Upload
ikwan
View
213
Download
0
Embed Size (px)
Citation preview
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
1/35
Architecture Design
Portfolio
Vincent Murad2015
Design
Analysis
Concept
Tectonics
Space
Relationship
Function
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
2/35
Contact Info
Email : [email protected]: (248) 225-7304
Education
Skills
Lawrence Tech University
Oakland Community College
13 - Present
(IP)
2010 - 13
Bachelor Of Science in Architecture
Assoc iate in Applied Science in Architecture
Adobe Suites
Autodesk
Illustrator
Photoshop
Autocad
Revit
Miscellaneous
Rhinocero
Sketchup
Lumion
Hand-Work
Drafting
Rendering
Model Building
Sketching
Microsoft Suitesor
Excel
Powerpoint
Humans survive on three basic necessities - Food Water Shelter.Food and Water are supplied by nature, and Shelter is created.What we choose to do with these creations are left to us, basedon the analysis of our surroundings and the relationships of spaces; As well as the Code, Budget and Time Constraints.
01 Information Background
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
3/35
Table of Contents
Prairie Style Public Library
Toledo Museum of Art
Spring 2013
(OCC)
(LTU)
(OCC)
(LTU)
Fall 2013
Design Studio 2
Design Studio 3
Freelance Work Summer 2014
Super 8 Motel
Visual Communications 4 Spring 2014
Case Study
Building Systems Spring 2012
Construction Documents
Sketches Spring 2013
Still life
Digital Fabrication
02 Table of Contents
03
09
19
29
25
33
Intermediate Structures
(LTU)
Fall 2014
Case Study17
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
4/35
s a homage to one o the most proli ic American architects o the late 19th - early 20th century,this design exhibits all the characteristics o Frank Lloyd Wright’s prairie school : Long, horizontalines, windows grouped in horizontal bands, and hipped roo s with broad overhanging eaves. A loorplan that is designed to integrate with nature is ac complished by extending the spaces outto be as much surrounded by nature as possible.
Monterey, Californiapublic librar
Pra re Style
03 Monterey Public Library
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
5/35
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
6/35
AdultCafeChildrenLobby Teen
Staff MechanicalComputerNook Meeting Room Fab Lab Event Space
12345
6789101112
Program 2D Massing
Circulation
Legend
05 Monterey Public Library
143
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
7/35
Section A-1nts
1
4
3
9
9
8
5
7
6
7
First Levelnts
4
4
Third Levelnts
Second levelnts
10
11
12
6
06Monterey Public Library
1 A
Design Development
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
8/35
Design Proposal
South Elevationnts
07 Monterey Public Library
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
9/35
East Elevationnts
Design Proposal
08Monterey Public Library
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
10/35
09 TMOA
The design set forth aims to replace the Grove Plac e Studio site with a New, Four story Multi-use building witha strong connection to the existing Toledo Museum of Modern Art. The spaces and adjac encies planned out inthe design aims to distinguish public space from private space. The following design incorporates the use of proportion as well as Le Corbusier’s Five Points of Architec ture. In an effort to repate the proposed buildingwith the museum, a major component used in the design is the golden ratio. It is used as a homage to C lassicalGreek architecture, as the Neoclassical museum derived itself from a Greek revival.
Toledo, OhioMulti-use Pavilion
Toledo Museum of Art
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
11/35
Site Analysis
0 25050
Main Museum
Professional Arts Building
Center for the Visual Arts
Glass Pavilion
10 TMOA
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
12/35
Site Analysis Program
0 500100
Public
ClassroomsEvent Space
Materials ArchiveMaterials Storage
LaboratorieResidence
Administration
Private
Courtyard
ntrance LobbyHigh BayAuditorium
Gallery
TMOA Level 2
TMOA Level 1
11 TMOA
Lobby
High Bay
Courtyard
Event Space
Administration
Auditorium
High Bay
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
13/35
Golden Rectangle Ratio
In geometry, the golden rectangleis a ratio that has sides 1:1.618
This ratio has been used as a methodof proportion in the architecture worldfor over 2,000 years. It is believed tobe aesthetically pleasing.
12 TMOA
0
5
0 0
1 0 0
Materials Archive
Gallery
Event Space
Classrooms
Auditorium
High Bay Laboratory
Residence
1 : 1.618
Site Analysis Program
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
14/35
Second Levelnts
First Levelnts
13 TMOA
CourtyardLobbyHigh BayStaff Admin.Materials Storage
Materials ArchiveMechanicalEvent SpaceAuditorium Laboratory Gallery Space C lassrooms Housing
Terrace Flexible Space
12345
678910111213
1415
Legend
1
45
2
3
3
8
7 7
7
9
7
10
15
Design Development
D i D l t
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
15/35
Fourth Levelnts
Third Levelnts
Floor Plates
9
13 14
15
13
8
7 7
7 7
3
12
11
12 11
10
6
Design Development
41 TMOA
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
16/35
15 TMOA
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
17/35
16 TMOA
Case Study
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
18/35
M er Hu Partners p, LL
Structura Case Stu
56 W SuperoCase Study
17 turesntermed ate tru
3d Model
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
19/35
3d Model
A 1
18rmediate StructuresInte
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
20/35
In the wake of new ownership of a Super 8 Motel, I am commissioned to redesign the existing lobby in the fashionsuited to the new owners. In first meeting the client, I asked what was the program needed in the redesign of theproposal. A larger cafe, private managerial office, and improved visibility and circulation within the lobby inin terms of both the customer and the clerk. After considering the program, aesthetics was discussed as amajor factor in the renovation. The client requested the use of various materials to create a setting of higher
standards for the business.
1343 S Center Rd
Flint Township, MI 4508
uper Mote
19 Super 8
Program Existing Conditions
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
21/35
20Super 8First Level Plan
Program Existing Conditions
After meeting with and understandingthe needs of the client, measurements weretaken through a traditional method of
Analogue to digital. In order to c reatethe drawings and proposal, I must firstget a sense of position in the program ona two dimensional scale.
Program Existing Conditions
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
22/35
g g
21 Super 8
1
5
6 7
8
94 2
3
1. Lo2. Clerk’s Desk 220 sq ft3. Clerk’s Office 50 sq ft
4. Cafe / Food 250 sq f 5. Ha way6. Ha way7. Staircase
8. Vend ng
9. Storage
Existing Lobby Plan
Disconnected
Connected
Affinity
41
2
3
5
6
7
89
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
23/35
Program Design Development
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
24/35
23 Super 8
1. Lo y2. Clerk’s Desk 160 sq3. Manager’s Office 325 sq f
4. Computer Stat on5. Lounge Seating6. Staircase7. Ca e / Food 516 sq t
8. Restroom
9. Foo Storage
10. Vend ng
1
6
8
9 5
4
37
10
2
Proposed Lobby Plan
Disconnected
Connected
Affinity
71
2
35
10
6 4
8 9
Design Proposal
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
25/35
24Super 8
Site Development
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
26/35
25 Building Systems
Site Development
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
27/35
26Building Systems
This course introduces the student to designissues for good site planning process principlesand methods. The course addresses the issuesrelated to site engineering such as grading,drainage, circulation, road alignment, and
overall organizational concepts relative to agiven site. The course content also includes anunderstanding of zoning, variances, easementsand ordinances.Site design and accessibilitywere the main focus for the surrounding project.
This course provides the foundationalinformation for producing quality construction
documents for light wood frame residentialconstruction. The student will be introduced tothe development, composition, and applicationof various building materials. Specific materialsthat will be addressed include wood, masonry,and concrete. Topics include residentialconstruction principles, wood frame detailing,footings, foundations, and electrical planconcepts and their relationship to wood frameconstruction, circulation methods, as well as
geographical, c limatic and safety issues.
Construction Documents
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
28/35
27 Building Systems
Construction Documents
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
29/35
28Building Systems
Case Study
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
30/35
29 Vis Comm 4
Milwaukee Art MuseumSantiago Calatrava
In analysis of this notable work, the primary formal characteristics are reducedto abstraction in the form of diagrams of the building in plan and section.
Case Study
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
31/35
30Vis Comm 4
A b s t r a c t i o n
Changing Exhibition Gallery
Gift Shop
West Corridor
East Gallery / Paid Space
Auditorium
Reception Hall
Main Lobby
Bridge
Milwaukee War Memorial
Plan & Level of Galleries
Parking Spaces
Garage Lobby
Garage Lobby
Mechanical Space
Restaurant
Loading Dock
Flexible / Hallway Space
Milwaukee War Memorial
Plan & Level of Garage
Meeting Spaces
N
N
Direct AmbientLIGHT
Near FarVIEW N
PrivateSemi-PrivatePublic
Transverse Section Main Level
Tubular SteelGlassWhite Concrete (CIP)Glass/Steel Brise Soleil
Material Use
Digital Fabrication
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
32/35
31 Vis Comm 4
Horizontal Roughing
Time(minutes)
Parallel Finishing
0
10
20
30
40
50
60
70
80
Digital Fabrication
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
33/35
32Vis Comm 4
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
34/35
33 Sketches
8/19/2019 ec8a5e87-bc7f-48be-9907-a6c03b4d0f5d-150117144137-conversion-gate01
35/35
34Sketches