CPI – Concrete Plant International – 5 | 2014 www.cpi-worldwide.com 222 PRECAST CONCRETE ELEMENTS Shenyang Wanrong Modern Architecture Industry Co., Ltd. was established in 2011. The city of Shenyang has a holding of 45% in the company. In the years that followed the company implemented several large building projects within the context of the Chinese National Games 2013. Between 2012 and 2014 it built the Security Com- mand Centre with 30 floors and a total building area of 31,000 m² as well as the Nanke Plaza, a modern office building with 24 floors and 41,100 m². Both building projects consist of 70% precast concrete elements. In order to play a pilot role in the precast industry in Shenyang, Wanrong has set itself the goal of improving and automating the manufacture of precast concrete ele- ments. At the beginning of 2013 the com- pany signed a contract with Ebawe Anlagentechnik for the delivery and instal- lation of one of the most modern circulation plants in China. The scope of delivery includes a complete circulation plant with 75 pallets with a gross size of 14 x 3.80 m, a storage and retrieval machine and a dry- Ultra-modern circulation plant for the production of precast concrete elements in China EBAWE Anlagentechnik GmbH, 04838 Eilenburg, Germany In the last few years the topic of industrialisation in residential construction has gained strongly in importance in the People's Republic of China. 45 locations for industrialised residential construction, so-called ‘National Residential Industrialization Bases’ sponsored by the Ministry of Residential Construction, will be created in future in the country of 1.35 billion inhabitants. The city of Shenyang in the northeast of China is part of this sponsorship programme and thus a special case, since 42 of the 45 sponsored locations are companies. The city of Shenyang has 8.3 million inhabitants and has been shaped exclusively by industry for 80 years. Due to the climatic conditions in Shenyang – the temperature can fall below -30 °C in winter – as well as increasing awareness of the need for environmental protection, the technol- ogy of the precast concrete construction method is particularly suitable for this city and is to be driven forward. M-System Evolution fully automatic mesh welding plant for the just-in-time production of the reinforcement meshes Magnetic crossbeam for the automatic placement of the manufactured reinforcement meshes into the prepared pallets Industrial workshop at Wanrong with a total size of 22,000 m² and a site of 70,000 m² Form Master formwork robot from progress Maschinen & Automation for precise setting of the formwork on the formwork surfaces of the pallets

EBAWE Anlagentechnik GmbH, 04838 Eilenburg, · PDF file · 2017-11-0975 pallets with a gross size of 14 x 3.80 m, a storage and retrieval machine and a dry- ... With the aid of the

Embed Size (px)

Citation preview

Page 1: EBAWE Anlagentechnik GmbH, 04838 Eilenburg, · PDF file · 2017-11-0975 pallets with a gross size of 14 x 3.80 m, a storage and retrieval machine and a dry- ... With the aid of the

CPI – Concrete Plant International – 5 | 2014 www.cpi-worldwide.com222

PRECAST CONCRETE ELEMENTS

Shenyang Wanrong Modern ArchitectureIndustry Co., Ltd. was established in 2011.The city of Shenyang has a holding of 45%in the company. In the years that followedthe company implemented several largebuilding projects within the context of theChinese National Games 2013. Between2012 and 2014 it built the Security Com -mand Centre with 30 floors and a total

building area of 31,000 m² as well as theNanke Plaza, a modern office building with24 floors and 41,100 m². Both buildingprojects consist of 70% precast concreteelements.

In order to play a pilot role in the precastindustry in Shenyang, Wanrong has setitself the goal of improving and automating

the manufacture of precast concrete ele-ments. At the beginning of 2013 the com-pany signed a contract with EbaweAnlagentechnik for the delivery and instal-lation of one of the most modern circulationplants in China. The scope of deliveryincludes a complete circulation plant with75 pallets with a gross size of 14 x 3.80 m,a storage and retrieval machine and a dry-

Ultra-modern circulation plant for the production of precast concrete elements in China

EBAWE Anlagentechnik GmbH, 04838 Eilenburg, Germany

In the last few years the topic of industrialisation in residential construction has gained strongly in importance in the People's Republic ofChina. 45 locations for industrialised residential construction, so-called ‘National Residential Industrialization Bases’ sponsored by theMinistry of Residential Construction, will be created in future in the country of 1.35 billion inhabitants. The city of Shenyang in the northeastof China is part of this sponsorship programme and thus a special case, since 42 of the 45 sponsored locations are companies. The city ofShenyang has 8.3 million inhabitants and has been shaped exclusively by industry for 80 years. Due to the climatic conditions in Shenyang– the temperature can fall below -30 °C in winter – as well as increasing awareness of the need for environmental protection, the technol-ogy of the precast concrete construction method is particularly suitable for this city and is to be driven forward.

M-System Evolution fully automatic mesh welding plant for the just-in-time production of the reinforcement meshes

Magnetic crossbeam for the automatic placement of the manufactured reinforcement meshes into the prepared pallets

Industrial workshop at Wanrong with a total size of 22,000 m² anda site of 70,000 m²

Form Master formwork robot from progress Maschinen &Automation for precise setting of the formwork on the formwork surfaces of the pallets

06b-Fertigteile_208-243_en_Layout 1 03.09.14 13:39 Seite 222

Page 2: EBAWE Anlagentechnik GmbH, 04838 Eilenburg, · PDF file · 2017-11-0975 pallets with a gross size of 14 x 3.80 m, a storage and retrieval machine and a dry- ... With the aid of the

CPI – Concrete Plant International – 5 | 2014 www.cpi-worldwide.com224

PRECAST CONCRETE ELEMENTS

ing chamber with 14 levels, a shutteringrobot and a turning unit. The reinforcementmachines were supplied by progressMaschinen & Automation, Ebawe’s associ-ated company. These include a mesh weld-ing plant, an automatic machine for placingthe meshes in the pallet, a plant for the pro-

duction of lattice girders and a robot forplacing the lattice girders. With regard tosoftware the plant was equipped withebos® ‒ a total solution for work prepara-tion, production and process analysis. Bothenterprises – Ebawe Anlagentechnik andprogress Maschinen & Automation – be -

long to the Progress Group, which suc-ceeded with this order in gaining entry tothe Chinese market.The new circulation plant is designed forthe manufacture of the most diverse precastconcrete elements such as floor slabs aswell as double, sandwich and solid walls,

The new factory in Shenyang is equipped with different compactiondevices for the different possible element types.

The insertion robot places the manufactured lattice girders fully automatically into the pallet.

With the aid of the VGA 215 lattice girder welding machine the lattice girders are automatically produced in the required heightsand lengths

Concreting of the first solid wall with concrete distributor from Ebawe

The pallets are put into and taken out of storage automatically by thestorage and retrieval machine. The stacking rack offers space for amaximum of 70 pallets.

For the production of double walls a turning unit is available forturning the first shell into the freshly concreted second shell.

06b-Fertigteile_208-243_en_Layout 1 03.09.14 13:40 Seite 224

Page 3: EBAWE Anlagentechnik GmbH, 04838 Eilenburg, · PDF file · 2017-11-0975 pallets with a gross size of 14 x 3.80 m, a storage and retrieval machine and a dry- ... With the aid of the

CONCRETE VISION

www.ebawe.de

EBAWE designs, engineers and installscomplete production plants for the manufactureof the most varied precast concrete panels.We are the ideal partner for your projects –regardless of size and kind.

Visit our stand!

15.10. – 17.10.2014

Concrete Show

South East Asiawww.concreteshowseasia.com

Jakarta - Indonesia

06b-Fertigteile_208-243_en_Layout 1 03.09.14 13:40 Seite 225

Page 4: EBAWE Anlagentechnik GmbH, 04838 Eilenburg, · PDF file · 2017-11-0975 pallets with a gross size of 14 x 3.80 m, a storage and retrieval machine and a dry- ... With the aid of the

CPI – Concrete Plant International – 5 | 2014 www.cpi-worldwide.com226

PRECAST CONCRETE ELEMENTS

which are used for the erection of residen-tial complexes.Before the start of a new production cyclethe pallets pass through a stationary clean-ing unit for the cleaning of the formwork sur-

faces. The formwork itself passes through acorresponding facility for cleaning and oil-ing. It is subsequently transported back tothe formwork store by the storage robotand is ready for the next production cycle.

The combined plotter/formwork robotplaces the new elements on the formworksurface. The required reinforcement meshesare meanwhile produced just in time off thecoil by the fully automatic M-SystemEvolution mesh welding plant. This flexiblemachine manufactures meshes with a maxi-mum size of 10 x 4m, wherein each mesh iswelded individually according to CADspecifications. The welding robot has sixwelding heads that weld the meshes withdifferent cut-outs and in preset grid sizes.Once the meshes have been completelywelded, the longitudinal and transversebars are bent if necessary by a fully auto-matic mesh bending machine with a singlebending system. The reinforcement meshesare subsequently placed inside the pre-pared pallet by means of a magnetic cross-beam.

For the production of the lattice girdersWanrong uses a lattice girder weldingmachine of the type VGA 215, which pro-duces the required lattice girders just in timeand in the required lengths in its own works.A robot deposits the finished lattice girdersin an active and passive store. A fully auto-matic placing traverse then positions the lat-tice girders on the pallet.The pallets proceed to the next cycle sta-tion. Here the concrete is discharged by aconcrete distributor with a screw system.Both a horizontal compaction device andtwo combined compaction devices areavailable for the compaction of the dis-charged concrete.

The solid or sandwich wall elements aretrowelled up by a levelling beam after com-paction. Following pre-hardening of the ele-ments, their surfaces can be finelysmoothed with a power trowel if necessary.

The cured wall elements are brought into a vertical position by thetilting unit and removed. A mobile ladder facilitates the process.

The floor slabs are removed horizontally and transported to the outdoor storage area on transport frames by means of a run-offtruck with cross-driving car.

a.) ACADPrecast offers a universal three-dimensional program structureb.) Example of an automatically created production drawing with diverse views, includingdimensioning as well as a list of built-in components, a reinforcement list and bending drawings. ACADPrecast as well as all outputs (drawings, etc.) are available in Chinese.

06b-Fertigteile_208-243_en_Layout 1 03.09.14 13:40 Seite 226

Page 5: EBAWE Anlagentechnik GmbH, 04838 Eilenburg, · PDF file · 2017-11-0975 pallets with a gross size of 14 x 3.80 m, a storage and retrieval machine and a dry- ... With the aid of the

Pfnorstr. 10 | 64293 Darmstadt | GermanyFon +49 6151 7903-0

Fax +49 6151 [email protected]

CAD - Software for precast concrete parts

Highly automated 3D Design Software for AutoCADSolid walls Double wallsInsulating walls Sandwich wallsNEW: Prefabricated facades

Solid slabs Lattice girder slabsHollow core slabs Double T slabs

Straight stairs Winding stairs

Columns Beams

Hollowcore slab design by

Autodesk Revit Structure –

find more info on

www.cpi-worldwide.com CPI – Concrete Plant International – 5 | 2014

PRECAST CONCRETE ELEMENTS

With the manufactured wall and floor elements Wanrong erects multi-storey office and residential buildings for the Shenyang region. The column and beam construction method is used.

The pallets are moved for curing into thestacking rack, which consists of five towers,each with 14 levels, offers sufficient roomfor all pallets and is equipped with a heat-ing and ventilation system.

For the production of double walls, the fin-ished first shell is turned into the freshly con-creted second shell with the aid of a turningunit. After the finished elements have left thestacking rack, they are taken off the palletsand transported by a transport frame on arun-off truck into the outdoor storage area.A tilting unit with mobile ladder that can beovertaken is available for lifting the wallelements.

In addition to the reinforcement machinesintegrated in the circulation, progressMaschinen & Automation also delivered anautomatic stirrup bending machine from theEBA S 12 line, which produces stirrups forinternal and external orders. Wanrong alsoproduces curved ladders for the productionof lining segments for tunnel constructionwith the Tunnel Master, which is also part ofthe Progress Group’s scope of delivery. Likeall plants from the progress Maschinen &Automation product range, both plantsoperate directly off the coil.

The entire precast element production iscontrolled, monitored and optimised by the

06b-Fertigteile_208-243_en_Layout 1 03.09.14 13:40 Seite 227

Page 6: EBAWE Anlagentechnik GmbH, 04838 Eilenburg, · PDF file · 2017-11-0975 pallets with a gross size of 14 x 3.80 m, a storage and retrieval machine and a dry- ... With the aid of the

CPI – Concrete Plant International – 5 | 2014 www.cpi-worldwide.com228

PRECAST CONCRETE ELEMENTS

ebos universal control system developed bythe Progress Group. ebos offers a total solu-tion for work preparation, production andprocess analysis. Complex interface prob-lems are dispensed with and the employeescan carry out their entire work process in ahomogeneous, user-friendly system.

The generation and provision of the ele-ment data for ebos are done in the techni-cal office with the aid of the ACADPrecast

CAD program from IDAT GmbH. ACAD -Precast is a highly-specialised software andis based on the market-leading CAD pro-gram AutoCAD. It supports the technicalplanner in all necessary steps of the ele-ment definition and is directly connectedwith ebos via the CAD/CAM interface.The use of modern 3D technologiesreduces the element planning work to aminimum for the technical draughtsman.ACADPrecast provides extensive automa-tisms for the generation of geometry andreinforcement and creates all necessaryplans and drawings fully automatically.

A special module for the production of thedata for the mesh welding plant supportsthe user directly in the machine-compatiblepreparation of the mesh reinforcement foreach element. Furthermore, ACADPrecastdetermines all accounting-relevant datasuch as material quantities, etc. and trans-fers them to the customer’s internal account-ing program via an open data interface.

The ‘Third China (Shenyang) InternationalModern Architecture Exposition’ took placefrom 15 to 18 May 2014, at the same timeas the opening ceremony of the new facto-ry. Over these 4 days alone over 1,000 vis-itors came from all over China to inspectWanrong’s modern precast element pro-duction. In the process, the Ministry ofResidential Construction conferred the titleof ‘National Residential IndustrializationBase’ on Wanrong and at the same timethe city of Shenyang gained some prestigeas it was awarded the title ‘NationalExemplary City of Residential Industrializa -tion’. �

FURTHER INFORMATION

Shenyang Wanrong Modern Architecture Industry Co., Ltd.No. 677 South Shengli Street110179 Shenyang, ChinaT +86 24-23776666F +86 [email protected]

EBAWE Anlagentechnik GmbHDübener Landstraße 5804838 Eilenburg, GermanyT +49 3423 6650F +49 3423 [email protected]

Progress Maschinen & Automation AGJulius-Durst-Straße 10039042 Brixen, ItalyTel. +39 0472 979100Fax +39 0472 [email protected]

IDAT GmbHPfnorstr. 1064293 Darmstadt, GermanyT +49 6151 79030F +49 6151 [email protected]

For the Chinese National Games, Wanrong built the Security Command Centre in Shenyangwith 30 floors and a precast concrete element area of 31,000 m².

Here is an example of a modern officebuilding with 24 floors and a total builtarea of 41,100 m²

06b-Fertigteile_208-243_en_Layout 1 03.09.14 13:40 Seite 228