    Process Improvement Strategies

  • 8/7/2019 Educ Process Improvement Day 2

    2/47

    AfterAnalyzing.

    Once we figure out and have verified what

    the issues and challenges are regardinga particular process, we try to streamline

    the process..

  • 8/7/2019 Educ Process Improvement Day 2

    3/47

    Streamlining Processes

    Streamlining processes suggest the

    trimming ofwaste and excess,

    contouring to provide the smoothestflow

    It is hoped that with streamlining the

    process will operate with the least

    disturbance to its surroundings

    In the end, we would like to have efficient

    and effective processes

  • 8/7/2019 Educ Process Improvement Day 2

    4/47

    Efficient & Effective Processes

    Have few handovers between staff / departments

    Produce minimum paperwork

    Have high quality outputs

    Deliver the desired output to stakeholders with minimalcontact /liaison

    Have effective ICT systems supporting orfacilitating

    them

    Are understood & mapped / documented wherebeneficial

  • 8/7/2019 Educ Process Improvement Day 2

    5/47

    Note that when we streamline

    processes

    ELIMINATE SIMPLIFY INTEGRATE AUTOMATE

    Over-productionNon-Value Activity

    Waiting Time

    Transport

    Processing

    InventoryDefects/Failures

    DuplicationReformatting

    Inspection

    Reconciling/Matching

    Forms

    ProceduresCommunication

    TechnologyProblem Areas

    FlowsProcessesPaper work

    Jobs

    TeamsCustomers

    Suppliers

    Dirty

    DifficultDangerous

    Boring

    Data CaptureData transferData analysis

  • 8/7/2019 Educ Process Improvement Day 2

    6/47

    Cornerstones ofStreamlining Processes

    Bureaucracy elimination

    Duplication elimination

    Value-added assessment

    Simplification

    Process cycle-time

    reduction

    Error proofing

    Upgrading

    Simple language

    Standardization

    Supplier partnerships

    Big picture improvement

    Automation

  • 8/7/2019 Educ Process Improvement Day 2

    7/47

    Bureaucracy Elimination

    Bureaucracy creates excessive paperwork

    Fact: managers spend 40-50% of their time writing andreading job related materials; 60% ofclerical work isspent on checking, filing, and retrieving information

    Why? Paranoia about being blamed for errors

    Poor training

    Distrust ofeveryone

    Lack ofwork

    Inability to delegate

    Need to overcontrol

    Unwilling to share information

    Thrill ofchecking for and finding miniscule mistakes

  • 8/7/2019 Educ Process Improvement Day 2

    8/47

    How do you identify bureaucracy?

    Are there unnecessary checks & balances

    Does the activity inspect or approve someoneelses work?

    Does it require more than one signature?

    Are multiple copies required?

    Are copies stored for no apparent reason?

    Are copies sent to people who dont need the

    information? Is there unnecessary written correspondence?

    Is someone approving something he or she hasalready approved?

  • 8/7/2019 Educ Process Improvement Day 2

    9/47

    Duplication Elimination

    If the same activity is being performed at

    different parts of the process or by

    different individuals in the process, see if

    both processes are needed.

  • 8/7/2019 Educ Process Improvement Day 2

    10/47

    Value-Added Assessment

    The object ofvalue-added assessment is

    to optimize business value addedactivities and minimize or eliminate no

    value-added activities.

  • 8/7/2019 Educ Process Improvement Day 2

    11/47

    (X)-Value Add?

    Activity

    Necessary to

    produce output?

    Contribute to

    Customer Req?

    Contribute to

    Bus. Functions

    Real Value Add BusinessValueAdd

    No Value Add

    Activities that must

    be performed to

    meet customer req.

    Activities that do not contribute to meeting

    customer req. These can be eliminated

    without deterioration on product/service

    functionality

    Yes No

    No

    YesYes

    No

  • 8/7/2019 Educ Process Improvement Day 2

    12/47

    Simplification

    The objective is to reduce complexity

    wheneverfeasible, leading to few stages,

    fewer tasks, fewer interdependencies, etc.

    How to simplify?

    Combine similar activities

    Reduce amount ofhandling

    Eliminate unused data

    Refine standard reports

  • 8/7/2019 Educ Process Improvement Day 2

    13/47

    Process cycle-time reduction

    Long cycle times prevent product deliveryto customers and increase storage costs.

    Strategies:Serial vs. Parallel activities

    Change activity sequence

    Reduce interruptions

    Set priorities Improved timing

    Location analysis

  • 8/7/2019 Educ Process Improvement Day 2

    14/47

    Error Proofing

    People make errors. So we correct the

    errors, but this takes time.

    Our objective in business, is to reducedouble-checking or second guessing

    ourselves.

    StrategyMake a list of things you could do wrong and

    then use error-proofing methods to eliminate the

    possibility ofmaking the error. (Negative

    analysis)

  • 8/7/2019 Educ Process Improvement Day 2

    15/47

    Fail Safing

    Creating a control

    condition where thecustomer, server, or

    process can take only the

    correct (or desired) action

    while engaged in aservice process.

  • 8/7/2019 Educ Process Improvement Day 2

    16/47

    Upgrading

    Old things, ways and knowledge may

    contribute to delays and distractions Upgrade them!

  • 8/7/2019 Educ Process Improvement Day 2

    17/47

    Simple Language

    Do you understand your memos?

    Evaluate the present documents used in

    the process to ensure that they are writtenfor the user.

    Strategies:

    Determine the reading and comprehension

    level ofyour audience

    Familiarity with terms and abbreviations

    All procedures that are more than 4 pages long

    should start with a flowchart

  • 8/7/2019 Educ Process Improvement Day 2

    18/47

    Standardization

    Standardization ofwork procedures is

    important to ensure that all current and

    future employees use the best way to

    perform the activity.

    Procedures should exist for performing

    most activities

  • 8/7/2019 Educ Process Improvement Day 2

    19/47

    Supplier Partnerships

    All processes have inputs that come from

    people outside the process

    Examine each input process and ask:Does the process really need the input

    Is it entering the right place?

    Is it at the right quality level?

    Is the timing correct?

    Is it received in the best possible format?

    DO you get more than you need?

  • 8/7/2019 Educ Process Improvement Day 2

    20/47

    Big Picture Improvement

    Step out of the current process and define

    what the perfect process would bewithout the constraints of the present

    organization and/or process.

  • 8/7/2019 Educ Process Improvement Day 2

    21/47

    Automation

    When deciding where to begin the

    automation, look for:

    Repetitive operations that will improve ifperformed more quickly

    Operations that will improve when people who

    are physically separated communicate more

    quicklyOperations for which standardized computer

    system components are available.

  • 8/7/2019 Educ Process Improvement Day 2

    22/47

    Project Management

    Fundamentals

  • 8/7/2019 Educ Process Improvement Day 2

    23/47

    What is a Project?

    Atemporary endeavor undertaken to create aunique product or service

    TemporaryA

    one time eff

    ort; having defined starting andend dates; having a specified objective and

    scope ofwork to be performed; having a setbudget; usually being performed by a temporaryorganization; being led by one ultimately

    accountable individual

    UniqueSolving a problem or addressing a need

  • 8/7/2019 Educ Process Improvement Day 2

    24/47

    Project vs. Program

    vs. Routine Work

    A group of related projects managed in a

    coordinated way to obtain benefits and

    control not available from managing them

    individually. Programs may include

    elements of related work outside scope of

    the discrete projects in the program.

    PMBOK 2009

  • 8/7/2019 Educ Process Improvement Day 2

    25/47

    What is Project Management?

    The selection, design (planning, scheduling), execution,

    control, evaluation, and termination ofa project to meet

    project objectives and customer expectations within

    allocated cost, time, resource, and performance

    constraints (Keating, 1998).

    Project management is the art ofcreating the illusion

    that any outcome is the result ofa series of

    predetermined, deliberate acts when, in fact, it wasdumb luck. (Kerzner, 1998)

  • 8/7/2019 Educ Process Improvement Day 2

    26/47

    Project Phases

    Step 1 : Define the projectINITIATION AND

    DEFINITION

    Step 2: Generate Tasks

    Step 3: Determine Roles and Responsibilities

    Step 4: Define Task Interdependences

    Step 5: Develop Schedule

    Step 6: Perform Resource Allocation

    Step 7: Generate Budget

    Step 8: Develop Risk Management

    PLANNING

    Step 9: Track and Manage the ProjectEXECUTION

    AND CONTROL

    Step 10: Perform Post-Project ReviewCLOSE OUT

  • 8/7/2019 Educ Process Improvement Day 2

    27/47

    About Project Scope

  • 8/7/2019 Educ Process Improvement Day 2

    28/47

    Project Scope

    Ascope describes what you expect to

    deliver to your customer when the project

    is complete

    A poorly defined scope is the most

    frequently mentioned reason for project

    failure.

  • 8/7/2019 Educ Process Improvement Day 2

    29/47

    Project Scope Checklist

    Project Objectives

    briefsummary of

    essential proj.

    information (who, what,why, optional : when &

    cost)

    Deliverables

    typically will include

    time, quantity and cost

    estimates

    Measures ofSuccess

    Milestones

    Important control points

    in the project

    Technicalrequirements

    Limits and Exclusions

    Reviews with

    customer

  • 8/7/2019 Educ Process Improvement Day 2

    30/47

    The PM Triage

    Project

    ScopeTime

    Resources

  • 8/7/2019 Educ Process Improvement Day 2

    31/47

    Project Management Dilemma

    Cost

    Perfor ance

    i eScope

    C = f(P,T,S)

  • 8/7/2019 Educ Process Improvement Day 2

    32/47

    Project Management

    Project Cost Management

  • 8/7/2019 Educ Process Improvement Day 2

    33/47

    Work PackageCosts

    Labor

    Materials Sub-contractedWork

    EquipmentLease

    Tools &Supplies

    Overhead

    Services

    (Some) Sources ofProject Costs

  • 8/7/2019 Educ Process Improvement Day 2

    34/47

    =Total

    ProjectCosts

    LaborMaterialsContractsSupport

    BenefitsOverheadAdmin+

    Types ofProject Costs

    Costs related to a

    project that can be

    traced back to a

    cost effective way

    Direct Indirect

    Costs related to a

    project that

    CANNOT be

    traced back to a

    cost effective way

  • 8/7/2019 Educ Process Improvement Day 2

    35/47

    Types ofcosts

    Intangible vs Tangible Costs

    Sunk Cost

    Money that has been spent in the pastBurdened Cost

    AKA Overhead, is all the "little" stuff that makes

    the project possible.

    Can be derived as a percentage ofdirect labor

    or the raw cost

  • 8/7/2019 Educ Process Improvement Day 2

    36/47

    Examples ofBurdened Cost

    Examples

    Land purchase or lease cost

    Building lease cost

    Real estate taxes Environmental fees and taxes

    Utilities (electrical, water, phone, etc.)

    Staffsalaries (management, indirect labor, etc.)

    Maintenance costs Real and capital depreciation

  • 8/7/2019 Educ Process Improvement Day 2

    37/47

  • 8/7/2019 Educ Process Improvement Day 2

    38/47

    Risk

    Dictionary definition: The possibility of

    loss or injury

    Question: So i

    fthere is a possibility o

    floss or injury, then why even perform a

    certain task?

    The change that an undesirable event will

    occur and the consequences ofall its

    possible outcomes

  • 8/7/2019 Educ Process Improvement Day 2

    39/47

    Risk Management

    The identification ofas many risks as

    possible

    Minimizing their impact

    The managing of responses to those

    events that do materialize

    Providing contingencyf

    unds to cover risksthat do materialize.

  • 8/7/2019 Educ Process Improvement Day 2

    40/47

    Risk Identification

    Process of transforming uncertainties and issuesabout a project into distinct risks that may bedescribed and measured.

    Risks cannot be assessed until identifiedNeed methodical process

    Risk definition: Scenarios & Consequences

    Central question -- what can go wrong with this project,activity, task?

    Good risk event definitionClear and concise easily understood

    Risk event captured

  • 8/7/2019 Educ Process Improvement Day 2

    41/47

    Evaluation ofRisks The Risk

    Severity Matrix (RSM)

    The RSM is a Systematic determination of

    the consequences of identified risk events

    Analysis in 3 phases

    PHASE 1: Determination of likelihood of

    occurrence --Low, Medium, or High

    PHASE 2: Determination of Impact ofEvent

    Low, Medium, or High ON... Cost, Performance, Scope, Time (Basics)

    PHASE 3: Determine the Severity of risk event

    Low, Medium, or High

  • 8/7/2019 Educ Process Improvement Day 2

    42/47

  • 8/7/2019 Educ Process Improvement Day 2

    43/47

    Planning for risks in the project

    Planning is function ofdeciding what, if

    anything, should be done with a specificrisk event The STRATEGY for managing

    the risk event.

  • 8/7/2019 Educ Process Improvement Day 2

    44/47

    How does one respond to a risk?

    Reduce the RiskCommon plan that is used.

    Retain the RiskThe project owner assumes the risk because the chance

    ofsuch an event happening is slim (e.g. flood orearthquake)

    Transferring the RiskThe risk is passed on to another party (e.g. the whole

    development project is given to a contractor - fixed

    price contracts) Share the riskPartnering with another company

  • 8/7/2019 Educ Process Improvement Day 2

    45/47

    Contingency Planning

    An alternative plan that will be used ifa

    possibleforseen risk event becomes areality

    It is necessary to identify the triggers that

    will activate the implementation of the

    contingency plan

  • 8/7/2019 Educ Process Improvement Day 2

    46/47

  • 8/7/2019 Educ Process Improvement Day 2

    47/47

    PMBOK Ratings Impact for a Risk