Effects of high PV penetration in a low voltage grid meteoRES Oldenburg University/ ForWind – 19.11.2013

Effects of high PV penetration in a low voltage grid - 3e.eu · PDF fileEffects of high PV penetration in a low voltage grid ... Clear Sky Day! ... Transformator-Abgängen im Sekundentakt

  • Upload
    vanthuy

  • View
    225

  • Download
    1

Embed Size (px)

Citation preview

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Agenda

2

Top 1: Introduction

Top 2: The Idea of Smart-Solar-Grid

Top 3: Results

Top 4: Outlook

Electricity Network SWU Netze GmbH

N11

, Flo

rian

Mei

er, N

etz-

& A

nlag

enpl

anun

g.

© S

WU

-Unt

erne

hmen

sgru

ppe

11/2

0/13

Sei

te 4

Distribution Network Total: 3.131 km HV: 26 km MV: 1.273 km LV: 1.832 km Meter: 53.000 Load: 94 – 282 MW Energy: 1.578 GWhPV-Systems Power: 86.6 MWp Systems: 4.164 Energy: 77,5 GWh

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

PV-Development – Number of Systems

4

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

PV-Development – Installed Power

5

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Agenda

6

Top 1: Introduction

Top 2: The Idea of Smart-Solar-Grid

Top 3: Results

Top 4: Outlook

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

The Idea of Smart-Solar-Grid

11/2

0/13

Sei

te 8

N11

, Flo

rian

Mei

er, N

etz-

& A

nlag

enpl

anun

g.

© S

WU

-Unt

erne

hmen

sgru

ppe

Roofpotential

Grid Data

PV Modell

Shading

Grid Simulation Weather Forecast

Weather Data

Satellit Images

Grid Status, Load Flow, Voltage, Feed In Management

PV System Info

endorse-fp7.eu

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Smart Grid Research at Ulm – Main Questions

! How much PV the grid can take?

! What happens when 25% / 50% ….100% of the houses have PV systems

! How the grid has to be enforced?

! Which technical solutions are available?

! What are the costs?

! Which are the cost effective solutions?

11/2

0/13

Sei

te 9

N11

, Flo

rian

Mei

er, N

etz-

& A

nlag

enpl

anun

g.

© S

WU

-Unt

erne

hmen

sgru

ppe

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Test Site 2 at Ulm„Hittistetten“ (setup started)

10

Eckdaten" Senden Hittistetten" 2 Trafostationen" 8,6 km Niederspannungskabel /

-freileitung" 110 Netzanschlüsse" 59 PV-Anlagen mit 1162 kW

Anschlussleistung

Senden

Gerlenhofen

Holzschwang

Richtung Ulm

A7

Hittistetten

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Test Site 2 - „Hittistetten“

11

Key Figures" Senden Hittistetten" 2 Transformer (630 kVA)" 8,6 km LV cables" 110 Grid connection points" 59 PV-Systems 1.162 kWp" Load 1.124 MWh" PV Input 1.104 MWh

" PV Fraction 100%

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Existing Monitoring Equipment

Energy Counter for PV-Systems• Power 15 Minute time resolution• Voltage 1 Minute-time resolution

„Smart-Meter“ at private selected Households• Power 15 Minuten• Smart Meter Gateway- Conexa

Grid Quality Measurement• Flicker • Voltage Quality (DIN EN 61000-4-30)

Sky-Image• General Electric Research

Local Weather Station/Solar Radiation Measurement• System from Skytron Energy: Solar Radiation, Wind, Temperature

LV Measurement at Transformer• Voltage, current, power at each feeder line

MV Measurement• Voltage at MV bus bar

Sei

te 1

3

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Meteorological data in Ulm

13

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Meteorological data in Ulm

13

Air temperatureRelative humidityWind speed and directionGround temperaturesRainAir pressure10 minutes averages

Air TemperatureWind speed and directionRelative humidityLuminosity

Wind speed and directionAir temperature and pressureRelative humidityPyranometer horizontal and 30 degreeDiffuse irradiance (under construction)10-minutes & Seconds

Air TemperatureWind speed and directionRelative humidityLuminosity

PV-Cell temperature (PT1000)Si-SensorPyranometer CMP11Air temperatureRainWind strength and direction10-Minutes & Seconds

PV-Cell temperature (PT1000)Si-SensorPyranometer CMP11Air temperatureRainWind strength and direction10-Minutes & Seconds

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Agenda

14

Top 1: Introduction

Top 2: The Idea of Smart-Solar-Grid

Top 3: Results

Top 4: Outlook

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

ResultsClear Sky Day

! Power flow at the LV transformer

11/2

0/13

N11

, Flo

rian

Mei

er, N

etz-

& A

nlag

enpl

anun

g.

© S

WU

-Unt

erne

hmen

sgru

ppe

Messung an 8 Transformator-Abgängenim Sekundentakt

Gefördert Im Rahmen des EU FP7-Projekts ENDORSE

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

ResultsScattered Day

! Power Flow at LV transformer

11/2

0/13

N11

, Flo

rian

Mei

er, N

etz-

& A

nlag

enpl

anun

g.

© S

WU

-Unt

erne

hmen

sgru

ppe

Messung an 8 Transformator-Abgängenim Sekundentakt

Gefördert Im Rahmen des EU FP7-Projekts ENDORSE

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

ResultsOvercast Day

! Power flow at LV transformer

11/2

0/13

N11

, Flo

rian

Mei

er, N

etz-

& A

nlag

enpl

anun

g.

© S

WU

-Unt

erne

hmen

sgru

ppe

Messung an 8 Transformator-Abgängenim Sekundentakt

Gefördert Im Rahmen des EU FP7-Projekts ENDORSE

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Variability Analysis (1 sec resolution)

! Power Change without PV

11/2

0/13

N11

, Flo

rian

Mei

er, N

etz-

& A

nlag

enpl

anun

g.

© S

WU

-Unt

erne

hmen

sgru

ppe

Gefördert durch das Bundesministerium für Umwelt

! Power Change with PV

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Voltage at the LV transformer

19

+10% (EN 50160)

-10% (EN 50160)

UN U

U

t

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Voltage at the LV transformer

19

+10% (EN 50160)

-10% (EN 50160)

UN

U

U

t

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Voltage at the LV transformer

19

• Voltage depends on • Load• Generation• Medium voltage

• Load following standard load profile• Generation following irradiance• Medium voltage is NOT constant 10.2 kV

+10% (EN 50160)

-10% (EN 50160)

UN

U

t

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Measurements Clear Sky

20

• No similarity even under clear sky condition Gefördert durch das Bundesministerium für Umwelt

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Medium Voltage Change

11/2

0/13

N11

, Flo

rian

Mei

er, N

etz-

& A

nlag

enpl

anun

g.

© S

WU

-Unt

erne

hmen

sgru

ppe

Gefördert durch das Bundesministerium für Umwelt

Dependency on medium voltage

Dependency ofload and generation

Will get steeper with larger PV share

or weaker grid

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

PV Influence on the voltage

22

Voltage rise: reduction of the voltage drop over the transformer

Clear Sky Overcast

Gefördert durch das Bundesministerium für Umwelt

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Agenda

23

Top 1: Introduction

Top 2: The Idea of Smart-Solar-Grid

Top 3: Results

Top 4: Outlook

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Pro-Active Grid Planning – Grid Enforcement

17

6

45

3/1

11

8

5

5

69

25

26

1824

11

2

4

58

3

67

Today: Buildings 130

Load 767 MWh PV-2013 222 kWp Transformer 630 kVA

Future: PV-100% 1.430 kWp PV/Ptr 227 %

Feeder-Lines Load Voltage

A 30% 1,00B 14% 1,00C 170% 1,09D 96% 1,04E 57% 1,03F 111% 1,07G 150% 1,11H 22% 1,05

1,03 pu

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Pro-Active Grid Planning – Feed in management

26

17

6

45

3/1

11

8

5

5

69

25

26

1824

11

2

4

58

3

67

Today: Buildings 130

Load 767 MWh PV-2013 222 kWp Transformer 630 kVA

Future: PV-100% 1.430 kWp PV/Ptr 227 %

Feeder-Lines Load Voltage

A 30% 1,00B 14% 1,00C 170% 1,09D 96% 1,04E 57% 1,03F 111% 1,07G 150% 1,11H 22% 1,05

Feed

er H

– P

V10

0%

Feed in management – better solution

# Precise curtailment on very few days/hours of the year

# Energy losses about 0,3%/year

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Solar Roof Potential Analysis

! Test Site Einsingen All roofs with PV Systems!! Transformer 630 kVA! PV Roof Power 1430 kWp

Two times solar energy compared to load! Load 747 MWh! PV Input 1500 MWh! BUT NOT DURING NIGHT! NOT ENOUGH DURING WINTER

11/2

0/13

N11

, Flo

rian

Mei

er, N

etz-

& A

nlag

enpl

anun

g.

© S

WU

-Unt

erne

hmen

sgru

ppe

Gefördert durch SWU, Stadt Ulm und Sparkasse Ulm

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

" Standard solar roofpotential analysis

" Old Data (2002)" Rough Estimate

(app. 1 Point/m²)

Solar Roof Potential Analysis – Experiences

GoogleMaps LUBW Potentialatlas EE

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

" No useful results

" Standard solar roofpotential analysis

" Old Data (2002)" Rough Estimate

(app. 1 Point/m²)

Solar Roof Potential Analysis – Experiences

GoogleMaps

SunArea + GridIt

LUBW Potentialatlas EE

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

" Improved results

" Still problems with existing PV

" No useful results

" Standard solar roofpotential analysis

" Old Data (2002)" Rough Estimate

(app. 1 Point/m²)

Solar Roof Potential Analysis – Experiences

GoogleMaps

SunArea + GridIt

LUBW Potentialatlas EE

SunArea + Blom

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

" Improved results

" Still problems with existing PV

" No useful results

" Standard solar roofpotential analysis

" Old Data (2002)" Rough Estimate

(app. 1 Point/m²)

Solar Roof Potential Analysis – Experiences

GoogleMaps

" New flight data

" Excellent results

" Correct analysis ofexisting PV-systems

SunArea + GridIt

LUBW Potentialatlas EE Laserscanner 2013

SunArea + Blom

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Smart Grid Gateway needed

29

11/2

0/13

Abt

eilu

ng, N

ame

in F

ußze

ile e

intra

gen

.

© S

WU

-Unt

erne

hmen

sgru

ppe

Our Research Projects are supported by:

Projects Financing Partner

ENDORSESolar Power Forecast

EU-FP7-Space(2010-2013)

Ecole d‘Mines, DLR,…

SmartSolarGridSmart Grid Gateway for PV-Systems

EU-EFRE-BW(2012-2014)

THEBEN, KACO, SWU, AMA Systems, BTC,Solare Datensysteme, Hessware

PVSYS-NSLV-Grid-Optimisation

BMU(2012-2014)

ZSW, SWU

NATHAN PVGrid Planning

BMBF(2013-2017)

SWU, Uni Agder (NO), AMA Systems, Digsilent

OrPHEuSElectricity/Gas/Heat

EU-FP7-ICT(2013-2016)

WIP, AIT, TU Wien, SWU, UNI/DSO Schweden, NEC

Contact:

Prof. Gerd HeilscherHolger RufFalko Ebe

Hochschule Ulm - University of Applied SciencesInstitut für Energie- und Antriebstechnik Eberhard Finckh Str. 1189075 UlmMail: [email protected] [email protected] [email protected]

Florian Meier