251
AD-A113 171 TRAINING ANALYSIS.AND EVALUATION GROUP (NAVY) ORLANDO FL F/G 5/9 PROCEDURE TRAINING AID FOR THE SH-30/H NORMAL START CHECKLIST.(U) FEB 82 R BRABY, P 6 SCOTT UNCLASSIFIED TAEG-TN-821 N EEEI/EmEEEEEB EEEnmE-EhhEnE

EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

AD-A113 171 TRAINING ANALYSIS.AND EVALUATION GROUP (NAVY) ORLANDO FL F/G 5/9PROCEDURE TRAINING AID FOR THE SH-30/H NORMAL START CHECKLIST.(U)FEB 82 R BRABY, P 6 SCOTT

UNCLASSIFIED TAEG-TN-821 N

EEEI/EmEEEEEBEEEnmE-EhhEnE

Page 2: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

PP-.o

1.JI25 ____ 1.

Page 3: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

T R AI N N GTECHNICAL MEMORANDUM 82-1

PROCEDURE TRAINING AIDFOR THE SH-3DIH

NORMAL START CHECKLIST

FEBRUARY 1982

w-JCUS ON THE TRAINIEb P

CD,

Li4. APR 7192"

9 HAPPROVED FOR PUBLIC RELEASE;1DISTRIBUTION IS UNLIMITED.

IRAIN I AN LSSA DEAU TO

ORA D 'O IA38

Page 4: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

Technical Memorandum 82-1

PROCEDURE TRAINING AID FOR THESH-3D/H NORMAL START CHECKLIST

Richard BrabyPaul G. Scott

Training Analysis and Evaluation Group

February 1982

Sponsored by

Chief of Naval Education and Training

and the

David W. Taylor Naval Ship Research and Development CenterNaval Technical Information Pres'itation Program

GOVERNMENT RIGHTS IN DATA STATEMENT 4Reproduction of this publication in wholeor in part is permitted for any purposeof the United States Government.

ALFRED F. SMODE, Ph.D., Director W. L. MALOY, Ed.D.Training Analysis and Evaluation Group Deputy Chief of Naval Education

and Training for EducationalDevelopment/Research, Development,Test, and Evaluation

Page 5: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

UncI assified,ECU'ITY CLASSIFICATION OF THIS PAGE ("o.n Date Entered)

REPORT DOCUMENTATION PAGE READ INSTRUCTIONSREPORTDOCUMENTATIONPAGE_ BEFORE COMPLETING FORM

I. REPORT NUMBER 2 GOVT ACCESSION NO. 3. RECIPIENT'S CATALOG NUMBER

Technical Memorandum 82-1 dZTh-iA2"3 - _ -I4. TITLE (and Subtitle) !. TYPE OF REPORT & PERIOD COVERED

PROCEDURE TRAINING AID FOR THESH-3D/H NORMAL START CHECKLIST

6 PERFORMING ORG. REPORT NUMBER

7. AUTHOR(e) I. CONTRACT OR GRANT NUMBER(,)

Richard Braby and Paul G. Scott

9. PERFORMING ORGANIZATION NAME AND ADDRESS 10 PROGRAM ELEMENT. PROJECT. TASK

Training Analysis and Evaluation Group AREA & WO1K UNIT NUMBERS

Department of the NavyOrlando, FL 32813

I1. CONTROLLING OFFICE NAME AND ADDRESS ItZ REPORT GATE

February 19823. NUMBER OFPA2

14 MONITORING AGENCY NAME A ADDRESSfif different from Conttrolling Office) IS SECURITY CLASS. (of this report)

UnclassifiedISe. DECLASSIFICATION, DOWNGRADING

SCHEDULE

16. DISTRIBUTION STATEMENT (of this Report)

Approved for public release; distribution is unlimited.

17. DISTRIBUTION STATEMENT (of the abstract entered In Block 20, If different from Report)

Is. SUPPLEMENTARY NOTES

Is. KEY WORDS (Continue on rtverse side It neceeary nd Identify by block number)

Procedure Training Aid Design of Instructional McProcedure Learning Instructional System Developot.Learning Aids Visual Imagery

20. ABSTRACT (Continue on reverse side If neceeeery nd Idenifty by block number)

This report presents a Procedure Training Aid for the SH-3D/H Normal StartChecklist. The intent of this report is to illustrate the scope and complexityof the varieties of information needed to document a procedure using theProcedure Training Aid format. The report documents the extensiveness of thegraphic production required by the format. It also shows the complexity ofthe information that must be displayed to describe the procedure in enoughdetail to enable the students to perform.

DO jAN7'3 1473 EDITION O I NOV ssIS OnSOLETS UnclassifiedS N 0102-LF-014.6601 SECURITY CLASSIFICATION OF THIS *AGE (ften Det ntetred)

Page 6: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

Technical Memorandum 82- ,O #

INTRODUCTION 4 4

The Training Analysis and Evaluation Group (TAEG) was tasked by the ' _Chief of Naval Education and Training to determine the training effectivenessof a new state-of-the-art flight simulator at Helicopter AntisubmarineSquadron One (HS 1), a Fleet Readiness Squadron, Naval Air Station,Jacksonville, Florida (Browning, McDaniel, and Scott (1981)). During thecourse of this program it became evident that improvements in procedureslearning were indicated. Better ways were needed for student aviators tolearn various cockpit procedures prior to practicing them in the syntheticground environment (i.e.,Device 2C44, cockpit procedures trainer, and Device2F64C, flight simulator).

Accordingly, a procedure training aid was designed and constructed asan example of the type of material that could be used in HS I academictraining to reduce the effort required by students in mastering complexcockpit procedures. The format for the procedure training aid carries outthe learning guidelines for procedure learning tasks described in Aagard andBraby (1976). These learning guidelines were also included in theInterservice Procedures for Instructional Systems Development (NAVEDTRA106A). This format was formally tested by Polino and Braby (1980) and wasfound to reduce practice time to proficiency when compared with traditionalmaterials in a simple procedure learning task (calibration of anoscilloscope probe).

The Procedure Training Aid for the SH-3D/H Normal Start Checklist(contained in the appendix) represents the application of the format to alengthy complex procedural task. In an experimental evaluation thistraining aid was compared with the traditional materials used by HS 1 forthis task (i.e., the Instructional System Development Workbook) and wasfound to be significantly more effective for this purpose (Scott, McDaniel,and Braby (1982)).

The TAEG designed format was also selected for inclusion in the Navy'scurrent Procedures for Instructional Systems Development (NAVEDTRA 110A).The format has also been accepted for inclusion in the Naval TechnicalInformation Presentation System (NTIPS). This system is being developed forthe Chief of Naval Material by the David W. Taylor Naval Ship Research andDevelopment Center. The NTIPS will be a state-of-the-art publishing systemfor preparing the operator, maintenance, training and logistic supportdocuments for new equipment.

To facilitate production of procedure training aids locally by subjectmatter experts, Terrell (1982) has produced guidelines and easy to-followdirections.

PURPOSE

The purpose of this report is to provide designers of instructionalmaterial with the entire Procedure Training Aid for the SH-3D/H Normal StartChecklist. The intent is to illustrate the scope and complexity of thevarieties of information needed to document a procedure using the Procedure

Page 7: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

Technical Memorandum 82-1

Training Aid format. (In Scott, McDaniel, and Braby (1982) only selectedpages of the training aid were offered as examples.) In terms of scope,this report documents the extensiveness of the graphic production requiredby the format. It also shows the complexity of the information that must bedisplayed to describe the procedure in enough detail to enable the studentsto perform.

The remainder of this report presents the Procedure Training Aid forthe SH-3D/H Normal Start Checklist.

2

Page 8: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

Technical Memorandum 82-1

REFERENCES

Aagard, J. A. and Braby, R. Learning Guidelines and Algorithms forTypes of Training Objectives. Technical Reprt No.23, March 1976.Training Analysis and Evalua ion Group, Orlando, FL 32813 (AD A023066).

Browning, R. F., McDaniel, W. C., and Scott, P. G. Preparation and Designfor a Training Effectiveness Evaluation of Device 2F64C forReplacement Pilot Training. Technical Report No. 108, 1981. TrainingAnalysis and valuation Group, Orlando, FL 32813.

Interservice Procedures for Instructional Systems Development, Phase IIIDevelop. NAVEDTRA 106A, 1 August 1975.

Polino, Anne M. and Braby R. Learning of Procedures in Navy TechnicalTraining: An Evaluation of Strategies and Formats. Technical ReportNo. 84, 1980. Training Analysis and Evaluation Group, Orlando, FL32813 (AD A084067).

Procedures for Instructional Systems Development, NAVEDTRA 110A,18 September 1981.

Scott, P. G., McDaniel, W. C., and Braby, R. Improved Procedures TrainingThrough Use of Aids Developed from Learning Guidelines. TechnicalReport No1. 1 82. TrainingAalysis and Evaluation Group, Orlando,FL 32813.

Terrell, W. R. A Guide for Preparing Procedure Training Aids. TechnicalMemorandum 82-T2,T9T7 Training Analysis and Evaluation Group,Orlando, FL 32813.

4

Page 9: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

Technical Memorandum 82-1

APPENDIX

SH-3D/H NORMAL START CHECKLIST

PROCEDURE TRAINING AID

NOTE: The Procedure Traininq Aid contained in this appendix retainsits oriqinal page numbers. It has not been renumbered toconform to the paoe number sequence of this technical memorandum,

4

Page 10: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

=PROCEDUTRO

AID

SH-3D/H NORMAL START CHECKLIST

... A LEARNING PACKAGEFOR PILOTS IN TRAINING

TRAINING ANALYSIS AND EVALUATION GROUP

ORLANDO, FLORIDA 32813

KRICHARD BRABYPAUL SCOTT

Page 11: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NAVAIR 01-230HLH-IC

SH-3D/H NATOPS PILOTS' CHECKLIST

NORMAL PROCEDURES

This checklist superseded NAVAIR 01-230HLH-1C dated I March 1977and NAVAIR O1-230HLE-1B dated 1 December 1975

NORMAL START

1. Circuit Breakers and Switches ....... .................... CHECK2. Fuel Dump Switches ...... .. .......................... OFF3. Brakes and Tailwheel ....... ........................ LOCKED4. Battery Switch ...... ... ............................. ON5. External Power ........ ......................... CONNECTED6. Battery Switch ........ ............................ OFF7. Landing Gear ........ ............................ CHECK8. Drop Tank Switch Panel(SH-3H) ..... .................... .CHECK9. Start Mode Switch ................................ AS REQUIRED10. Blade Panel(Radios SH-3D),Hoist, Trim ................... .CHECK11. Torquemotor Switches ....... ......................... OFF12. Anti-ice ....... ........................ .CHECK AS REQUIRED13. Ignition Switches ........ ....................... NORMAL14. Accessory Drive Switch .... ................. .FORWARD, LIGHT ON15. Manual Throttles, Speed Selectors .................. .FREE AND OFF16. Emergency Start and Override Switches ..... OFF17. Rotor Brake. . ... ............... CHECKED(320 PSI MINIMUM)18. Fire Warning, Caution, Advisory Panels. ................ CHECK19. PMS Disable Switch(SH-3H) ....... ....................... PULL20. Fuel Panel/Quantity ........ ......................... CHECK21. Battery Switch ........ ............................. ON22. Lights ........ .. ........................... AS REQUIRED23. No. 1 Engine ........ .. ............................ START24. All Gages ........ ............................. .CHECK25. Boost Pumps. ....... ............................. .OFF26. Speed Selector ........ .................... ...... 104% Nf27. Generators ........ ... ........................... ON28. No. 1 Overspeed System .... ....................... CHECK29. External Power ...... ........................ DISCONNECTED30. Compass System, Console Switches ..... ............... AS REQUIRED31. RAD ALT, BAR ALT, RAWS ....... .................... SET AND TEST32. Servo Sensor ........ ............................ CHECK

Extracted from NAVAIR 01-230HLH-1C

W6I

Page 12: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

INTRODUCTION

Learning When you complete this packageObjective you will be able to:

1. describe each item in the NATOPS SH-3HNormal Start Checklist, using the checklistand the paper mock-up of the cockpit.

2. perform each item on the SH-3 CockpitProcedures Trainer, without hesitation,error, or omission.

Why Learn NATOPS requires use of the Normal Start ChecklistThis Procedure each time a normal No. 1 engine start is performed.

Resources In addition to this booklet, you will need:Required

1. paper mock-up of the SH-3H cockpit.

2. NATOPS SH-3H Normal Start Checklist.

3. SH-3H Cockpit Procedures Trainer (usedonly in the final phase of lesson).

Cockpit The SH-3H cockpit is divided into sections. Figure IDescription shows the locations and names of the sections involved

in the No. 1 Engine Normal Start Checklist.

" ' - - I lrd . . . ... . . . .| m ' ' " -- l nm . . . . ..2

Page 13: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

DOME LIGHT PANEL

CENTER CIRCUIT BREAKER PANELCOPILOTS CIRCUIT BREAKER PANEL PILOT CIRCUIT BREAKEk PANEL

OVERHEAD SWITCH PANELOUTSIDE AIRk SPEED SELECTORSTEMPERATUREr

COPILOTROTOR BRAKE

INNSTRUMENT

RUDDER PEDALSCOPILOTS SIDE

CONSOLE

CENTER

CONSOLE

Figure 1

3

Page 14: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

HOW TO USE LEARNING MATERIALS

Directions 1. This lesson will be presented in a way that may benew to you. The following information will helpyou in completing it quickly and easily.

a. Each item in the NATOPS SH-3H Normal StartChecklist has been broken down into ACTIONand RESULT steps.

b. If the performance of an ACTION step causesthe system to do something you can observe(e.g., light a lamp), what the system does willbe presented as a RESULT step.

c. If something can go wrong that requirescorrective action by you, the symptoms andcorrective action are described in anIF/THEN statement.

d. In addition, CAUTIONS, WARNINGS, MEMORY AIDS,and NOTES are presented where appropriate.

e. Each item in the checklist requires a VOICERESPONSE when that item is completed.

2. Take your time and learn all of the steps ofeach item correctly and in sequence. The stepboxes with directions are numbered. READ THEM INORDER and touch the locations on the paper mockup.

3. After each item you will be required to recall theACTION and RESULT steps and the IF/THEN statements.You will also need to recall the CAUTIONS, WARNINGS,MEMORY AIDS, and NOTES and touch the locations onthe paper mockup.

4. After each item state (verbalize) the VOICERESPONSE.

5. For best results, follow all of the instructions.

4

Page 15: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL STARt CICKLIsT 46M No, 7. C~rcf Breakers and SvtceCHCP tu r o s : T o v e r i fy t h t t e c r u t b a k s

PILOT

Set hem ase nrlred wic

as appropriate ONr3

Page 16: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purposo: To verify that the circuit breakers are IN and switches areset as appropriate.

4. Action

Set Meter Selector switch to ASE

(counter clockwise)-

5. Action

Set Vertical Gyrj switch to PORT(up)

6. Action

Check 4 Hardover switches OFF(covers down)

.7. Action

Check 4 Channel Disconnect switchesto ON (up)

6

Page 17: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. I. Circuit Breakers and Switches .... CHECK

Purpose: To verify that the circuit breakers are IN and switches are

set as appropriate.

S. Action

Set ICS AMPL SEL mode switch toNORM

9. Action

Set ICS microphone selector switchto COLD

10. Action

Set radio transmitter selectorswitch as desired, usually 1 or 4(I for UHFI, 4 for VHFL)

11. Action

Set ICS switch on RAD panel to ON

7

Page 18: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose: To verify that the circuit breakers are IN and swi -uhes areSset as appropriate._

41 -

1/ .

12. Action

Set mixer switches as desired.Usually UHF 1 to ON (UP)

8

Page 19: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No, 1. Cic t Br kes ndS tce10 E X EX1S Ci c i BreakYUR AN WE Sers an Swi che THE BI

AtU4CS NTEBAK

3. Action

Set hemisphere 0t oas appropriate .o

Page 20: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

4. Action

Set Meter Selector switch to

( )

5. Action

Set Vertical Gyro switch to ()

6. Action

Check 4 Hardover switches(covers

7. Action

Check 4 Channel Disconnect switchesto ( )

PR IT * K P P N

AGANGO O AP R M CKUP '6 (A[ WATTODO ITOU HfT10N

Page 21: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

8. Acti on

Set ICS AMPL SEL mode switch to

9. Action

Set ICS microphone selector switch

10. Action

Set radio transmitter selectorswitch as desired, usually or(1 for UHFl, 4 for VHF2) - -

11 cto

Se IC1wth1nRDpne o'0

Page 22: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches ... CHECK

Purpose:

12. Action

Set mixer switches as desired.Usually UHF 1 to

12

Page 23: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

SH-3D/H NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches ....

Directions:

Using the SH-3 PAPER MOCKUP and the NORMAL START CHECKLIST (Steps 1 - 12)

State in your own words the Purpose

Go through each step in the ITEM mentally

Touch the location on the PAPER MOCKUP as you go through the steps

13

Page 24: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. I-Circuit Breakers and Switches ... CAECK-Purpose: To verify that thee circuit breakers are IN and switches areI set as approv Dr Iat e

ReseAt ifon T etfy oew

Chs ere Pild oucjt orredktagged

iF. N.ote

Pilot hto CBsaon chnek Ciciot'

Page 25: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECKPurpose: To verify that the circuit breakers are IN and switches are

set as appropriate.

Y'tJ

17. Action

4000 Set START Mode switch to NORMAL

10. Action

Set UHF ANT SEL switch to NORMAL

19. Action

Set CHAN MON switch to OFF

14a

Page 26: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches ... CHECK

Purpose: To verify that the circuit breakers are IN and switches are

set as appropriate.

4

22. Action

ft 'I cow Set BLADES FOLD MSRAD tcswit PS OFcve towFntrpsio

SPREADJI411[TIUI~ Jp~ Aru~esTuSAFETYj[fJjf

b LADES P ON ALVE21. ctio

Page 27: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Swi'.cnes .... CHECK

Purpose: To verify that the circuit breakers are IN and switches areset as appropriate.

i i

23. Action

Set WINDSHIELD ANTI-ICE switchto.OFF, center position

S24. Action

Iona Set CABIN HEATER A, switch

FA* LW goLY 0to Off

WAN 25. Action

EXTE"Ul 1 1 Set CABIN HEATER switch

WA E sio Pos TA 1, SO M A I

1c to OFF

t26. Action

4" Set &H PITOT HEAT switchto OFF

14c

Page 28: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECK 'ST ITEM NO. I. Circuit Breakers and Switches .... CHECK

Purpose: To verify that the circuit breakers are IN and switches areset as appropriate.

I

27. Action

Set forward rotator light(FWD ROT LT) switch to OFF

28. Action

Set ROTOR HEAD LT switchto OFF

OE29. Action

Set STEADY - FLASH switchto STEADY

' 30. Action

Set MASTER SWITCH to OFF

14d

-----------------------

Page 29: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose: To verify that the circuit breakers are IN and switches areset as approoria'c.

31. Action

Set SIDE POS switchto OFF

Set TAIL POS switchto OF F

33. Action

Set BEACON ANTI-COLL switchto OFF

14e

Page 30: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose: To verify that the circuit breakers are IN and switches areSset as appropriate.

i 4!

34. Action

Set COPILOT FLIGHT INST LTS rheostatto O f (counter clockwise).

35. Action

Set CONSOLE & PANEL LIGHTS rheostatto OFF (counter clockwise).

36. Action

Set INSTRUMENT EMER LTS rheostat,, to OF..F (counter clockwise).

37. Action

Set NON-FLIGHT INST LTS rheostatto OF..F (counter clockwise).

14f

..

Page 31: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose: To verify that the circuit breakers are IN and switches areset as appropriate.

,ii

38. Action

Set PILOT FLIGHT INST LTS rheostatto OFF (counter clockwise)

S39. Action

Set HOIST switch to OFF

40. Action

Set BEEPER TRIM switchto OFF

Al. Action

Set SONAR INTERCOM switch

14q

Page 32: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches CHECK

Purpose: i To verify that the circuit breakers are IN and switches areset as appropriate.

£ +4

42. Action

Set Torque Motor switchesto OFF

43. Action

Set both ENGINE ANTI-ICE

switches to OFF

44. Action

Set BATTERY switch to OFF

{ 45. Action

-- Set both Generator switchesto OFF

14h

Page 33: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO 1. Cii tit BRe-_alers and Switchw 'i:.

Purpose: lo \'r 'thaf t , :reak.ers ace ', and switches, ar-e

both IG-T i swtce

ction

,c tion

Set R.F.(Riqjht Forwar-d Launcher)ST("RES switch to OFF I.up)

IDRCIEIEM 0KE RCICN-NI OGO ~ ~ ~ ~ ~ ~ ~~ m TO PAE-OKU EALWA T0WTOTHSTTN

Page 34: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose: To verify that the circuit breakers are I and switches are

set as appropriate.

_ F

49. Action

Set Accessory Drive switch toACCESS DR. position (forward)

50. Action

Set Emergency start switchesto OFF

51. Action

Set Overspeed Governor switchesto OFF

PRCTC ITEM *KE PRCICN UNI YOU

TEi

-- ~ -

Page 35: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose: To verify that the circuit breakers are IN and switches areset as appropriate.

wN I,

52. Action

Set No. 1 Engine and No. 2 EngineFIREWALL VALVE switches to CLOSE

,," 54. Action

Set 4 boost pump switches YFT

, Set both Radar Altimeters toOFF (counter clockwise)

14k

Page 36: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose: To verify that the circuit breakers are IN and switches areset as appropriate.

56. Action

Set UHF/DF switch to SHORT (down)

571 . Actin

58. Action

.,,:. Set MASTER/RETRACT switch to OFF(center) -

59. Action

~Set PRI OFF/AUX OFF switch to_Neutral, center position

14L

Page 37: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

INTENTIONALLY LEFT BLANK

15

Page 38: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

*FL/NTEBAK WIEO SRTHPPR-NTTEBO

13. Action

Check Pilot Circuit Breakers

14. Action

Check Center Circuit Breakers

1K Note___CB on Center Circuit

Brler Panel is norm'ally foundReset if __. Menta*vy note whircTCBs were found out or -red tagged

16. Note

Pilot to Visually check copilot'scircuit breakers__

OPRATICEITE OKEP PACTIINGUNTI YO

Page 39: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches ... CHECK

Purpose:

17. Action

Set START Mode switch to

10. Action

Set UHF ANT SEL switch to

16a

Page 40: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose:

20. Action

Set BLADE FOLD MASTER switch__ cover down

B 21. Action

Set BLADE FOLD SAFETY VALVE

switch cover down

I NO T0LGT 22. Action

Set BLADES FOLD SPREADswitch to, center position

* AI ITE *KE PCI UN

AGANGO O APE M CK-P ECAL HATTODO ITOUTHEITAIN

Page 41: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose:

(rr,,

23. Action

Set WINDSHIELD ANTI-ICE switchto __,center position

24. Action

Set CABIN HEATER FAN switchmw Oto __to

25. Action

MABTR SIE PO TAL P" 6 MW I I Set CABIN HEATER switch$IV~lTto DIMt

26. Action

-hoh Set PITOT HEAT switch

-RA TIC ITE 0' KEE PRIIIGUT

16c

Page 42: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. I. Circuit Breakers and Switches .... CHECK

Purpose:

27. Action

Set forward rotator light(FWD ROT LT) switch to

28. Action

Set ROTOR HEAD LT switchto

0 29. Action

Set STEADY - FLASH switchto

j 30. Action

Set MASTER SWITCH to

16d

Page 43: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches . ... CHECK

Purpose:

37. Action

ac:="Set SIDE POS switch

32. Action

Set TAIL POS switcnto

33. Action

Set BEACON ANITI-COLL switchto

l6e

Page 44: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches ... CHECK

Purpose:

\34 Action7

Set COPILOT FLIGHT INST LTS rheostat

to (counterE clockwIie).II ii

35.Acio

Page 45: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. I. Circuit Breakers and Switches .... CHECK

t Purpose.

9L

Set PILOT FLIGHT INST LTS rheostatto . (counter clockwise)

39. Action

Set HOIST switch to

t40. Action

' Set BEEPER TRIM switchto._

S41. Action

Set SONAR INTERCOM switchto

16g

Page 46: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose:

42. Action

FOSet~TOQU Torque oorswtce

Set both ENGINE ANTI-ICEswitches to

v044 Action

Set BATTERY switch to

45. Action

Set both Generator switchesto

16h

Page 47: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST JTEM NO. 1. Circuit Biteakers and '-witches ... Cli[C

Purpose.

Alt

Set both IGNIT10ON switches~ .MI __to __(center)

'7. Action

Set both NOP. 1 [INGIN[ andNO. 2 ENG INE T-fiandl es

Set. R.F. (Right Forward Lamjcher)-SIORES switch to up)

PRATIC ITE *KE PRCICN UNTI YO

Page 48: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches ... CHECK

Purpose:

/1

6~~~9 Action ~I 66

IMES $TAM

Page 49: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. I Circuit Breakers ano Switches .... CHECK

Purpose:

52. Action

Set No. 1 Engine and No. 2 EngineFIREWALL VALVE switches to

.. 53. Action

Set CROSSFEED switch to

WI5. Action

SIeL Vbostpum switches t

Set boRadarE Aiter to

(counter clockwise)

16k

Page 50: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose:

56. Action

Set UHF/OF switch to .(

r57. Action

Set HOVER LT/FLOOD LT switch to_ ( , )

58. Action

Set MASTER/RETRACT switch to

59. Action

Set PRI OFF/AUX OFF switch to_.. ,center position

161-Il

Page 51: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

INTENTIONALLY LEFT BLANK

17

Page 52: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

SH-3D/H NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches.

Directions:

Using the SH-3 PAPER MOCKUP and the NORMAL START CHECKLIST (Steps 13-59)

State in your own words the Purpose

Go through each step in the ITEM mentally

Touch the location on the PAPER MOCKUP as you go through the steps

18

Page 53: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose: To verify that the circuit breakers are IN and switches are

set as appropriate.

60. Action

4- 1Set CONT IND PWR switch to OFF (down)

-0 j-61. ActionSet NAV PLTR (Local) Control Panel

C/ 0 MODE switch to STBY (counter clockwisE)

62. Action

0 'Set NAV PLTR (Remote) Control Panel0\ MODE switch to OFF (counter clockwise)

\-- -

.1 STE IHOO ITEM

19

Page 54: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose: To verify that the circuit breakers are IM: and switches are

set as appropriate.

63. Action

Set NAV (Ponoler) mode switch to OFF(counter clockwise)

64. Action

Set CHAFF MASTER switch to OFF(pull out and down)

65. Action

Set TACAN mode switch to OFF(counter clockwise)

PRCTC ITEM *KE PRCICN UNTILYOU

20

Page 55: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. CirCUit Breakers and Swi tches ... OEC

Purpose: To verify that the circujit breakers are IN and switches ar e

set as a ppropr-iate.

Set LU mode switch as desired(uIsually PRESET)

6.Aton

Set UH1F function swi tch OFF

6c1. ActionSet KY 23 Powver switch to OFF. SetCipher switch to P ( Plain)7

____________________GO TO PA E MO KU Tt WHER EAC ACIO AN.EPNE AELC

Page 56: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Swi tches .... CHECK

set as appropriate.

D#Poe ovrf thNt theRE circui breker ar an switches are OF

Age

""10 #AK 0 owad+ ON7A

0. offg70 Action h* S

02

Page 57: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No, I i r-Cui t r Ct-,j frl dtid ,Wl

Purpose: ce

73. Action

JITTI SON HTTISON ALL Switch OFF.. , I'll . 0 cover g", shear wired,-

selecto-r-Tnob to SAFE

1 74. ActionSet PF mode selector switch to OFF

A& ....... -equency(counter clpckwisei; set fit 29.000

e 9,. o o o -

'IUDA P, Kj 75. Action

VC BAND Set AUXILIARY FLOTATION to OFFA (pull out and down)F 14 41

.R

Ec

00 e, 4 76. Action

Set LF/ADF to LLL (Volume controlcounter clock

*PRACTICE ITEM *KEEP PRACTICING UNTIL YOUGO TO PAPER MOCK-UP R ECALL WHAT TO DO WITHOUT HESITATING

23

Page 58: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switchec,...HC

Purpose: Toverify that the cir'cuit breakers and switches areset as appropriate

78. ~? Ioic Repos

a'HF K"4

m~~u~myI~jp..mwE~~g~m zu.g ppI0~ UI

UEUUISUVBE![SOIUIE~L

Of'4

Page 59: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches ... CHECK

*ILIN THE BLANKS 0 WRITE ON SCRATCH PAPER - NOT THE BOOK

LEXER ISE * REFER BACK TO CHECK YOUR ANSWERS

0C 0 Set NAV PLTR (Local) Control Panel0 0MODE switch to __

Set N1AV PLTR (Remote) Control PanelMODE switch to

24a

Page 60: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

64. Action

Set CHAFF MASTER switch to___(pull e'nd

65. A~ction

Set TACAN mode switch to

PR A C IE I M 0 )I RA(TI N- NTII,-AGAIN, O TO PAPE MO KUP L IA 0DOWTO 1114i

24b

-.- Mom

Page 61: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

66 . Action

Set UHF mode switch as desired(usually _

67. Action

Set UHF function switch

68. ActionSet KY 28 Power switch to SetCipher switch to_( Pai~n"

24c

Page 62: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Swi tches . . .. CHECK

i~~isto, I S .0

0'0 "' St Drn Tnk sitchs t

CROP j

Page 63: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches . . . CHECK

Purpose:

C-1

SE73. Action

JTO Set JETTISON ALL switchcover , shear wired,-selec o®rknob to

74. ActionSet HF mode selector switch to.___

,.....set frequencyio .0

75. Action

BSet AUXILIARY FLOTATION to

D(pull _ and ____

76. Action

Set LF/ADF to (Volume control

24e

Page 64: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches ....

Purpose:

0b

77. Acti on

Set IFF MASTER switch to

78. Voice Response

al I a

24'f

Page 65: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

SH-3D/H NOR!IAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .

Directions:

Using the SH-3 PAPER MOCKUP and the NORMAL START CHECKLIST (Steps 60-78)

State in your own words the Purpose

Go through each step in the ITEM mentally

Touch the location on the PAPER MOCKUP as you go through the steps

25

Page 66: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose: To v, ify that the circuit breakers are IN and switches are set

as appropriate.

7.'"

COPILOT .

1. Action

Set ICS AMP SEL mode switch to NORM

2. Action

Set ICS MIC SEL switch to COLD or HOTas desired.

26

Page 67: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose: To verify that the circuit breakers are IN and switches are set

as appropriate.

3. Action

Set mixer switches as desired.~~UHFI usually to ON (p

Set RAD TRANS SEL switch as desired,

[5. Action

~Set RAD ICS switch to ON (UP)

27

Page 68: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

Purpose: To verify that the circuit breakers are IN and switches are set

S as appropriate. ,

1-N

6. Action

Check copilot circuit breakers IN

7. Note

Copilot to visually check pilot andcenter circuit breakers IN

8. Voice ResponseCHECK

Page 69: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. I. Circuit Breakers and Switches .... CHECK

{~~~ EX RIS i L IN THE BLANKS *WRITE ON SCRATCH PAPER -NOT THE BOOK

EX RCS *REFER BACK TO CHECK YOUR ANSWERS

COPILOT

1. Action

Set ICS AMP SEL mode switch to

2. Action

Set ICS MIC SEL switch to oras desired.

29

Page 70: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches ... CHECK

3. Sctio

30 ie wthe sdsrd

Page 71: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches .... CHECK

/ ,

6. Action

Check copilot circuit breakers

7. Note

Copilot to visually check pilot andcenter circuit breakers

8. Voice Response

PRCTC ITEM *KE PRCICN UNI YOU..

31

Page 72: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

SH-3D/H NORMAL START CHECKLIST ITEM NO. 1. Circuit Breakers and Switches ....

Directions:

Using the SH-3 PAPER MOCKUP and the NORMAL START CHECKLIST (Copilot steps

1 - 8)

State in your own words the Purpose

Go through each step in the ITEM mentally

Touch the location on the PAPER MOCKUP as you go through the steps

State the VOICE RESPONSE at completion of the steps

32

Page 73: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

Page 34 through 49 Intentionally Left Blank

33

Page 74: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 2. Fuel Dump Switches .... OFF & SHEAR WIRED

Purpose: To prevent inadvertent dumping of fuel when electrical poweris applied.

1. Action

FWD and AFT FUEL DUMP switches 0FF(covers down and shear wired)

2. NoteSH-3H GROUPS A, B, and C FUEL DUMPswitches are located on the instrumentpanel. SH-3H GROUP D and subsequentFUEL DUMP switches are locatedon the left side of the Center ConsolA

3. Voice Response"FF and SHEAR WIRED"

50

Page 75: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 2. Fuel Dump Switches .... OFF & SHEAR WIRED

EXERCISE 0 FILL IN THE BLANKS *WRITE ON SCRATCH PAPER - NOT THE BOOKEX RCS *REFER BACK TO CHECK YOUR ANSWERS

1. Action

FWD and AFT FUEL DUMP switches,.(covers . and

2. NoteSH-3H GROUPS A, B, and C FUEL DUMPswitches are located on the instrumentpanel. SH-3H GROUP D and subsequentFUEL DUMP switches are locatedon the left side of the Center Console

3. Voice Response1,and.

5 1

51

Page 76: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 3. Brakes and Tailwheel .... LOCKED

P s To set the parking brakes and ensure the tailwheel is locked.

Purpose:

I. Acoebrkepeal

Press pilot's toe brake pedals

2. Result

i, (down)--

3. Action

L ,;,;LHold pilot's toe brake pedals

4. CAUTION

, M~ake sure that both toe brake

pedals are Dressed firmly whensetting the parkinq brake

0STE THOG ITEM * 0

52

Page 77: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 3. Brakes arid Tailwheel .... LOCKED

Purpose:

To set the parking brakes and ensure the tailwheel is locked.

5. ActionPull PARKING BRAKE handle to ON (out)and HOLD

6. Action

Release pilot's toe brake pedals

7. Action

Release PARKING BRAKE handle

R. Result

PARKING BRAKFS are set

STEP~ THROUG ITE

Page 78: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 3. Brakes and Tailwheel ... LOCKED

Purpose:To set the parking brakes and ensure the tailwheel is locked.

9.Acio

Veiyta teTI H PL OLChadl is in OCK(up

10 IF

gHandle is DOWN

THE

Page 79: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 3. Brakes and Tailwheel .... LOCKED

4.XERCISE *REFER BACK TO CHECK YOUR ANSWERS

1777

I

1. Action

Press pilot's toe brake pedals

2. Result

PARKING BRAKE handle moves tc

3. Action

Hold pilot's toe brake pedals

4. CAUTION

Make sure that... toe brakepedals are pressed firmly when

setting the parkinq brake

55

Page 80: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 3. Brakes and Tailwheel .... LOCKED

1 7

5. ActionPull PARKING BRAKE handle toand- -

6. Action

pilot's toe brake pedals

7. Action

PARKING BRAKE handle

,. Result

PARKING BRAKES are

g . .,

PRACTIC ITE KEE ,PRA.TI.ING UNTIL..OU

i AG IN O T PAPR M CK-P ORCAL WHT TODO ITHUT HSITTIN

Page 81: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 3. Brakes and Tailwheel .... LOCKED

9. Action

Verify that the TAIL WHL PULL TO LOCKhandle is in

10. IFHandle is

THENDepress button in center of handleand handle will spring up; then pullhandle up to insure it is locked

11. Voice Response

57

Page 82: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 4. Battery Switch .... ON

Purpose: The main purpose for turning the Battery Switch ON is to apply power to

the external power contactor relay to accept external electrical power.

1. Action

Place BAT switch to ON (pull out anddown)

2. ResultCheck v9 lights on CAUTION PANELillumnated (on later model aircraftthe COMPASS FAIL light will also be

* ON)

STPTR U HIEGO T PA ER OCKUP TUCHWHEE ECH ATIO AN REPONS TAES [AC

Page 83: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 4. Battery Switch .... ON

Purpose: I The main purpose for turning the Battery Switch ON is to apply power to

the external power contactor relay to accept external electrical power.

Two Advisory lights will illuminate if

!Trdes are folded (PARKING BRAKE ON,CHECK BLADE FOLD), only PARKING BRAKEif blades are spread; EXT PWR lightmay be on

4. Voice Response

"ON"

SU TR U S * 'O O P E M

Page 84: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 4. Battery Switch . . .. ON

IIA

JF

1. Action

Place BAT swi4tch to __(pul I__ and

2. Resul tCheck lichts on CAUTION PANELillum"-ted (on later model aircraftthe COMPASS FAIL liciht, will also be

o fON)

*PATC ITE *KEE PRCICN UNI YOU*O

-AGAINI GO TO PAPER MOC-P RCL HTT OWTOTHSTTN

Page 85: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 4. Battery Switch .... ON

7_

CHECK BLADE FOLD), only PARKING BRAKEif blades are spread; EXT PWR lightmay be on

4. Voice Response

61

AIM ima -ANN& -a At.. *. . f-

Page 86: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 5. External Power .... CONNECTED

Purpose: To connect AC external power to the helicopter electricalsystem.

" I

1.Action

Pilot gives hand signal to connectexternal power

2. ResultPPlane Captain gives Connect AC power

signal; Power crew connects AC power

to helicopter receptacle

1 3. ResultCaution lights remain ON

Vand #2 RectifierW. lights qoing out is* a positive indication of

external power connected)

0-

2 0 T RS

62

Page 87: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 5. External Power .... CONNECTED

Purpose: To connect AC external power to the helicopter electrical

system.

I

LFL-

4. Result

Three lights on Advisory panel ON(EX-TPower ON illuminates)

Pilot gives Thumbs Up to LSE

6. Note

FFflags in GYROS disappear andGYROS erect in approximatelyS_,minutes

7. Voice Resnonse

"CONNECTED"

63

Page 88: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 5. External Power .... CONNECTED

*FILS IN THE BLANKS 0 WRITE ON SCRATCH PAPER - NOT THE BOOKEXERCISE REFER BACK TO CHECK YOUR ANSWERS

~A

1. Action

Pilot gives hand to connectexternal power

2. ResultPlane Captain gives Connect AC power

CUINN signal; Power crew connects AC powerto helicopter receptacle

3. Result

Caution lights remain ON (#1"ectifier, #2 Rectifier and Tail

O* Takeoff lights go OFF)

64

Page 89: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 5. External Power .... CONNECTED

771

4. Result

lights on Advisory panel ON(EX-TPower ON illuminates)

5. Action

Pilot gives Thumbs Up to LSE

6. Note

flags in GYROS disappear and7rOS erect in approximately-minutes

7. Voice Resnonse

65

Page 90: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 6. Battery Switch .... OFF

Purpose: To prevent overcharging the battery with external electricalpower applied.

0~1 AcTIonE

ENpN to OOF

U UU.0 F FS F

66E

Page 91: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 6. Battery Switch .... OFF

* FILL IN THE BLANKS *WRITE ON SCRATCH PAPER - NOT THE BOOKEXERCISE REFER BACK TO CHECK YOUR ANSWERS

GI/ TES

ANI-C PIT 2

1. Action

Pilot pull Battery switch __and

to

2. Voice Response

67

Page 92: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

SH-3D!H NORMAL START CHECKLIST ITEM 2 THROUGH ITEM 6

Directions:

Using the SH-3 PAPER MOCKUP and the NORMAL START CHECKLIST

State in your own words the Purpose for each ITEM

Go through each step in the ITEM mentally

Touch the location on the PAPER MOCKUP as you go through the steps

State the VOICE RESPONSE at completion of the steps

PAGES 68 THROirH 77 IITENTIONALLY LEFT BLANK

78

Page 93: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 7. Landing Gear .... CHECK

Purpose: To ensure that landing gear is down and emergency system is

properly set.

II

Rheosta whes ONdlightomaybe DIMWnd

Check , LDLER OThandleiF Orand OCKD O N G ok a'

1. Action

Ceckreess ndictr for TDSOswtc

2 . Action

Checkiht LDG GEAR CORT dlasNScomesLOCKE (SoPleotis Incs Lihts

Rhedsa light ay GEAR Chand

not seen durn da liht

7PH GI

Page 94: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 7. Landing Gear .... CHECK

Purpose: To ensure that landing gear is down and emergency system is

properly set.

-5. Action

Release HDL LT TEST switch

" 6. Result

i Light in LDG GEAR CONT handle goes

OUT

80

...< (. . .. I6r '

Page 95: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 7. Landing Gear .... CHECK

Purpose: To ensure that landing gear is down and emergency system is

Jproperly set.

0

):• 7. Action [

Verify Emergency Landing Gear Handle, OWN, facina fore and aft, andi sr, wi red, -"

8. Action

Verify Emergency Landing Gear Releaselever AFT, and shear wired (located

on side-of Broom Closet behind pilot'scompartment)

9. oice Response

"CHECK"

STEP T ITEG T P -T

.... 1

Page 96: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 7. Landing Gear .... CHECK

* FILL IN THE BLANKS *WRITE ON SCRATCH PAPER - NOT THE BOOKEXERCISE REFER BACK TO CHECK YOUR ANSWERS

uHF/DF 1O

IIRheosta isG G ht my e iO

nOt sel -enidgnhd i ohes

3. Action

.~2 Actionswtc

W ~Ceckiht LDG GEAR CONT handlecames(Soeni Ploks Lihts~

Rhedostat in l gh GE A be DIhand

not seen during daylight)l

82

• IJ

Page 97: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 7. Landing Gear .... CHECK,

5. Acti on

HDL LT TEST switch

6. Result

Light in LDG GEAR CONT handle goes

3

Page 98: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 7. Landing Gear ... CHECK

onerif ErncyLanin piranlet'

fa in an andII * *0

=se rwire

P. 4ct io

Page 99: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

AD-A%13 171 TRAINING ANALYSIS AND EVALUATION GROUP (NAVY) ORLANDO FL F/6 5/9PROCEDURE TRAININO AID FOR THE SN-3D/H NORMAL START CHECKLIST. (U)FEB 82 R BRABY. P 6 SCOTT

UNCLASSIFIED TAEG-TM-82-1

2.,3

ommmmmmNIml

mmmiiiiimmIEu-u,--.-.lm-- EEEEEEEEEEm

Page 100: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

II A

Page 101: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 8. Drop Tank Switch Panel (SH-3H) .... CHECK

Purpose: To control fuel transfer from the DROP TANKS (SH-3H Groups A, B, and C)

LI. 1 _

, 1. Action

LEFT and RIGHT DROP TANK switchesnormally to OFF (forward)

2. Note

This panel installed on SH-3H GroupsA, B, and C ONLY. Not installed onGroup D and subsequent

3. Voice Response

"CHECK"

85

Page 102: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 8. Drop Tank Switch Panel (SH-3H) .... CHECK

*EXERCIS FILL IN THE BLANKS *WRITE ON SCRATCH PAPER - NOT THE BOOKSE REFER BACK TO CHECK YOUR ANSWERS

LEFT and RIGHT DROP TANK switches

nomal to

This pan installed on SH-3H GroupsA, B, and C ONLY. Not installed onGroup 0 and subsequent

3. Voice Response

86

Page 103: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 9. Start Mode Switch .... AS REQUIRED

Purpose: To provide automatic dropout of the starter at about 45, Nq

when the START MODE switch is in NORMAL.

1. Action

Verify START MODE Switch in NORMAL

2. Voice Response

"AS REQUIRED"

87

Page 104: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 9. Start Mode Switch .... AS REQUIRED

I ~~ EECS •FILL IN THE BLANKS •WRITE ON SCRATCH PAPER -NOT THE BOOK

EXRCSE REFER BACK TO CHECK YOUR ANSWERS

1. Action

Verify START MODE Switch in

2. Voice Response

II

88

Page 105: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 10. Blade Panel. Hoist, Trim ... CHECK

IF BLADES ARE FOLDED

Check BLADES FOLDED, CO' T Lff ~ADV and SAFETY VALVE OPEID 1ichts

2. IFLiqhts are OFFTHENCheck Accessory Drive YJ1- IN DPposition and Liqht.QON

GO TO PAPE MOC -UP * .smC~WFEEC CINADRSOS AE LC

Page 106: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 10. Blade Panel, Hoist, Trim .... CHECK

Purpose: IF BLADES ARE FOLDEDTo ensure that the Blade Panel, Hoist and Beeper Trip Switches are setfor start.

Accessory Drive Switch is in ACCESS DRposition and lights are OFFTHENCheck BLADE FOLD circuit breaker, reselif necessary_,

4. IFLights are still out PRESS TO TEST,If lamps are OK

___/ THENCall maintenance

1 5. Action

(Q,- No. 1 BLADE POS, BLADESSPREAD, FLIGHT POS, PYLON UNLOCKED andFOLD PWR ON lights

6. ActionCheck SAFETY VALVE CnvDr..QMASTER Switch Cover DownFold Pwr light off.Blade Fold Switch OFF Cenr position)

90

Page 107: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 10. Blade Panel, Hoist, Trim .... CHECK

4 Purpose: I IF BLADES ARE FOLDED

4 To ensure that the Blade Panel, Hoist and Beeper Trim Switches are set

UI~i~v-CItD O

MST BLATE AUEGHSE

~\

8. Action

BEEPER TRIM switch to ON (down)

9. Voice Response

"CHECK'

91

'~~ ~~ ~ 0 0... ... ii...

Page 108: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL, START CHECKLIST ITEM NO. W0. Blade Panel, Hoist, Trim .. HC

IF BLADES ARE FOLDED~

Page 109: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 10. Blade Panel, Hoist, Trim .... CHECK

Purpose:

Accessory Drive Switch is in ACCESS DRposition and lights are OFFTHENCheck circuit breaker, reselif necessary

4. IFLights are still out .If lamps are OKTHENCall ______

5. Action

0/1- No. I BLADE POS, BLADESSPREAD, FLIGHT POS, PYLON UNLOCKED andFOLD PWR ON lights

" Check SAFETY VALVE..m MASTER Switch "

Fold Pwr light93I ~Blade Fold Switch....-.

93

Page 110: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 10. Blade Panel, Hoist, Trim JQ. CHECK

-N- -11 F

- ON

-- PLTFLGT CNSL ANLp

00

£ %

94 DRTO

Page 111: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. IC. Blade Panel , Hoist, Tri: .... CC

EXE CIS FILL IN THE BLANKS * WRITE ON SCRATCH PAPER - NOT THE BOOKEXERCIS *REFER BACK TO CHECK YOUR ANSWERS

IF BLADES ARE Sr~l'..

1.Action

Check RLAnES SPREAD and FLIC~iT "P~S

Lights areOF

Check Accessory Drive Switch to ACCESSI_. poiinjlqtO

'A TS

0STE THOG ITEM*

GO O APE M CK-P TOCHWHEE ACHACIONAN REPOSE AKS PAC

Page 112: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. P'). Rli-le Panel, Hioist, Tii ... CF

Purpose: I r FlAf Fn VM n~

I.F

Ac-o so-' .'-v -. vt h 'nA4

Po ito -ld l c tc e O '

THEN

Page 113: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 10. Blade Panel , Hoist, Trim . ... CHECK

Purpose- IF BLADES ARE SPREADITo ensure that the B~lade Panel, Hoist and Beener Tri!- Switche are set

for start.

HIST Lstht R ()

ITBEEPER TRMsic SOAR~~

9.~~N Voc2esos

___________________________________TRIM__________ 1NECO__________________________________________C)_______ 0

g~ ~ ~~~ F * ..

97 O

Page 114: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 10. Blade Panel , Hoist, Trim .... CHECK

1r BLADES ARE SkV1EAI>'

1. Action

Check BLADES SPREAD and FLIGHIT POSI qh's S__[2. IF

Lights are __

THENCheck Accessory Drive Switch to

position, light__

PR CTC ITE 0 KFF PR CIIG N IS

AGAIN, GO TO PAPER MOCK-UP REALWA ODOWTOTHSTTN

Page 115: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITkM NO. 10. Blade Panel , Hoist, Trim . . .. CHECK

IF BL ADES ARE SPREA'P

LOC P1 N FD.BAE FLE.W

positio nd liht r

Check SAET onLV ente MAFsches

Liht ar stl u

PRS T ES igt

Page 116: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 10. Blade Panel, Hoist, Trim .... CHECK

Purpose:

IST Lsic toIGHTS

BEEPER TRNAM switch Mo T,11 PW)

100

Page 117: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 11. Torquemotor Switches .... OFF

Purpose: To disconnect the Power Management System (PMS) for starting(Electrical overspeed protection is still operatinq)

OFF (up)RTOF

-W ~ ~ ~ 2 Voc RespoIM NsERO I N 2

OFF (p

101

Page 118: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 11. Torquemotor Switches .... OFF

*FILL~~~~~ ~ ~ ~ ~ IN TH LNS * RT NSRTHPPR-NTTEBO

TOQLOT O FLIGH CNOEN 1 PANdL 2 hE

1102

Page 119: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 12. Anti-Ice .... CHECK AS REQUIRED

Purpose: To set No. 1 [nqine Anti-Ice for startinq dependino on prevailingweather conditions.

IF OAT ABOVE 10 C

1 . Action

Check Free Air Temperature Gage forcurrent outside air temperature

Free air temperature is 100 C or

Continue with step3

3. ActionVerify No. 1 Engine ANTI-ICE switch

_ is in OFF _p

4. Voice Response

'CHECK M R EQiIRED"

103

...... . ... . .... ., .. .. , ° ... . . ali i i0

Page 120: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 12. Anti-Ice ... CHECK AS REQUIPED

•FILL IN THE BLANKS 0 WRITE ON SCRATCH PAPER - NOT THE BOOKEX RCS :REFER BACK TO CHECK YOUR ANSWERS

K -

IF OAT ABOVE 100C

1. Action

Check Free Air Temperature Gage forcurrent outside air temperature

2. IFFree air temperature is C orhigherTHENContinue with step 3

RESEVE FRE3. ActionI Verify No. 1 Engine ANTI-ICE switch

is in ._ . (

4. Voice Response

104

Page 121: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 12. Anti-Ice CHECK AS REQUIRED

Purpose: To set NO. 1 Engine Anti-Ice for starting depending on prevailing~weather conditions.

4i

F -0

~\

IF OAT BELOW 10° C

1. Action

Check Free Air Temperature Gage forcurrent reading.

2. IF Free air temperature is below, 0C with visible moisture in the airTHENContinue with step 3

3. Action

Place No. 1 ENGINE ANTI-ICE switch toON (dI N )

105 THRO IT[M

105

Page 122: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 12. Anti-Ice .... CHECK AS REQUIRED

Purpose: To set No. 1 Engine ANTI-ICE for starting depending on the prevailingweather conditions

IF OAT BELOW 100C

4. Result=1 INLET ANTI-ICE caution light isilluminated (light will qo o8t wheninlet temperature reaches 38 C)

5. Result

=1 ENG ANTI-ICE ON advisory light isilluminated

6. Voice Response

"CHECK AS REQUIRED"

106

Page 123: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 12. Anti-Ice .... CHECK AS REQUIRED

l EX RCI E *FILL IN THE BLANKS *WRITE ON SCRATCH PAPER -NOT THE BOOK

EXE CIS REFER BACK TO CHECK YOUR ANSWERS

* /

IF OAT BELOW IO°C

1. Action

Check Free Air Temperature Gaqe forcurrent reading.

2. IF Free air temperature is belowC with moisture in the airTHEN -

Continue with step 3

00-- 1 . Action

Place No. 1 ENGINE ANTI-ICE switch to.--.

a 3.iAction

107

Page 124: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 12. Anti-IceCHKASRUIE

IF OAT BELOW 10O0

4. Result#1 INLET ANTI-ICE caution light is

(light will go out whenI ~inlet temperature reaches 38u C)

S. Result

#1 ENG ANTI-ICE ON advisory light is

6. Voice ResponseSiAs_

108

Page 125: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

SH-3D/H NORMAL START CHECKLIST ITEM NO. 7 through ITEM NO. 12

Directions:

Using the SH-3 PAPER MOCKUP and the NORMAL START CHECKLIST

State in your own words the Purpose

Go through each step in the ITEM mentally

Touch the location on the PAPER MOCKUP as you go through the steps

State the VOICE RESPONSE at completion of the steps

PAGES 109 THROUGH 124 INTENTIONALLY LEFT BLANK

125

Page 126: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

THIS PAGE INTENTIONALLY LEFT BLANK

126

Page 127: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 13. Ignition Switches . ... NORMAL

Purpose: To set ignition .witches to provide ignition during start.

1. Action

Place both ENG 1 and ENG 2 IGNITIONswitches to NORMAL (push fowad)

2. Voice Response

"NORMAL"

127

Page 128: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 13. Ignition Switches .... NORMAL

! E ERCS E *FILL IN THE BLANKS 0 WRITE ON SCRATCH PAPER -NOT THE BOOK

EX RCS 0 REFER BACK TO CHECK YOUR ANSWERS

/'/

1. Action

Place both ENG 1 and ENG 2 IGNITIONswitches to (push

2. Voice Response

128

Page 129: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 14. Accessory Drive Switch .... FORWARD, LIGHT ON

Purpose: -T~ accessory drive switch allows the No. 1 engine to drive the accessoryjIdrive section of the main gearbox.

1. Action

Verify Accessory Drive switch inACCESS OR position (pull out andforward7F

3. Voice Response

'.FORWARD, LIGHT ON"

129

Page 130: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 14. Accessory Drive Switch .... FORWARD, LIGHT ON!- a

I ~IFL EX R IEI, N THELAK 0,. .WRITE ON SCRATCH PAPER- NOT THE BOOKEX RCS 0 REFER BACK TO CHECK YOUR ANSWERS

iAA

1. Action

Verify Accessory Drive switch in

position (pull and

2. Result

Accessory Drive Warning Light,-

3. Voice Response

130

Page 131: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 15. Manual Throttles, Speed Selectors ....FREE AND OFF

Purpose: To check the Manual Throttles and Speed Selectors for freedom ofmovement and for prooer operation.

7..

1. ActionMove No. 1 Engine Manual Throttle(EMERGENCY FUEL CONTROL) full forwardto OPEN position. Check for freedomof mover'ent

2. ResultNo. 1 Engine Manual Throttle movesfreely without binding to the OPENposition

3. ActionMove No. 1 Enqine Manual Throttlefull aft to the CLOSED position.

4. ResultNo. 1 Enaine Manual Throttle movesfreely without binding to the CLOSEDposit3on

131

Page 132: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 15. Manual Throttles, Speed Selectors ....FREE AND OFF

Purpose: ITo check the Manual Throttles and Speed Selectors for freedom ofumovement and for proper operation.

5. Action

Move No. 2 Engine Manual Throttle(EMERGENCY FUEL CONTROL) full forward

to the OPEN position. Check fotrfreedom =f movement

6. Result

No. 2 Engine Manual Throttle movesfreely without binding to the OPENposition

7. Action

Move the No. 2 Engine Manual Throttle~full aft to the CLOSED position

8. Result

No. 2 Enqine Manual Throttle movesfreelywithout binding to the CLOSED

posi ion

I32

Page 133: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 15. Manual Throttles, Speed Selectors ..FREE AND OFF

Purpose: To check the Manual Throttles and Speed Selectors for freedom ofmovement and for oroper ooeration.

9. ActionMove NJo. 1 Engine Speed Selector to theGROUND IDLE D ul dwnoSEE CT77 -oisengag~etent and

L move full forward to 100 SPEED positior

The No. 1 Speed Selector movesfreely without binding

Move No. 2 Engine Speed Selector to theGROUND IDLE OFET Pull down on=PEED SELECTO7fod is en g ae detent andmove full forward to 10O -SPEED

The No. 2 Engine Sneed Seit.tor movesfreely without binding

STE THOG ITEMGO O APE M CK-P OUC WER EAC ACIO AN RSOS *AI L

133

Page 134: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 15. Manual Throttles, Speed Selectors .....FREE AND OFF

Purpose: To check the Manual Throttles and Speed Selectors for freedom of

movement and for proper operation.

13. ResultThe No. 1 and No. 2 Enaine SpeedSelectors should be approximatelymatched (within_ inch) at the fullforward, 100 SPEED position

14. IFThe Speed Selectors are not matchedTHENNote the discrepancy for a maintenancewrite-up. Continue the checklist

15. ActionRetard the No. 1 Speed Selector aftto the Ground Idle position, GND IDLE.The SpeedeTector should freely latchin that position

16. Note

A high load region which feels likea bind will be noticed just prior toreaching GND IDLE

GO T A E OC -P:OC WHER EAC ACIO AN. REPNEKS PLC

134

Page 135: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 15. Manual Throttles, Speed Selectors

FREE AND OFF

Purpose: I To check the Manual Throttles and Speed Selectors for freedom ofmovement and for proper operation.

17. Action

Return the No. 1 Speed Selector toSHUTOFF (pull down and aft)

S18. Action

Retard the No. 2 Engine Speed Selectoaft to the qround idle oosition, GNDInLE. The spe seector shouldfreely latch in that position

A high load region which feels like abind will be noticed just prior toreaching GND IDLE

Return the No. 2 Speed Selector toSHUT OFF (pull down and aft)

135

Page 136: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 15. Manual Throttles, Speed Selectors ....FREE AND OFF

Purpose: To check the Manual Throttles and Speed Selectors for freedom ofmovement and for proper operation.

21. Voice Response"FREE AND OFF"

136

Page 137: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 15. Manual Throttles, Speed Selectors ....FREE AND OFF

1. ActionMove No. 1 Engine Manual Throttle(EMERGENCY FUEL CONTROL) fullto position. Check forof movement

2. ResultNo. 1 Engine Manual Throttle moves

without to theon "

3. ActionMove No. 1 Engine Manual Throttlefull _ to the position.

4. ResultNo. 1 Enaine Manual Throttle moves

without 'o theposition

137

Page 138: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

Ne";.MAL START CHECKLIST ITEM NO. 15. Manual Throttles, Speed Selectors ..FREE AND OFF

5. Action

Move No. 2 Engine Manual Throttle(EMERGENCY FUEL CONTROL) fullto the position. Check forfreedom7rmovemen t[6. ResultNo. 2 Engine Manual Throttle moves

without to thepositilon-

7. Action

Move the No. 2 Engine Manual Throttlefull ___to the position

8. Result

No. 2 Engine Manual Throttle moves____without to the

p051 tion

138

Page 139: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 15. Manual Throttles, Speed Selectors .....FREE AND OFF

9. ActionMove No. 1 Engine Speed Selector to the

* Pull on

S=ED SELECT7to disengageetent andmove full forward to lO0 SPEED positior

10. Result

The No. 1 Speed Selector moveswithout

' 11. Action

Move No. 2 Engine Speed Selector to the.,_ . Pull on

SPEED SELECTR to disengage detent andmove full forward to 100" SPEED

I oosition

S12. Result

The No. 2 Engine Soeed Selector moveswithout

A , O O P R MP T O D W

Page 140: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 15. Manual Throttles, Speed Selectors ..FREE AND OFF

13. ResultThe No. 1 and No. 2 Engine SpeedSelectors should be aoproximatelymatched (within ) at the fullforward, 100' SPEED position

Note the discreoancy for a maintenance

-o -h position, GND IDLE.

Th pedSlcorsoldfel

in~~ that poito

Page 141: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 15. Manual Throttles, Speed Selectors

FREE AND OFF

17. ActionReturn the No. 1 Speed SelE:tor to

-(pull _and)

18. Action

Retard the No. 2 Enoine Speed Selector

aft to the p_____ osition, GNDIDLE. The so~eedselector shouldfreely in chat position

19. Note

A hioh load reoion which feels like abind will be noticed just prior toreaching GND IDLE

Return th No 2 Seed Seeco to

141

Page 142: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 15. Manual Throttles, Speed Selectors ..FREE AND OFF

n- -

21. Voice Response

1t42

Page 143: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO . Emergency Start and Override Switches .. OFF

Purpose: Placing the IMP IAQIO swi tches to OFF ensures that the interlocks are

V.Atoinesos

toOFF (u

3. Voc Respons

S * 0 "OFF"*

STP HRUG IE

Page 144: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. IF). Enmergency Start and Override Switches . .. OFF

VC.PI FILL. IN THE BLANKS *WRITE ON SCRATCH PAPER - NOT THE BOOKEEXERCISEL :Ef R BACK TO CHECK YOUR ANSWERS

1. Action

Place No. I and No. 2 EMER STARTswitches to _ (pull _ and

2. Action

Place No. 1 and No. 2 OVRD switchesto ( )

3. Voice Response

PRCTC .TM14P RCIIG NI O

Page 145: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

SH-3D/H NORMAL START CHECKLIST ITEM NO. 13 Through ITEM NO. 16

Directions:

Using the SH-3 PAPER MOCKUP and the NORMAL START CHECKLIST

State in your own words the Purpose

Go through each step in the ITEM mentally

Touch the location on the PAPER MOCKUP as you go through the steps

State the VOICE RESPONSE at completion of the steps

PAGES 145 THROUGH 154 INTENTIONALLY LEFT BLANK.

155

Page 146: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 17. Rotor Brake .... CHECKED

Purpose: To ensure that the Manual Rotor Brake is ON and if blades are foldedthat there is sufficient pressure to close the safety interlock prior tostarting No. 1 engine.

1. Action

Ensure Rotor Brake Lever is forward

and latche in thed, rosition

i ; ' i 2. Action

Read Rotor Brake Pressure GaneI for a minimum of 3?0 psi

Gage reads less thannpn psiTHEN

Ch Rotor Brake Lever to increaseqaqe to a minimum of 320i psi

S *4. CAUTIONIf blades are folded, recyclinqRotor Brake requires nersonnel tohold blades to prevent heashi fting.•

--i~ ~ ~ ~ ~ ~~SE THROUGH.. ITEM..munnnl ... ' " "

Page 147: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 17. Rotor Brake .... CHECKED

Purpose: To ensure that the Manual Rotor Brake is ON and if blades are foldedthat there is sufficient pressure to close the safety interlock prior toIstarting No. I engine.

5. Action

Verify ROTOR BRAKE ON caution lightis illuminated

6. Voice Response

"CHECKED"

157

Page 148: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 17. Rotor Brake ... CHECKED

0FILL IN THE BLANKS *WRITE ON SCRATCH PAPER - NOT THE BOOKEXERCISE* REFER BACK TO CHECK YOUR ANSWERS

I .Action rof dd PC~iin

Ens Roor3 rke Lu ev ers forward

2. 7Action

Page 149: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 17. Rotor Brake ... CHECKED

_41

5. Action

Verify ROTOR BRAKE ON caution lightis _______!. Voice Response

AGIN GO TO * PAE MOKU OFAIWA OD WTOTHSTI

159

Page 150: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 18. Fire Warningi, Caution, Advisory Panels..CHECKED

Purpose: To test the FIRE WARNING SYSTEM and CAUTION and ADVISORY lights.

.......

1. Action

Place FIRE TEST switch ON (up)and hold

~ lights illuminate

3. Result

lights illuminate2 in No. I ENGINE SELECTOR handle)2 in No. 2 ENGINE SELECTOR handle)

4 .Action 0

160

Page 151: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 18. Fire Warning, Caution, Advisory Panels..C HECKED

Purpose: To test the FIRE WARNING SYSTEM and CAUTI0ON and ADVISORY lights.

5. Action

Depress LAMP TEST switch and hold

6. Result

Al7 amber placard lights on theCAUTION PANEL illuminate

r)oth MASTER CAUTION PUSH TO RESETlights are illuminated

P. Resul It

All green nlacard licihts on the

ADV'ISORY PANEL illuminate

j 161

Page 152: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. II. Fire Warning, Caution, Advisory Panels ....

CHECKED

Purpose: J To test the FIRE WARNING SYSTEM and CAUTION and ADVISORY lights.

9. Action

Release LAMP TEST switch

10 Result

Six amber placard liahts on CAUTION"1EL remain illuminated

11. ResultBoth MASTER CAUTION lights go off.If lights remain on, push either

* MASTER CAUTION ligt to reset lightoff

12. Re ult~J Tw green placard lights on ADVISORY

-PANEL remain illuminated.--- +; +J+'-]1 i' -- CHECK BLADE FOLD will be illuminated~if blades are folded

16.2

Page 153: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 18. Fire Warning, Caution, Advisory Panels ....CHECKED

Purpose: To test the FIRE WARNING SYSTEM and CAUTION and ADVISORY lights.

'17f-Aft

13. Result

-fI INLET ANTI-ICE caution light maybe on

14. Result

il ENG ANTI-ICE ON advisory light willbe ON if #1 ANTI-ICE switch is ON

15. Voice Response

"CHECKED"

163

Page 154: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 18. Fire Warning, Caution, Advisory Panels..CHECKED

0 FILL IN THE BLANKS *WRITE ON SCRATCH PAPER - NOT THE BOOKEX IE* REFER BACK TO CHECK YOUR ANSWERS

2.~ Resul9',S

164

Page 155: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 18. Fire Warning, Caution, Advisory Panels ...

CHECKED

-- --- 6

5. Action

LAri1P TEST switch and

6. Result

J loth MASTER CAUTION PUSH TO RESETlights are______

8. Result

All green nlacard lights on theADVISORY PANEL

165

Page 156: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 18. Fire Warning, Caution, Advisory PanelsCHECKED

9. Action

LAM~P TEST switch

II

10. Result

- amber placard lights on CAUTIONP7N'EL remain illuminated

[ 11. Result

Both MASTER CAUTION lights goIf lights remain ,push eitherMASTER CAUTION li-g1t to reset light

12. Resultgreen placard lights on ADVISORY

PANEL remain illuminated.CHECK BLADE FOLD will be illuminatedif blades are

166

Page 157: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 18. Fire Warning, Caution, Advisory Panels ....CHECKED

"IMP1- 4

' '0

13. Result

#1 INLET ANTI-ICE caution light maybe14. Result#1 ENG ANTI-ICE ON advisory light willbe - if ;vI ANTI-ICE switch is -

15. Voice Response

167

- Q W ..........i |6il... . -11....16. .. -

Page 158: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

THIS PAGE INTENTIONALLY LEFT BLANK

168

Page 159: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 19. PMS Disable Switch (SH-3H) .... PULL

It ~Purpose: T rvd lcrcloesedpoeto uigeqn trig

1. Action

Pull PMS Disable switch onPilot's cyclic out

2. Action

Pull PMS Disable switch on Copilot'scyclic out

3. NoteIf either button is depressed, noelectrical overspeed protectionis available

4. Voice Response

"PULL"

1 6g. .. . .. TH O G ..... ."-T... . ....EMI' t i

Page 160: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 19. PMS Disable Switch (SH-3H) .... PULL

1. Action

PMS Disable switch on=TTot's cyclic out

2. ActiL'f

=7 PMS Disable switch on Copilot'scyclic out[3. NoteIf either button is ,no

electrical overspeedn-roTec ionis available

4. Voice Response

170

Page 161: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 20. Fuel Panel/Quantity .... CHECKED

Purpose: To set the Fuel Panel switches for starting No. 1 engine and to

test the fuel quantity gages for proper operation.

7 -7

1. Action

Place No. 1 ENG FIREWALL VALVE switchto OPEN (pull out and up)

2. Action

Verify CROSSFEED switch as desired,usually to CLOSE (down)

3. Action

Verify No. 2 ENG FIREWALL VALVE switch

at CLOSE (pull out and down)

4. Action

Verify two FWD TANK and two AFT TANKPUMP switches at OFF (down)

II[ TRU I T*.171

171

Page 162: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 20. Fuel Panel/Quantity .... CHECKED

Purpose: To set the Fuel Panel switches for starting No. 1 engine and to

test the fuel quantity gages for proper operation.

r -!

5. Action

Read FUEL QUANTITY gages(remember readings)

6. NoteSome SH-3D/H aircraft have a centertank fuel quantity gage in place ofthe FUEL DUMP switches. In theseinstances READ ALL THREE GAGES

7. Action

Pes FUEL GAGE TEST switch and hold.Note time by clock or mentally)r

8. Result

7 FUEL QUANTITY GAGES drop to 0 withoutstopping or sticking in appr7_imately

10Oseconds

~172

Page 163: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 20. Fuel Panel/Quantity .... CHECKED

Purpose: 1o set the Fuel Panel switches for starting No. 1 engine and to

est the fuel quantity gages for proper operation.

9. Action

Release FUEL GAGE TEST switch

10. Result

FUEL QUANTITY GAGES return to readingsnoted in step 5

11. Voice Response

"CHECKED"

173

Page 164: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 20. Fuel Panel/Quantity .... CHECKED

- 04

70

2. Action

Verify No. 2 ENG FIREWALL VALVE switchato (pull __and

4. Action

Verify twoSFD TANKc and twosATrTAN

Veiy o JMPIEAL AV switchesaa ~ ~ -pl n

1!1_I' I'I PUM 2 _~~... . . . . . - - - - - - -

14. Ato

Page 165: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 20. Fuel Panel/Quantity .... CHECKED

.< /: , , , , I .

4 L.

1 0>

~\~\!! "iv5. Action

FUEL QUANTITY gages7r-ember )

6. NoteSome SH-3D/H aircraft have a centertank fuel quantity qage in place ofthe FUEL DUMP switches. In theseinstances READ ALL GAGES

V 7. Action

FUEL GAGE TEST switch and(Note time by clock or mentally)

too8. Result

FUEL QUANTITY GAGES drop to withoutstopping or sticking in appr7ximately

seconds

175

Page 166: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 20l. Fuel Panel/Quantity . .. . CHECKED

9 .A ti on FUEL GAGE TEST switch

FUEL QUANTITY GAGES to readingsnoted in step 5

11. Voice Response

PR CTC ITE 0)11 PR CICN UNTI YOAGAIN, ~~~~6. GOT0AE OKU RC~ HTT OWTO FjTIN

176

Page 167: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 21. Battery Switch ...... ON

Purpose: To prevent damage to the rotor system if external power is lostduring No. 1 engine start.

1. Action

Place BAT switch ON(pull out and down"

2. CAUTIONFailure to have battery switch on withNo. 1 engine running and blades foldedmay result in damage to the swashplateand rotary wing head with inadvertentloss of external power

3. Voice Response

"ON"

177

Page 168: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 21. Battery Switch ...... ON

EXERCSE •FILL IN THE BLANKS *WRITE ON SCRATCH PAPER - NOT THE BOOK!

EXERCIS OREFER BACK TO CHECK YOUR ANSWERS

> /t

1. Action

Place BAT switch(pull _ and __

2. CAUTIONFailure to have battery switch on withNo. 1 engine running and blades foldedmay result in damage to the swashplateand rotary wing head with inadvertentloss of external power

3. Voice Response

170

Page 169: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 22. Liaht... 4 A I r "

Purpose: To signal the ground personnel that vor )-(,r strtinc 'I e noine.

1. Ac 1iom

SL/wa tc ;

2. Act (

"I ace eC L! - , ,

4. Voc

STE TH OUGH ITEM

GO O PPERMOC-UP TOUH WEREEAC ACIONANDRESONS TAES LAC

Page 170: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 22. Lights ... . AS REQUIRED

EXERCIPlac theFE EXTRIO LIHT MASTERRNSER

SWITCH ~ ~ F TV___ to _ psiio

2. Actio

Plc Fh ECNAT-OLsictF poito

- - -

130

Page 171: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

SH-3D/H NORMAL START CHECKLIST ITEM NO. 17 through ITEM NO. 22

Directions:

Using the SH-3 PAPER MOCKUP and the NORMAL START CHECKLIST

State in your own words the Purpose

Go through each step in the ITEM mentally

Touch the location on the PAPER MOCKUP as you go through the steps

State the VOICE RESPONSE at completion of the steps

PAGES 181 THROUGH 192 INTENTIONALLY LEFT BLANK

193

Page 172: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 23. No. 1 Engine ...... START

To make a Normal Start of No. 1 engine.

~1

1. ActionPilot brief copilot1. Clear left side, verify fire guard2. Start clock on starter engagement, ,Q

seconds maximum to starter dropout3. Standby boost pumps at 10 No

2. ActionPilot holds No. 1 engine Speed Selectof

STO*f C,:~ s Oin HFF and momentarily depressesNo. 1 engine Starter ButtonCopilot start clock

3. Result

Wet Compass (standby compass) swingserratically to a false compassreading due to the strong magneticfield setup by starter current

194

Page 173: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 23. No. 1 [ngine ...... START

Purpose:

To make a Novi~il rt- f rNo. I enoline.

4. Action

N - Pilot verifies No. I engine oilpressure shows positive pressureindication as Ng acceleraLes toward 19 '

5. IFNo positive oil pressure indication7717Abort start by pullino down on theNo. 1 Engine Speed Seleor

STE THO I TE

Page 174: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 23. No. 1 Engine ....... START

Purpose: To make a Normal Start of No. I Engine

Pilot verifies T5 less thanLQ

g ~ I 7. Action*

Pio veife N t 9

Page 175: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 23. No. 1 Engine ...... START

Purpose:To make a Normal Start.of No. 1 engine.

8. Action

Pilot calls for Copilot to turn onNo. 1 engine boost pumps """

9. NoteIf boost pumps are turned ON prior toNg reaching 19? there is a possibilityof washing contaminates in the fuelpurifier into the fuel control

10. Action

Copilot places FWD TANK PUMP 1 and 2switches to ON (up)

11. Voice Response

Copilot reports BOOST PUMPS 1N

197

Page 176: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 23. No. 1 Engine ...... START

Purpose:To make a Normal Start of No. 1 engine.

12. ActionPilot advances No. 1 Speed Selectorto GND IDLE and starts timing fortim rto-ite-off not to exceed 10seconds (mentally or by clock)

13. IFStart is inadvertently aborted byPilot pulling DOWN on Speed SelectorTHENReturn No. 1 Speed Selector to SHUTOFFand turn Boost Pumps OFF

198

Page 177: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 23. No. 1 Engine .... START

Pupoe: To make a Normal Start of No. 1 engine.

:4

14. Action

Pilot/Copilot verify lite-offby noting rapid rise in T5 andNq and Nf increasinq

15. Note

Normal starts are characterized by7 0-75D0 T5 in I seconds afterlite-off

16. If T5 is incrasinn too rapidlyv orappears to be overshooting,then depress Engine Start Controlswitch on either cyclic to aid inlimitinq excessive TS

17. If T5 is risino abnormally orreaches; 240C, then abort ,tartby pullinoj :L4 on S need Selectorand poll U AT to 'ji~0_ Turnboost. fipp to PEEr

II ~a*STEP THROUGH*ITEM

GO O AP R M CKUP 0 TUC WEREEAH CTIN NDRESONE AKE PAC

Page 178: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 23. No. 1 Engine ...... START

Purpose:To make a Normal Start of No. 1 engine.

18. Action

Pilot monitor Ng until it reaches

2(100

k45,-219. 2ctio

Pilot ~ ~ ~ 3 veiytat2atrha0 rpeout~ byvriyn ta tadyCops

SindiAcation

has reundtocret edn

Page 179: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 23. No. 1Engine ...... START

Purpose:

To make a Normal Start of No. I engine.

20. Action

Pilot verify that Ng has reachedGROUND IDLE Ng 56I

21. Voice Response

"START"

201

Page 180: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 23. No. 1 Enqine ...... START

Purpose:

1. ActionPilot brief copilot1. Clear left side, verify fire guard2. Start clock on starter engagement,.

seconds maximum to starter dropout3. Standby boost pumps at-.... No

2. ActionPilot holds No. 1 enqine Speed Selectowin - and momentarily depressesNo. 1 engine Starter ButtonCopilot start clock

3. Result

Wet Compass (standby compass) swingserratically to a false compassreading due to the strong magneticfield setup by starter current

AGAIN, GO TO P R MP R L W T T

2n12

Page 181: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 23. No. IEngine .... START

Purpose:

t OIL

Pio veif No I enin oil

Page 182: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 23. No. 1 Enqine .... ST ART

Purpose:

-~~6 Action I * ~

Page 183: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 23. No. 1 Engine ...... START

8. Action

Pilot calls for Copilot toNo. 1 engine boost pumps

9. Note7' boost pumps are turned ON prior toNg reaching there is a possibilityof washing co7aminates in the fuelpurifier into the fuel control

10. Action

Copilot places FWD TANK PUMP 1 and 2switches to

11. Voice Response

Copilot reports BOOST PUMPS

205

Page 184: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 23. No. 1 Engine ...... START

12. ActionPilot advances No. 1 Speed Selectorto and starts timing fortimfeto' te-off not to exceedseconds (mentally or by clock)

13. IFStart is inadvertently aborted byPilot pulling _ on Speed SelectorTHENReturn No. 1 Speed Selector toand turn Boost Pumps

206

Page 185: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 23. No. I Ergine ... TART

14. Action

Pilot/Copilot verify lite-offby noting ra 'pid rise in andNg and Nf increasing -

Normal starts are characterized by-T5 in seconds after

lite-off

16. If '5 is increasing too rapidly orappears to be overshooting,then Engine Start Controlswitch on either cyclic to aid inlimiting excessive T5

17. If- T5 is rising ahnormallv orreachw,__ then ihort startby piilling o__ n Siced Selectorand pull AFT to .Turn

boosi pumlps to

PRCTC ITE *KE PRATIIN UNI YOU

AGAIN,~~~~~~~~~~~~~~ GOT AE(OKU RCL HTT 0WTOTHSTTN

Page 186: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 23. No. 1 Engine ...... START

r 7'P8. Action

Pilot monitor Ng until it reaches

Pilot verify that starter has droppedout by verifying that Standby Compasshas to correct headingi nd ica tion

. I 111TI. ITE . . K EEP IR.. .. U N T L .

2 0,11

Page 187: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 23. No. 1 Engine ...... START,

20. Action

Pilot verify that Ng has reachedGROUND IDLE Ng

21. Voice Response

PRCT1 ITE *WP PRCKIC UNg S

209

Page 188: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 24. All gages ...... CHECK

Purpose:Check for indications of a Normal Start No. I Engine.

( 2. Action

Pilot check Tg56 +g TEMP

3 . Action

Pilot check ENG OIL TEMP ri onAg vitin range (nora rag C! to IlC)

4. Action

Pilot check ENG OIL PRESS _ psi or~above (normal range 25 to " psi)

7i

210

Page 189: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 24. All gages ...... CHECK

Purpose:Check for indications of a Normal Start No. I Engine.

5. Action

Pilot check PRESS XMSN above 12 psi(normal range 45 to 90 psi)

6. ActionPilot check OIL TEMP XMSM risinor within range( normal range is40 C to 120 0C)

7. Action

Pilot check AUX HYD PRESS Normal(normal range is 1300 to l0pi)

IPilot check PRI HYD PRESS Zero if1 blades folded (normal rane 100

211

Page 190: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 24. All gages ...... CHECK

Purpo.e:Purpose: Check for indications of a Normal Start No. I Engine.

9. Action

Pilot check UTL HYD PRESS Normal(normal range is 2600 to 3150 psi)

l10. Action

Pilot/Copilot check No. 1 Torque, Zero

il i 1I. Action

Pilot/Copilot check No. 1 Nf (freeTurbine) speed approximately 45to 25%

212

Page 191: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 24. All gages ...... CHECK

Purpose: Check for indications of a Normal Start No. 1 Engine.

12. CAUTIONUpon initial indication of a lack ofaccessory drive when operating inaccessory, the engine should be shutdown immediately and not restarted

13. Voice Response

"CHECK"

213

Page 192: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 24. All gages ...... HC

0 FILL IN THE BLANKS * WRITE ON SCRATCH PAPER - NOT THE BOOKIEXERCISE * REFER BACK TO CHECK YOUR ANSWERS

1. Action

Pilot check Ng-

2. Action

Pilot check T5 (EXH TEMP)approximately-

S3 Action *

Pio2cek14 ILTM

Page 193: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 24. All gages ....... CHECK

5. Action

Pilot check PRESS XMSN above psi(normal range _to ._ psi)-

6. ActionPilot check OIL TEMP XMSMor within range( normal rag i

to __

7. Action

Pilot check AUX HYfl PRESS(normal range is - to pi)

8. Action

Pilot check PRI HYD PRESS ifO-blades folded (normal range___

toV_ psi)

PRATIC ITE 0 KEE 0R( N UNI0O

215

Page 194: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 24. All gages ...... CHECK

Ior

Pio/oio ch No I Torque*

1.Ato

Page 195: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 24. All gages ...... CHECK

I~I~

/ -

12. CAUTIONUpon initial indication of a lack ofaccessory drive when operating inaccessory, the engine should be shutdown and not restarted

13. Voice Response

217

Page 196: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

THIS PAGE INTENTIONALLY LEFT BLANK

218

Page 197: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

A0-AI13 171 TRAINING ANALYSIS AND EVALUATION GROUP (NAVY) ORLANDO FL FIG 5/9PROCEDURE TRAINING4 AID FOR THE SH-3D/H NORMAL START CHECKLIST. (U)FEB A2 R BRABY, P 6 SCOTT

UNCLASSIFIED TAEGTM-82-1

3.EEEEEE

Page 198: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

11.25 1.4 111.6

Page 199: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 25. Boost Pumps .... OFF

Purpose To check for ergine flarne~ut due to possible air leak in a fuel line.

Leave boost pumos on for about I minuteafter start to purge air from 1uel linep

FW T N 3. Voice Response

"OFF"

219

Page 200: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 25. Boost Pumps ...... OFF

* FILL IN THE BLANKS 0 WRITE ON SCRATCH PAPER - NOT THE BOOKEX R IS REFER BACK TO CHECK YOUR ANSWERS

1. IFFuel filters have been justbefore flight-

Leave boost pumps on for about minuteafter start to purge air from iul line

2. Action

Copilot turns FWD Tank Pump 1 and 2switches

3. Voice Response

220

Page 201: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 26. Speed Selector ...... 104 14f

Purpose: To bring the accessory section of the miain gear box up to norrnal speed.

3. Aoctisons

104tor Nf aeutl14i

I,~~ achedI

221 esl

Page 202: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 26. Speed Selector ...... 104"' Nf

1. VoieRon s

Pio pul on No I speede*

seetr222ovsi frad

Page 203: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

SH-3D/H NORMAL START CHECKLIST ITEM NO. 23 through ITEM NO. 26

Directions:

Using the SH-3 PAPER MOCKUP and the NORMAL START CHECKLIST

State in your own words the Purpose

Go through each step in the ITEM mentally

Touch the location on the PAPER MOCKUP as you go through the steps

State the VOICE RESPONSE at completion of the steps

PAGES 223 THROUGH 236 INTENTIONALLY LEFT BLANK

237

'i

Page 204: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

THIS PAGE INTENTIONALLY LEFT BLANK

238

Page 205: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 27. Generators....... ON

*Purpose: To connect. the AC generators to the AC nower system.

1. Action

Pilot place GEN 1 and 2 switchesto ON (down)

2. Result

Twa CAUTION lights ON (41 GENERATORand : 2 GENERATOR CAUTION lights goout)

3. Voice Response

"ON"

II STEP THOG ITEMGO~~~~~~~ ~ ~~ TO PAPE MOC-U 0OC*HR AHATO ADRSOS AELC

2_0 ~

Page 206: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 27. Generators ...... ON

~.Vrf~IE 0FILL IN THE BLANKS *WRITE ON SCRATCH PAPER - NOT THE BOOKEXERCISE 0:REFER BACK TO CHECK YOUR ANSWERS

ON

1 . Action

Pilot place GEN I and 2 switchesto~

3. Voice Response

211C

Page 207: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO, 1 . I Oversocee rystem ....... CHECK

Purpose: I i Uj t r tion :r clieckinq the electricaloie ec s~ :

nereene shielded

TENOtf wildrptobtwe 3 nd9

I ction

Pilot pace OVSP GOV OVR switch to0'N (FWD)

7oI thi oS S *

A 6

24 esl

Page 208: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 2S. %o. 1 9verspeed System ....... CHECK

Purpose: To simulate an ovet-soeed condition for checking the electrical

5. Reul

6. VoieRon s

7. Actio

Page 209: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. ';. 1 .'er;:oe Sv~ter.... CHECK

0 FILL IN Iht BLANKS * WRti ON SCRATCH PAPER -. NOT THE BOOKEX IE 0 REFER BACK TC:) C'if CK YOUR ANSWERS

Pilot p~lace OVSP GOV TEST switch to

a~~~ti position.. 3.*

Page 210: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 28. N1o. Overspeed System ...... CHECK

OVSP GOV TEST switch (spring

Pilot place OVSP GOV CJVRD switch

8. Voice Response

PRCTC ITE *KE PRATIIN UNI YOUAGAIN,~ ~ ~ ~ ~ ~ ~ ~~~S GOT0AE OKU RCL HTT OWTOTHSTTN

244

Page 211: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 29. External Power ...... DISCONNECTED

Purpose:~To disconnect externai electrical power from the aircraft.

1. Action

Pilot gives Disconnect Electrical_Power signal to Plane Captain

2. Result

Plane Captain gives DisconnectElectrical Power signal; Powercrew disconnects AC power

3. Result

Two Advisory lights remain ON. (EXTPWR ON advisory light goes out whenexternal power access door is closed)

4. Voice Response

"DISCONNECTED"

STFPCTHRUSH ITE

245

Page 212: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 29. External Power ...... DISCONNECTED

EXE CIS *FILL IN THE BLANKS *WRITE ON SCRATCH PAPER - NOT THE BOOKEXERCSE *EFERBACK TO CHECK YOUR ANSWERS

/ 1. Action

Pilot gives t ln-signal toPaeCaptain

2. Result

246 apangie isonc

Page 213: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 30. Compass System, Console Switches ... AS REQUIRED

* Purpose: To slave and align the compass system, and to set navigation andScommunication panels as required.

1. Action

Pilot check Hemisphere and LATITUDEsettinas for present positio-n

2. Action

Press PUSH to SYNC and hold untilsynced

3. Result

SYNC IND needle positions at NULL

247

Page 214: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 30. Compass System, Console Switches . .. AS REQUIRED

Pu rpose: [ o lav ad allan the connass svstem, and to set navigation andconmunication oanels as re-nuired.

Af

4. Action

Chek standby compass reading

Pilcontrol.hc I 5

Rai Manei Iniao RA

agis2tadycmas8edn

Page 215: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 30. Compass System, Console Switches .. . AS REQUIRED

Purpose: To slave and align the compass system, and to set navigation and

I S. Action

asR dep si freuie

9. Actiong

Plc AVDplr otolsic

Page 216: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 10. Comnass Svqtpm, r ,sole S)%-itches . .. P"s PFflL'RFO

Purpose: To slave and align the compass system, and to set navigation and

communication panels as required.

12. Acio

Turn UHF 1 ON (usually ROHand mode sw~itch to PRE frr

13. ActionTurn UHF 2 ON and set desiredchannel

250

Page 217: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 30. Compass System, Console Switches ... AS REOUIRED

Purpose: I To slave and align the compass system, and to set navigation andI communication panels as required.

-14. Action

Set HF 0FF; verify frequencyse

at 29.000. 5t

Set LF (ADF) to 0N and set desiredfrequency.

I I O

251

• - - - , . . .. .... ._ . ,

9l .0 -0t

Page 218: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 30. Compass System, Console Switches ... AS REQUIRED

Purpose: I To slave and align the compass system, and to set navigation andI comunication panels as required.

17. Action

Set MODE switches (M-l, M-2, M-3/Aand M-C) to ON (center)

18. Action

Set RAD TEST-OUT-MON switch asdesired, usually MON (down)

252

Page 219: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 30. Compass System, Console Switches ... AS REQUIRED

Purpose: ITo slave and align the compass system, and to set navigation and* communication panels as required.

9.7 Action

Set MODE 3/A code selector thumbwheels to 1200

21. Voice Response

"AS REQUIRED"

253

Page 220: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 30. Compass System, m-aw. jULI.R.ED

Console Switches AS0 FILL IN THE BLANKS *WRITE ON SCRATCH PAPER; NOT THE BOOKEXERCISE 0 REFER BACK TO CHECK YOUR ANSWERS F "BOOK

r I Ir

Action

Pilot checksettinqs fo and

r Present positi,)-n,--

2. Action

PISH to SYNC and untilsynced

3. Result

SYNC MD needle POSitions at

Ims "ifff

254

Page 221: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 30. Compass System, Console Switches ... AS REQUIRED

', Purpose:

Q0

4. Action

standby compass reading

5. Action

t Pilot ID 250Radio Magnetic Indicator (RMI)against standby compass

6. Action

Pilot/Copilot BearingDistance Heading Indicator (BDHI)against standby compass

If Z>7. If

LAThe RMI and BDHIs' and standbycompass differ more than plus or inus

then align compasses with thecontrol.

A,5 ( F T

AGAN, O T PA ERMOC -UP A tL IIT T WII 111I I",IATN

Page 222: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 30. Compass System, Console Switches ... AS REQUIRED

8. Action

Place Control Indicator switch to.L. Dosition if required

• I. Action

Place NAV Doppler Control switchto

1 0. Action

Check ASE off (all liqhts out). If ASEis on deprpss button oneither cyclic

11. Action

Set TACAN to and channel

as desired

R A Cg k A C I I I

256

L .

Page 223: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 30. Lompass Syste-1, Console Switches .. AS REQUIRED

Tur HF I (usuallySand moesitht

257

Page 224: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 30. Compass System, Console Switches . .. AS REQUIRED

Purpose-

14. Aton

1e 0, _ _

e i y r q e

c e

Se 44 0 AF o_ n e eie

fequency. yfeqeny e

25t

Page 225: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 30. Compass System, Console Switches ... AS REQUIRED

Set MASTER switch to

17. Action

Set MODE switches (M-1, M-12, M-3/Aand M-C) to ____

18. Action

Set RAD TEST-OUT-NON switch asdesired, usually__

*PATC ITE OKFF PRCICN UNI YOU..

259

Page 226: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 30. Compnass System, Console Switches .. AS REQUIRED

I.&AND

VY/ )P

*1T

(s )

19. Vctoinesos

260OE / oe eeto ~m

.- ,--whee-s to

Page 227: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 31. RAD ALT, BAR ALT, RAWS .... SET AND TEST

Purpose: To set and test the Radar Altimeters, Barometric Altimeters, and

the Radar Altimeter Warning System.

9to

_ _ _ _ _ _ _ _ _I _owl_

2610

1. Action

Both Pilot and Copilot rotatecontrol knobs clockwise from OFFto turn system ON

2. Action

Both Pilot and Copilot continue toS rotate control knobs clockwise to set

low altitude warning indext (usually to 30 feet)

261

Page 228: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 31. RAO ALT, BAR ALT, RAWS .... SET AND TEST

Purpose: ITo set and test the Radar Altimeters, Barometric Altimeters, and

the Radar Altimeter Warning System.

-~-7

3. Action

Pilot/Cooilot set Barometric Pressureto current pressure reading

4. Action

Pilot/Copilot crosscheck altimeterreading to knonTmie evation

II~5 IF I g

Eihraliee62 oethnt7

Page 229: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 31. PPD 4LT, PAP PtT, PA64S .. SET AND TEST

V .2

MET

1 ilt derI , RN6PW TESST swi tch

Re (I t

P-l sajnq, mou'l tone( in both Pilot/

ALTITUDE[ caution light

and Mlaster Caution lights

pulsates Wh and OFF

1f n.(I' oic ns(

Page 230: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 31. RAD ALT, BAR ALT, RAWS .... SET AND TEST

~1T0

1. Action

Both Pilot and Cooilot rotatecontrol knobs from OFFto turn system_

2. Action

Both Pilot and Copilot continue torotate control knobs to setlow altitude warning -(usually to _ feet3

26 A I I IIC U LY

264

Page 231: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 31. RAD ALT, BAR ALT, RAWS .... SET AND TEST

1

3. Action

Pilot/Copilot ___Barometric Pressureto pressure reading

5. IFEither altimeter is more than tfeet in error

19 THEN4 AL11 -Altimeter is not acceptable for

2-fi~jht-

29976. Action4Pilot verify flag on

Pilot's baromeit-rc-Ttimeter

displayed

265

Page 232: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 31. RAD ALT, BAR ALT, RAWS .... SET AND TEST

Purpose:

aural tone in both Pilot/

and Master Caution lightspulsates __ and

10. Voice Response

F_- - 7

Page 233: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 32. Servo Sensor ... CHECK

Purpose: To insure proper operaition of the primary servo 1000 PSI switch which

prevents securing the ALIX if PRI pressure is less than 1000 PSI.

1. Alction

Place ser-vo swi tch to AL'X oFF (AFT)

2.~ Resu-

AUJX JIYP p)ressure should -emain atnormal range (1300 to 1600 PSI)

3. IFAUX HYD pressure dosTHENPrimary servo 1000 P"4 swjtch isde ~ve. Aircraft DOWN

STE THRUG ITEMIGO~~~~~ ~ ~ TO PA E MO KU TOUC WHR*AHATO N RSOS AELC

Page 234: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 32. Servo Sensor ...... CHECK

Purpose: I To insure proper operation of the primary servo 1000 PSI switch whichprevents securing the AUX if PRI pressure is less than 1000 PSI.

IF BLADES ARE FOLDED

4. Action

Place servo switch to centerposition

5. Voice Response

"CHECK"

GO TO PA R MP H

268

Page 235: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 32. Servo Sensor . . .. CHECK

EXE CIS :FILL IN THE BLANKS *WRITE ON SCRATCH PAPER -NOT THE BOOKEXERCSE :EFERBACK TO CHECK YOUR ANSWERS

91" Ilk

IF BLADES ARE FOLDPI

1. Action

Place servo switch to

AUX HYP pressure0

TH N servo 1000 -PS swith isdefectve. Ai rcra fL

FR CT~ ITM * IP 11 I(IG U TL 1

Page 236: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 32. Servo Sensor ...... CHECK

IF BLADES ARE FOLOEfl

4. Action

Place servo switchi to

position-

5. Voice Response

0 R(I_ TM 0KE RCIIG U T1 OAGAIN,~~~~~~ ~ ~ ~~ GOT AE OKUP RbL.WA O DOWTOTHSTTN

270

Page 237: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 32. Servo Sensor .... CHECK

Purpose: To insure proper operation of the primary servo 1000 PSI switch which

prevents securing the AUX if PRI pressure is less than 1000 PSI.

~IF BLADES ARE SPREAD

1. Action

Place blade fold SAFETY VALVEswitch to OPEN (cover up switch UP)

2. Result

SAFETY VALVE OPEN light comes ONFLIGHT POS light goes off

3. Result

CHECK BLADE FOLD" - - Advisory light comes ON

271

Page 238: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 32. Servo Sensor ... CHECK

4. Action

Place blade fold MASTER switch toON (cover tip switch UP)

7. Result

(ORD SERONFSCATOlight comes ON)

6.Reul

Page 239: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 32. Servo Sensor .... CHECK

Purpose: To insure proper operation of the primary servo 1000 PSI switch whichprevents securing the AUX if PRI pressure is less than 1000 PSI.

H 81~F BLADES ARE SPREADcto

~Place servo switch to AUX OFF (AFT)S9. Result

~At'y ;IYD pressure should remainat nc,'mal range (1300 to 1600 PSI)__-

10. IF

AUX HYD pressure dropsTHENPrma servo 1000 PSI switch isc~ eEive. Aircraft is DOWN

/7W

11. Action

Place servo switch to centerposition r 3 6

273

- -

Page 240: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 32. Servo Sensor .... CHECK

IF BLADES ARE SPREAD -12. Action

Place Blade Fold SAFETY VALVE switchto CLOSED (switch DOWN cover DOWN)

13. Action

Place Blade Fold MASTER switch to OFF(switch DOWN, cover DOWN)

14. Result

Fold PWR ON light goes offSAFETY VALVE OPEN lightgoes offFLIGHT POS light comes ON

15. Result

PARKING BRAKE ONAdvisory light ON

274 (CHECK BLADE FOLD light )

,m=:w i "

l 274

Page 241: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. .32. Servo Senvor ... C HECK

IF BLADES ARE SPREAD

16. Result

PRI HYD gage readinq Normal

(1300 to 1600 PST)

[17. Result

ROTOR BRAK[ ON CAUT1ION light ON(PRI SERVO PRESS

o [ CAUTION light goes out)

18. Voice Respoose

"CHECK"

275

Page 242: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 32. Servo Sensor .... CHECK*FIL INC THE N BLANKS *WRIT ON SCRATC PAE O H OOK'EXERCISE * REFER BACK TO CHECK YOUR ANSWERS

IF BLADES ARE SPREAD

1. Action

Place blade fold SAFETY VALVEswitch to _ (cover switch )

2. Result

SAFETY VALVE OPEN light comesFLIGHT POS light goes ____

3. Result

CHECK BLADE FOLDAdvisory light comes

276

Page 243: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 32. Servo Sensor .... CHECK

9

-r - Pe*

Place blade fold MASTER switch to

5. Result

• ~~lTwomesTIO lihs-

(PRI SERVO PREA

AB

light comes

?77

Al 6.Rsl

Page 244: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 32. Servo Sensor .... CHECK

IF BLADES ARE SPREAD

8. Action

Place servo switch to

' I 9. Result

d AUX HYD pressure should remain

i at normal range (_to_ PSI)

10. IFAUX HYD pressure dropsTHEN___ evservo 1000 PSI switch isdefective. Aircraft is

11. Action

Place servo switch toposition

RT[ P IAGIN GO TOPPRM C-PI (I (F( ItO

Page 245: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM NO. 32. Servo Sensor .... CHECK

IF BLADES ARE SPREAD

12. Action

Place Blade Fold SAFETY VALVE switchto _ (switch i cover

13. Action

Place Blade Fold MASTER switch to(switch ___,,cover )

14. Result

Fold PWR ON light goesSAFETY VALVE OPEN light goes ,FLIGHT POS light comes

15. Result

PARKING BRAKEAdvisory light

i- / (CHECK BLADE FOE light )

279

Page 246: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

NORMAL START CHECKLIST ITEM No. 32. Servo Sensor .... CHECK

18. Voic "A'on

(T M

Page 247: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

SH-3D/H NORMAL START CHECKLIST ITEM NO. 27 through ITEM NO. 32

Directions:

Using the SH-3 PAPER MOCKUP and the NORMAL START CHECKLIST

State in your own words the Purpose

Go through each step in the ITEM mentally

Touch the location on the PAPER MOCKUP as you go through the steps

State the VOICE RESPONSE at completion of the steps

PAGES 281 THROUGH 302 INTENTIONALLY LEFT BLANK

303

Page 248: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

SH-3D/H NORMAL START CHECKLIST ITEM NO. 1 through ITEM 32

Using the SH-3 PAPER MOCKUP and the NORMAL START CHECKLIST

Go through EACH ITEM in the CHECKLIST mentally

Touch the Location for EACH STEP in EACH ITEM as you go throughthe ITEMS

STATE the VOICE RESPONSE at the completion of EACH ITEM

CONTINUE TO PRACTICE UNTIL YOU CAN PERFORM THE CHECKLISTWITHOUT ERROR OR HESITATION

AFTER YOU HAVE REACHED CRITERION

CONGRATULATIONS: You are now ready to perform the CHECKLIST

in the COCKPIT PROCEDURES TRAINER. GOOD LUCK

304

Page 249: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

Technical Memorandum 82-1

DISTRIBUTION LIST

Navy

OASN (MRA&L (Mr. Graves, Mr. Paschke))CNO (OP-594, OP-594B, OP-401E)COMDTNSRDC (1803 (5 copies))ONR (458 (2 copies), 455, Lcdr Dietzler)CNM (MAT-08T2, MAT-042, MAT-04C)CNET (01, 02, N-5, 913)COMNAVSEASYSCOM (05L0, 04B, 05L)COMNAVAIRSYSCOM (03, 340F, 413G, 340C, 00A4)CNTECHTRA (016 (5 copies), N-63)CNATRA (Library)COMTRALANTCOMTRALANT (Educational Advisor)

COMTRAPAC (2 copies)Tehia Lbry(2cps)

CNAVPERSRANDCEN (Library, 260, 14)NAVPERSRANDCEN Liaison (021)Superintendent Naval Academy Annapolis (Library)

CO copies))CEPA ( cpisCO NAARMDSHA CifAviation Psych. Div.)

CO AVTCHTACE Cory taton(1018, 3330, Cryptologic Training Department)

Exeutie DrecorNAVINSTPRODEVDETVT-10 (Education Specialist)CO NAVSUBSCOL NLON (Code 0110)CO NAVTECHTRACEN Treasure Island (Technical Library)TAEG Liaison, CNET 022 (5 copies)NAVEDTRAPRODEVCENDET MemphisCO NAVAVSCQLSCOM (Code 40C)CO NAVTECHTRACEN MeridianCOMFLETRAGRU Pearl HarborNAVEDTRAPRODEVCENDET MeridianCONSEABASEDW INGSLANTCOMNAVA IRLANTCOMHSWING ONECO HELANTISUBRON ONECO HELANTISUBRON TENPresident NAVWARCOLCO NAVSHIPWPNSYSENGSTA (5001, 5700, 5710)COMOPTEVFOR (32)COMNAVELEXSYSCOM (8122)COMNAVSUPSYSCOM (0423)DIR NPPS Washington (Mr. Karpovich)CO NAVAIRTECHSERVFAC (01, 122, Cdr Arnold)

(Page 1 of 2)

Page 250: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

Technical Memorandum 82-1

Air Force

Headquarters AFLC/LOLMP, Wright-Patterson Air Force BaseAir Force Human Resources Laboratory (Mr. R. Johnson), Wright-Patterson

Air Force BaseHeadquarters, U.S. Air Force (Mr. Stiegman)1550th Technical Training Squadron (CH 3/HH3 Training Office),

Kirtland Air Force Base

Army

ATSC-DS-SPAS (Mr. Klesch)USA DARCOM (DRXMD-MP)USA Materiel Development and Readiness Command (DRCSM-PMP)Army Communicative Technology Office (COL Goetz)

Marine Corps

CO MARCORCOMMELECSCOL

Other

ASD (MRA&L (Dr. Sicilia, Mr. Shorey, Mr. Webster))Program Manager, Office of Cybernetics Technology, Defense Advanced Research

Projects AgencyCOM National Cryptologic School (Code E-2)Director, Center for Educational Technology, FSUDARPA (Mr. Kelly)E-TECH (Mr. Geyer)EG&G Hydrospace - Challenger (Mr. Grubb)Bio Technology, Inc. (Mr. Bean)Grumman Aerospace Corp. (Mr. Everett)Ana-Log, Inc. (Mr. Cash)

Information Exchanges

DTIC (12 copies)DLSIEExecutive Editor, Psychological Abstracts, American Psychological AssociationERIC Processing and Reference Facility, Bethesda, MD (2 copies)

(Page 2 of 2)

Page 251: EEEI/EmEEEEEB EEEnmE-EhhEnE · Information Presentation System (NTIPS). This system is being developed for the Chief of Naval Material by the David W. Taylor Naval Ship Research and

DI