EGLINTON CROSSTOWN Eglinton-Mount Pleasant March 13, 2018

Page 2: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

2

INFORMATION IS CURRENT AS OF MARCH 13, 2018 AND SUBJECT TO CHANGE

Page 3: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

3

Agenda

• Eglinton Station Update • Mount Pleasant Station Update

Page 4: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

4

Eglinton Station Update

Page 5: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

5

Eglinton Station Update

Recently Completed • First three weekends of TTC subway closure works at Berwick Avenue

Ongoing • Shoring on and west of Yonge Street, north and south side of Eglinton • THESL 2B – Hillsdale (partially complete), Yonge (ongoing)

Upcoming • Traffic shift for shoring on the north side of Eglinton Avenue, east of Yonge Street (20-40

Eglinton East) – March 13th • Water site service connections proposed overnight on Eglinton east of Yonge –

tentatively March 15th for 2-3 nights (20-50 Eglinton East affected by water shut off) • Toronto Hydro relocation 2A

– Eglinton Avenue East, Dunfield Avenue, Holly Avenue

• Weekend subway closures for TTC upgrades – May 19/20 is the next weekend closure; another public meeting will be arranged for April

• Shoring on the north side of Eglinton Avenue, west of Yonge Street

Page 6: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

6

Next Phase of Shoring – March 13th

Presenter
Presentation Notes
These relocations will take place in order to allow for construction and excavation of the future station.
Page 7: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

7

THESL Relocation 2A – March/April

Presenter
Presentation Notes
These relocations will take place in order to allow for construction and excavation of the future station.
Page 8: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

8

Next Phase of Shoring – April/May

Presenter
Presentation Notes
These relocations will take place in order to allow for construction and excavation of the future station.
Page 9: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

9

Mount Pleasant Station Update

Page 10: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

10

Mount Pleasant Station Construction Update

ACTIVITY LOCATION APPROXIMATE DURATION

WINTER/SPRING 2018

Support of Excavation (Piling) North side of Eglinton Ave E Ongoing through March 2018

Storm Sewer Installation – Stage 1 Taunton Road and Eglinton Ave E Week of March 12 for three (3) weeks

Pedestrian Rerouting SW sidewalk at Mt. Pleasant Rd and Eglinton Ave E (Brownlow Ave site) As early as March 19, 2018

Storm Sewer Installation – Stage 2 Brownlow Ave and Eglinton Ave E Week of March 26 for two (2) weeks

Traffic Change See map Early April 2018

Traffic Change See map Early May 2018

Page 11: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

11

Current Construction Staging

Until April 2018

Page 12: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

12

Pedestrian Rerouting

Beginning as early as March 19, 2018

STORM SEWER SITE

STORM SEWER SITE

Page 13: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

13

Upcoming Construction Staging

Beginning early April for approximately four (4) weeks

Page 14: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

14

Future Construction Staging

Early May 2018

Page 15: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

What to Expect: Storm Sewer Installation

• In December 2017, crews began installation of a new storm sewer system along the south side

of Eglinton Ave E, between Taunton Rd and Brownlow Ave

• Work will resume on March 12, 2018

• Crews will use a hand-mining method whereby the sewer pipe will be hydraulically pushed

through the soil from the shaft while soil is simultaneously removed

• The work will be completed in three stages:

• Part 1 – Mining and pipe installation Taunton Rd to Mt Pleasant Rd (three weeks)

• Part 2 – Mining and pipe installation Brownlow Ave to Mt Pleasant Rd (two weeks)

• Part 3 – Connection work (two weeks)

What to Expect

• 24/5 operation, Monday through Friday

• Noise from construction equipment, 25K generator, pumps and fans

• Pedestrian rerouting around Brownlow Ave/Eglinton Ave E work zone

• Truck traffic entering/exiting work zones

Page 16: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

16

Mount Pleasant Station Concept Aerial View

Main Entrance

Secondary Entrance

*60% rendering

Page 17: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

17

Mount Pleasant Station Main Entrance

*60% rendering

Page 18: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

18

Mount Pleasant Station Secondary Entrance

*60% rendering

Page 19: EGLINTON CROSSTOWN · of Eglinton Ave E, between Taunton Rd and Brownlow Ave • Work will resume on March 12, 2018 • Crews will use a hand-mining method whereby the sewer pipe

19

Mount Pleasant Station Plan View

STATION BOX