Sponsored by: Presented by:
C/VLM Working Group
Easy C/VLM Cost
Justification:
Calculate the true
cost and ROI of
carousels and
vertical lifts
Horizontal Carousel
Vertical
Carousel
Vertical Lift
Module
Easy C/VLM Cost Justification:
You know that using space and resources more efficiently will improve your operations and lower your costs.
An automated carousel or vertical lift module may be the ideal system for you.
C/VLM Equipment “Benefit Zone”
• Short term, dynamic storage.
• Highly accurate item location.
• Enhanced security.
• Small to medium article sizes.
• Individual lots.
Easy C/VLM Cost Justification:
How do you justify the cost of the capital equipment that will
allow you to achieve those goals ?
Calculate R. O. I. (Return on Investment)
Gain from investment - Cost of investment
Cost of investment
Calculate R.O.I.
$110,000
- $75,000
$35,000
.466
X 100
Revenue +
Machine Cost ÷$75,000
$35,000 Gain
= 47% R.O.I
Calculate R.O.I.
Gain from investment - Cost of Investment
(AS HIGH AS POSSIBLE) - (AS LOW AS POSSIBLE)
Cost of Investment
(AS LOW AS POSSIBLE)
Gain from Investment
Tier1: Financial Justifications
• Reduce Costs
• Avoid Costs
• Increase Revenue
Gain from Investment
Tier 2: Benefits of C/VLM
• Reduced workplace injuries
• Boost productivity
• Increase security/ reduce loss
• Improved inventory accuracy
• Add reporting and analysis
• Integrate with vendors/customers
Gain from Investment
Tier 3: Additional Benefits
• Competitive advantage
• Reduced Environmental Impact
• Employee retention and promotion
• Enhanced image and reputation
• Preparation for future growth
• Image and prestige
Research
Pull financial records
Determine company procedures
Know your hurdle rate
Research
Get the inside track
Know historical successes and failures
Know ALL of the approvers
Get everyone affected on your team
Present a united front
Research
Use industry statistics
Don't guess, estimate or over inflate
Get input internally and externally
Involve vendors who may be affected
Get 3rd party endorsements
C/VLM Equipment Benefits
High Density and Vertical Storage
• Make room for more inventory
• Make room for new profit centers
• Avoid new construction
• Eliminate storage and transportation fees
• Reduce energy costs (lights, HVAC)
• Reduce workload (cleaning, safety)
C/VLM Equipment Benefits
High Density and Vertical Storage
$3,000,000 Building Expansion
vs
$600,000 Machine Investment
$2,400,000 Saved
400% R.O.I.
C/VLM Equipment Benefits
Enclosed Storage Offers Protection
• Avoid environmental damage
• Avoid disaster damage
• Increase shelf life
C/VLM Equipment Benefits
Enclosed Storage Offers Protection
$25,000 Machine Investment
Vs
Avoid $1.2 Million Inventory Loss
C/VLM Equipment Benefits
Enclosed Storage Enhances Security
• Physical Locks
• Passcode access to the machine
• Passcode access to individual shelves
• Passcode access to individual part numbers
• RFID & Magnetic Card Reader security
C/VLM Equipment Benefits
Increased Inventory Accuracy Avoids:
• Overstocking
• Rush charges
• Missed orders
• Production delays and shutdowns
• Expired inventory
• Wasted time searching
C/VLM Equipment Benefits
Boost Productivity
• Pick & Pull items faster
• Batch jobs for speed
• Pull the right part for the job
• Combine processes together
• Quick access to entire inventory
C/VLM Equipment Benefits
Boost Productivity
$160,000 Machine Investment
vs
$100,000 salary reduction
$15,000 Overtime
$8,000 Rush Shipping
Annually
C/VLM Equipment Benefits
Enhance Security
• Enclosed storage
• Physical locks
• Passcode access
• RFID
• Card swipe
C/VLM Equipment Benefits
Improve Ergonomics
•Lift in the “Golden Zone”
•Avoid climbing and stooping
•Avoid slip & fall
•Avoid collisions
•Avoid lifting and carrying
Present your case
1. Executive summary
• 2 Paragraphs
• 3-4 sentences each.
2. Situational analysis
• Proposed solution
3. Financial benefits
• Return on Investment
4. (Steps to counteract risks)
Tractor and Utility Vehicle Manufacturer
Application • Pick And Pass Spare Parts
Order Fulfillment
Solution • Six Horizontal Carousels
• Four VLMs
• Pick To Light
• Software
Cost Justification • Doubled Productivity
• Recovered 83% Floor Space
“We couldn’t throw any more bodies
into the mezzanine zone without
people tripping over each other. We
were able to increase our picking
productivity by over 90% and only
need one worker to manage the
carousel zone.”
- Logistics Manager
Retail Pharmacy Distribution
Application • Order Fulfillment For Retail Operations
Equipment • Six Horizontal Carousels
• Pick To Light
• Software
Cost Justification • 90% Faster Picking
• 72% Labor Reduction
“We were picking as fast as staff,
shelving and technology would permit,
but it wasn’t fast enough, the addition
of the horizontal carousels has
allowed us to meet current order
demand and expand into a seasonal
fulfillment program,”
-Operations Manager
Equipment Manufacturer
Application • Fulfilling Parts Orders For
Manufacturing
Equipment • Three VLMs
• Pick To Light
• Software
Cost Justification • Picking 44% Faster
• Reduced Labor
“Before installing the VLMs, we did a
time study. Our average picking time
has been reduced from 4.72 to 2.64
minutes per pick, a 44% increase in
productivity.”
- Warehouse Supervisor
Textile Distributor
Application • Wholesaler & Distributor Of
Decorative Fabrics
Equipment • Four VLMs With Pick to Light
and Software
Cost Justification • Recovered 67% Floor Space
• Increased Capacity
• Doubled Productivity
“Picking hardware was an inefficient
and labor intensive process. The
VLMs allowed us to add more
inventory while maintaining our 3pm
order cutoff time - growing our
hardware business.”
- Vice President
Medical Center
“We had run out of space in our
central sterile storage room, and were
faced with a multi-million dollar
building expansion. Vertical carousels
allowed us to remain in our existing
space, avoiding the cost and hassle of
construction. We even have room to
grow in the future now.”
- CSP Director
Application • Central sterile storage
Equipment • Eleven vertical carousels
Cost Justification • Avoided $3 Million
construction
• Reduced overstocking
• Reduced errors impacting
surgical scheduling
CNC Equipment Supplier
“We were staffed based on peak
demand times, and even then were
not able to ship all orders same day.
The VLMs allowed us to reduce staff
and still guarantee our customers that
all orders will ship the same day. The
VLMs saved us $180,000 the first
year. In labor and other costs.”
- National Parts Manager
Application • Distribution Center
Equipment • Nine vertical lift modules
Cost Justification • More picks with reduced staff
• Cross-check for accuracy
• 24hr. guaranteed shipping
Automobile Dealerships
Application • Parts and Service Department
Equipment • 4 vertical lift modules
• 1 vertical carousel
Cost Justification • Larger parts inventory
• Specialized tool storage
• Added security and accuracy
“We included vertical storage as an
integral part of each of our
dealerships. We freed up a lot of floor
space, and greatly improved the
performance of
the parts counter for our service
departments and the appearance of
the service area for our customers.”
- CFO
Lawn & Garden Equipment Supplier
“I can leave here at night
and I know that every order
is gone, and I know that
every order is gone
accurately.”
- President
Application • Distribution Center
Equipment • Four vertical lift modules
Cost Justification • Eliminated overtime
• 128sq/ft footprint freed space
• Accuracy increased to 99.9%
Questions?
For More Information:
Gary Forger, AS/RS Managing Executive, MHI
Email: [email protected]
Website: http://www.MHI.org/AS-RS