7
EF 151 Group Project Code Name: Frank

EF 151 Group Project Code Name: Frank. Team Members Josh Barnes Michael Mcmillan Dhaval Patel Christopher Tarpy

Embed Size (px)

Citation preview

EF 151 Group Project

Code Name: Frank

Team Members

• Josh Barnes• Michael Mcmillan• Dhaval Patel• Christopher Tarpy

Construction Materials

• 1/2’ Thick 2x4 Board.• Two PVC pipes and elbows.• Two Hexagon bolts.• Styrofoam tubing• Two Marbles for Device • Some assorted nails, screws, and

trash!

Stage One

• The weighted marble goes down the Styrofoam tubing, which tilts up the other side of the PVC Pipe.

Stage Two

Right in front of the bolt in the 2nd Pipe is a light marble. When the Pipe gets knocked up from the 1st Pipe it cause the marble to fall and goes down the ramp.

Final Stage

• The marble goes down the shoot, bouncing down to each platform. Until it falls in to the cup.

Complete Picture!!!