EC PROJECTS. BACKGROUND, STRATEGY AND RESULTS. UNICA - EC PROJECTS. PROJECTS. Information Project on Higher Education Reform II: Lisbon Strategy and Bologna Process Tempus IV: Promotion of European Higher: Education Reforms in the Tempus countries - PowerPoint PPT Presentation

Citation preview

Page 1: EC PROJECTS

UNICA - EC PROJECTS

EC PROJECTS

BACKGROUND, STRATEGY AND RESULTS

Page 2: EC PROJECTS

UNICA - EC PROJECTS

PROJECTS

• Information Project on Higher Education Reform II: Lisbon Strategy and Bologna Process

• Tempus IV: Promotion of European Higher: Education Reforms in the Tempus countries

• Tempus Joint European Project: PRIUM PRomoting a Model of Integrated University in the FYR of Macedonia

Page 3: EC PROJECTS

UNICA - EC PROJECTS

HE Reform II: Details• Contract Period: 06.12.07– 05.12.08• Budget: € 277,000 (UNICA € 58,400)• Consortium members: UNICA-BES-

ACA• Main objectives:

– Assisting National Bologna Experts through materials, case studies and two training seminars.

– Virtual Community of Bologna Experts.

project
Page 4: EC PROJECTS

UNICA - EC PROJECTS

HE Reform II: Seminars

Two training seminars:1. ‘Universities and Lifelong Learning: Opening up for the

Knowledge Society’ University of Vienna, 25-26thMarch, 200880 participantshttp://vienna2008.bolognapromoters.net/

2. ‘European Qualifications Framework, Learning Outcomes and Labels for ECTS and Diploma Supplement’ Universidad Complutense de Madrid, 30thJune -1stJuly, 2008130 participants http://madrid2008.bolognapromoters.net/

Page 5: EC PROJECTS

UNICA - EC PROJECTS

HE Reform II: Seminars

Page 6: EC PROJECTS

UNICA - EC PROJECTS

HE Reform II: Seminars’ evaluations

Vienna and Madrid training seminars: Statistics

Page 7: EC PROJECTS

UNICA - EC PROJECTS

HE Reform II: Next steps

• Awarness-raising about the Bologna Process amongst stakeholders in the 27 EU Member States, the EEA countries and one Candidate Country

• Development and dissemination of the Virtual Community as a main information and communication platform for Bologna Experts

• Materials – Publication of 10 papers on the Bologna objectives 2010– Development of the EC HE Reform website – Brochures and casebooks on Bologna Process objectives

• Contract renewal with the EC

Page 8: EC PROJECTS

UNICA - EC PROJECTS

TEMPUS IV: Details

• Contract Period: 20.12. 2007 – 19.12. 2008 • Budget: € 140,000 (UNICA € 51,700)• Consortium members: UNICA-BES• Main objectives:

– Raising awareness about EU Higher Education policies and modernisation process,

– Promoting convergent reforms in the Tempus partner countries

– Integration of Tempus Experts into the Virtual Community of Bologna Experts.

Page 9: EC PROJECTS

UNICA - EC PROJECTS

TEMPUS IV: Seminars

Two training seminars:1. ‘Contribution of the Bologna Process: Principles and

Instruments’ Vrije Universiteit Brussel,14-15thApril, 2008

40 participants

http://brussels2008.bolognapromoters.net/

2. ‘Promoting Higher Education Reforms: Quality through Modernisation of Universities’ University of Zagreb, 16-17thJune, 2008

70 participants

http://zagreb2008.bolognapromoters.net/

Page 10: EC PROJECTS

UNICA - EC PROJECTS

TEMPUS IV: Seminars

Page 11: EC PROJECTS

UNICA - EC PROJECTS

TEMPUS IV: Seminars’ evaluations

Brussels and Zagreb training seminars: Statistics

Page 12: EC PROJECTS

UNICA - EC PROJECTS

TEMPUS IV: Next steps

• Provision and dissemination of updated information about EU Higher Education Policies

• Thematic support to the Higher Education Reform Experts (HERE)

• Support National Tempus Offices on the organization of events

• Maintenance of mechanisms of information, communication & coordination

• Integration of Tempus HERE in the Virtual Community of Bologna Experts

Page 13: EC PROJECTS

UNICA - EC PROJECTS

Challenges of both projects

• Late signature of the contracts and subsequent time pressure;• Heavy workload concentrated on this first part of the contracts period; • Difficulties to schedule seminar dates at such short notice;• Finding trainers and speakers available at short notice and preparing them; • Short notice for invitations, in some cases visa issue problems, and

subsequent lower number of participants;• Little time to gather presentations and prepare seminar documents;• The UNICA Secretariat was moved twice in 2007-2008;• Creation of a new position.

Given the circumstances, UNICA has managed to organise four successful seminars. Indeed, the evaluations sent back to the UNICA Secretariat

are mainly positive as previously depicted in the graphics. The proposal of contract renewal states the EC perception of the work done.

Page 14: EC PROJECTS

UNICA - EC PROJECTS

TEMPUS JEP - PRIUM

• Contract Period: 01.10. 2007 – 01.10. 2009• Budget: € 209,045 (UNICA € 13,215) • Consortium members: UNICA

(coordinator)- Ss. Cyril & Methodius University in Skopje- St. Kliment Ohridski University in Bitola- University of Vienna- Vrije Universiteit Brussel- Brussels Education Services

• Main objective: Promoting an Integrated Model of University in the FYR of Macedonia

Page 15: EC PROJECTS

UNICA - EC PROJECTS

TEMPUS JEP-PRIUM: Fields of Action

• University Governance and Financing Reform

• Strengthening of Strategic Management Capacities

• Strengthening of Central University Services

Each aspect is dealt by a specific team lead by academic experts from the 4 universities involved.

Page 16: EC PROJECTS

UNICA - EC PROJECTS

TEMPUS JEP-PRIUM: Work Packages

• WP 1: State of the Arts in Macedonian Universities in the three fields

– Kick-off in Skopje, 3rd March 2008– Meeting with the EC, 10-11th March 2008– Site visit University of Vienna, 29-30th May 2008– Site visit Vrije Universiteit Brussel, 9-10th September 2008

• WP 2: Exchange of Best Practice Seminar with the participation of different UNICA universities

Skopje,12-13th November 2008• WP 3: Drafting a new model structure • WP 4: Evaluation of the draft new model structure• WP 5: Information Sessions • WP 6: Proposal for an Integrated University Model in

FYRoM

Page 17: EC PROJECTS

UNICA - EC PROJECTS

TEMPUS JEP-PRIUM: Challenges

• Delay in the concession of the bank guarantee; • Subsequently the general start-up activities

were also held up;• Difficulties to schedule events dates at such

short notice;• A formal request for a modification of the

project’s eligibility period and the reasons for this request were sent to the EC on 10th December 2007;

• Eventual approval for the extension of the project’s eligibility period after the approval of the second interim report.

Page 18: EC PROJECTS

UNICA - EC PROJECTS

Erasmus Mundus Action IV

• Contract Period: Two years starting in November 2008• Budget: € 262,800 (UNICA to be calculated)• Consortium members: Coordinator UNICA

Formal partners:– Youth Agora– Erasmus Student Network (ESN)– ESN Tallinn– Tallinn University– University Pierre and Marie Curie– Asociación Orión, Network of Latin American, Caribbean and European Universities

and NGOs – Brussels Education ServicesNon-formal partners:– University of Vienna– University of Cyprus– University of Zagreb– Stockholm University– Sapienza University of Rome– ESN Rome ASE

Page 19: EC PROJECTS

UNICA - EC PROJECTS

Erasmus Mundus Action IV

Main objectives:– To develop a Mobility Information Platform that

provides the necessary information to access all opportunities of personal and professional growth offered by the study experience in the EHEA

– To make the mobility experience in the EHEA richer and more successful,

– To encourage more students from all over the world to study in the EHEA

– To strengthen cooperation between universities and students organizations.

Page 20: EC PROJECTS

UNICA - EC PROJECTS

EC ProjectsOutcomes for UNICA

• Increase visibility and credibility of the Network;• Driving force in the development of the Bologna

Process; • Face-to-face relations with the European

Commission and lobbying; • Integration of universities from Central and

Eastern Europe into the EHEA;• Support members in co-operative projects;• New UNICA staff for the projects’ management.

Page 21: EC PROJECTS

UNICA - EC PROJECTS

EC ProjectsUNICA Funding

Total funding EC projects 2008-2010– Approx. € 1.200,000– UNICA share approx. € 250,000 / 21%