EHS-MS TechnologyEHS-MS TechnologyUpdateUpdate
Harold BurchfieldHarold BurchfieldIS&T EHS Project ManagerIS&T EHS Project Manager
June 23, 2004
Page 2
Motivation – EPA “University Initiative”Motivation – EPA “University Initiative”
The Environmental Protection Agency’s (EPA) “University Initiative” – EPA enforcing environmental laws beyond Industry to Higher Education
Yale, Brown, Stanford, Boston University among others subject to enforcement
MIT inspection in May 1998 resulted in a Consent Decree w/ the EPA. Lincoln Labs will also comply to the Consent Decree.
EPA found common problems in environmental management in higher education No organizational infrastructure for compliance w/ environmental laws – locally and
centrally
No clear delineation of roles, responsibilities and accountability for compliance – locally and centrally
No systems approach to environmental management
Inadequate institutional knowledge of materials in use locally for compliance and emergency response
Inadequate regulatory training of faculty, principal investigators, staff and students who manage regulated materials
Page 3
EPA-MIT Consent Decree ComponentsEPA-MIT Consent Decree Components
Environmental Policy completed – see web.mit.edu/environment Committing to compliance, “continuous improvement in environmental performance”, and adequate resources
Functional Organizational Infrastructure with clear roles, responsibility, and accountability in DLCs and in EHS Office and MIT to ensure compliance Identify positions with EHS responsibilities, EHS duties in position descriptions and Organization charts completed
PI Space Registration using SAP EHS module underway, Phase 1 of SAP project
Regulatory RCRA/SPCC Training and Education re: EHS Roles and Responsibilities Employing: Uniform Materials + Chemical Hygiene Plans/Flexible Delivery completed
Training plan: Describing how training will be implemented and records kept and how those needing training will be identified initially and begin implementing completed
Central Record Keeping for Institute accountability and reliable identification of those to be trained (through interface with HR Payroll)- 4+ year deadline planned
Training Needs Assessment using SAP EHS module planned, Phase 3 of SAP project
Standard, Self and Outside Audits – Other Controls/Preventative Measures Uniform Audit Forms completed
Develop Audit Program and Begin Implementation underway
Findings (inspections, incidents, corrective actions, consequences) using SAP EHS module planned, Phase 2 of SAP project
EHS Manual completed - see informit.mit.edu
Pollution Prevention and Sustainability underway
Full Implementation of EHS-MS Manual including Automation Features underway
Outside Consultant Verification of EHS-MS planned Identify Consultant - (March 18, 2006, 6 months after planned September 18, 2005 completion)
Complete Review/Submit to EPA - (March 18 2006-June 18, 2006) key verification of technology system and wide use/ acceptance/ awareness of entire EHS management system
Page 4
TaskTask
1. Web Portal1. Web Portal
2. All Application Design 2. All Application Design
4. Findings – Inspections … (phase 2)4. Findings – Inspections … (phase 2)
5. Training Needs Assessment (phase 3)5. Training Needs Assessment (phase 3)
6. Management Reports 6. Management Reports
5/20045/2004 8/2004 8/2004
7. Roles & Security 7. Roles & Security
EHS-MS Technology Project PlanEHS-MS Technology Project Plan
11/200411/2004 2/2005 2/2005 5/2005 5/2005 9/2005 9/2005
8. Existing Solution Support8. Existing Solution Support
9. Project & Change Management9. Project & Change Management
3. PI Space Registration & Inv. (phase 1)3. PI Space Registration & Inv. (phase 1)
TimelineTimeline
2/20042/2004
Page 5
Internet
Offline DB
EHS Portal
Digital Certificat
e
Roles DB
EHS-MS Manual
DataWarehouse
InternetWeb Course
DeliveryTraining &
Events
SAPTBD
Records Retention
Athena
HR
Facilities
SIS
Oracle
SAP
TBD
Management Reports
• EPO Reports• EHS Office Reports• EHS Annual Report• DLC Reports• PI Reports
Hazards
SAP
• Hazard Registration• SARA Reporting• Local Inventory• Reports
Findings
SAP
• Inspections• Corrective Actions• Consequences• Emergency Incidents• Reports
PI Space Reg.
SAP
• PI Registration• Room Registration• Emergency Contacts• Reports
Training Requirements
• Cert. Rules Engine• Needs Assessment• Training Records• Reports
• Course Reg.• Record Completion
• Course Information.• Take Course
Program Applications
TBD
• Radiation Protection• Bio-safety• Environmental Mgmt.• Industrial Hygiene• Safety
• Environment• Emergency• EHS-MS
EHS-MS Technology SolutionEHS-MS Technology Solution
JUNE 2004
MARCH 2004
OCTOBER 2004
TBD
OCTOBER 2004
MARCH 2005
SEPTEMBER 2005
AUGUST 2005
OCTOBER 2004
Page 6
EHS-MS Technology UpdateEHS-MS Technology Update
Initial web version of EHS-MS Manual has been developed and submitted to the EPA (see informit.mit.edu)
PI Space Registration and SARA (Superfund Amendments and Reauthorization Act)
Reporting requirements have been developed and locked-in with the help of the MIT EHS Working Committee
SAP ASAP methodology will be used for SAP components of project
The Technology Team has finished the ASAP business blueprint of the EHS module (Industrial Safety and Hygiene component ) for PI Space Registration
The Technology Team is about to begin the ASAP Realization phase for PI Space Registration. EHS module that will leverage standard SAP functionality that integrates with Human Resources and Plant Maintenance data
The user Interface is being designed as an easy to use web front-end that will simplify the complexities of the SAP interface
The Reports Team released a draft version of the training reports with an easy to use dashboard interface
Lincoln and Campus are working together to develop a cost effective technology solution that will meet the needs of both locations
Page 7
Waste ManagementOccupational Health
Industrial Hygieneand Safety
Dangerous Goods ManagementHazardous Substance Management/Product Safety
mySAP PLM EH&S CapabilitiesmySAP PLM EH&S Capabilities
Some mySAP PLM EH&S CustomersSome mySAP PLM EH&S Customers
Ashland-Südchemie- Kernfest
BASF Bärlocher Ciba Spezialitäten-
chemie Clariant CN Rail Colgate-Palmolive Deere Deutsche
Telekom Deutsche Steinkohle AG
DSK Dow Corning
Eastman Chemical ExxonMobil Henkel Herberts Hoechst-Gruppe F. Hoffmann-
La Roche ICI Australia Lyondell Lockheed Master Builders Meteor MCM
Monsanto Nalco Novartis RAG RWE Sigma-Aldrich SKW Trostberg Stockhausen VIAG Veitsch-Radex Volvo Aero Wacker Chemie Witco Zeiss
Page 9
mySAP PLM EH&S Is for All IndustriesmySAP PLM EH&S Is for All Industries
Substances
Work
AreasPeople
Page 10
ExposureLog
RiskAssessment
Work Area
Incident/AccidentManagement
Standard OperatingProcedure
Health and SafetyBriefing
Site Inspection
IHS InformationSystem
Industrial Hygiene and Safety FunctionsIndustrial Hygiene and Safety Functions
Page 11
Product Safety
Functional Loc’n Exposure Group
Work Center Storage Location
Material
Work AreaWork AreaProduction
PlanningOccupational
Health
Plant Maintenance
Materials Management
Human Resources
ExposureLog
StandardOperatingProcedure
Site Inspections Incident/
AccidentMgmt
Health and Safety
Briefing
RiskAssessment
Industrial Hygiene and Safety Work Area: The Key to It AllIndustrial Hygiene and Safety Work Area: The Key to It All
Page 12
EHS Module RelationshipsEHS Module Relationships
Work AreaEHS DLC
Work AreaEHS Room or Subroom
HR Work AreaEHS Room Set
HR
PrincipalInvestigator
EHSRepresentatives
EmergencyContacts
QuestionnaireAgentsSubstancesIncidents /Accidents
Safety Measures
- Quantities
SubstanceType
AgentType Questions
SARA Title III Hazards Inspections
DLC CommitteeDept. Head
EHS Lead ContactEHS Coordinator
HR
MM
PM
Other
MM integration apply to the current implementation for Lincoln Labs
PMWork Order
Triggers
Operations Center
Org Units
Functional Locations (Room Level)
Corrective actions &Consequences
Phase 2 Phase 2
Page 13
PI Space Registration - MockupPI Space Registration - Mockup
Page 14
Thank you for your
attention!Thank you for your
attention!
Page 15
Page 16
Training Reports DashboardTraining Reports Dashboard
Page 17
Training ReportsTraining Reports