EFCOG Supply Chain Quality Task Team Conference Call March 2015 Vince Grosso WRPS Quality Assurance Subgroup Vice Chair Supply Chain Quality Task Team Chair March 18, 2015

EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

EFCOG Supply Chain Quality

Task Team

Conference Call

March 2015

Vince Grosso

WRPS

Quality Assurance Subgroup Vice Chair

Supply Chain Quality Task Team Chair

March 18, 2015

Page 2: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

2

Overview

1. Upcoming Conferences / Workshops

2. Industry / Suppl ier Issues

3. In ter face Update

4 . Pro ject Updates

5 . Audi t Update

6 . Old / New Business

7. Discussion & Close Out

Page 3: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

3

Supplier Database Access

• For JSEP access, send an email to:

[email protected]

• For MASL access:

– Obtain an entrust account

• New MASL website

– https://thesource.energy.gov/

– https://thesource.energy.gov/ptl/group/masl/masl-

homepage

• Use MASL cost avoidance form

• Any issues with access or use?

Page 4: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

4

Upcoming Conferences / Workshops

April 2015

Date Conference Title Location Website

April 13-16, 2015

ASME Core Engineering Management - Sacramento

Sacramento, CAhttps://www.asme.org/products/courses/core-engineering-management

April 14-15, 2015

5th Annual Small Modular Reactor Summit 2015

Charlotte NChttp://www.nuclearenergyinsider.com/smr/

April 20-22, 2015

ASME International Business Ethics and Foreign Corrupt Practices Act

Chicago, ILhttps://www.asme.org/products/courses/intl-business-ethics-and-fcpa

April 20-22, 2015

ASME NQA-1 and DOE Quality Assurance Rule 10 CFR 830 -Chicago

Chicago, ILhttps://www.asme.org/products/courses/nqa1-doe-quality-assurance-rule-10-cfr-830

April 21-23, 2015

ASME NQA-1 Spring 2015 Meeting

Charlotte, NC

http://calendar.asme.org/EventDetail.cfm?EventID=29686http://calendar.asme.org/EventDetail.cfm?EventID=29686

Page 5: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

5

Upcoming Conferences / Workshops

April 2015

Date Conference Title Location Website

April 22-24, 2015

Manufacturing, Fabrication & Examination Responsibilities in Codes, Standards and Regulations for Nuclear Power Plant Construction - Chicago

Chicago, IL

https://www.asme.org/products/courses/manufacturing--fabrication---examination-responsib

April 23-24, 2015

ASME Comprehensive Negotiating Strategies: Engineers & Technical Professionals - Chicago

Chicago, IL

https://www.asme.org/products/courses/negotiation-techniques-for-engineers

April 23-24, 2015

Communications Essentials for Engineers - Chicago

Chicago, IL

https://www.asme.org/products/courses/communication-essentials-for-engineers

April 23-24, 2015

NQA-1 Requirements for Computer Software Used in Nuclear Facilities - Chicago

Chicago, IL

https://www.asme.org/products/courses/nqa1-requirements-computer-software-used-nuclear

Page 6: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

6

Upcoming Conferences / Workshops

April 2015

Date Conference Title Location Website

April 23-24, 2015

ASME Understanding the Foreign Corrupt Practices Act

Chicago, ILhttps://www.asme.org/products/courses/understanding-foreign-corrupt-practices-act

April 26-May 1, 2015

Boiler, Pressure Vessel and Piping Technologies MasterClass Series (Colorado)

Colorado Springs, Colorado

https://www.asme.org/wwwasmeorg/media/ResourceFiles/Shop/Courses/ASMETrainingDevelopment/Webpage-MC-Series-Apr-2015.pdf

April 26-May 1, 2015

Pressure Vessel & Piping Master Classes at ASME Boiler & Pressure Vessel Code Week

Colorado Springs, CO

https://www.asme.org/wwwasmeorg/media/ResourceFiles/Shop/Courses/ASMETrainingDevelopment/Webpage-MC-Series-Apr-2015.pdf

April 28, 2015

Non-Destructive Examination (NDE) and Quality Control (QC) Personnel Qualification and Certification Workshop

Broadmoor Hotel, Colorado Springs,

CO

https://www.asme.org/shop/certification-accreditation/personnel-certification/ande/ande-personnel-certification-workshop

Page 7: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

7

Upcoming Conferences / Workshops

May 2015Date Conference Title Location Website

May 4-7, 2015

Design in Codes, Standards & Regulations for Nuclear Power Plant Construction - Las Vegas, NV

Las Vegas, NV

https://www.asme.org/products/courses/design-in-codes--standards---regulations-for-nucle

May 4-7, 2015ASME NQA-1 Lead Auditor Training - Las Vegas 2015

Las Vegas, NVhttps://www.asme.org/products/courses/asme-nqa1-lead-auditor-training

May 5 - 6, 2015

2015 DOE Safety and Security Enforcement Workshop

Nevada Support Facility/Nevada Field Office, Las Vegas, Nevada

http://energy.gov/ea/2015-doe-safety-and-security-enforcement-workshop

May 11-15, 2015

Nuclear Master Classes at ASME Washington Center

Washington, DC

https://www.asme.org/wwwasmeorg/media/ResourceFiles/Shop/Courses/ASMETrainingDevelopment/MC-Nuclear-Series-May-2015.pdf

May 12-14, 2015

B31.1 Power Piping CommitteeClearwater Beach,

Floridahttp://calendar.asme.org/EventDetail.cfm?EventID=27247

May 18-21, 2015

NQA-1 Lead Auditor Training -London, ENG

London, ENGhttps://www.asme.org/products/courses/asme-nqa1-lead-auditor-training

Page 8: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

8

Upcoming Conferences / Workshops

May 2015

Date Conference Title Location Website

May 18-21, 2015

BPV Code Section III, Division 1: Rules for Construction of Nuclear Facility Components - Atlanta

Atlanta, GA

https://www.asme.org/products/courses/asme-boiler---pressure-vessel-code-section-iii--di

May 18-20, 2015

Quality Assurance (QA) Considerations for New Nuclear Facility Construction

Atlanta, GAhttps://www.asme.org/products/courses/qa-considerations-for-new-nuclear-facility-constru

May 18-20, 2015

Overview of Codes & Standards for Nuclear Power Plant Construction - Atlanta

Atlanta, GAhttps://www.asme.org/products/courses/overview-nuclear-codes-standards-nuclear-power

May 18-21, 2015

ASME Core Engineering Management - Atlanta

Atlanta, GAhttps://www.asme.org/products/courses/core-engineering-management

May 19-21, 2015

GIDEP New User Training Clinic -Tysons Corner, VA

Tysons Corner, VA

http://www.gidep.org/events/clinic/clinic.htm

May 21-22, 2015

Comparison of Global Quality Assurance & Management System Standards Used for Nuclear Applications - Atlanta

Atlanta, GAhttps://www.asme.org/products/courses/comparison-global-quality-assurance-management

Page 9: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

9

Upcoming Conferences / Workshops

June 2015

Date Conference Title Location Website

June 1-3, 2015

ASME NQA-1 and DOE Quality Assurance Rule 10 CFR 830 -Houston

Houston, TXhttps://www.asme.org/products/courses/nqa1-doe-quality-assurance-rule-10-cfr-830

June 4-5, 2015

Communications Essentials for Engineers - Houston

Houston, TXhttps://www.asme.org/products/courses/communication-essentials-for-engineers

June 9-10, 2015

Master Class: Inspection Planning Using Risk-Based Methods

Houston, TX

https://www.asme.org/wwwasmeorg/media/ResourceFiles/Shop/Courses/MC124-RBI-PhilHenry.pdf

June 22-25, 2015

Master Class Series on Application of Design Rules in Section VIII of the ASME Boiler and Pressure Vessel Code

Milan, Italy

https://www.asme.org/wwwasmeorg/media/ResourceFiles/Shop/Courses/ASMETrainingDevelopment/MC-Series-Jun-2015-Milan.pdf

Page 10: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

10

Upcoming Conferences / Workshops

July / August 2015

Date Conference Title Location Website

July 26–29, 2015

World Congress 2015: The Innovative Edge to Contract Management

Dallas, TXhttp://www.ncmaworldcongress.org/

July 27–31, 2015

Radiological Emergency Planning: Terrorism, Security, and Communication

Boston, MA

https://ecpe.sph.harvard.edu/programs.cfm?CSID=REP0000&pg=cluster&CLID=1&loc=bottom&utm_source=SubscriberMail&utm_medium=email&utm_campaign=REP15%2DEM02&utm_term=&utm_content=eb60907034c04ddbaa57eb6f30de375e

August 10–14, 2015

In-Place Filter Testing Workshop

Boston, MAhttps://ecpe.sph.harvard.edu/programs.cfm?CSID=IPFTW0815&pg=cluster&CLID=1

Page 11: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

11

Industry Supplier Issues / Feedback

• Argonne Partnering for advanced reactor designs

– The Argonne National Laboratory will work with three of

the world's leading nuclear products and services

companies on projects that could unlock the potential of

advanced nuclear reactor designs, helping create a new

generation of safer, more efficient reactors.

– The three projects partner Argonne with AREVA Federal

Services (Aiken, S.C.), GE Hitachi Nuclear Energy

(Wilmington, N.C.), and Westinghouse Electric Company

(Monroeville, Pa.) to address significant technical

challenges to the design, construction and operation of

next-generation reactors.

Page 12: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

12

Industry Supplier Issues / Feedback

• DOE Awards Support Service Contract

– DOE announced the award of an Indefinite Delivery/Indefinite

Quantity (ID/IQ) contract to Trinity Engineering Associates of

Cincinnati, OH. Trinity Engineering Associates is a small-

disadvantaged business under the Small Business Administration’s

8(a) Program. The contract will have a maximum value of $4

million over four years. Firm-fixed-price and time-and-material task

orders will be issued from the basic contract.

• New guidance has been issued for applications to DOT for

IAEA Special Form Class 7 materials, per 49 CFR 173.476.

– New guidance can be found at

http://rampac.energy.gov/certinfo/certificates/doespf/default.aspx

and is effective immediately.

– Contact Lawrence Gelder, SRNL (803-819-8403) or Dr. James

Shuler, DOE Packaging Certification Program Manager (301-903-

5513).

Page 13: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

13

Industry Supplier Issues / Feedback

• Vibrant Wins Air Force Contract

– Vibrant has won a $1.26 million contract with the Air Force

Materiel Command to develop new modeling techniques for

aircraft components. Vibrant uses sonic resonance technology

originally developed at Los Alamos National Laboratory.

• EFCOG Quarterly Newsletter / EFCOGBLOG

– There is a new post on EFCOGBLOG about the EFCOG

Quarterly Newsletter. Check it out by going to:

• www.efcogblog.com

– Send comments / or article ideas to: Michael D. Gaden Deputy

Director, Performance Assurance TRU Waste Processing

Center

Page 14: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

14

Industry Supplier Issues / Feedback

• Hanford Excessing a NITON 703A XLp XRF Analyzer

– WRPS has an analyzer they are listing for disposal. It is a

high dollar instrument

– Lead-Based-Paint Analyzer

– Contains a 40mCi Cd109 source

– Any one need it?

– Contact:

• Darren Hagen ([email protected]) 509-373-9412

• Lee Livesey ([email protected]) 509-373-1975

Page 15: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

15

Industry Supplier Issues / Feedback

Page 16: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

16

Industry Supplier Issues / Feedback

Page 17: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

17

Industry Supplier Issues / Feedback

• Request for Assistance - Liquid Type A package

– Argonne National Laboratory is looking for two different

types of containers:

• Type A package rated for liquids with a capacity of

approximately 100 pounds or more for experimental

material.

• CROFT CU106A packages (up to 5)

• Please contact Jeff McGhee (630-252-5712,

[email protected]

Page 18: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

18

Industry Supplier Issues / Feedback

• DOE Issues Final RFP for Idaho Cleanup Project Core

– At the end of this 5 year contract the majority of cleanup will be complete in

Idaho and remaining nuclear materials will be in safe storage

– The ICP Core contract is a performance based contract type that includes

Cost-Plus-Incentive-Fee (CPIF) Contract Line Item Numbers (CLINs) with

hybrid fee structures for both CPIF and schedule milestone and performance

incentive fees; and a Cost-Plus-Fixed-Fee (CPFF) CLIN

– The estimated dollar value for this procurement is greater than $1 Billion, with

a five year period of performance

– RFP includes ongoing Advanced Mixed Waste Treatment Project and ICP

work scopes that must continue into the future: completing treatment of the

liquid sodium bearing waste, stabilizing and storing spent nuclear fuel and

high-level waste; dispositioning transuranic waste; retrieving and

dispositioning targeted buried waste; closing the Idaho Nuclear Technology

and Engineering Center (INTEC) tank farm; maintaining the Comprehensive

Environmental Response Compensation and Liability Act (CERCLA) remedial

actions; and operating and maintaining the INTEC, the Radioactive Waste

Management Complex (RWMC), and the Radioactive Scrap and Waste

Facility (RSWF) facility infrastructure.

Page 19: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

19

Industry Supplier Issues / Feedback

• Contractors Transportation Management Association (CTMA)

2015 Workshop in Point Clear, Alabama

– Will focus on contractor transportation and packaging topics

throughout the DOE/NNSA complex

– QA Requirements for Type B Packages

– Radiological Asistance Program (RAP) Teams

– Type A&B Reusable Containers

– Large TSD Moves

– DOT Enforcement

– http://ctmaconf.com/

– DOE/NNSA employees & contractors register using the DOE

Conference Management as the “49th Annual Contractors

Transportation Management (CTMA) 2015 Workshop, Event ID

#19132 by April 3, 2015

Page 20: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

20

Industry Supplier Issues / Feedback

• DOE S/CI Handbook

– Joint Task with DOE Quality Council

– DOE Sponsor - Duli Agarwal, AU-33

– Looking at IAEA-TECDOC-1169 (2014)

– Team Lead - Bob Carter ([email protected])

• Contact Bob if you or your site S/CI person want to get involved

• Others??

Page 21: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

21

Interface Representative(s) Update

• EPWOG - Kronvall / Weaver

• Supply Chain Management Center - Biagioli

• Packaging Management Committee - Natali / Hawk

• EFCOG QE Task Team - Thompson

• EFCOG SQA Task Team - Williams

• ICPT - Bass

• NNSA

• EM

• Office of Science

• HSS

• Others??

Page 22: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

22

Project Update (Supply Chain Contacts)

Task: SC-12-01

Project Manager: Cathy Nesser

• Action: Comprehensive Supply Chain Quality Site, Site

contact, and list of Subject Matter Experts from across the

complex.

A. This is a living document

B. Email updates to: [email protected]

C. Status:

Page 23: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

23

Project Update (Supply Chain Contacts)

Recent Complex Organizational Moves

• Sandia:

– James Peery appointed VP of Defense Research

• Hanford:

– Jim Arflin acting WRPS Procurement Manager

• Savannah River:

– Dr. Moody Manager, Savannah River Operations Office will be

retiring June 2015

– Jack Craig appointed Manager, Savannah River Operations

Office

• Others??

Page 24: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

24

Project Update (Non-NQA-1 Suppliers)

Task: SC-12-03

New Project Manager: Rick Chester (Y-12)

Action: Work with Engineering Practices Work Group to

evaluate the feasibility of developing a standard set of

criteria for Commercial Grade Surveys and Suppliers

for Non-NQA-1 suppliers.

• Status Update:

Page 25: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

25

Project Update (JSEP / MASL Integration)

Task: SC-12-04

Project Manager: Vince Grosso

• Action: Utilize a single tool for supplier quality data.

(MASL / JSEP Integration)

• Status Update:

Page 26: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

26

Project Update (Grow Supply Base)

Task: SC-12-08

Project Managers: Cathy Nesser; Bill Wingfield

Action: Determine how the Supply Base can be increased with

quality suppliers for upcoming project work

Status Update:

• Preparation for future projects

• Status:

Page 27: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

27

Project Update (Packaging)

Task: SC-12-09

Project Manager: Vince Grosso

1. Joint EFCOG / PMC-QA Packaging CGD and

Standardized Procurement Specification Team (Lead:

Mark Bowers)

– Update:

2. Joint EFCOG / PMC-QA Packaging Graded Approach

Team (Lead: Ron Natali)

– Update:

Page 28: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

28

Project Update

(JSEP/MASL Program Guide)

Task: SC-14-01

Project Manager: Joe Fulghum

Team: Bill Winfield, Lesa Brownell

• Action: Revise the existing JSEP program plan and MASL

program plan to be an integrated JSEP-MASL Program

Plan and guidance document as part of the JSEP-MASL

integration process.

• Status:

Page 29: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

29

Project Update (CGD Handbook Training)

Task: SC-14-02

Project Manager: Cynthia Williams

Team: TBD

• Action: Evaluate / modify existing Commercial Grade

Dedication training in conjunction with the new DOE CGD

Handbook to provide consistent application of NQA-1

2008/2009a requirements.

• Status:

Page 30: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

30

Project Update (CGD Handbook)

Task: SC-14-03

Project Manager: Spencer Daw, Dennis Weaver, Rick

Chester

Team: See Next Slide

• Action: Provide a DOE / NNSA Commercial Grade

Dedication Handbook with examples that clarify the

programmatic controls for consistent application of NQA-1

2008/2009a requirements.

Status Update:

• Team meeting held March 18th

Page 31: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

31

Audit Opportunities Update

(As of March 2015)

Page 32: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

32

Audit Scheduling – April 2015

Supplier Website Lead

Myers Container Corporation, Portland, OR (J102)http://www.myerscontainer.com/

M. Fish

Energy and Process Corporation, Tucker, GA (J19)http://energyandprocess.com/locations.shtml

J. Maupin

Pacific Northwest National Laboratory, Richland, WA (J174)

http://www.pnnl.gov/ B. Twigg

TSI Incorporated, Shoreview, MN (J223) http://www.tsi.com/ B. Chavez

Fowler General Construction, Richland, WA (J220) http://fowlergc.com/ B. Twigg

Energy Solutions Diversified Services, Inc., Columbia , Md (J212)

http://www.energysolutions.com/

J. Vines

Government Scientific Source, Reston, VA (J20) http://www.govsci.com/ B. Wingfield

Orbit Industries, Inc, Washougal, WA (J145)http://www.orbitindustries.com/index.html

B. Twigg

Petersen Inc., Ogden, UT (J16)http://www.peterseninc.com/index.php

A. Fix

Fugro Consultants, Inc., Walnut Creek, Ca (J217)http://www.fugroconsultants.com/about-us/

M. Ryan

Page 33: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

33

Audit Scheduling – May 2015

Supplier Website Lead

Nuclear Assurance Corporation (NAC International), Norcross, GA (J23)

http://www.nacintl.com/ J. Vines

QualTech NP, Cincinnati, OH (J27) http://qualtechnp.cwfc.com/ D. Frazier

Savannah River Nuclear Solutions, Aiken, SC (J81)http://www.savannahrivernuclearsolutions.com/

TBD

Consolidated Power Supply, Birmingham, AL (J34)http://www.consolidatedpower.com/

TBD

Page 34: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

34

Audit Scheduling – June 2015

Supplier Website Lead

Nuclear Filter Technology (NFT), Golden, CO (J24) http://nuclearfilter.com/nucfil/ Hendrickson

Areva Federal Services NP, Richland, WA (J72)http://www.areva.com/EN/operations-925/areva-inc--richland-nuclear-fuel-production.html

D. Ripplinger

Nuclear Logistics Inc., Fort Worth, TX (J25)http://www.nuclearlogistics.com/company

TBD

Skolnik, Chicago, IL (J30) http://www.skolnik.com/ TBD

Nutherm International, Mt Vernon, IL (J26) http://www.nutherm.com/ M. Ryan

Page 35: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

35

Audit Scheduling – July - September 2015

Supplier Website Lead

Applied Technical Services, Marietta, GA (J114) http://www.atslab.com/ TBD

Lockheed Martin Corp, Richland, WA (J219) http://www.lockheedmartin.com/ J. Sanwald

Canberra Inc., Meriden, CT (J4) http://www.canberra.com/ J. Vines

Babcock and Wilcox (B&W) Nuclear Operations Group, Inc., Lynchburg, VA (J17)

http://www.babcock.com/about/business_units/nuclear_operations_group/

R. Henderson

ANSYS, Inc., Canonsburg, PA (J40) http://www.ansys.com/ M. Ryan

Page 36: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

36

Audit Scheduling – October - December

2015

Supplier Website Lead

Operation Technology (ETAP), Irvine, CA (J7)http://www.etap.com/company/oti-operation-technology.htm

J. Vines

Cygna Energy Services (Cygna), Walnut Creek, CA (J123)

http://cygna.net/ D. Frazier

Bentley Structural Group, Walnut Creek, CA (J118)http://www.bentley.com/en-US/Corporate/Contact+Us/Find+Local+Office/

J. Vines

Paragon D&E, Grand Rapids, MI (J56) http://www.paragonde.com/ D. Frazier

Page 37: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

37

Supply Chain Quality Webex Calls

2015 Supply Chain Quality Webex / Conference Call Schedule

Date EST CST MST PST

Apr 16 2015 11 AM 10 AM 9 AM 8 AM

May 21 2015 11 AM 10 AM 9 AM 8 AM

Jun 18 2015 11 AM 10 AM 9 AM 8 AM

Jul 16 2015 11 AM 10 AM 9 AM 8 AM

Aug 20 2015 11 AM 10 AM 9 AM 8 AM

Sep 17 2015 11 AM 10 AM 9 AM 8 AM

Oct 15 2015 11 AM 10 AM 9 AM 8 AM

Nov 19 2015 11 AM 10 AM 9 AM 8 AM

Dec 17 2015 11 AM 10 AM 9 AM 8 AM

Page 38: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

38

EFCOG Meeting(s)

• Next QA/ISM Meeting Plan – May 19-21, 2015

– Will try to get video / audio links

– This is an operational working meeting and is

exempt from conference management process

– First Day

• Morning – General Session

• Afternoon – Information Sessions

– Second Day

• Supply Chain Quality Working Day

– Third Day

• Supply Chain Quality Working Day

– QA / Packaging Working Teams

– JSEP / MASL Integration Team

– CGD Handbook

Page 39: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

39

Old Business

• Any Other Old or New Business to Discuss?

Page 40: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

40

Open Discussion

Page 41: EFCOG Supply Chain Quality Task Team Conference Call March ... · •DOE Issues Final RFP for Idaho Cleanup Project Core –At the end of this 5 year contract the majority of cleanup

Tank

Operations

Contract

41

Next Webinar/Call & Close Out

• Next Webinar/Call:

– 4/16/15

• 11:00 AM EST

• 10:00 AM CST

• 09:00 AM MST

• 08:00 AM PST