EFFICIENT BUILDINGS BEYOND DESIGN.... Rumi Engineer .. Godrej Green Building Consultancy Services

Source: Mc Kinsey Report

1 Billion new

consumers in emerging market cities by 2025

Cities are expected to build floor space equivalent to

85% of today’s

building stock Nearly 80 Billion cu.m

increase in municipal water demand by 2025

GLOBAL SCENARIO

Source: Mc Kinsey Report

NATIONAL SCENARIO

12.8% Increase in

population from 2010- 2025

Floor space in Cities expected to increase by

8.7% from

2010-2025

Nearly 15.8% increase in municipal water demand by 2025

• Current account deficit (CAD)

2003-04: + 7.36 Billion US$

2012-13: - 21.77 Billion US$

2013-14: - 7.8 Billion US $

Gold imports accounts for 12%

• Oil imports accounts for 30%

2009-10: 123 MMT

2013-14: 190 MMT

ECONOMICS OF SUSTAINABILITY

Source: Planning commission of India/McKinsey Global Institute

11th Five Year Plan:

Planned Target :78,700 MW

Revised Target :62,374 MW

Achievement :54,000 MW

12th Five Year Plan:

Planned Target : 88,537 MW

INVESTMENT : 1 MW POWER PLANT …?

Demand – Supply Gap : 12,000 MW

7 CR.

NATIONAL POWER SCENARIO

DYNAMICS OF ECONOMICS

Year Unit (kWh) Rate MD (kVA) Rate Cumulative Rate

FY 2012-13 6.00 150 7.03

FY 2013-14 7.09 200 8.19

% Change 18% 33% 14%

COST IMPACT?...

Design Technology

Operation and

Maintenance

Energy Efficiency…?

No Building is an Island

Inbuilt intelligence

Infrastructure

Interactive

Informative

Accountability

9

SMART & INTELLIGENT BUILDINGS

Fixtures &

Fittings

Baseline (Mandatory)

20% Reduction

Flow Unit Flow Unit Flow Unit Flow Unit

WC 1.6 GPF 6 LPF 1.28 GPF 4.8 LPF

Urinals 1.05 GPF 4 LPF 0.84 GPF 3.2 LPF

Faucets 2.1 GPM** 8.0 LPM** 1.69 GPM** 6.4 LPM**

WATER FLOW RATES ……IGBC –EB

** Design Test Water Pressure : 3 BAR / 44 PSI

PRICE is measurable, whereas VALUE is immeasurable

WASTE WATER MANAGEMENT : INCREASE USE OF RECYCLED WATER

12.80%

28%

59.20%

22%

33%

45%

29%

22.59%

48%

33%

16.00%

51%

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%R

ecy

cle

d

Gro

un

d

Mu

nic

ipal

Re

cycl

ed

Gro

un

d

Mu

nic

ipal

Re

cycl

ed

Gro

un

d

Mu

nic

ipal

Re

cycl

ed

Gro

un

d

Mu

nic

ipal

2009 2010 2011 2012

Trend for Use of Recycled Water

Introduced Organic Composting Vermicomposting : Canteen and Garden waste Organic Compost Yeild in the range of 3 to 4 MT/year

Organic Composting

Recycling of canteen & garden waste

12

Reducing Heat Island Effect by Roof Garden

Project: Godrej IT Park at Mumbai Platinum Rated CS project

34 Deg C

24 Deg C

42 Deg C

26 Deg C

HEAT ISLAND EFFECT NON-ROOF

Thermal Gradient : 28 to 43 ° C

Parking Areas with open grid pavers

42 Deg C

33 Deg C

Project: Godrej IT Park at Mumbai Platinum Rated CS project

TECHNOLOGIES

• Vertical landscaping

• STP – Reed bed Root Zone

• Regenerative elevators

• Hybrid cooling towers

• Evaporative cooling

• Motorized shading devices

• PV installed shading devices

• Radiant cooling

• Rainwater harvesting system – system

• Magnetic levitation compressors in chillers

• VAV-VFD Controls

Water Pumping System- An Efficient Pumping Solution

Monthly Energy Consumption Reduction : 44%

Water Pumping Efficiency Improvement(kWh/KL) : 12.34 to 3.96

Annual Energy Saving : 78,000 kWh

Annual Energy Bill Reduction : Rs. 4,90,000

Investment on Project : Rs. 12 Lacs

Payback (months) : 30

Annual Reduction in CO2 Emission : 62.4 MT

RETROFIT OF RECIP. CHILLER WITH SCREW .. CASE STUDY

ENERGY EFFICIENT CENTRAL AIR CONDITIONING CHILLER

180 TR DX Type Reciprocating AC system 150TR Screw water cooled system

More than 15 years OLD. Energy efficient- Screw Chiller

Consumption(KW/TR)- 1.22 Consumption(KW/TR)- 0.7

Regular operational breakdown New system – Preventive maintenance

Refrigerant -HCFC-R22 Refrigerant -HFC134a

Annual Savings- Rs. 16 Lac Pay back - 2.5 Years

Investment – Rs.40 Lac

CONDENSER : Approach-in-Energy Efficiency …..?

Condenser Approach @ 16 ° F Energy / mth. : 42,000 kWh

Condenser Approach @ 3 ° F Energy / mth. : 34,000 kWh

% Savings : 19 %

TDS CONTROL : AUTO BLOW DOWN @ COOLING TOWER

COND. APPROACH : DIFF. BETWEEN REF. SAT. TEMP & COND. WATER LEAVING TEMP.

Operation & Maintenance : Area of Concern

Scale Formation in Condenser

CT Wr. Fills

GODREJ BHAVAN .... MUMBAI

Built Up Area : 41,000 Sq. ft. No of Floors : G + 6

LEED For Existing Building Operation & Maintenance V-2

Gold 56 /92

Sustainable Sites 07/12

Water Efficiency 09/10

Energy & Atmosphere 18/30

Material & Resources 10/14

Indoor Environmental Quality 07/19

Innovation in Design 05/07

Regional priority Credits 04/04

Energy Cons. Units 2009-10 2010-11 2011-12 2012-13 2013-14

Energy kWh Units

48,703

45,406

42,928

44,257

43,655

% diff Base Year -7% -12% -9% -10%

Max. Demand

kVA 197 164 158 164 136

% diff Base Year -17% -20% -17% -31%

Water Units 2009-10 2010-11 2011-12 2012-13 2013-14

BMC kL

229

118

113

134

111

% diff Base Year -49% -51% -41% -52%

SCORE CARD --- ENERGY & WATER

48,703 45,406 42,928 44,257 43,255

4,17,642

3,54,617 3,22,277

4,58,491 4,98,254 4,17,642

3,84,290 3,77,140

5,04,551

5,61,008

-

1,00,000

2,00,000

3,00,000

4,00,000

5,00,000

6,00,000

40,000

41,000

42,000

43,000

44,000

45,000

46,000

47,000

48,000

49,000

50,000

2009-10 / Base Year 2010-11 2011-12 2012-13 2013-14

Actual Energy / Cost Vs Incremental Energy / Cost

Actual Energy Inc. Energy Actual Cost Rs Inc .Cost

Godrej Bhavan - Y-O-Y Energy Vs Cost Performance

** The Energy values is measured in kWh ** The Cost unit is INR ** The Values are Considered as Average Values for the FY

It’s not about the points to get a Building

certified…

The points are not the point

The points are not sustainable.

Are we missing the actual point?

Courtesy : Ar. Karan Grover

L & T Office Building (North Block)…. MUMBAI

Built Up Area : 2.3 lac Sq. ft. No of Floors : G + 7

LEED For Existing Building Operation & Maintenance V-3

Gold 73/110

Sustainable Sites 19/26

Water Efficiency 09/14

Energy & Atmosphere 28/35

Material & Resources 05/10

Indoor Environmental Quality 04/15

Innovation in Design 04/06

Regional priority Credits 04/04

CISCO BGL-13 .. BANGALORE

Built Up Area : 2.6 lac Sq. ft. No of Floors : G + 4

LEED For Existing Building Operation & Maintenance V-3

Platinum 87 /110

Sustainable Sites 17/26

Water Efficiency 12/14

Energy & Atmosphere 34/35

Material & Resources 07/10

Indoor Environmental Quality 08/15

Innovation in Design 05/06

Regional priority Credits 04/04

OBEROI MALL, GOREGAON

Project Details

Project Title : OBEROI MALL

Building Use : ENCLOSED MALL

Location : GOREGAON, MUMBAI

Size : 712957 SQFTS

Certification Level : GOLD under LEED-EBOM

Project Team Profile

Owner : OBEROI REALTY

Green Consultant : Godrej & Boyce Mfg. Co. Ltd

FIRST MALL IN INDIA TO GET CERTIFIED UNDER LEED EXISTING BUILDING

CATEGORY

Stakeholder Awareness

Project Management : Motivation

Energy / Water Accountability at System Level

Selection & Sourcing of ‘Appropriate’ Technology / material

Capacity Building : Skilled Workforce

Integration of Systems with IBMS

Documentation

GENERIC CHALLENGES…..

In nature there are neither rewards nor punishments, there are only consequences If civilization has to survive it must live on the Interest, not the Capital of nature ! - Ronald Wright

Green Building Consulting

Building Simulation

Building Commissioning

MEP Design Consulting

Building Information

Modeling (BIM)

CFD Analysis Third Party Audits

OUR SERVICES