Outline Installation ............................................................ .2-5
Outline End Filler Installation ...............................................6-9
Outline Outside Corner Installation ...................................10-13
Outline Inside Corner Installation .....................................14-19
EDGE Evolution Outline INSTALLATIONINSTRUCTIONS
EDGE Evolution Outline INSTALLATIONINSTRUCTIONS
Shim Detail
Screw Slot Mounting
Flange Detail
Non-Flange Spackle Flange
Wall Line
Shim to Vertical
Wall Line
Shim to Vertical
3/8”
Locking Screw
Mounting Screw
5-5/32”
4-1/4”6-3/16”
5-1/4”
4-1/2”
1” Grid Mounting Options 9/16” Grid Mounting Options
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Do not assemble fixture together on ground and then install.
OUTLINE
© 2014 Pinnacle Architectural Lighting
October 2014
Setup and Considerations
MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.
1. Fixture is to be installed flush with wall.2. Fixture mounts directly to J-Bar. (See Illustration A)
3. If fixture is not full length of wall, fixture should be centered on wall and End Fillers should be used to make up the difference in length. (see End Filler installation sheet for details.)
4. J-Bar may need to be shimed prior to fixture installation to accommodate wall inconsistences. (See Illustration B)
Installation Instructions
Illustration A
Illustration B
3 o
f 19
Designed and Fabricated in Denver Colorado Phone: 303.322.5570 www.pinnacle-ltg.com
EDGEE V O L U T I O N
Step 2:Installing and Wiring
© 2014 Pinnacle Architectural Lighting
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Do not assemble fixture together on ground and then install.
Step 1:Wall Bracket (J Bar)
1. Attach J Bar to wall at desired mount height.2. Use only top holes (2) for mounting J Bar to wall.
1. Fixture mounts on J Bar and against wall.2. Once installed and resting in J Bar put screw into lower screw holes (3) in J Bar to “lock” fixture in.3. Secure and level fixture to building structure with tie offs on non wall side of housing.4. Run building power to fixture, make necessary wire connections via access plate on top of fixture.
October 2014
See illustration B
See illustration A on pg. 1
Illustration B
(Note: Each J Bar has 5 screw holes. 2 upper holes for mounting J Bar and 3 lower holes for “locking” fixture to J Bar.)
MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.
J Bar
Fixture
Mounting Screw
“B”
“A”
J BarPart # K-WG-XX-04
Dim “A” is from end of J Bar to first mounting holeDim “B” is from mounting hole to mounting hole
Dim “B”
23-3/8”
Dim “A”
12-5/16”
OUTLINEInstallation Instructions
4 o
f 19
Designed and Fabricated in Denver Colorado Phone: 303.322.5570 www.pinnacle-ltg.com
EDGEE V O L U T I O N
Step 4:Joining Fixtures
© 2014 Pinnacle Architectural Lighting
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Do not assemble fixture together on ground and then install.
Step 3:Opening the Driver Cover
1. Open the driver cover by removing the screws in the cover, one screw per end.2. Once the screws are removed the driver cover swings open and remains captive to the fixture.
1. With the driver covers open, align fixtures with joining biscuits and butt fixtures together.2. Secure fixtures using provided screws through brackets fixture joints.
October 2014
MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.
Biscuit
OUTLINEInstallation Instructions
5 o
f 19
Designed and Fabricated in Denver Colorado Phone: 303.322.5570 www.pinnacle-ltg.com
EDGEE V O L U T I O N
EDGE Evolution Outline END FILLERINSTALLATION
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Do not assemble fixture together on ground and then install.
© 2014 Pinnacle Architectural Lighting
November 2014
Unit Breakdown
For incoming row see EVL_WS installation instructions*Adjustable 1” to 12”, recommended max 6”
MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.
Incoming Run
End Filler Top Hat
#8 Screws (provided)Part # S-832-1/4”
Part # K-EL-001
Part # K-E6-06
Part # K-WGC-XXX
Part # H-EL-016 for Left HatPart # H-EL-017 for Right Hat
Part # H-EL-001 for Left HatPart # H-EL-002 for Right Hat
End Plate
Wall Interface Biscuit
Joining Biscuit
End Filler Rail Piece
Adjustable Range*
Top HatBracket
OUTLINEEnd Filler Installation Instructions
7 o
f 19
Designed and Fabricated in Denver Colorado Phone: 303.322.5570 www.pinnacle-ltg.com
EDGEE V O L U T I O N
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Do not assemble fixture together on ground and then install.
1. Attach end plate through holes in end of approaching fixture and nut (provided) from inside the fixture.2. Make sure J rail is cut back to the end of the fixture.
1. Measure the distance from the end of the fixture to the wall.2. Cut the End Filler Rail Piece to the above measured dimension.3. Insert both Wall Interface Biscuit and Joining Biscuit into End Filler Piece.4. Level End Riller Rail and slide Joining Biscuit to join the End Filler Rail to the Fixture Rail.5. Secure the Wall Interface Biscuit to the wall with screw (by others).
Step 1:End Plate
Step 2:Filler Rail
© 2014 Pinnacle Architectural Lighting
November 2014
MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.
Wall Interface Biscuit
End Filler Rail Piece
Joining Biscuit
OUTLINEEnd Filler Installation Instructions
8 o
f 19
Designed and Fabricated in Denver Colorado Phone: 303.322.5570 www.pinnacle-ltg.com
EDGEE V O L U T I O N
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Do not assemble fixture together on ground and then install.
1. If electircal access is needed, trim End Filler Top Hat to needed length.2. Place Top Hat on top of fixture and butt up to wall.3. Attach top hat through slot using #8 screws provided. If Top Hat was trimmed, utilize Top Hat Bracket to attach Hot Hat to incoming fixture4. Screw Top Hat to wall (screws by others).
1. Optional End Trim used with grid, flanged, or spackle flange mounting options.2. Secure end trim using 3 screws (provided)
Step 3:Top Hat
Optional:End Trim
© 2014 Pinnacle Architectural Lighting
November 2014
MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.
#8 Screws (Provided)
End Filler Top Hat
Top HatBracket
Break tab off when using shallow configuration
OUTLINEEnd Filler Installation Instructions
9 o
f 19
Designed and Fabricated in Denver Colorado Phone: 303.322.5570 www.pinnacle-ltg.com
EDGEE V O L U T I O N
EDGE Evolution Outline OUTSIDE CORNERINSTALLATION
Left Fixture
Right FixtureTop Hat BracketsPart # K-EL-002
Part # K-WGC-XX
Part # K-EL-001
Part # K-WGC-XXPart # E-EL-001 for LeftPart # E-EL-002 for Right
Part # H-EL-003 Part # H-EL-004
Top Hats
Left Mitered Rail
Right Mitered Rail
Corner Joining Biscuit
End Plates
Outside corner min. distance: 0”Outside corner max. distance: 9-1/2”
© 2014 Pinnacle Architectural Lighting
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.
Unit Breakdown
For incoming rows see EVL installation instructions
MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.
October 2014
OUTLINEOutside Corner Installation Instructions
11 o
f 19
Designed and Fabricated in Denver Colorado Phone: 303.322.5570 www.pinnacle-ltg.com
EDGEE V O L U T I O N
© 2014 Pinnacle Architectural Lighting
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.
1. Measure the above noted distances to determine the length of each flange piece.2. Cut the Mitered Rails and the End Plates to fit the measurements.
1. Install End Plates using supplied nuts inside of fixture. 2 nuts per End Plate.
Step 1:Prepping The Flange Pieces
Step 2:End Plates
MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.
Wall
Measure this distance for Mitered Right Rail & Right End Plate
Measure this distance for Mitered Left Rail & Left End Plate
End Plates
October 2014
OUTLINEOutside Corner Installation Instructions
12 o
f 19
Designed and Fabricated in Denver Colorado Phone: 303.322.5570 www.pinnacle-ltg.com
EDGEE V O L U T I O N
© 2014 Pinnacle Architectural Lighting
October 2014
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.
1. Secure top hat(s) to housing though slot using provided #8 screws2.If screw location is not available trim Top Hat to reveal holes. And use Top Hat Bracket to attach Top Hat to fixture.
1. Using the Rail pieces cut in Step 1 and the corner joining biscuit, you will have the corner Rail piece. 2. Attach the corner Rail piece with the supplied joining biscuits.3. If using the EVL fixture (5-1/4” tall) add double sided tape to the tabs on the top hats. If using EVLS fixture (4-1/4” tall) remove the tabs.
Step 3:Top Hats and Top Hat Brackets
Step 4:Corner Flange Pieces
MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.
Top Hats
Top Hat Bracket
Tabs
OUTLINEOutside Corner Installation Instructions
13 o
f 19
Designed and Fabricated in Denver Colorado Phone: 303.322.5570 www.pinnacle-ltg.com
EDGEE V O L U T I O N
EDGE Evolution Outline ILLUMINATED INSIDE CORNER INSTALLATION
8-32 Flanged Nuts (x4)
Left Top Hat (H-EL-008)
Top Hat Holder (K-EL-002)
Left End Plate (E-EL-017)
Left Mitered Rail
Incoming Left Fixture
Inside Corner Light Engine Assembly Left Inside Corner Light Engine Assembly Right
Incoming Right Fixture
Right Mitered Rail
Right End Plate (E-EL-016)
Right Top Hat (H-EL-007)
Leads for LED boardLeads for LED board
© 2015 Pinnacle Architectural Lighting
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.
Unit Breakdown
For incoming rows see EVL installation instructions
MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.
May 2015
OUTLINEInside Corner Installation InstructionsEDGE
E V O L U T I O N
Note: Incoming fixtures are specific to corner and contain an extra driver. See submittal for more information.
Designed and Fabricated in Denver Colorado Phone: 303.322.5570 www.pinnacle-ltg.com
15 o
f 19
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.
1. Install the Left Top Hat over the top of the left side of incoming fixture.(Note: The Top Hat might need to be cut to allow access to electrical cover.)2. If Top Hat is cut, install using Top Hat Holder.3. Top Hat or Top Hat Holder installs with two (2) #8 Screws (provided)
1. Before installing the Corner Light Engine Assembly, measure back to the beginning of the incoming fixture. Use this measurement, trim fold over tab to expose LED diodes up into the corner.2. Installing the Corner Light Engine Assembly is done by attaching the assembly to the inside of the Top Hat using two (2) #8 Flanged Nuts (provided)
Step 1:Left Top Hat
Step 2:Getting Light in Your Corner
MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.
May 2015
OUTLINEInside Corner Installation InstructionsEDGE
E V O L U T I O N
Left Top Hat (H-EL-008)
Top Hat Holder (K-EL-002) Fold over tab
Inside Corner Light Engine Assembly Left
Leads for LED board
© 2015 Pinnacle Architectural Lighting
Designed and Fabricated in Denver Colorado Phone: 303.322.5570 www.pinnacle-ltg.com
16 o
f 19
May 2015
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.
1.Once the Top Hat and the Light Engine Assembly is installed you can install the End Plate.2. From inside the corner slide End Plate into place, Pems will go through two (2) holes in end of fixture.
Step 3:End Trim
Step 4:Right Top Hat
MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.
OUTLINEInside Corner Installation InstructionsEDGE
E V O L U T I O N
Right Top Hat (H-EL-007)
Left End Plate (E-EL-017)
© 2015 Pinnacle Architectural Lighting
1. Install the Right Top Hat over the top of the right side of incoming fixture.(Note: The Top Hat might need to be cut to allow access to electrical cover.)2. If Top Hat is cut install using Top Hat Holder.3. Top Hat or Top Hat Holder installs with two (2) #8 Screws (provided)
Designed and Fabricated in Denver Colorado Phone: 303.322.5570 www.pinnacle-ltg.com
17 o
f 19
May 2015
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.
MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.
OUTLINEInside Corner Installation InstructionsEDGE
E V O L U T I O N
Fold over tabRight End Plate (E-EL-016)
Leads for LED board
© 2015 Pinnacle Architectural Lighting
1. Before installing the Corner Light Engine Assembly, measure back to the begin-ning of the incoming fixture. Use this measurement, trim fold over tab to expose LED diodes up into the corner.2. Installing the Corner Light Engine Assembly is done by attaching the assembly to the inside of the Top Hat using two (2) #8 Flanged Nuts (provided)
Step 5:Getting Light in Your Corner
1.Once the Top Hat and the Light Engine Assembly are installed, you can install the End Plate.2. From inside the corner, slide End Plate into place, pems will go through two (2) holes in end of fixture.
Step 6:End Trim
Designed and Fabricated in Denver Colorado Phone: 303.322.5570 www.pinnacle-ltg.com
18 o
f 19
19 o
f 19
May 2015
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.
1. Cover the low voltage leads coming from the Light Engine Assemblies using the provided white shielding.2. Run the shielded leads through the top of the Top Hat and back to the corresponding fixture as called out in the submittal.3. Make electrical connections inside fixture using provided quick disconnect.
1. Measure and cut provided Mitered Rails to fit into corner. 2. Attach rails together using provided Corner Joining Biscuit.3. Slide Joining Biscuits (one each) into the outside ends of each side of corner rails.4. Insert corner rails into corner and slide Joining Biscuits into place between corner rails and fixture rails.
Step 7:Powering the Corner
Step 8:Corner Flange Pieces
MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.
OUTLINEInside Corner Installation InstructionsEDGE
E V O L U T I O N
Right Mitered RailLeft Mitered Rail
Corner Biscuit
Joining Biscuits
© 2015 Pinnacle Architectural Lighting
Designed and Fabricated in Denver Colorado Phone: 303.322.5570 www.pinnacle-ltg.com