ZIMS security ready to move in case of any emergency situatio

    This team will also be performing visits to all MHUB and BSC sites during Eid days.

    All ZTE NS executives will be on standby incase of any emergency.

    MSCs Officer will be on their duty at Core locations and Backup team will keep visiting on recurrent bas

    EID Readiness For Security

  • 8/10/2019 EID Radiness Plan for 2014, North-II--.pptx

    9/13

    Shaqoori Core Eid Roster

    Regional Team ON Call

    Shift Region Responsibility Day before EID EID Day-1 EID Day-2

    Full Day North 1&2 MSKhizar mahmood

    (RM)

    Khizar mahmood

    (RM)

    Khizar mahmoo

    (RM)

    Full Day North 1 MS Naveed Mushtaq (PS) Naveed Mushtaq (PS) Naveed Mushtaq

    Full Day North 2 MS Behzad Anwar (PS) Behzad Anwar (PS) Behzad Anwar (P

    Day North 1&2 NOC Saqib Chaudhary Saqib Chaudhary Saqib Chaudha

    Night North 1&2 NOC Nadeem Ahmed Nadeem Ahmed Nadeem Ahme

    Shaqoori Core Eid Roster

  • 8/10/2019 EID Radiness Plan for 2014, North-II--.pptx

    10/13

    ZTE/HNL Telco/Non-Telco Spares availab

    Telco spares are in sufficient quantity in all warehouses RRUs and RSUs are in

    quantity to deal with any quality issue. Except for R8882 S1800(B) which is notnationwide.

    Power Rectifiers are available of all types Power One, Eltek and ZTE.

    NEC Transmission IDUs are sufficient However and ODUs are available at threare also arranged when ever required

    Non Telco Spares Like DG and Air Cons Spares are arranged and ensure thresho

    in all region.

  • 8/10/2019 EID Radiness Plan for 2014, North-II--.pptx

    11/13

    Escalation Level for (N2) Region

    Raheel Wahab

    Saeed/Mushtaq

    Hilal/Munnawar

    Mushtaq Ahmad

    First LevelEscalation

    Adnan Ali/ Zeeshan Aman

    SecondLevel

    Escalation

    Inam KhanThird LevelEscalation

    Mr. Faisal NSajidullah/ Abid KhattaGhazanfer

    First LevelEscalation

    Farrukh Kha

    SecondLevel

    Escalation

    Faiq ShehzaThird LevelEscalation

    HNL Escalation Level ZTE ESCALATION L

  • 8/10/2019 EID Radiness Plan for 2014, North-II--.pptx

    12/13

    To ensure that subscriber can have the best quality of network available following steps have b

    Each on call team is planned in such a way that a BSS specialist is included in the team to resolveZero Call and Customer Complains during Eid days.

    Quality sheet will be generated on all 4 Days of Eid and Issues will be resolved accordingly.

    To ensure minimum number of outages on Eid below steps are taken:

    Repeated PM visits are being carried out on Mhub, HUB and HIR Sites.

    Genset health check has been initiated on GLO Site which will be completed befor eid in which Gstatus is being checked and made operational.

    Educating SubCon on the importance of Network Availability on Eid Days.

    Resolving all sitting issues on problematic that may lead to outages.

    Steps Taken to Ensure Network Availability during Eid Days: