23
US Army Corps of Engineers ® Engineer Research and Development Center Economic Effects on Construction of Uncertainty in Test Methods Toy Poole U.S. Army Corps of Engineers August 2005

Economic Effects on Construction of Uncertainty in Test

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

Economic Effects onConstruction of Uncertainty in

Test MethodsToy Poole

U.S. Army Corps of EngineersAugust 2005

Page 2: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

Selected Examples

• CRD-C 114 - F/T dur of aggregates• ASTM C 78 – flex beam• ASR testing• Curing compound testing• Heat of hydration testing

Page 3: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

Test Method Uncertainty

• Within-laboratory variation– Operator– Equipment

• Between-laboratory variation• Simple bias• Material-dependent bias

Page 4: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

ASTM

• Requires precision and bias statement– Within laboratory - repeatability– Between laboratory – reproducibility

• d2s – based on std dev• d2s% - based on CV

Page 5: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

d2s

• Maximum difference among a set ofdeterminations in 95% of cases

• For duplicate determinations,– d2s = 2.8*s, or 2.8*CV

• For triplicate determinations,– d2s = 3.3*s, or 3.3*CV

• Multipliers for larger sets in ASTM C670

Page 6: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

Example – ASTM C 138Density of Concrete

• Within-lab std dev = 0.65 lb/ft3– d2s (n=2) = 1.85 lb/ft3

– d2s (n=3) = 2.15 lb/ft3

• Between-lab std dev = 0.82 lb/ft3– d2s (n=2) = 2.31 lb/ft3

Page 7: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

CRD-C 114Durability of Aggregates to Cycles of

Freezing and Thawing• Acceptance testing of concrete aggregate• Based on ASTM C 666

– Air-entrained concrete– Results reported as a Durability Factor 0 – 100%– 100% Specifications typically 50 – 75%

• No reported precision estimate

Page 8: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

CRD-C 114Durability of Aggregates to Cycles of

Freezing and Thawing• Significant between-

laboratorydisagreements

• Changes in use ofdurability factorspecifications

Page 9: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

Mather 1954

DFE

0

20

40

60

80

100

SAD SPD MRD NPD ORD WES SWD

Laboratory

Dur

abili

ty F

acto

r, %

Page 10: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

Precision CRD-C 114

• Standard deviation among labs– 19.3%

• d2s among labs– 54%

Page 11: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

Economic Consequences ofRejection

• Hauling distance to secondary source• 10 mi of 4 lane highway

– 120,000 yd3 of concrete at $0.15/ton/mi– 25 mi haul = $450,000– 50 mi haul = $900,000

Page 12: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

ASTM C 78Flexural Strength

• Basis foracceptance of mixdesign

• CV = 7% betweenlaboratory

• At 650 psi– d2s ~ 125 psi

Page 13: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

Economic Consequences

• Delays over mixture acceptance• Add extra 100 lb/yd3 to insure

compliance• 10 mi of 4 Lane• ~$1,000,000 in cement cost

Page 14: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

AAR

Page 15: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

ASTM C 150 – Low Alkali

Alkali Content of Cement, % (as Na2O)

0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0

Expa

nsio

n, %

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0error bars = std. dev. among 6 aggregates

Page 16: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

ASR Testing

Mortar (C 1260), % dL

0.0 0.1 0.2 0.3 0.4

Con

cret

e (C

129

3), %

dL

0.00

0.05

0.10

0.15

0.20

0.25

0.30

Page 17: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

AAR Cost Factors

• Rejection of acceptable aggregate– Short term $$

• Acceptance of inadequate aggregate– Long term $$

Page 18: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

ASTM C 156 – TM for CuringCompounds

Page 19: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

ASTM C 156

• Typical limit: 0.55 kg/m2

• Typical production: 0.45 - 50 kg/m2

• Between Lab Std dev = 0.07 kg/m2

• Between Lab d2s = 0.20 kg/m2

Error > Safety Margin!!

Page 20: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

C 156 Cost Factors

• User – producer disputes• Over conservative specification

– High solids materials– Difficult to apply

• May not perform• Little testing by Federal Gov’t

Page 21: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

ASTM C 186Heat of Hydration of Hydraulic Cement

Page 22: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

ASTM C 186Heat of Hydration of Hydraulic Cement

• Between Lab std dev = 4 cal/g• d2s = 11 cal/g• Represents ~1,000 psi strength difference• Target strength = 1500 psi, 3 days• Specification limit = 1000 psi, 3 days

Page 23: Economic Effects on Construction of Uncertainty in Test

US Army Corpsof Engineers® Engineer Research and Development Center

Cost Issues

• Uniformity in Strength Gain– Weekly variation ~1,000 psi

• Uncertainty in Form Removal