EDS 2Early Delivery Systems

Review and Request for ApprovalMay 2007

John Webb

Page 2: EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb

2EDS 2 – Approach and ScheduleMarch 2007

Page 2EDS 2 – Early Delivery Systems

Agenda– EDS 2

• Context Setting• Review

– Scope– Approach– System Requirements– Schedule

• Request for Approval

Page 3: EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb

3EDS 2 – Approach and ScheduleMarch 2007

Page 3EDS 2 – Early Delivery Systems

EDS 2 – Context Setting– 3/22/2007 TPTF Meeting

• Presented EDS 2 Approach and submitted document for comment• No comments received

– 4/25/2007 TPTF Meeting• TPTF requested that EDS 2 Approach contain more detail• Additional detailed provided and the updated document was submitted for

comment

– 5/22/2007 TPTF Meeting• No comments received• Can provide overview of EDS 2 as a presentation• Request for approval

Page 4: EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb

4EDS 2 – Approach and ScheduleMarch 2007

Page 4EDS 2 – Early Delivery Systems

EDS 2 – Scope of Transition Plan Tasks

Tasks Transition Plan Task Descriptions

5.4.1 (2a) Verify all data and telemetry submittals meet Protocol 3.10 (NOMCR)

5.4.1 (2b) Verify accuracy of all transmission element constraints

5.4.1 (2c) Verify TSP calculations for transmission constraints likely to be binding in SCED

5.4.2 (1) Verify SE performance meets Protocol 3.10.9

5.4.2 (2) Verify trial of SE test based on live SCADA, resolving errors to meet performance criteria, and to verify bus load forecast functionality

5.4.2 (4) Begin continuous operation of SCADA and post information to TSPs and QSEs meeting Protocol 6.3.2

5.4.3 (1) Begin NSA verification, testing major transmission elements

5.4.3 (2) Compare NSA to Zonal and add contingencies and screening

5.4.3 (3) Continuously monitor Mon-Fri meeting Protocol 6.5.7.1.11

Page 5: EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb

5EDS 2 – Approach and ScheduleMarch 2007

Page 5EDS 2 – Early Delivery Systems

EDS 2 – Approach– Release 3

• Verify Telemetry and SE performance

• Provide performance reports to TSPs and QSEs

• Verify Network Security Analysis (NSA)

• Develop Maintenance Procedures

– Release 4• Verify Network Model Management System (NMMS)

• Verify Network Operations Model Change Request (NOMCR)

• Develop Network Model Maintenance Procedures

Page 6: EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb

6EDS 2 – Approach and ScheduleMarch 2007

Page 6EDS 2 – Early Delivery Systems

EDS 2 Release 3 - Approach– Telemetry Verification

• Accumulate and calculate monthly and quarterly availability data• Generate reporting per Telemetry Standards

– Highlight and verify availability issues– Provide on MIS for market participants

• Develop ERCOT Operations Procedures to address and resolve issues

– State Estimator Verification • Topology build• Forecast bus load• Nodal SE solution and compares to Zonal• Accumulate and calculate monthly performance data• Generate reporting per SE Standards

– Highlight and verify data issues– Provide on MIS for market participants

• Develop ERCOT Operations Procedures to address and resolve issues

Page 7: EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb

7EDS 2 – Approach and ScheduleMarch 2007

Page 7EDS 2 – Early Delivery Systems

EDS 2 Release 3 - Approach– Topology Consistency Analyzer

• Identify and report on status errors

– Forced Outage Detection• Identify and report on unplanned outages• EDS 3 integrates with the outage scheduler

– Network Security Analysis• Verify dynamic ratings are correctly calculated• Verify overload notification• Verify constraints and contingency list• Verify Special Protection Schemes (SPS) / Remedial Action Plans (RAP):

– Triggering conditions are defined and can be executed– Post-SPS and post-RAP results are correct and can be reported

• Verify load rollover modeling• Verify transmission constraint management (calculate shift factors)• Develop Nodal NSA operating procedures• Benchmark results against Zonal real time operations

Page 8: EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb

8EDS 2 – Approach and ScheduleMarch 2007

Page 8EDS 2 – Early Delivery Systems

EDS 2 Release 3 - Approach

SCADA Telemetry

DynamicRatings

EDW MIS

NetworkSecurityAnalysis

StateEstimator

TopologyConsistency

Analyzer

TransmissionConstraint

Management

ForcedOutageDetector

Page 9: EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb

9EDS 2 – Approach and ScheduleMarch 2007

Page 9EDS 2 – Early Delivery Systems

EDS 2 Release 3 - Systems– Release 3 configuration

• Early releases of software packages

– EMS 2.3 (COTS+ - Commercial off the Shelf with customizations)

» Telemetry Performance Tool

» SE Functionality

» SE Performance Tool

» NSA Functionality

– Enterprise Data Warehouse

» Reporting on SE and Telemetry performance by QSE and TSP

– MIS Portal

» Providing QSE and TSP access to performance reports

» Providing QSE and TSP access to hourly status reports

<< See the next slide for the desired configuration >>

Page 10: EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb

10EDS 2 – Approach and ScheduleMarch 2007

Page 10EDS 2 – Release 3 Configuration

EDS 2 - Release 3

Objectives EDS 2 - Release 3 System Diagram

SE Verification * Verify SE performance * Provide report to TSPs and QSEs

Telemetry Verification * Verify Telemetry performance * Provide report to TSPs and QSEs Network Security Analysis * Compare NSA to Zonal * Continuously monitor Monday - Friday

TPTF Activities Mapping5.4.1.2.b5.4.1.2.c

5.4.2.15.4.2.25.4.2.4

5.4.3.15.4.3.25.4.3.3

* Verify Transmission Element constraints* Verify TSP calculations likely binding in SCED

* Verify SE Performance (3.10.9)* Begin trial of SE test based on live SCADA* Begin continuous SCADA (6.3.2)

* Begin NSA* Compare NSA to Zonal* Continuously monitor Mon - Fri (6.5.7.1.11)

Genesys 3.1.1

Network Model

OAG 2.4

Map

OAG 2.4

Map

EMS 2.2

NSA

SESCADA

NodalTelemetry

EMS 2.2 to2.3

converter

Reportexceptions

NSA

SESCADA

Telemetry

Performance

SE

Customs

Zonal Nodal

Nodal – EMS (COTS+)

Reporting

EDWRTC

Archive

MIS

EMS 2.3

DNP

RTUMap

ZonalTelemetry

Zonal - EMS

TSP

QSE

TSP

QSE Nodal

QSE

Zonal

ICCP 2.3

ICCPMap TSP

Page 11: EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb

11EDS 2 – Approach and ScheduleMarch 2007

Page 11EDS 2 – Early Delivery Systems

EDS 2 Release 4 - Approach– Network Model Management System (NMMS):

• Network model, ICCP database and with ownership / operatorship information

• Nodal Network Model is under change control

– Network Operations Model Change Request (NOMCR)• TSPs and QSEs electronically submit model changes and receive

acknowledgement

• Network model has been correctly updated

• TSP and QSE updates are confirmed

• TSPs may export network model for review

– Single Entry Model– Network Model Export

Page 12: EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb

12EDS 2 – Approach and ScheduleMarch 2007

Page 12EDS 2 – Early Delivery Systems

EDS 2 Release 4 - Systems– Release 4 configuration

• Early releases of software packages

– Network Model Management System (NMMS)

» Database for network model, ICCP mapping, Ownership/Operatorship

– EMS 2.3 (COTS+)

» Integration with NMMS

<< See the next slide for the desired configuration >>

Page 13: EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb

13EDS 2 – Approach and ScheduleMarch 2007

Page 13EDS 2 – Release 4 Configuration

EDS 2 - Release 4

Objectives EDS 2 - Release 4 System Diagram

NMMS Network Model Verification * Verify NMMS Database is successfully loaded with: * Network Model Database * ICCP Database * Ownership / Operatorship * Placed under change control * Verify NMMS and EMS Integration * Verify EMS Applications * Verify NMMS Functionality * Verify NOMCR Process

TPTF Activities Mapping5.4.1.2.a * Model data & telemetry meet Protocol 3.10

(NOMCR)Genesys 3.1.1

Network Model

OAG 2.4

Map

OAG 2.4

Map

EMS 2.2

NSA

SESCADA

Nodal - NMMS

CIM

Network Model

SCADA Model

NodalTelemetry

Refresh /Convert

Reportexceptions

NSA

SESCADA

Telemetry

Performance

SE

Customs

Zonal Nodal

Nodal – EMS (COTS+)

Reporting

EDWRTC

Archive

MIS

EMS 2.3

Network Model Interface

DNP

RTUMap

ZonalTelemetry

QSE

Zonal - EMS

TSP

QSE

MIS

TSP

Nodal

TSP

QSE

ICCP 2.3

ICCPMap TSP

Zonal

Page 14: EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb

14EDS 2 – Approach and ScheduleMarch 2007

Page 14EDS 1 and 2 – Early Delivery Systems

EDS 2 Schedule

2007

Initiation/Planning

Load Modeling

Feb Mar Apr May Jun Jul Aug Sep OctJan Nov

Release 3 – SE/Telemetry/NSA

Dec Jan Feb

Release 4 – NMMS/EMS Integration

Monitoring and Control

2008

Page 15: EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb

15EDS 2 – Approach and ScheduleMarch 2007

Page 15EDS 2 – Early Delivery Systems

EDS 2 Approach Questions?

Page 16: EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb

16EDS 2 – Approach and ScheduleMarch 2007

Page 16EDS 2 – Early Delivery Systems

Request for Approval