Upload
erol-dag
View
222
Download
1
Embed Size (px)
Citation preview
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
1/31
1 of 31
A 11.11.2013 ISSUED FOR INFORMATION Z.K T.T. E.D
Rev. Date Description Prepared Checked Approved --------------No.
ORIGINATOR Published by
EDOPE ENERJ PETROL MHENDSLK SANAY VE TCARET LMTEDRKETHead Office:Palmiye Mah. Adnan menderes Bulv. Oktay Sitesi No:9/8 PK = 33100 Yeniehir /Mersin TURKEYP:+90 324 3260595F:+90 324 3260596Ankara OfficeUUR MUMCU CAD(krolu cad) ERDL APT 87/13
Gop-ankaya -Ankara-TURKYEP: +90 312 447 17 18 / 20F:+90 312 447 17 21stanbul OfficeBurhanye Mahalles amlca Caddesihlamur villalar no 28 / 6^RD3K Villa Beylerbeyiskdar stanbul / TURKEYP : +90 216 4220414 PBXF: +90 216 4220415
www.edopec.com. [email protected]
Document Title
SAMPLE PROJECT QUALITY MANAGEMENT FORSTORAGE TANK
Document No.
EDO PLN QAC GNR INT XXX 013 110 111Rev
AScale
Co. Org.Cod
DocType
Disc.Code
UnitCode
Prj.
Type
Prj.
NO
Prj.
Year
Proj.
Seq.No
DCCSeq.No Page 11
http://www.edopec.com/mailto:[email protected]:[email protected]:[email protected]:[email protected]://www.edopec.com/8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
2/31
2 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
INDEX
1. Quality Management 31. General 3Objectives 3EDOPEC Duties 3
CUSTOMER Duties 5
Specific Requirements 6
Quality Management System 6EDOPEC 's Plans and Procedures 7
EDOPEC Interface and Oversight of Sub-contractors, Vendor and Sub-Vendors 8ATTACHMENTS 9
2. Attachment Quality Plan Contents 9Overview of Quality Plan Contents: 9The Quality Plan should provide detailed descriptions of: 9
3. Attachment :Inspection and Test Plans 11Overview: 11
4. Attachment 1-3:Criticality Rating System 12General 12
Principles 12
Process 12
5. Attachment : Criticality Rating CR) Determination 136. Attachment: Organizational Responsibilities 14Personnel and Responsibilities: 14
7. Attachment 1-6:Control Procedures 168. Attachment: Form B-2 Typical Inspection and Test Plan Format 17
Page 1 of 5 179. ORIGINATOR: 1710.STORAGE TANKS 17
Preparation of activity 17Verification of inspectors qualifications 17Verification of NDT technicians qualifications 17FABRICATE AND ERECTION 18
Submit radiographs. 19Monitor quality of test medium. 20Hydrostatically test tank. 20Survey fill vertical levels and Peaking and Banding 20Internal inspection (post hydrotest) 20
11.AS BUILT DRAWINGS 2112.Attachment: Form C-1 Design EDOPEC Quality Submittal Requirements DQSR) 2213.Attachment 5-8: Form D-1 Page 2 2414.Attachment 5-8: Form E-1 Page 1 Construction/Installation/Hook-Up Quality SubmittalRequirements CQSR) 25
Attachment 5-8: Form E-1 Page 2 26
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
3/31
3 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
15.Attachment 5-9: Levels of Vendor Surveillance and Site Inspection 27Levels of Vendor or Site Surveillance 27
1. Quality ManagementGeneral
This section establishes CUSTOMER 's Quality assurance and control (QA/QC) requirements that willprovide assurance that Ammonia Storage Tank Project will conform to Tender Documents regulatoryrequirements, and sound and generally accepted engineering and construction practices. In thisregard, Quality Management is applicable to all Ammonia Storage Tank works activities of EDOPEC.
Objectives
The objectives of quality assurance are:
Ensure installed CUSTOMER meet requirements as defined in Tender Documents and the supportingdesign and construction specifications, drawings, etc.
Ensure non-conformances are reported and resolved through approved dispositions and follow upactions to confirm acceptable results.
Provide documentation that confirms compliance with project requirements and is sufficient to supportproduction operations.
Provide early identification of process failures and hardware non-conformance to minimize rework costand schedule impacts.
EDOPEC Duties
a. Comply with TENDER DOCUMENTS , through the application of approved Quality Plans,Inspection and Test Plans and Control Procedures and ensure that EDOPEC has and utilizessimilar plans and procedures.
b. Ensure Quality through, CUSTOMER and Storage Tank works , ,CUSTOMER and StorageTank works performed by EDOPEC.
c. Provide Quality Assurance for Storage Tank works , consisting of all those planned andsystematic activities that are necessary to establish quality requirements and to ascertain withconfidence that Storage Tank works will conform to established requirements and performsatisfactorily in service.
d. Provide Quality Control for and Storage Tank works , consisting of those quality assurance
controls, operational techniques, and activities that provide a means of measuring andcontrolling the characteristics of an item, element, component, product, service, or installationto meet the established requirements.
e. Prepare required Quality Plans and Inspection and Test Plans and submit to CUSTOMER forapproval, before start of the corresponding part of Storage Tank works . Prepare and submitControl Procedures for CUSTOMER review and comment.
f. Define and staff the overall organization to manage and control quality of Storage Tank works
g. Identify and resolve deficiencies detected during the execution of Storage Tank works .
h. Ensure qualified inputs, qualified resources, personnel, tools, equipment and materials, andqualified Storage Tank works processes are used to produce Storage Tank works products
in conformance with Tender Documents .
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
4/31
4 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
i. Address and resolve, to CUSTOMER 's satisfaction, issues identified during:
CUSTOMER reviews, audits, surveillance, and inspection Third party reviews and inspections (e.g., Warranty Survey, Class Certification, Regulatory
Certification, Source Inspection)
j. Provide CUSTOMER personnel and designated representatives timely and free access to allplaces where Storage Tank works is performed, including, but not limited to, materials,equipment, Storage Tank works SITES documents, and records for the purpose of review,inspection, audits and surveillance. EDOPEC shall ensure that Subcontractor s, vendors andsub-vendors are also required to provide this right of access.
k. Support CUSTOMER 's QA/QC activities related to Storage Tank works .
l. In addition, EDOPEC shall:
Submit EDOPEC 's Quality Audit schedule, including audits of EDOPEC , Subcontractor s,vendors and sub-vendors to CUSTOMER for review and comment.
Implement and maintain the Quality Audit Schedule to provide periodic verification ofcompliance with the approved Quality Plans, Inspection and Test Plans and associatedControl Procedures including those of Subcontractor s, vendors and sub-vendors.
Perform design control, including establishing design requirements, reviewing designinputs, and reviewing and approving design outputs. Provide design review and approvalmatrix identifying EDOPEC and CUSTOMER participation.
Control design changes. Maintain design change control log. Include review by QualityRepresentative for compliance with Quality requirements.
Prepare design review plan and design verification plan. Conduct design reviews andverification, including independent reviews, to ensure that design requirements are met.
Define Equipment Criticality Ratings and provide Criticality Rating Matrix for procureditems unless advised by CUSTOMER of items for which Criticality Rating is not required.
Approve Manufacturing Procedures for major procured materials such as line pipe andstructural steel. Include review by Quality Personnel for compliance with Qualityrequirements.
Require and approve Subcontractor and vendor Quality Plans, Control Procedures andInspection and Test Plans as applicable. Track all Quality submittals and maintain aregister of status to ensure that submittals are provided, and approved in a timely manner.
Conduct reviews of procurement documents by Quality personnel for compliance with
Quality requirements.
Conduct pre-production and pre-inspection meetings as applicable to Storage Tank worksfor Subcontractor and vendors providing critical services, material and equipment.
Detect, report and control non-conforming processes and items, including Subcontractor ,vendor and sub-vendor activities.
Conduct vendor and Source Inspection and Field Inspection and Surveillance inaccordance with EDOPEC 's Control Procedure.
Identify, segregate, control, track, and certify equipment and materials that will beincorporated into the FACILITY, including Positive Materials Identification (PMI) for alloymaterials.
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
5/31
5 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Conduct in-process inspection during fabrication, construction, installation and hook-upand commissioning. Cover all disciplines required to complete critical items.
Provide sufficient notification as required by CUSTOMER of impending inspection andtests involving CUSTOMER participation.
Provide Quality metrics for gauging Quality performance, and report status monthly.
Develop and implement corrective and preventive actions to resolve Quality issues andconcerns for all phases of Storage Tank works . Resolve all non-conformances.
Provide and control all Inspection and Test records and associated Quality relateddocumentation, including the collation in relevant sections of the Documentation forOperations (DFO) and the ultimate hand-over to CUSTOMER as specified in theCoordination Procedures. Review and approve DFO provided by the respectiveSubcontractor s, vendors and sub-vendors to ensure that Project Quality requirements
have been met. Forms C-1, D-1 and E-1, are a tool for ensuring identification, organizationand submittal of all Quality related documentation. EDOPEC may utilize its own systemand format for this activity as long as it captures the same degree of information containedin CUSTOMER 's forms.
CUSTOMER Duties
a. CUSTOMER shall perform certain QA/QC activities, however the performance of which shallnot relieve EDOPEC of its responsibilities to ensure compliance with Tender Documents orEDOPEC 's overall responsibility for quality of Storage Tank works . CUSTOMER 's Qualityactivities include:
Source Inspection CUSTOMER may conduct independent source inspections asStorage Tank works progresses. Results of CUSTOMER source inspections will be
made available to EDOPEC .
Design Reviews (both day-to-day review of design documents and EDOPEC conductedformal design review meetings) Storage Tank works , CUSTOMER will perform reviewsof design documents. CUSTOMER 's Specialists will meet with EDOPEC 's engineersperiodically to discuss various aspects of and Storage Tank works . EDOPEC shallprovide the documentation required for Design Reviews and shall follow up on all items notresolved during a review.
QA Audit CUSTOMER will audit EDOPEC 's QA/QC program. Audit scope will includebut not be limited to: (i) review of EDOPEC 's documented QA/QC procedure, (ii) randomreview of EDOPEC 's procurement documents for inspection and specification content, (iii)EDOPEC 's specific equipment inspection plans in relation to specification requirementsand Criticality Rating assessments, (iv) review of inspector's surveillance and non-conformance reports, (v) EDOPEC 's deviation log and procedure approval logs, (vi)receipt inspection discrepancy reports and field inspection reports, and (vii) activitiesundertaken by Subcontractor s, vendors and sub-vendors.
b. Approve EDOPEC , Subcontractor and critical vendor and sub-vendor Quality Plans andInspection and Test Plans prior to start of Storage Tank works .
c. Review and comment on EDOPEC's Control Procedures and audit schedule and monitorcompliance. CUSTOMER will monitor the resolution of any issues raised.
d. Participate in design control, including review design input and review and approve designoutput per identified review and approval requirements.
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
6/31
6 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
e. Approve Equipment Criticality Ratings and Criticality Rating Matrix prior to procurement orprovide the Equipment Criticality Ratings.
f. Review procurement documents, including changes, for technical and Quality compliance forcritical items prior to issue.
g. Participate in selected pre-inspection and pre-production meetings.
h. Conduct oversight of EDOPEC 's Quality activities including but not limited to vendorInspection activities, Field Inspection and surveillance activities. Participate in inspection andtest stages per approved Inspection and Test Plans (ITPs).
i. Approve Non-Conformance Reports (NCRs) where proposed dispositions do not result inmeeting the Tender Documents .
Specific RequirementsQuality Management System
EDOPEC shall have a documented and functional Quality Management System or Program in place toensure the quality of Storage Tank works . EDOPEC is not required to submit the QualityManagement System and Program for CUSTOMER approval, but it shall be available to CUSTOMERRepresentatives for reference during the execution of Quality audits, inspection, testing andsurveillance. The Quality Management System shall:
a. Emphasize building Quality into Storage Tank works product through use of documentedcontrol processes that incorporate necessary activities to ensure Quality.
b. Be formally documented and in compliance with a recognized national or international Quality
Standard such as ISO-9000 or API-Q1. Accreditation is not required, except where specificallydefined for a specific component. (e.g., API Specification Q1 monogram or ASME CodeStamping).
c. Be supported by an established Quality organization meeting the requirements, with qualifiedresources, and formally documented control procedures to effectively administer andimplement the requirements.
d. Produce documentation to demonstrate the quality of Storage Tank works performed.
e. Be supported by a functioning audit program to provide verification of compliance with qualityrequirements during Storage Tank works .
f. Be able to demonstrate that:
All personnel related to a given Storage Tank works process, understand the respectivejob requirements.
Qualified inputs are utilized in Storage Tank works processes to produce Storage Tankworks products that meet Tender Documents . Quality process inputs include qualifiedworkers, qualified tools, qualified equipment and qualified materials.
Storage Tank works products are in compliance with the specified tender documentsthrough inspection and surveillance.
The extent of inspection and surveillance is commensurate with the risk, cost, schedule,safety, and the magnitude of any quality problems that may adversely impact Storage Tankworks .
All re-work is recorded and the cause is identified for all Storage Tank works processes.
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
7/31
7 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
EDOPEC 's Plans and Procedures
Quality Plan
EDOPEC shall submit the Project Quality Plan (PQP) to CUSTOMER for approval.
The Quality Plan may be based on existing Quality Management Systems or Programs inuse but shall comply with the requirements listed.
Individual Quality Plans are also required for the following:
i. Design Subcontractors.
ii. Vendors, and sub-vendors (as identified in the vendor's list of sub-vendors) approvedby the CUSTOMER , supplying critical materials and equipment (medium and highcriticality as defined including shop fabricators and manufactures.
iii. Construction, Installation, Hook-Up Subcontractors.a. Control Procedures EDOPEC shall provide control procedures to reflect the quality activities
of the Tender Documents and implement the Project Quality Plan for all phases of StorageTank works . EDOPEC shall, as far as practical, provide existing procedures that adequatelyaddress the controls required for quality activities.
Detailed description of ,CUSTOMER and Storage Tank works is to be performed, reviews,approvals required and checks and inspection to be conducted, including responsibilities
Timing of the required checks and inspections in Storage Tank works sequence
Accept and reject criteria applicable to the activity and/or approval requirements.
b. Inspection and Test Plans
EDOPEC shall submit Inspection and Test Plans (ITPs) in compliance with CUSTOMERfor approval prior to start of Storage Tank works activity covered by tender documents. Thepreferred format is provided EDOPEC may adopt any format that conveys the same levelof information and addresses the sequencing of Storage Tank works . ITPs may besubmitted separately for each discipline or as a combined document.
Individual ITPs for detailed design, manufacturing, fabrication, construction, installation,hook-up and commissioning are required for the following:
i. EDOPEC when Storage Tank works is performed directly
ii. Vendors, and sub-vendors as identified in the vendor's list of sub-vendors approved byCUSTOMER , supplying critical materials and equipment, including shop fabricationand manufacturers
iii. Construction, Installation, Hook-Up Subcontractors
Additionally EDOPEC shall ensure that inspection and testing activities conducted duringStorage Tank works are:
iv. In accordance with approved control procedures
v. Conducted at agreed pre-designated stages
vi. Coordinated with CUSTOMER and regulatory authority with adequate notification ofnominated hold and witness points requiring their participation
vii. Supported by documentation generated to provide objective evidence of acceptablequality and compliance with CUSTOMER specified requirements
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
8/31
8 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
EDOPEC Interface and Oversight of Sub-contractors, Vendor and Sub-Vendors
c. Criticality Rating for Procured Materials and Equipment
Criticality System shall be used to establish the criticality ratings. Criticality ratings are tobe determined by EDOPEC and submitted for CUSTOMER approval prior tocommitment.
CUSTOMER requires that the extent of quality activities related to procured materials andequipment will be based on the criticality of the goods to be provided, where theSPECIFICATION does not have specific requirements.
d. EDOPEC is responsible for:
Ensuring Subcontractor s, vendors and sub-vendors selected to execute elements of theproject Storage Tank works scope are approved by CUSTOMER prior to commitment.
Ensuring that applicable CUSTOMER quality requirements are communicated toSubcontractors, vendors and sub-vendors and ensuring that the requirements, includingcertification, are implemented.
Identification of Subcontractor and vendor Quality Submittals, Quality Plans, ControlProcedures and Inspection, and Test Plans for EDOPEC review and approval prior to startof Storage Tank works .
Where identified by CUSTOMER and EDOPEC , submittal of Subcontractor , vendor andsub-vendor Quality Documents, Quality Plans, and Inspection and Test Plans forCUSTOMER approval.
All quality-related documentation, inspection and test records are generated as required bySPECIFICATION.
Providing notification and obtaining CUSTOMER prior approval of dispositions for anynon-conforming conditions which do not result in meeting SPECIFICATION, including, butnot limited to, "repair" or "use as is."
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
9/31
9 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
ATTACHMENTS
Attachment Quality Plan Contents
Overview of Quality Plan Contents:
(a) Scope
(b) Quality Objectives
(c) Definitions, Terms and Abbreviations
(d) Organization Chart and Quality related Roles and Responsibilities associated with Technicaland Quality activities for all project phases
(e) Management Review of CONTRACT and Purchase Orders
(f) Information Management System
(g) Audit Planning including Project Audit schedule, to include timing and frequency for EDOPECactivities and critical Subcontractor s, vendors and sub-vendors.
(h) Listing of all Control Procedures required to perform Storage Tank works .
The Quality Plan should provide detailed descriptions of:
(i) Responsibilities of EDOPEC 's management related to Quality activities with special attentionto interfacing with non-English speaking organizations.
The systems and procedures EDOPEC will use to ensure that quality is an intrinsic part of all aspects ofStorage Tank works and the resulting FACILITY, including:
How information, reports and records relating to quality assurance and quality control willflow among the various groups (e.g., design, engineering, purchasing, construction,controls, other EDOPEC s) and CUSTOMER and how this information will be stored andretrieved.
How site specific codes and standards will be analyzed in conjunction with theSPECIFICATION and EDOPEC 's internal standards to ensure that the engineering designwill comply with Tender Documents , sound and generally accepted practice, and
regulatory requirements.
How procurement documents will be prepared to properly establish requirements withSubcontractors, vendors and sub-vendors. EDOPEC shall have major Subcontractors,vendors and sub-vendors prepare a product-specific or service-specific quality assuranceplan for their respective scopes of supply.
How potential Subcontractors, vendors and sub-vendors will be evaluated/selected toensure they have the requisite resources, tools, procedures, and quality capabilities tomeet established requirements.
How individual inspection plans will be prepared for each equipment or material itemassigned a Criticality Rating Category of medium or high. Each plan shall include a list ofthe specifications that must be met, describe the tests that will be done to ensure
compliance, and identify who will perform the tests. Further, each such plan shall identify
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
10/31
10 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
inspections and Quality steps that will be taken by the Subcontractor s, vendors and sub-vendors in addition to those done by EDOPEC or CUSTOMER .
How calculations and fabrication drawings prepared by Subcontractors, vendors and sub-vendors will be reviewed for consistency with engineering design and standards.
How records will be maintained to demonstrate that all design, materials, equipment, andconstruction conforms to established requirements and how and in what form the recordswill be turned over to CUSTOMER .
How nonconformities, concessions and waivers shall be controlled and resolved includingthe process that will be used, the personnel responsible for administering the process, andthe information flow through EDOPEC 's organization for resolution.
How all instruments used for testing and inspection in Storage Tank works will beproperly certified, including positive material identification (PMI) devices, equipment for
calibrating instrumentation, hydrostatic test gauges, and the like. EDOPEC shall identifythe instruments to be certified and describe the methods to be used.
The auditing, appraising, sampling techniques, reviews, and reporting EDOPEC intends to carry out forStorage Tank works to confirm the effectiveness of the Quality activities, and that the Quality programs andsystems are indeed delivering the quality required.
The way EDOPEC plans to meet CUSTOMER s requirements for PMI, source inspection, and field qualitycontrol including the frequency of testing, the locations where the testing will be conducted and the types of testequipment to be used.
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
11/31
11 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Attachment :Inspection and Test Plans
Overview:
(j) Where practical all disciplines involved in Storage Tank works should be included in a singleInspection and Test Plan (ITP).
Each ITP format may vary however, the following information is required to be included in an ITP:
Activity and associated control procedure and specification reference governing the activity
ACCEPTANCE Criteria
Responsibility for activity execution
Objective evidence of activity execution or verifying document
EDOPEC and Vendor participation at the inspection and test stages listed
CUSTOMER participation as required
Certification as required
Authorized Inspector and CVA participation
ITPs shall, as far as practical, follow Storage Tank works sequence. ITPs shall identify the stages requiringapproval, inspection and testing that include participation by CUSTOMER , Third party and others, in additionto those inspection stages normally undertaken by EDOPEC .
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
12/31
12 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Attachment 1-3:Criticality Rating System
General
(k) Quality activities are driven by a formal criticality rating processes which considers:
Safety, operability, and financial consequences
Probability factors, including design complexity and manufacturing and fabricationcomplexity
Principles
(l) The degree of Quality planning, level of inspection, oversight and verification is driven by
criticality.
(m) Users are responsible to use this criticality rating process as a tool to reach a reasonableaction plan. It is not intended to replace good judgement and experience. Actions can beadded or deleted from the those indicated for the risk rating, based on a variety of factors suchas experience or knowledge of vendor strengths and weaknesses.
Process
(n) Criticality Ratings and Inspection coverage levels are developed for each procurementpackage for materials, equipment, and group of similar packages as outlined below.
(o) Identify the item or group of items to be procured. Use the Criticality Rating Form, to developthe base Criticality Rating established from the following,
The lowest criticality index number (i.e., 1 is lower than 2) determined for any of thefollowing: FACILITY or financial consequences or safety factors, and
The lowest criticality alphabetical index (i.e., A is lower than B) determined for eitherdesign factors or manufacturing complexity.
The indices shall be plotted on the block chart as included in order to determine the base criticality rating. Thisvalue may be amended based on judgement factors such as experience and previous knowledge of thevendor, and or vendor location, selected to provide the materials or equipment for incorporation into the project.
In the event that the base rating is amended, the Worksheet shall be used to record the justification for thechange.
The Worksheet shall be used to identify the inspection coverage required during the execution of Storage Tankworks .
Generally the following Levels of Inspection Coverage are applied.
High Criticality = Inspection Level I or II
Medium Criticality = Inspection Level II or III
Low Criticality = Inspection Level III or IV
The Worksheet shall be signed off by the parties determining the rating, which shall be responsible forrecommending the level of inspection coverage during fabrication and manufacture of the items.
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
13/31
13 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Attachment : Criticality Rating (CR) Determination
Item/Equipment Title: Form B-1
Item/Equipment No: Requisition No:
Criticality ElementCR
BaseCR
Assigned
FACILITY Consequences
Results in long term production shutdown due to mobilization time of repair equipment or fabrication time for replacement parts
What impact would equipment failure have on plant/unit operation?
1
Cause operational upset and/or production downtime of more than 24 hours. 2
Moderate impact so as to inhibit full production and require emergency maintenance and control operations. 3
Inconvenient to plant operation and result in operational difficulties without loss of process operations. 4
Financial Consequences
Replacement or repair cost above 1M US$
What would be the likely financial consequences of equipment failure during commissioning, start-up and/or operation?
1
Replacement or repair cost between 100k US$ to 1M US$. 2
Replacement or repair cost between 10k US$ and 100kUS$ 3
Replacement cost below 10k US$ 4
Safety Factors
Significant risk to personnel or environment due to or toxic or high inventory of hazardous fluid/process/temperature/pressure/corrosiveness.
Would failure during commissioning, start-up and/or operation jeopardize health and safety of personnel or the environment?
1
Medium risk to personnel or environment due to hazardous fluid/process/temperature/ pressure/corrosiveness 2
Moderate risk to personnel or environment due to medium hazard process or fluid. 3
Low risk to personnel or environment due to inherently low risk of fluids or process 4
Design Factors
New innovative design with unproven reliability or non-code based requirements.
Are there critical or new design features which warrant special engineering or inspection follow-up?
A
Extrapolation of proven design with limited reliability data or previous experience. B
Modification of proven design with known reliability and past experience C
Frequently used and well-proven design with easily obtained spare parts D
Manufacturing Complexity
Large number of complex processes, exotic, highly specified or modified materials of construction, which require extensive testing orare not easily secured
Is the manufacturing complexity of the equipment such that a high level of in process verification is required?
A
At least one complex process, special materials, etc., with limited previous experience. B
Large number of routine processes with common materials of construction C
Few routine processes with common materials of construction. D
A B C D Rating Code Input/Justification for amending Criticality Rating
1 H H M LHigh CriticalityComponent
H
2 H M M LMedium CriticalityComponent
M
3 M M L LLow CriticalityComponent
L
4 L L L L Established Rating Final Rating
Print Name Signature Date
Prepared by JV
Checked by
Approved by CUSTOMER
Recommended Inspection
Coverage
Level I
ResidentFull Time
Level II
RegularWeekly Visits
Level III
RandomFor Witness Tests
Level IV
No InspectionRequired
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
14/31
14 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Attachment: Organizational Responsibilities
Personnel and Responsibil ities:
(p) EDOPEC 's Quality Organization shall include personnel whose responsibilities, as a minimum,include the functions listed below:
Quality manager, empowered by senior management with operational freedom andauthority to manage Quality issues and their resolution, and to oversee the management ofQuality project wide, and to issue stop Storage Tank works notices as required to correctnon-conformances and or adverse Quality trends.
Quality auditor to conduct formal internal and external audits on a project-wide basisthroughout the applicable phases of the project execution.
Quality engineer, for design, procurement, construction phases including installation andhook-up.
viii. To prepare Quality procedures and plans
ix. Conduct reviews prior to submittal to the CUSTOMER for approval, of technicalspecifications for Quality requirements
x. Review RFQs, ITTs, POs, Contracts, and EDOPEC Quality submittals for compliancewith CUSTOMER requirements listed in the contract
Inspection coordinator for Procurement, Construction Phases including Installation and
Hook-Up: to oversee and implement the approved EDOPEC Inspection ExecutionProcedure for vendor supplied materials and equipment and the daily supervision ofEDOPEC assigned qualified discipline inspectors, during Construction, Installation andHook-Up activities undertaken by EDOPEC .
Inspection supervision to oversee the daily inspection and testing activities associated withConstruction, Installation, and Hook-Up and the daily supervision of EDOPEC assignedqualified field discipline inspectors.
Adequate qualified inspection personnel by discipline to undertake vendor Inspectionactivities, and conduct surveillance and inspection, witness of testing during Construction,Installation and Hook-Up.
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
15/31
15 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
GUIDANCE ATTACHMENTS
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
16/31
16 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Attachment 1-6:Control Procedures
Act iv it y Procedu res
QA
Q.1 Detect and report Non-conformances Control of Non-Conformances
Q.2 Resolve Quality Issues Corrective and Preventative Actions
Q.3 Conduct Quality Audits Quality Audit Procedure
Q.4 Process PO/CONTRACT Changes Change Control
Design
D.1 Provide design software/hardware Software QA
D.2 Establish Design Input Design Input Control
D.3 Develop CAD Drawings CAD QA
D.4Review Technical Package intended for inclusion inRFQs and ITTs
Technical Package Review
D.5 Approve Design Subcontractor and vendor Qualitysubmittals and procedures Subcontractor Control
D.6 Establish vendor Equipment CriticalityCriticality Rating Matrix for vendor supplied materialsand equipment
D.7 Administer vendor Design Vendor Design Review
D.8 Assess Design OutputReview and Approval Control, Design VerificationTechnical Review and Approval matrix for designDeliverables
D.9 Process Design Changes Change Control
D.10 Generate and maintain documentation and records Document and Data Control
FieldPr
ocurement
P.1Review of RFQs and ITTs for EDOPEC Procured itemsfor Quality Requirements prior to issue
RFQ and ITT Package Review
P.2Prepare POs and CONTRACTs, ProcessPO/CONTRACT Changes
Control of POs and CONTRACTs
P.3 Approve Manufacturer and Subcontractors Qualitysubmittals prior to submission to CUSTOMER Approval of Quality Submittals
P.4Conduct Manufacture and vendorOversight/Surveillance
Source Inspection Procedure
Fabrication,
Construction
,Installation,
Hook-up
F.1Control AFC Drawings, Prepare and Issue ShopDrawings
Drawing Control
F.2Calibrate measuring and testing equipment, includingwelding equipment
Calibration Procedure
F.3 Control and Monitor Preheat application Preheat application and Monitoring procedure
F.4Evaluate production use of approved WeldingProcedures
WPS In-process verification
F.5Identify welds, Identify qualified welders, develop weldmaps and maintain weld history records
Weld Mapping and Weld History Records
F.6 Maintain Status of Inspection activities Inspection and Test Status
F.7 Control timing and application of Production NDE Requests For NDE
F.8 Evaluate welder performance Welder Performance Evaluation
F.9Conduct inspection by discipline during construction,Installation, Hook-Up
Inspection Procedures per discipline
F.10Conduct Surveillance of Subcontractor and vendoractivities
Source Inspection Procedure
F.11 Coordinate Mechanical COMPLETION Mechanical COMPLETION Procedure
F.12 Generate and Maintain Test and Inspection Records Document Control Procedure
F.13 Compile Job Data Books Job Data Book Contents
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
17/31
17 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Attachment: Form B-2 Typical Inspection and Test Plan Format
Page 1 of 5 INSPECTION AND TEST PLANDOCUMENT NO.: ORIGINATOR: SCOPE OF PLAN;
STORAGE TANKSDATE:
Stage
No.
Description of
Act iv ity
Controlling
Document
Acceptance
Criteria
Quality
Record
Inspection, Test and Witnessing Plan
Contractor BP Third PartyST.1
Preparation of activityMethod
statementApproveddrawings
Equipmentlayout
ST.2Verification of inspectors qualifications
Inspectorstrainingrecords
Certification
ST.3 Verification of NDT techniciansqualifications
ASNT CP 189 Certification
ST.4 Verification of test house calibrationcertificates Test House
procedureCertification
ST.5 Verification of the equipment calibrationcertificates
Subcontractorsprocedure
Certification
ST.6 Check Plate Material recordsMill Certificates
Procurementrequirements
MRR
Prepared B y:
App rov ed By:
Legend;
W = WitnessW x% = Witness percentage
C = Check
I = InspectionI x% = Inspection percentage
H = Hold Point
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
18/31
18 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Page 2 of 5 INSPECTION AND TEST PLAN
DOCUMENT NO.: ORIGINATOR: SCOPE OF PLAN;STORAGE TANKS
DATE:REVISION: C
StageNo.
Description ofAct ivi ty
ControllingDocument
AcceptanceCriteria
QualityRecord
Inspection, Test and Witnessing Plan
Contract or BP Third Party CUSTOMER
FABRICATE AND ERECTION
ST.7 Materials for tanks, fittings, walkways andladders etc.
Material Take-offs
specifications MRRI
ST.8 Submit welders' quals. for approval. TA.Y.41ASME IX
API 620 CertificateH/I
ST.9 Submit N.D.T. operators quals. forapproval.
ASME IXAPI 620 Certificate
H/I
ST.10 Submit weld procedure specs. forapproval.
ASME IXAPI 620 Certificate
H/I
ST.11 Submit N.D.T. procedures for approval. ASME V API 620 Certificate H/IST.12 Check datums i.e.
a) levelb) locationorientation
API 620
TA.Y.60.f.01
W x %
ST.13 Lay and weld Annular ring and Baseplates to First course Vert.
API 620Report I
ST.14 Fit up and weld joints.. API 620 Report IST.15 NDT / Vacuum Box Floor API 620 Report W x %ST.16 Visual Inspect Floor API 620 Report C
Prepared By:
App rov ed By:
Legend;
W = WitnessW x% = Witness percentageC = Check
I = InspectionI x% = Inspection percentageH = Hold Point
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
19/31
19 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Page 3 of 5INSPECTION AND TEST PLAN
DOCUMENT NO.:TPE-PLN-QAC-PTG-005-10
ORIGINATOR: TEPE SCOPE OF PLAN;STORAGE TANKS
DATE: 28/02/03REVISION: C
Stage
No.
Description of
Act iv ity
Controlling
Document
Acceptance
Criteria
Quality
Record
Inspection, Test and Witnessing Plan
Contractor BP Third Party CUSTOMERST.17 Submit radiographs.
API 620 API 620 Report I
ST.18 Weld repairs API 620 ASME V Report W x %ST.19 MPI/DPT Visual surface checks API 620 ASME V Report IST.20 Tank dimensional checks API 620 API 620 Report WST.21 Complete all tank-welded
attachments.procedure API 620 Report C
ST.22 Perform Diesel / or DPT test onAnnular ring to First Course VerticalAngle
API 620 API 620 Report W
ST.23 Install all tank internals procedure API 620 Report CST.24 Remove all temporary attachments. procedure API 620 Report CST.25 Internal inspection prior to hydrotest. procedure API 620 Report IST.26 Verify Technical Integrity Report HPrepared B y:
App rov ed By:
Legend;
W = Witness
W x% = Witness percentageC = Check
I = Inspection
I x% = Inspection percentageH = Hold Point
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
20/31
20 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Page 4 of 5 INSPECTION AND TEST PLANDOCUMENT NO.: ORIGINATOR: TEPE SCOPE OF PLAN;
STORAGE TANKSDATE:REVISION: C
StageNo.
Description ofAct iv ity
ControllingDocument
AcceptanceCriteria
QualityRecord
Inspection, Test and Witnessing Plan
Contractor BP Third Party CUSTOMER
ST.27 Monitor quality of test medium. API 620 API 620 Certificate I
ST.28 Hydrostatically test tank. API 620 API 620 Report W
ST.29 Survey fill vertical levels and Peakingand Banding API 620 API 620 Report W
ST.30 Internal inspection (post hydrotest)Procedure API 620 Report I
ST.31 Erect walkways, ladders, grating, etc. Procedure API 620 Report CST.32 Bolt up manways. API 620 API 620 Report CST.33 INTERNAL AND EXTERNAL
COATINGS
ST.34 Review data sheets for suitability ofcoating materials for use in confinedworking spaces.
COSHH assessments H I
ST.35 Shot blast, prime and paint. ManufacturerProcedure
API 620 Report W x %
Prepared B y:
App rov ed By:
Legend;W = WitnessW x% = Witness percentageC = Check
I = InspectionI x% = Inspection percentageH = Hold Point
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
21/31
21 of 31
.
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Page 5 of 5 INSPECTION AND TEST PLANDOCUMENT NO.: ORIGINATOR: SCOPE OF PLAN;
STORAGE TANKSDATE
StageNo.
Description ofAct iv ity
ControllingDocument
AcceptanceCriteria
QualityRecord
Inspection, Test and Witnessing Plan
Contractor
BP Third Party CUSTOMER
ST.36 Apply intermediate coats. ManufacturerProcedure
API 620 Report C
ST.37 Apply final coats. ManufacturerProcedure
API 620 Report W x %
ST.38 Apply any special coating finishes. ManufacturerProcedure
API 620 Report W x %
ST.39 Clean out, Close and Contract gasketdoor / manway
API 620 Report W
AS BUILT DRAWINGSST.40 Identify any non- conforming items. List of non -
conformancesH
ST.41 Raise any concession whereapplicable.
Concessionreport
I
ST.42 Submit as-built drawings anddocumentation.
Procedure Inspection report I
ST.43 Pre-commissioning API 620 Report WST.44 Final Closure report
API 620Mechanical
Completion report
W
Prepared B y:
App rov ed By:
Legend;
W = WitnessW x% = Witness percentageC = Check
I = InspectionI x% = Inspection percentageH = Hold Point
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
22/31
22 of 31
Attachment: Form C-1 Design EDOPEC Quality Submittal
Requirements (DQSR)
CONTRACT No. Titl e: Page #
EDOPEC Location : Date
Item # Submi ttals to be submitted with Bid For CUSTOMER Review ( 2 Copies requi red)
QDR.1 Project Quality Plan (Typical)
QDR.2 Project Quality Organization Chart Roles and Responsibilities (Typical)
QDR.3i) Audit Schedule (For Typical Project)
ii) Details of No. of Audits Planned and No. conducted
QDR.4 Listing of Control Procedures for Typical Project
Item #Post Award Submittal Topic (Submittals to be reflective of the scope of Storage Tank works )
required for Approval, required of submittals Approved for Use
Required
Yes No
QUALITY PLANNING (QP)
QDP.1 Project Specific Quality Plan
QDP.2 Quality Audit Schedule ( Main EDOPEC to include Subs)
QDP.3 Listing of EDOPEC Control Procedures applicable to Storage Tank works scope
QUALITY ASSURANCE (QA)
QDA.1 Control of Non-Conformances,
QDA.2 Corrective and Preventative Actions
QDA.3 Quality Audit Procedure ( Main EDOPEC )
QDA.4 CONTRACT ReviewQDA.5 Subcontractor Assessment, Selection and Control
QDA.6
Design Control
Q.6.1 Design Input Control
Q.6.2 Design Output Control Review and Approval, inc. Matrix for Technical Review and Approval ofDesign Deliverables, Design Verification.
Q.6.3 Change Control
Q.6.3 Review of vendor Design (Main EDOPEC )
Q.6.4 Software and CAD QA
QDA.7 Document and Data Control
QDA.8 Review and Approval of Subcontractor Quality Submittals
QDA.9 Interface Management
QDA.10 Information Management
QDA.11 Weight Control/Verification
QDA.12 Criticality Rating Matrix for Procured Material and Equipment
QDA.13 Review of Technical Package for Inclusion in ITT/IFB/RFQ s
QDA.14
QDA.15
QDA.16
QDA.17
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
23/31
23 of 31
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Att achment 5-8:Form D-1 Page 1 Procurement Quali tySubmittal Requirements (VQSR) PO #
TitlePage 1 of 2
Vendor and Location: Criticality High Medium Low Date
Item # Submi ttals to be submit ted with Bid For CUSTOMER Review (2 Copies requi red)
QVR.1 Project Quality Plan (Typical )QVR.2 Project Quality Organization Chart Roles and Responsibilities (Typical)
QVR.3i) Audit Schedule (for Typical Project)
ii) Details of No. of Audits Planned and No. ConductedQVR.4 Listing of Control Procedures for Typical Project
Item #Post Award Submittal Topic to be reflective of the scope of Storage Tank works
required for Approval, required of submittals Approved for Use
Required
Yes No
QUALITY PLANNING
QVP.1 Project Specific Quality Plan
QVP.2 Inspection and Test Plans per Discipline
QVP.2.1 Piping
QVP.2.2 Structural and Equipment
QVP.2.3 EquipmentQVP.2.4 Electrical and Instrumentation
QVP.2.5 HVAC
QVP.2.6 Outfitting
QVP.3 Quality Audit Schedule
QVP.4 Listing of EDOPEC Control Procedures applicable to Storage Tank works scope
QUALITY ASSURANCE
QVA.1 Control of Non-Conformances,
QVA.2 Corrective and Preventative Actions
QVA.3 Quality Audit Procedure
QVA.4 Document and Data Control
QVA.5 Sub-vendor / Subcontractor Assessment, Selection and Control
QVA.6 Review and Approval of sub-vendor/Subcontractor Quality submittals
QVA 7 Vendor Inspection Procedure(Source Inspection)
FABRICATION
VF.1 Material Control Receipt, Storage, Segregation, Issue
VF.2 Material Traceability
VF.3 Positive Material Identification
VF.4 Weight Control and Verification
VF.5 Calibration of measuring and testing equipment, including welding machines
VF.6 Welding Procedure Specifications and Supporting Qualification Records
VF.7 NDE Procedure s
VF.8 NDE Technician Certification
VF.9 Welder/Operator Qualification Procedure and Records
VF.10 In-process Verification of WPS s
VF.11 Welder Performance Evaluation
VF.12 Weld Consumable Control
VF.13 Weld Mapping and Weld History Records
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
24/31
24 of 31
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Attachment 5-8: Form D-1 Page 2
PO # Title:Page 1 of 2
Item #Post Award Submittal Topic
(Submittals to be reflective of the scope of Storage Tank works )required for Approval, required of subm ittals Approved for Use
Required
YES NO
FABRICATION Continued
VF.14 PWHT Procedure
VF.15 Dimensional Control Procedure
VF.16 Surface Treatment and Painting Procedure
VF.17 Inspection Procedures
VF.17.1 Piping
VF.17.2 Structural
VF.17.3 Equipment
VF.17.4 Electrical and Instrumentation
VF.17.5 Surface Treatment and Painting
VF.17.6 HVAC
VF.17.7 Outfitting
VF.18 Pressure Testing
VF.19 Final Inspection and Release Notification
VF.21 Job Data Book Contents and Compilation
VF.22 Preparation, Review and Approval of As-Built Drawings
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
25/31
25 of 31
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Attachment 5-8: Form E-1 Page 1 Construction/Installation/Hook-Up
Quality Submittal Requirements (CQSR)
CONTRACT # Titl e: Page 1 of 2
EDOPEC Location: Date
Item # Submi ttals to be submitted with Bid For CUSTOMER Review ( 2 Copies requi red)
QCR.1 Project Quality Plan (Typical )QCR.2 Project Quality Organization ChartRoles and Responsibilities (Typical)
QCR.3i) Audit Schedule (for Typical Project)
ii) Details of No. of Audits Planned and No. conductedQCR.4 Listing of Control Procedures for Typical Project
Item #Post Award Submittal Topic
(Submittals to be reflective of the scope of Storage Tank works )required for Approval, required of submit tals Approved for Use
Required
Yes No
QUALITY PLANNING
QCP.1 Project Specific Quality Plan
QCP.2 Inspection and Test Plans per Discipline
QCP.2.1 Piping
QCP.2.2 Structural
QCP.2.3 Electrical and Instrumentation
QCP.2.4 HVAC
QCP.2.5 Outfitting
QCP.3 Quality Audit Schedule
QCP.4 Listing of EDOPEC Control Procedures applicable to Storage Tank works scope
QUALITY ASSURANCE
QCA.1 Control of Non-Conformances,
QCA.2 Corrective and Preventative ActionsQCA.3 Quality Audit Procedure
QCA.4 Document and Data Control
QCA.5 Subcontractor Assessment, Selection and Control
QCA.6 Review and Approval of Subcontractor Quality submittals
EDOPEC PROCUREMENT
CP.1 ProcurementCP.1.1 RFQ and ITT Package ReviewCP.1.2 Selection of Qualified BiddersCP.1.3 Control of POs and CONTRACTsCP.1.4 Review and Approval of Manufacturer and vendor Quality SubmittalsCP.1.5 Source Inspection Procedure
CONSTRUCTION/INSTALLATION/HOOK-UP
CF.1 Material Control
Receipt, Storage, Segregation, Issue
CF.2 Material Traceability
CF.3 Positive Material Identification
CF.4 Weight Control Verification
CF.5 Calibration of measuring and testing equipment, including welding machines
CF.6 Welding Procedure Specifications and Supporting Qualification Records
CF.7 NDE Procedure s
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
26/31
26 of 31
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
At tachment 5-8:Form E-1 Page 2
CONTRACT # Titl e: Page 2 of 2
EDOPEC Location: Date
CF.8 NDE Technician Certification
CF.9 Requests for NDE
CF.10 Welder/Operator Qualification Procedure and Records
CF.11 In-process Verification of WPSs
CF.12 Welder Performance Evaluation
CF.13 Preheat Application and Monitoring Procedure
CF.14 Weld Consumable Control
CF.15 Drawing Control
CF.16 Weld Mapping and Weld History Record Procedure
CF.17 Inspection and Test Status
CF.18 Mechanical COMPLETION Procedure
CF.19
Inspection Procedures
CF.19.1 Piping
CF.19.2 Structural
CF.19.3 Electrical and Instrumentation
CF.19.4 HVAC
CF.19.5 Surface Treatment and Painting
CF.20 Data Book Contents and Compilation
CF.21 Preparation, Review and Approval of As-Built Drawings
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
27/31
27 of 31
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Attachment 5-9: Levels of Vendor Surveillance and Site Inspection
Note: The Actual Criticality Ratings will be developed during CONTRACT execution in accordance withAttachment 5-3 and implemented in accordance with the associated Inspection and Test Plan (Ref:Attachment 5-7 for typical format)
Levels of Vendor or Site Surveillance
(q) A simplified system of coding the level of planned purchaser and EDOPEC inspectioncoverage shall be utilized for ease and clarity and defining requirements.
(r) Key factors such as complexity, special materials, unusual processes, safety, operationalreliability quality history of supplier and EDOPEC, ease of replacement. Site location anddelivery schedule should be considered with setting the required inspection level, inconjunction with the quality of the inspection and testing service by the vendor andEDOPEC.
(s) Use the following four (4) levels of inspection coverage:
Level 4 No inspection required or final inspection only, prior to shipment or atinstallation.
Level 3 Includes as a minimum, inspection meetings, one or more unspecified,"in-progress" surveillance type visits, or observations, all witness and holdpoints, final inspection and release for shipment or final ACCEPTANCE.
Level 2 Same as Level 3 above except that "in-progress" surveillance inspectionsshall be on a regular basis (weekly, monthly, etc.)
Level 1 Resident inspector continuously monitor Storage Tank works.
Refer to the following notes for clarifications:
Notes:
Possible surveillance increase for fabrication of castings, forgings, NDT and welding on rotatingequipment in hydrogen sulfide or carbon dioxide service.
Possible surveillance increase for material procurement, fabrication, NDT, welding, stress relief, andmechanical testing of materials exposed to critical service, including cryogenic service.
Possible surveillance increase for fire protection control systems.
This requirement is for GE Frame 5 or larger gas turbines. Requirements may possibly be reducedfor smaller units.
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
28/31
28 of 31
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Critical ity Level Area
PreliminaryRating
Numeric Level EDOPEC Proposes
1.0 CIVIL/STRUCTURAL
1.1 Structural Steel
High 1.6.a Welders qualification tests
High 1.6.b Welding procedure qualifications prior to any welding
High 1.6.c Shop Fabrication
High 1.6.d Application of any coating
High 1.6.e Field Erection
2.0 ROTATING EQUIPMENT
2.1 Installation
Medium 2.2.a In place storage and preventive maintenance
3.0 VESSELS
3.1 Tank Construction
High 3.2.a Grading
High 3.2.b Foundation
High 3.2.c Tank Erection
High 3.2.d Painting
High 3.2.e Hydro Test
Medium 3.2.f Bund Walls/Approaches
Medium 3.2.g Tank Area Drains
5.0 PIPING AND PIPELINES
5.1 Piping Procurement
Medium 5.1.a Carbon Steel Piping
Medium 5.1.b Stainless and Alloy Piping
5.1.c Fittings, Flanges and Other Apparatus
Low 1 Carbon Steel
Medium 2 Stainless and Alloy
Low 5.1.d Bulk Items, i.e., Bolts, Gaskets
Low 5.1.e Valves (build)
Medium 5.1.f Valves (engineered)
5.2 Pipelines Procurement
Medium 5.2.a Steel making (pipeline)
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
29/31
29 of 31
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Critical ity Level Area
Preliminary
Rating Numeric Level EDOPEC Proposes
High 5.2.b Pipe-line (pipelines, flowlines, induction bends and risers)
High 5.2.c Induction bending
5.2.d Coating and wrapping
High 1 Pipelines and flowlines (FBE)
High 2 Pipelines and flowlines (Concrete)
High 3 Induction Bends (FBE)
High 4 Risers (Polychloreprene)
High 5.2.e Anodes
5.2.f Subset valves
High 1 Castings
High 2 Ball Valves
5.3 Piping Fabrication/Installation
5.3.a Fabrication
High 1 Receiving, inspection and storage
High 2 Layout cutting, preparation of pipe and fittings
High 3 Welding proceduresHigh 4 Welding operations
High 5 PWHT
High 6 Visual and NDT
High 7 Dimensional Verification
High 8 Cleaning, Painting and Preservation
High 9 Coating and Wrapping Installation
5.3.b Installation
High 1 Erection spools, etc.
High 2 Restraints, supports, anchorages, and guides properly installed
High 3 Hydrostatic/pneumatic testing
High 4 Flushing and cleaning
High 5 Painting and permanent markings
High 6 Final Documentation
5.4 Pipelines Installation
High 5.4.a Transportation, receiving, inspection and storage
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
30/31
30 of 31
Project: Prj. Identification:
Document Title:SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGETANK
Document No.: EDO-PLN-QAC-GNR-INT-XXX-013-110-111-REV-A.SAMPLE PROJECT QUALITYMANAGEMENT FOR STORAGE TANKB
Revision: A Date:11.11.2013
Critical ity Level Area
Preliminary
Rating Numeric Level EDOPEC Proposes
High 5.4.b Restraints and supports
High 5.4.c Preparation of pipe and fittings
High 5.4.d Welding procedure qualification and testing
High 5.4.e Welder testing
High 5.4.f Welding operations
High 5.4.g Visual and NDT
High 5.4.h Field joint coating (FBE and Polyurethane infill)
High 5.4.i Cleaning
High 5.4.j Leak and hydro testing
High 5.4.k Painting
High 5.4.l Final Documentation
6.0 ELECTRICAL
6.1 Installation
High 6.2.a Threaded conduit and cable trays
Medium 6.2.b Cable pulling
Medium 6.2.c Terminators
High 6.2.d Testing of circuits/cables verifies corrections/completeness
7.0 INSTRUMENTATION
7.1 Procurement
7.1.a Panels
Medium 1 Main Process
Medium 2 Oil movement, remote tank gauging
Medium 3 Water and waste water treatment
7.2 Installation
High 7.3.aGeneral, i.e., proper layout correct scale range, nameplates,tagging of wire terminals, spare terminals, etc.
High 7.3.b Instrument calibrations
High 7.3.c Pressure tests
High 7.3.d Foundation testing of instrumentation loop
8.0 SPECIAL EQUIPMENT
Medium 8.1 Package units, i.e., hydraulic control systems, driers, etc.
8/13/2019 EDO-PLN-QAC-GNR-INT-XXX-013-110-111-Rev-A.SAMPLE PROJECT QUALITY MANAGEMENT FOR STORAGE TANK.pdf
31/31
31 of 31
Project: Prj. Identification:
Critical ity Level Area
Preliminary
Rating Numeric Level EDOPEC Proposes
High 8.2 Internal erosion resistant linings
Medium 8.3Equipment designed and fabricated to fit a specific service, or involvingOwner know-how and technology; i.e., quick-opening closure, special firefighting equipment and fire suppression systems
High 8.4 Fabrication of Single Point
High 8.5 Pedestal Crane
9.0 LOSS PREVENTION
9.1 Not Used
High 10.0 INSULATION Thermal and Acous tical (In Field)
11.0 BUILDINGS/QUARTERS
11.1 Construction