EE&SE Goals Work GroupEE&SE Goals Work Group
Group’s Charge: Identify the key results-Group’s Charge: Identify the key results-oriented actions and corresponding oriented actions and corresponding milestones, that if successfully milestones, that if successfully implemented, will achieve the EE&SE implemented, will achieve the EE&SE Board’s Vision 2025. And secondarily, Board’s Vision 2025. And secondarily, develop an “elevator speech” version of develop an “elevator speech” version of the vision.the vision.
33
What We Need To Do – Buildings SectorWhat We Need To Do – Buildings Sector
Over time, all new residential and commercial Over time, all new residential and commercial buildings to use zero net energy (RCI 1.1) buildings to use zero net energy (RCI 1.1)
Reduce energy consumption by 60% in all Reduce energy consumption by 60% in all existing homes (RCI 1.2)existing homes (RCI 1.2)
Reduce energy consumption in existing Reduce energy consumption in existing commercial, industrial, and municipal buildings commercial, industrial, and municipal buildings by 50% (RCI 1.3)by 50% (RCI 1.3)
44
Buildings – Ramp Up ScenarioBuildings – Ramp Up ScenarioUnits Per Year Units Per Year
6,713
1,047
2,640
162
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 20250
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
New Construction - Residential New Construction - Commercial Commercial Retrofit
Industrial Retrofit Residential Retrofit
55
Buildings – Ramp Up ScenarioBuildings – Ramp Up ScenarioTotal Units Completed by 2025 Total Units Completed by 2025
Residential Retrofit: 470,938
New Construction - Residential: 107,415
New Construction - Commercial: 16,756
Commercial Retrofit: 38,640
Industrial Retrofit: 2,314
66
Estimated Annual Costs - Buildings SectorEstimated Annual Costs - Buildings Sector(includes escalation)(includes escalation)
$0
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
New Construction - Residential & Commercial Retrofit - Residential Retrofit - Commercial & Industrial TOTAL
Mill
ion
s o
f $
77
Cumulative Costs and Savings - Buildings SectorCumulative Costs and Savings - Buildings Sector(includes escalation)(includes escalation)
86,604
144,142
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
$160,000
2010
2012
2014
2016
2018
2020
2022
2024
2026
2028
2030
2032
2034
2036
2038
2040
2042
2044
2046
2048
2050
Estimated Cumulative Costs Estimated Cumulative Energy Savings
Mill
ion
s o
f $
88
What We Need To Do – Electric SectorWhat We Need To Do – Electric Sector
Lower COLower CO2 2 emissions from in state emissions from in state
generation sources by 37% below BAU generation sources by 37% below BAU through emissions reductions at existing through emissions reductions at existing power plants and deployment of power plants and deployment of renewable sources capable of displacing renewable sources capable of displacing existing COexisting CO22 emitting generation. emitting generation.
99
Electric Sector – Current StateElectric Sector – Current State
5.8
7.38 7.51 7.63 7.76 7.88 8.01 8.13 8.26 8.39 8.51 8.64 8.76 8.89 9.01 9.14 9.26
6.44 6.44 6.44 6.44 6.44 6.28 6.13 5.97 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Business As Usual Target
Em
issi
on
s [M
MT
CO
2e/y
r]
Actual
1010
Issues/Next StepsIssues/Next Steps
Additional actions will be needed to reach Additional actions will be needed to reach 50% reductions in the Buildings and 50% reductions in the Buildings and Electric Sectors.Electric Sectors.