20

ECAL crate (front view)

  • Upload
    fancy

  • View
    24

  • Download
    0

Embed Size (px)

DESCRIPTION

ECAL crate (front view). TVB. TVB. L0DU. TRIG40 (tell40 structure). X 14. Selection board in barrack. TELL1 (1MHz). Actual Design. Upgrade – setup. Calorimeter detector. 20 bits @40Mhz Link = 4 copper wire Serial LVDS 280Mhz. Front-end boards. Optic Mezzanine - PowerPoint PPT Presentation

Citation preview

Page 1: ECAL crate (front view)
Page 2: ECAL crate (front view)

Upgrade: Calo Trigger Study [email protected]/20

ECAL crate (front view)

X 14

TVB TVB

Selection boardin barrack

TELL1(1MHz)

L0DU

TRIG40(tell40

structure)

Page 3: ECAL crate (front view)

Upgrade: Calo Trigger Study [email protected]/20

Calorimeterdetector

20 bits @40Mhz

Link =4 copper wire

Serial LVDS280Mhz

32 bits @40Mhz

Link =Optic fibre

1.6 Ghz

Front-end boards

Selection Board (SB)

Optic Mezzaninerubbon of 12 fiber

Trigger Validation Board (TVB)

To farm DAQ 1Mhz To L0DU

Actual Design

108x32 bits @40Mhz

Link =Optic fibre

~infiniband rateTo Be Define

1,6Ghz or 4,8Ghz or…

Tell 40 system with 1.6 GHZ inputs

To farm DAQ 40Mhz To SuperODIN(LLT)

Upgrade – setup

Page 4: ECAL crate (front view)

Upgrade: Calo Trigger Study [email protected]/20

Previsionnal Tell40 designATCA board

ATCA mezzanine

Page 5: ECAL crate (front view)

Upgrade: Calo Trigger Study [email protected]/20

TELL40To replace SB

TELL40To replace LODU

Page 6: ECAL crate (front view)

Upgrade: Calo Trigger Study [email protected]/20

Page 7: ECAL crate (front view)

Upgrade: Calo Trigger Study [email protected]/20

Page 8: ECAL crate (front view)

Upgrade: Calo Trigger Study [email protected]/20

Page 9: ECAL crate (front view)

Upgrade: Calo Trigger Study [email protected]/20

Page 10: ECAL crate (front view)

Upgrade: Calo Trigger Study [email protected]/20

Other input by muons,

LLT_L0DU Firmware work: Clermont?

Page 11: ECAL crate (front view)

Upgrade: Calo Trigger Study [email protected]/20

2 TRIG40 = full Calo trigger upgrade

7000€

7000€

7000€

7000€

5000€

Total installation cost = 8 x 7000 + 2 x 5000 = 66 000 €

+ common ATCA Crate with SuperODIN

LLT_CALO Firmware work: Annecy ?(old bologna concept)

LLT_OUT_CALO Firmware work: Annecy ?(link with LLT_L0DU firmware)

Page 12: ECAL crate (front view)

Upgrade: Calo Trigger Study [email protected]/20

TELL40: Actual CPPM prototype in may 2011ATCA board

ATCA mezzanine

2 stratix4 instead 1 stratix5

1 microATCA crate+ commercial µ ATCA board

with specific board on

ATCA board with normal ATCA Crate

instead

Page 13: ECAL crate (front view)

Upgrade: Calo Trigger Study [email protected]/20

TELL40: CPPM schedule

Page 14: ECAL crate (front view)

ATCACrate

(15 slots)

Upgrade: Calo Trigger Study [email protected]/20

LAPP devellopment schedule

ATCAmanager board:

Commercial+

CCPM part

First prototype boardSummer of 2012

> CCPM (Marseille)

CCPM debugging

First board available for LAPP:

Proto: Spring of 2013

Page 15: ECAL crate (front view)

SmallATCACrate

(2 slots)

Commercial ATCA

Carrier board

Upgrade: Calo Trigger Study [email protected]/20

First possible LAPP devellopment setup

7000€

2000€

First cost = 20 000 €

Commercial ATCA

manager board

3500€3500€4000€

ComputerWith tools

Page 16: ECAL crate (front view)

Upgrade: Calo Trigger Study [email protected]/20

(Timeline from Pierluigi Campana - 27/6/2011)

LAPP Team previsionnal installation for Calorimeter Trigger upgrade

STARTElectronic work

END Electronic work

TRIG40Preliminary study

Page 17: ECAL crate (front view)

Upgrade: Calo Trigger Study [email protected]/20

Possible upgrade TVB

HCAL FPGAEPPI FPGA Available Inputs:• 8 RJ45 connector on backplane (8 bits@40Mz each) (= instead PSPD Pattern bus)• 8 ECAL total energy• 8 ECAL cluster energy• 8 ECAL cluster adress

Available Outputs:• 3 optical link (32bit@40Mhz each)

Remarks:•Devellpment tools from 2005 -> old in 2018…

Free space in EPPI FPGA TVBTo implement new functions

Page 18: ECAL crate (front view)

Slow-Control of FE crate – scheme1

Upgrade: Calo Trigger Study [email protected]/20

GBT

GBT-SCA

conv-SPECS

FSC40 board

clock-DRIVER

FE Backplane CRATE

Instead CROC

FEB&

TVB

FEB&

TVB

FEB&

TVB

FEB&

TVB

FEB&

TVB

FEB&

TVB

FEB&

TVB

FEB&

TVB

FEB&

TVB

FEB&

TVB

FEB&

TVB

FEB&

TVB

FEB&

TVB

FEB&

TVB

Page 19: ECAL crate (front view)

Slow-Control of FE crate – scheme2

Upgrade: Calo Trigger Study [email protected]/20

GBT

GBT-SCA

conv-SPECS

FSC40 board

clock-DRIVER

FE Backplane CRATE

Instead CROC

TVB TVB

GBT

DATAprocess

FEB

TELL40 board

Page 20: ECAL crate (front view)

New TVB

Slow-Control of FE crate – scheme3

Upgrade: Calo Trigger Study [email protected]/20

GBT

GBT-SCA

FSC40 board

FE Backplane CRATE

CROCSlotEMPTY

GBT

DATAprocess

FEB

TELL40 board

I2C

DATAprocess

GOL

clk

TRIG40 board