10
EE/CS 480 Fall 2008 1 08/28/22 01:42 PM University of Portland School of Engineering Project STEEL Bridge Program Review 2 Team Shawn Patterson Chris Wong Kyle Woodard Advisor Dr. Albright, Dr. Osterberg Industry Representative Andrew Hui Intel

EE/CS 480 Fall 2008 19/8/2015 9:09:41 AM University of Portland School of Engineering Project STEEL Bridge Program Review 2 Team Shawn Patterson Chris

Embed Size (px)

Citation preview

Page 1: EE/CS 480 Fall 2008 19/8/2015 9:09:41 AM University of Portland School of Engineering Project STEEL Bridge Program Review 2 Team Shawn Patterson Chris

EE/CS 480 Fall 2008

104/21/23 10:18 AMUniversity of Portland School of Engineering

Project STEEL BridgeProgram Review 2

TeamShawn Patterson

Chris Wong

Kyle Woodard

AdvisorDr. Albright, Dr. Osterberg

Industry RepresentativeAndrew Hui

Intel

Page 2: EE/CS 480 Fall 2008 19/8/2015 9:09:41 AM University of Portland School of Engineering Project STEEL Bridge Program Review 2 Team Shawn Patterson Chris

EE/CS 480 Fall 2008

2University of Portland School of Engineering

Overview

• Introduction

• Scorecard

• Additional Accomplishments

• Plans

• Issues/Concerns

• Conclusions

Page 3: EE/CS 480 Fall 2008 19/8/2015 9:09:41 AM University of Portland School of Engineering Project STEEL Bridge Program Review 2 Team Shawn Patterson Chris

EE/CS 480 Fall 2008

3University of Portland School of Engineering

Introduction

• Goal: Create a digital thermostat to provide cold and refreshing food and beverages that will not exceeds one’s desired temperature

• Digital thermostat– Thermal couple sensor– 7-segment display– User interface

Page 4: EE/CS 480 Fall 2008 19/8/2015 9:09:41 AM University of Portland School of Engineering Project STEEL Bridge Program Review 2 Team Shawn Patterson Chris

EE/CS 480 Fall 2008

4

Introduction (Cont.)

High Level Design MOSIS

10/28/2008University of Portland School of Engineering

Page 5: EE/CS 480 Fall 2008 19/8/2015 9:09:41 AM University of Portland School of Engineering Project STEEL Bridge Program Review 2 Team Shawn Patterson Chris

EE/CS 480 Fall 2008

5University of Portland School of Engineering

Scorecard

• October’s accomplishments:– Obtained refrigerator– MOSIS

• Completed an averager, binary-to decimal-decoder

• Last time we completed: comparator, up/down counter & seven segment displays

• October’s shortcomings:– Found error in the design of the counter—needs

debugging.

Page 6: EE/CS 480 Fall 2008 19/8/2015 9:09:41 AM University of Portland School of Engineering Project STEEL Bridge Program Review 2 Team Shawn Patterson Chris

EE/CS 480 Fall 2008

6University of Portland School of Engineering

Additional Accomplishments

• As a team, we found a good routine that suits us.– Knowing our roles, and being active in it.– Consistent on meeting times– Helping each other when needed.

Page 7: EE/CS 480 Fall 2008 19/8/2015 9:09:41 AM University of Portland School of Engineering Project STEEL Bridge Program Review 2 Team Shawn Patterson Chris

EE/CS 480 Fall 2008

7University of Portland School of Engineering

November Plans

• Finish MOSIS design (by Nov. 26)• Start Theory of Operations• Order all parts:

– A to D converter– Buffer– Amplifier– Display– User-interface

Page 8: EE/CS 480 Fall 2008 19/8/2015 9:09:41 AM University of Portland School of Engineering Project STEEL Bridge Program Review 2 Team Shawn Patterson Chris

EE/CS 480 Fall 2008

8

University of Portland School of Engineering

MilestonesNumber Description Original

10 Oct 08Previous

N/APresent

23 Sep 08

1 Pre-approval document 29 Aug 08 29 Aug 08

2 Order Thermocouple Module 17 Sep 08 17 Sep 08

3 Finish Higher Level Block Diagram

17 Sep 08 17 Sep 08

4 Finish MOSIS Block Diagram 17 Sep 08 17 Sep 08

5 Purchased fridge 20 Sep 08 27 Sep 08

6 Program Review #1 23 Sep 08 23 Sep 08

7 Functional Spec 1.0 10 Oct 08 10 Oct 08

8 Program Review #2 28 Oct 08 28 Oct 08

9 1st .edf file 30 Oct 08 30 Oct 08

10 MOSIS Specification Complete

22 Nov 08 22 Nov 08

11 Burn CPLD 23 Nov 08 23 Nov 08

12 Theory of Operations 0.9 24 Nov 08 07 Dec 08

13 Program Review #3 02 Dec 08 02 Dec 08

14 Mount Hardware 03 Dec 08 03 Dec 08

15 TOps version 0.95 23 Jan 09 23 Jan 09

16 TOps version 1.0 30 Jan 09 30 Jan 09

Page 9: EE/CS 480 Fall 2008 19/8/2015 9:09:41 AM University of Portland School of Engineering Project STEEL Bridge Program Review 2 Team Shawn Patterson Chris

EE/CS 480 Fall 2008

9University of Portland School of Engineering

Concerns/Issues

• We still are deciding and researching ideas on the refrigerator and design.– Ex: If we can get the refrigerator to go 2°below

the desired temperature.

• Finishing MOSIS design

Page 10: EE/CS 480 Fall 2008 19/8/2015 9:09:41 AM University of Portland School of Engineering Project STEEL Bridge Program Review 2 Team Shawn Patterson Chris

EE/CS 480 Fall 2008

10University of Portland School of Engineering

Conclusions

• Our team has each block of our MOSIS designed.

• Need to fix and debug MOSIS design.

• We are still on track, thanks to a good start to the project.