16
First Increment of the G-3273 and S-356 Pump Station Field Test for Operation of the Modified Water Deliveries Project: Ecological Monitoring Update David Rudnick, Joffre Castro, Dilip Shinde, Agnes McLean, Jed Redwine, Everglades National Park Len Scinto, Florida International University Christa Zwieg, South Florida Water Management District First Quarterly Project Delivery Team Meeting January 26, 2016

Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

First Increment of the G-3273 and S-356 Pump Station Field Test for Operation

of the Modified Water Deliveries Project: Ecological Monitoring Update

David Rudnick, Joffre Castro, Dilip Shinde, Agnes McLean, Jed Redwine, Everglades National Park

Len Scinto, Florida International University Christa Zwieg, South Florida Water Management District

First Quarterly Project Delivery Team Meeting January 26, 2016

Page 2: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

Ecological Monitoring Goals and Objectives Overarching goal Assess restoration successes and problems, contributing to adaptive management process

Short-term Objectives (for 1st and 2nd Increments, but pertain to future projects and ops) 1. Quantify and assess effects of tests on: Nutrient inputs, legacy accumulations, transport into un-impacted marsh Ecosystem restoration indicators, including

• hydropatterns • periphyton • soil condition (accretion) • plant community structure and biomass • prey base (fish and invertebrates) • wading birds and alligators

Threatened and endangered species Invasive exotic species Downstream salinity (with S-197 operations)

2. Improve “baseline” documentation and understanding for long-term assessment

3. Provide ecological information supporting water control plan development and implementation

Page 3: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

Monitoring Design Near-canal transects to quantify changes in areas with sharp

environmental gradients (notably to track legacy phosphorus);

Broad-scale sentinel sites (fixed stations) distributed across the marsh sufficient to assess changes in ecological zones and identify management influences;

Broad-scale, fine resolution mapping vegetation via remote sensing.

Monitoring Strategy Maximize use of established ecological indicators

Maximize use of existing stations with data collection history

Priority on rapid response metrics and rapid reporting for test period assessment

Include critical, slower response metrics (plant habitat, soils) to assess long-term change with MWD-TTNS-CEPP implementation

Page 4: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

• Sentinel monitoring site(sampled 2006-2008, 2012)

/14 Sentinel monitoring site(sampled2012)

l=:::I Near- canal transects

• Culverts

Water control structures

- Canals

Ecological Monitoring Site Locations

Page 5: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

Progress

Execution of 5 year ENP cooperative agreement with SFWMD, supporting water quality analysis, near-canal ecological assessment (flow and vegetation, hydrologic modeling support; S. Scully, SFWMD lead)

Execution of 5 year ENP task agreement with FIU for downstream ecological monitoring, assessment, reporting (L. Scinto, FIU lead)

ENP permits issued to SFWMD and FIU for field sampling planned in above agreements

Dye tracer studies of flow from L-29 into NESRS conducted in Oct and Nov at 3 sites to establish the direction of near-canal sampling transects . Result: established north-south orientation for all transects.

Completed “wet season” sampling of NESRS sites (near canal transects and sentinel sites) by FIU cooperators (Nov 16 – Dec 16)

Page 6: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

Near-Canal Transect Locations in Northeast Shark River Slough (near 1-mile bridge)

Page 7: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

Near-Canal Transect Locations in Northeast Shark River Slough (near future 2.6-mile bridge)

Page 8: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

SFWMD Fluorescein Dye Test at Tamiami Canal Culvert (October 2015)

From: C. Zweig and J. Redwine

Page 9: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

SFWMD Fluorescein Dye Test at Tamiami Canal Culvert (October 9, 2015)

Star: dye release location Red dots: aerial photo position Blue dots: photos with dye observed

Page 10: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

SFWMD Fluorescein Dye Test at Tamiami Canal Culvert (October 15, 2015)

Star: dye release location Red dots: aerial photo position Blue dots: photos with dye observed

Page 11: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

SFWMD Fluorescein Dye Test at Tamiami Canal Culvert (western edge of 1-mile bridge; November 13, 2015)

Stars: two dye release locations Yellow dots: aerial photo position Blue dots: photos with dye observed

Page 12: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

' ' '\ ' '\ ' '\ ' '\ ' '\ ..__ ....... "\\

I

' ' '

~ \ \

t -JI' ...... \,.

~

a5eis a5eJa/\'lf £~oz: Jaqwaidas a5eis a5rua/\'lf g ~oz: '~ £-v ~ Jaqopo ....-

Initial Flow Direction During S-356 Pump Test Compared to High Water Month, Estimated from EDEN

From: Troy Mullins

Page 13: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

\,

\, \,

Stage Levels Only

-+ October 14-31 2015Average Stage

September 2013 Average Stage scale= 1 :18,500

source of stage data = EDEN

Initial Flow Direction During S-356 Pump Test Compared to High Water Month, Estimated from EDEN

From: Troy Mullins

Page 14: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

SOUTH F LORI D A WATER MANAGEMEN T D I STRICT

~wflllJ !ill~ rJi] ~ ; . ~ 'i131!.J.l'a ~iT1J 'IrllJJ.rJJ) ~-J~-Y ; aJ3iJ:::Ja

1800

1600

1400

1200

1000

800

600

400

200

0

5197 [)ai ly Fllow ~

arrows indicate mapping dates

cfs )

12/1/2015 12/9/2015 12/17/2015 12/25/2015 1/2/2016

Page 15: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

Salinity

Salinity Distribution before and after December Rainfall event

From: C. Madden, S. Kelly, J. Stachelek (SFWMD)

Page 16: Ecological Monitoring Update - United States Army · 2016-02-01 · Broad-scale sentinel sites ... Progress Execution of 5 year ENP cooperative agreement with SFWMD, supporting water

Datasonde Deployment Locations in Manatee Bay

From S. Kelly, SFWMD