17
Outreach 2017 Clarion County PennDOT Maintenance County Manager – Joshua Clinger Assistant County Manager – Jason Powell Assistant County Manager – Vern Slaugenhoup County Equipment Manager – Brant Cirrincione Roadway Programs Coordinator – Ashley Downs Adopt a Highway Coordinator – Corri Shumaker County Office Number (814) 226-8200

Effective Customer Service...2017 Clarion County PennDOT Maintenance • County Profile – $11.6 million dollar budget – 87 Employees – 5 Stockpile Locations – 476 Linear State

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • Outreach 2017Clarion County PennDOT Maintenance

    • County Manager – Joshua Clinger• Assistant County Manager – Jason Powell• Assistant County Manager – Vern Slaugenhoup• County Equipment Manager – Brant Cirrincione• Roadway Programs Coordinator – Ashley Downs• Adopt a Highway Coordinator – Corri Shumaker• County Office Number (814) 226-8200

  • 2017 Clarion County PennDOT Maintenance

    • County Profile– $11.6 million dollar budget– 87 Employees– 5 Stockpile Locations– 476 Linear State Highway Miles– 28 Miles of Interstate 80– 208 State Owned Bridges over 8’ span– 26 Dump Trucks– 6 Front End Loaders– 2 Graders– 3 Anti-icing Trucks

  • 2017 Clarion County PennDOT Maintenance

    • Winter Services– $1.12 million dollar budget for

    2016/17– 1,040 total snow lane miles– 120 snow lane miles of I80– 22 assigned snow routes– 6 assigned stockpile sections– 56 full-time operators– Average 18,000 tons of antiskid– Average 12,000 tons of salt– Use on average 100,000

    gallons of salt brine

  • 2017 Clarion County PennDOT Maintenance

    Maintenance Cycle Activities Summer 2017

    – General Maintenance

    – Drainage Improvements

    – Seal Coat Surface Treatment

    – Shoulder Cutting

  • 2017 Clarion County PennDOT Maintenance2016-2017 Low Cost Safety Initiative Project

    Remove debris from bank seen as a safety concern on SR 58

    AfterBefore

  • 2017 Clarion County PennDOT Maintenance

    Seal Coat Program

    Planned 434,000gallons of production

    for the 2017 Seal Coat Program.

    299,765 gallons completed in 2016

  • 2017 Clarion County PennDOT Maintenance

    Shoulder Cutting Program

    Planned 196 miles of shoulder cutting

    for 2017

    129 miles completed in 2016

  • 2017 Clarion County PennDOT Maintenance

    Pipe Replacement / Drainage Program

    Planned 240 feet of Pipe Replacement for 2017

    and2,035 feet of Parallel Pipe

    542 feet of cross pipe &3,700 feet of parallel pipe

    completed in 2016

  • 2017 Clarion County PennDOT Maintenance

    Crack Sealing Program

    Planned82.25 miles of Crack Sealing

    (including roadway shoulders) for 2017

    78.05 miles completed in 2016

  • 2017 Clarion County PennDOT Maintenance

    Underdrain Program

    Planned 6,600 feet of Underdrain for

    2017

    9,980 feet completed in 2016

  • 2017 Clarion County PennDOT Maintenance

    Ditch Cleaning Program

    Planned 43,000 feet of Ditch Cleaning for

    2017

    12,610 feet completed in 2016

  • 2017 Clarion County PennDOT Maintenance

    Department Force Mowing Program

    28 Miles of Interstate 80 gets

    mowed three times a year while 193 Miles

    of Mainlines get mowed twice each

    year

  • 2017 Clarion County PennDOT Maintenance

    SR 2003 closed June

    2016

    BEFORE BEFORE

    AFTERReopened August 2016

    Department Force Bridge Replacement

    SR 2003 Reids Run BridgeMonroe Township

  • 2017 Department Force Bridge ReplacementSR 4005 Over a Tributary to Canoe Creek

    Beaver Township

    2017 Clarion County PennDOT Maintenance

    BEFORE BEFORE

  • 2017 Clarion County PennDOT Maintenance

    Project Location

    Department Force Bridge Detour

  • Plans for the future Maintenance Activities

    Clarion County PennDOT has joined forces with Jefferson County PennDOT, piloting a combined crew (DOT Crew). This DOT Crew will allow us to stretch resources between the two counties allowing both counties to complete general maintenance activities along with surface improvement programs in both counties.

  • 2017 Clarion County PennDOT Maintenance

    Agility Program

    Current active work plans• Clarion County Career Center

    − PennDOT – sweep, patch and sealcoat school’s driveway, use of message boards

    − Career Center – provides use of conference room with refreshments and also provides lunches for various meetings.

    • Clarion County Sheriff’s Office− PennDOT – allows the use of Department wash facilities− Sheriff’s Office – patrols in I-80 work zones to alert motorists

    Agility is a tool to build relationships with local communities by sharing and exchanging services and resources.

    Outreach 20172017 Clarion County PennDOT Maintenance2017 Clarion County PennDOT Maintenance2017 Clarion County PennDOT MaintenanceSlide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Plans for the future Maintenance Activities Slide Number 17