Energy-Efficiency-Package EEP BAUER Maschinen GmbH 52,0 37,8 0 10 20 30 40 50 60 BG 30 BG 30 EEP used fuel [l/100cycles]

EEP PI 116 EN 04-15 EEP PI 116 en 04/2015 3 • Practical test - use on a construction site: In order to verify the practical suitability of the machine, it was

  • Upload
    ngokhue

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EEP PI 116 EN 04-15 EEP PI 116 en 04/2015 3 • Practical test - use on a construction site: In order to verify the practical suitability of the machine, it was

Energy-Efficiency-Package

EEP BAUER Maschinen GmbH

52,0

37,8

0

10

20

30

40

50

60

BG 30 BG 30 EEP

used

fu

el [l/

100cyc

les]

Page 2: EEP PI 116 EN 04-15 EEP PI 116 en 04/2015 3 • Practical test - use on a construction site: In order to verify the practical suitability of the machine, it was

Energy-Efficiency-Package EEP PI 116 en 04/2015 2

Motivation

Reduction of energy consumption on construction sites is an ecologically as well as economically

justified objective. In addition to reducing emission of CO2 and other pollutants, reduction of

expenditures on diesel is a highly motivating factor, contributing to the efficiency of a construction

site.

A specific work result can be achieved by using different methods and equipment. Besides

choosing the best construction method, another important factor that has considerable influence on the energy consumption of a construction project is the efficiency of the used equipment.

Methods of evaluation and improvement of energy-efficiency of specialist

foundation engineering equipment are developed within the scope of the

TEAM project (development of technology for energy-efficient drives of

mobile machines).

The Energy-Efficiency-Package EEP is one actual result of the project. It combines various

measures for increasing energy-efficiency and is available as an extra for the Bauer BG

PremiumLine drilling rigs.

Research and Development

The work carried out in research and development from 2012 to 2014 is divided into the following

phases:

• Reference tests:

At the beginning of the project, a current

drilling rig Bauer BG 30 PremiumLine was

used as a reference machine for the tests. These included bench tests, winch tests and

drilling trials in order to determine fuel

consumption rates of serial equipment.

• Analysis phase: Detailed evaluation of energy flow in a

drilling rig was done on the basis of these

reference tests. Specific improvement

measures could be identified, developed and

evaluated based on these analyses.

• Implementation phase: Measures with a high potential for reducing

fuel consumption and short pay-off periods

were implemented on the demonstration

machine.

Page 3: EEP PI 116 EN 04-15 EEP PI 116 en 04/2015 3 • Practical test - use on a construction site: In order to verify the practical suitability of the machine, it was

Energy-Efficiency-Package EEP PI 116 en 04/2015 3

• Practical test - use on a construction site: In order to verify the practical suitability of

the machine, it was used in normal operation

on a BAUER Spezialtiefbau GmbH

construction site for several months. The BG

30 PremiumLine achieved excellent results with its reliable operation with very high

productivity and low fuel consumption. This

proves that this new technology is not just a

"display rig" for trade-fairs and exhibitions -

but that the benefits can directly be used in

practice.

• Demonstration trials: At the end of the project, the machine was

put through the identical tests as in the first

phase. This helps determine the reduction in

fuel consumption, which allows for a direct

before-after comparison.

Measures to increase energy efficiency

Bauer BG 30 PremiumLine's Energy-Efficiency-Package EEP contains numerous modifications to

improve efficiency. The drive system of the main winch, with its significant share in energy

consumption, especially during Kelly-drilling, was fundamentally re-engineered. The new system

makes it possible to recover the energy released during the lowering of the tool. Thus, the fuel

consumption can be significantly reduced, especially when drilling deep boreholes. Further benefits

are increased efficiency during lifting, higher speed and independent parallel operation of several

functions (e.g. main winch, crowd, slewing and rotary drive).

Energy consumption by all ancillary devices, such as fan drives and pressure supply units was

optimized. This reduces not only the energy consumption, but also the noise emissions. The

already low values of pressure loss in hydraulic hoses and valves were further reduced.

Theoretical and practical tests have proven that the use of generously dimensioned components

pays off after a few months of operation.

The diesel engine control is also optimized. The RPM of the diesel engine while operating the

ancillary functions (e.g. auxiliary winch) or in standby mode has thus also been dynamically

adjusted. This makes the machine significantly quieter. A special hydraulic fluid with a favourable

viscosity over a wide temperature range further increases the efficiency. Prerequisites for the

highest energy efficiency are not only the individual measures taken, but also their optimal

coordination.

Page 4: EEP PI 116 EN 04-15 EEP PI 116 en 04/2015 3 • Practical test - use on a construction site: In order to verify the practical suitability of the machine, it was

Energy-Efficiency-Package EEP PI 116 en 04/2015 4

Benefits to the user

• Reduction of fuel consumption by up to 30% while operating the main winch:

The adjacent diagram shows the fuel consumption

for 100 stroke cycles with a load of 14 t.

• Reduction of fuel consumption by 10-20% in normal operation:

The adjacent diagram shows the fuel consumption

for two identically performed drilling operations, with

and without the Energy-Efficiency-Package.

• Increased productivity through improved efficiency

• Independent control of the main winch function

• Considerably reduced noise levels achieved by optimization of the diesel engine and fans

• Cost-effective investment by focussing on measures with a short pay-off period

• Tried and proven suitability for practical application

Summary

Bauer has a long tradition of productivity and efficiency. The Energy-Efficiency-Package EEP was

developed on the basis of contemporary research and development. Besides significantly reducing

the fuel consumption, it also offers other advantages and thus shows that high performance, low

noise emission and low fuel consumption are not necessarily incompatible. Numerous tests have

proven the suitability for practical application. Your contact person at BAUER Maschinen GmbH

will gladly supply the information on availability and launch dates.

BAUER Maschinen GmbH

BAUER-Strasse 1 86529 Schrobenhausen,

Germany

Phone: +49 8252 97-0

[email protected]

Design developments and process improvements may require the specification and materials to be updated and changed without prior notice or liability. Illustrations may include optional equipment and not show all possible configurations. These and the technical data are provided as indicative information only, with any errors and misprints reserved.