EC DG-MOVE-B1Helmut Morsi – Deputy Head B1 & TENtec Team Leader
TEN Committee Meeting Brussels, 22 February 2010
TENtec Information System
The iReport Online Module
EUROPEANCOMMISSION
| 2Trans-European Networks for Transport
Overview
.Policy: current step implementing the Open Method of Coordination (OMC) .iReport within TENtec.Roadmap.The TENtec Team
.Demo of iReport
| 3Trans-European Networks for Transport
Policy: The Open Method of Coordination
The current step:.Moving iRep from offline to online.Using the TENtec Portal function.Improvement of co-operation MS – COM.Improving efficiency: Introducing virtual teams.Improving user friendliness: the TENtec data pre-fill feature.Further improvement of the data quality (offline -> online).Final iRep product: PP Progress Report 2010.Additionally: online availabitity of all data to MS, COM & TEN-T EA
| 4Trans-European Networks for Transport
TENtecDatabase
TENtecPortal
Interfacemodule
GIS
ePMS
TENtecDecisionmodule
TENteceSub
module
TENteciReportmodule
TENtecOMC
module
TENtecCOM Reporting
module
Internet
S-NET
COM TENTEA
Contributors
Public
On demandsynchronization
ECASauthentication
Applicants
TENtecSecuritymodule
Authorization
Other COMapplications
(e.g. CIRCA,ASR,SAP)
The TENtec Information System- Open Architecture: Common Frame & Individual Modules
TENtecPublic Reporting
module
On demandsynchronization
| 5Trans-European Networks for Transport
Assessing iReport
.External user roles: » The Validator (1 per ministry)» The Editor(s) (as many as needed per MS).Nomination of the validator.Nomination of the editor.Registration process for all external users» ECAS – general access to TENtec portal» iRep module – registration.Validation of data: the overall process
| 6Trans-European Networks for Transport
TENtec Private portal (online)
| 7Trans-European Networks for Transport
TENtec iReport module (online)
| 8Trans-European Networks for Transport
Roadmap – 2010 & beyond
. 12 Jan 2010 (TEN-T EA Workshop) – online eSub & offline eSub-2010 presented. 5 Feb – production level at Luxembourg data centre for modules eSub, iRep, ECAS, proposal/eval/decision plus all TENtec data. 22 Feb – start of TEN-T’s PP Progress Report 2010 exercise. 25 Feb – iRep opened for external access (no maps). Mid March – limited maps functionality. April/May – GIS server in production level (outside TENtec/dir B control). April - Public Portal (Acceptance level). June-Dec – Implementation Report 2006-2009 exercise (via OMC module). End May – Public Portal (Production level). 8 June 2010 - Saragossa Conference (TEN-T Days 2010 & Progress Report 2010 publication) . Aug-Nov - Integration of TEN-T EA special project manag. Modules: ASR & SAP. July-Dec Development of data bridge between DG-TREN and DG-REGIO. Future Upgrades 2011
» New bridges to other TEN-T stakeholders (indicative): European Investment Bank
» Upgrade of citizens outreach » Integration of other specialised module(s)
| 9Trans-European Networks for Transport
iReport Demonstration
.Online Demo of iRep by Sebastien Lim (Technical Coordinator).Hands-on experience in next pause (3 online laptops available – including guidance by TENtec team members)
| 10Trans-European Networks for Transport
Thank you for your attention!
. TENtec Team (European Commission DG-MOVE-B1: “TEN-T Policy, RTD Coord. & ERNP”):» Sorin Andrei (GIS developer), » Thomas Gascoigne (TENtec developer), » Mohammadi Laazzouzi (Content coordinator),
Sébastien Lim (Technical coordinator), » Helmut Morsi (Team leader)
. Further information:» Link for the TENtec Portal: see demo
» Link to DG Energy and Transport (EC DG-MOVE)http://ec.europa.eu/transport/index_en.htm
. TENtec Technical Help Desk (managed by EC DG-MOVE-B1):» Email : TREN [email protected] » Phone: +32 (0) 2 297 61 12