Eastwood and Elmwood Park Neighbourhood Renewal Exploring Options and Tradeoffs

Eastwood and Elmwood Park Workbook

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Eastwood and Elmwood Park Workbook

Eastwood and Elmwood Park Neighbourhood Renewal Exploring Options and Tradeoffs

Page 2: Eastwood and Elmwood Park Workbook

Building Great Neighbourhoods - Working together to make the most out of your neighbourhood.

This is your city and your neighbourhood. We want to understand how you experience your neighbourhood and ask for your input on what we might do to make it better. We will engage and work with you on the renewal of roads, sidewalks, street lights, and park spaces, and promote other community opportunities to enhance how people live and interact in your neighbourhood. We commit to being open and transparent about how your input is used. Let’s make the most out of your neighbourhood.

At the end of the workshop please turn in your completed workbook at the welcome table to be entered into a draw!

Page 3: Eastwood and Elmwood Park Workbook

How We Engaged

A public workshop including a guided neighbourhood walk was held December 1, 2018 at the Eastwood Community League.

Two online surveys gathering input on Visioning and Local Knowledge were available from December 1, 2018 to January 15, 2019.

A community pop-up was held at the St. Gerard School Christmas Concert on December 12, 2018 to promote the online surveys.

St. Gerard School students from grades 4 to 6 answered questions about Visioning and Local Knowledge in a classroom handout.

A community pop-up was held at Safeway Coliseum on January 10, 2019 where shoppers completed the surveys.

A pop-up event on January 31, 2019 at Crystal Kids allowed youth to give feedback through both a handout and table exercises.

A survey exploring specific design options and features was available online from February 19 to March 4, 2019.

Starting the Conversation

Building a Project Vision Together

Exploring Opportunities

Creating a Design for Your Neighbourhood

Community Feedback on Draft Design

Construction on Your Streets

Celebratewith Us

Cost SharingOpportunities

Community Feedback on Final Design

Exploring Options and Tradeoffs

Completing Construction

Drawings

Preparing forConstruction

Updating Design Using Input

Street LightExpression of Interest

legend

Public Engagement and Communications Opportunities

Concept Phase

Design Phase

Build Phase

Operate Phase

You are here

Page 4: Eastwood and Elmwood Park Workbook

Event OverviewWe ask for you to share your level of support for an idea so we can better prioritize the needs and wants of the community. We will use your priorities to guide the decision making process where we can.

What do the different levels of support mean?

Support - I would like to see this option carried forward in the neighbourhood design.

Do not support - I do not agree with this option being part of the neighbourhood design.

Neutral - I would be satisfied if this design was a part of the design or not part of the design.

Please also leave comments! The more information you can provide around why you support or do not support an option, the better!

PUBLIC INPUT

TECHNICAL REQUIREMENTS

CITY POLICIES AND PROGRAMS

PROJECT DECISION

Page 5: Eastwood and Elmwood Park Workbook

Event Overview Vision and Guiding Principles

Please indicate whether you are in support, neutral or do not support the following:

Vision: “Eastwood and Elmwood Park are proud to be safe, prosperous, and self-reliant neighbourhoods. Many generations will have the opportunity to set down roots in this quiet and inviting area of Edmonton, known for its vibrant parks and greenery.”

Support Neutral Do not support

Comments:

Page 6: Eastwood and Elmwood Park Workbook

Guiding Principles:

Eastwood and Elmwood Park:

+ are safe areas where residents feel comfortable walking throughout the neighbourhoods at any time of day.

Support Neutral Do not support

+ residents have access to a range of amenities, businesses, and resources located within the community.

Support Neutral Do not support

+ feature a natural beauty within their parks, open spaces, and a community garden.

Support Neutral Do not support

+ are both connected and accessible while offering a peaceful and serene quality.

Support Neutral Do not support

+ are multi-generational where families can grow with the community.

Support Neutral Do not support

Page 7: Eastwood and Elmwood Park Workbook

Comments:

Page 8: Eastwood and Elmwood Park Workbook

1 Eastwood Park - Open Field Space Existing Conditions

Toboggan Hill

New Sidewalk With Benches

Public Art (Option A and B)

Design Option Examples

Option A: Pathway and Toboggan Hill

Option B: Pathway

Page 9: Eastwood and Elmwood Park Workbook

1 Eastwood Park - Open Field Space Option A: Pathway and Toboggan Hill

Do you support this option? Support Neutral Do not support

Comments:

Option B: Pathway

Do you support this option? Support Neutral Do not support

Comments:

Page 10: Eastwood and Elmwood Park Workbook

2 Eastwood Park - Along 119 Avenue

(Between the east edge of the park and 85 Street)

Existing Conditions

Design Option Examples

Option A: Shared Roadway

Shared Roadway Surface

Page 11: Eastwood and Elmwood Park Workbook

2 Eastwood Park - Along 119 Avenue (Between the east edge of the park and 85 Street)

Option A: Shared Roadway

Do you support this option? Support Neutral Do not support

Comments:

Option B: Adjust Curb Line

Do you support this option? Support Neutral Do not support

Comments:

Page 12: Eastwood and Elmwood Park Workbook

3 Off-Leash Dog Park Existing Conditions

Design Option Examples

Fenced Off-Leash Dog Park (Entrance) Fenced Off-Leash Dog Park

Drinking Fountain (Option A and B)

Option A: Fence and Natural Material Agility Course

Option B: Landscape Barrier

Page 13: Eastwood and Elmwood Park Workbook

3 Off-Leash Dog Park Option A: Fence and Natural Material Agility Course

Do you support this option? Support Neutral Do not support

Comments:

Option B: Landscape Barrier

Do you support this option? Support Neutral Do not support

Comments:

Page 14: Eastwood and Elmwood Park Workbook

4 James Kidney ParkExisting Conditions

Design Option Examples

Option A: Pathways

Option B: Pathways and Gathering Spaces

Pathway Within Park with Pedestrian Oriented Lights

Pergola/Trellis Structure Meeting Area with Benches

Bench Shrubs

Page 15: Eastwood and Elmwood Park Workbook

4 James Kidney ParkOption A: Pathways

Do you support this option? Support Neutral Do not support

Comments:

Option B: Pathways and Gathering Spaces

Do you support this option? Support Neutral Do not support

Comments:

Page 16: Eastwood and Elmwood Park Workbook

5 Izena Ross ParkExisting Conditions

Design Option Examples

Option A: North-south Pathway

Option B: Bus Pad and Landscaping

Sidewalk and Bench

Seating Area Shrubs

Page 17: Eastwood and Elmwood Park Workbook

5 Izena Ross ParkOption A: North-south Pathway

Do you support this option? Support Neutral Do not support

Comments:

Option B: Bus Pad and Landscaping

Do you support this option? Support Neutral Do not support

Comments:

Page 18: Eastwood and Elmwood Park Workbook

6 Elmwood Park - Park 2Existing Conditions

Option A: Closure of 75 Street Access Option B: Closure of 123 Avenue Access

Sidewalk and BenchRoad Closure

Design Option Examples

Page 19: Eastwood and Elmwood Park Workbook

6 Elmwood Park - Park 2Option A: Closure of 75 Street Access

Do you support this option? Support Neutral Do not support

Comments:

Option B: Closure of 123 Avenue Access

Do you support this option? Support Neutral Do not support

Comments:

Page 20: Eastwood and Elmwood Park Workbook

7 Elmwood Park - Park 1Existing Conditions

Design Option Examples

Option A: Off-Leash Dog Park

Option B: Walking Loop

Off-Leash Dog Park (Entrance)

Sidewalk in Park Area

Page 21: Eastwood and Elmwood Park Workbook

7 Elmwood Park - Park 1 Option A: Off-Leash Dog Park

Do you support this option? Support Neutral Do not support

Comments:

Option B: Walking Loop

Do you support this option? Support Neutral Do not support

Comments:

Page 22: Eastwood and Elmwood Park Workbook

8 East-west Grassed Area South of the Yellowhead Trail Noise Wall

Existing Conditions

Design Option Examples Option: Shared-Use Path/Sidewalk

Shared-Use Path

Page 23: Eastwood and Elmwood Park Workbook

8 East-west Grassed Area South of the Yellowhead Trail Noise Wall

Option: Shared-Use Path/Sidewalk

Do you support this option? Support Neutral Do not support

Comments:

Page 24: Eastwood and Elmwood Park Workbook

9 St. Gerard School and ParkExisting Conditions

Design Option Examples

Option A: New Drop-off Road Option B: Car Drop-off Area

Bus Drop-off Pads Drop-off Area

Page 25: Eastwood and Elmwood Park Workbook

9 St. Gerard School and Park Option A: New Drop-off Road

Do you support this option? Support Neutral Do not support

Comments:

Option B: Car Drop-off Area

Do you support this option? Support Neutral Do not support

Comments:

Page 26: Eastwood and Elmwood Park Workbook

10 Inner Neighbourhood Seating/ Meeting Areas

Design Option Example

Benches, Bike Rack and Waste Receptacle

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St 82

St

82 S

t

80 S

t80

St

79 S

t79

St

78 S

t78

St

77 S

t77

St

118 Ave118 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

82 S

t82

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

77 S

t77

St

76 S

t76

St

75 S

t75

St

81 S

t81

St

89 S

t89

St

90 S

t90

St

124 Ave124 Ave

Yellowhead HighwayYellowhead Highway

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

118 Ave118 Ave

117 Ave117 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

78 S

t78

St

83 S

t83

St

82 S

t82

St

84 S

t84

St

81 S

t81

St

117 Ave117 Ave

89 S

t89

St

89 S

t89

St

90 S

t90

St

90 S

t90

St

119 Ave119 Ave

125 Ave125 Ave

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

119 Ave119 Ave

124 Ave124 Ave

Yellowhead HighwayYellowhead Highway

Way

ne G

retz

ky D

rive

Way

ne G

retz

ky D

rive

Fort

RdFo

rt Rd

Fort

RdFo

rt Rd

Willi

am Sh

ort R

d

Willi

am Sh

ort R

d

Mount

Lawn R

d

Mount

Lawn R

d

124 Ave124 Ave

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

118 Ave118 Ave

117 Ave117 Ave

119 Ave119 Ave

125 Ave125 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

82 S

t82

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

77 S

t77

St

81 S

t81

St

89 S

t89

St

90 S

t90

St

200mNBike Route Concept

Capital Line LRT & Station

Inner Neighbourhood Seating/Meeting Areas Concept (Item 10)

Pedestrian Route

St. Gerard School Park

Delton Park

Delton School Park

Eastwood Park

Eastwood School Park

Parkdale School Park

St. Alphonsus School Park

Parkdale Park 1

Parkdale Park

Eastwood Park 1

James Kidney Park

Izena Ross Park

Elmwood Park Park 2

Elmwood Park Park 1

Elmwood Park Community League

Eastwood Community League

Parkdale Square

I N D U S T R I A L A R E A

(part of Yellowhead Corridor East Neighbourhood)

Page 27: Eastwood and Elmwood Park Workbook

10 Inner Neighbourhood Seating/ Meeting Areas

Do you support this option? Support Neutral Do not support

Comments:

Page 28: Eastwood and Elmwood Park Workbook

Park Prioritization Upgrading City-owned outdoor park spaces are subject to funding. The City will explore potential partnerships with other City programs, community partners and initiatives to leverage potential funding opportunities.

On the following page, please indicate with a check mark if it’s important to you for the park to built in the:

Short Term (1-3 years)Medium Term (3-10 years) Long Term (10+ years)

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

82 S

t82

St

80 S

t80

St

79 S

t79

St

78 S

t78

St

77 S

t77

St

118 Ave118 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

82 S

t82

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

77 S

t77

St

76 S

t76

St

75 S

t75

St

81 S

t81

St

89 S

t89

St

90 S

t90

St

124 Ave124 Ave

Yellowhead HighwayYellowhead Highway

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

118 Ave118 Ave

117 Ave117 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

78 S

t78

St

83 S

t83

St

82 S

t82

St

84 S

t84

St

81 S

t81

St

117 Ave117 Ave

89 S

t89

St

89 S

t89

St

90 S

t90

St

90 S

t90

St

119 Ave119 Ave

125 Ave125 Ave

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

119 Ave119 Ave

124 Ave124 Ave

Yellowhead HighwayYellowhead Highway

Way

ne G

retz

ky D

rive

Way

ne G

retz

ky D

rive

Fort

Rd

Fort

Rd

Fort

Rd

Fort

Rd

Willi

am Sh

ort Rd

Willi

am Sh

ort Rd

Mount L

awn Rd

Mount L

awn Rd

124 Ave124 Ave

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

118 Ave118 Ave

117 Ave117 Ave

119 Ave119 Ave

125 Ave125 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

82 S

t82

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

77 S

t77

St

81 S

t81

St

89 S

t89

St

90 S

t90

St

200mNOpen Space Concept

Pathway Option Capital Line LRT & Station

Inner Neighbourhood Seating/Meeting Areas Concept (Item 10)

1-3

4

5

6

78

9St. Gerard School Park

Delton Park

Delton School Park

Eastwood Park

Eastwood School Park

Parkdale School Park

St. Alphonsus School Park

Parkdale Park 1

Parkdale Park

Eastwood Park 1

James Kidney Park

Izena Ross Park

Elmwood Park Park 2

Elmwood Park Park 1

Elmwood Park Community League

Eastwood Community League

Parkdale Square

I N D U S T R I A L A R E A

(part of Yellowhead Corridor East Neighbourhood)

7 Elmwood Park - Park 18 East-West Grassed Area South of the

Yellowhead Trail Noise Wall9 St. Gerard School and Park10 Inner Neighbourhood Seating/

Meeting Areas

1 Eastwood Park - Open Field Space2 Eastwood Park - along 119 Avenue3 Off-Leash Dog Park4 James Kidney Park5 Izena Ross Park6 Elmwood Park - Park 2

Page 29: Eastwood and Elmwood Park Workbook

Short Term (1-3 years)

Medium Term (3-10 years)

Long Term (10+ years)

1 Eastwood Park - Open Field Space

2 Eastwood Park - Along 119 Avenue

3 Off-Leash Dog Park

4 James Kidney Park

5 Izena Ross Park

6 Elmwood Park - Park 2

7 Elmwood Park - Park 1

8 East-West Grassed Area South of the Yellowhead Trail Noise Wall

9 St. Gerard School and Park

10 Inner Neighbourhood Seating/Meeting Areas

Page 30: Eastwood and Elmwood Park Workbook

11 120 Avenue Enhancements

Existing Conditions

Design Option Examples

Trees in boulevard Painted/Textured Crosswalk

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St 82

St

82 S

t

80 S

t80

St

79 S

t79

St

78 S

t78

St

77 S

t77

St

118 Ave118 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

82 S

t82

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

77 S

t77

St

76 S

t76

St

75 S

t75

St

81 S

t81

St

89 S

t89

St

90 S

t90

St

124 Ave124 Ave

Yellowhead HighwayYellowhead Highway

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

118 Ave118 Ave

117 Ave117 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

78 S

t78

St

83 S

t83

St

82 S

t82

St

84 S

t84

St

81 S

t81

St

117 Ave117 Ave

89 S

t89

St

89 S

t89

St

90 S

t90

St

90 S

t90

St

119 Ave119 Ave

125 Ave125 Ave

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

119 Ave119 Ave

124 Ave124 Ave

Yellowhead HighwayYellowhead Highway

Way

ne G

retz

ky D

rive

Way

ne G

retz

ky D

rive

Fort

Rd

Fort

Rd

Fort

Rd

Fort

Rd

Willi

am Sh

ort R

d

Willi

am Sh

ort R

d

Mou

nt La

wn Rd

Mou

nt La

wn Rd

124 Ave124 Ave

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

118 Ave118 Ave

117 Ave117 Ave

119 Ave119 Ave

125 Ave125 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

82 S

t82

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

77 S

t77

St

81 S

t81

St

89 S

t89

St

90 S

t90

St

200mN

Capital Line LRT & Station

Pedestrian Route

Direction of Curb Extension

Painted/Textured CrosswalkExample (Not to scale)

80 S

t80

St

120 Ave120 Ave

St. Gerard School Park

Delton Park

Delton School Park

Eastwood Park

Eastwood School Park

Parkdale School Park

St. Alphonsus School Park

Parkdale Park 1

Parkdale Park

Eastwood Park 1

James Kidney Park

Izena Ross Park

Elmwood Park Park 2

Elmwood Park Park 1

Elmwood Park Community League

Eastwood Community League

Parkdale Square

I N D U S T R I A L A R E A

(part of Yellowhead Corridor East Neighbourhood)

Page 31: Eastwood and Elmwood Park Workbook

11 120 Avenue Enhancements

Do you support this option? Support Neutral Do not support

Comments:

Page 32: Eastwood and Elmwood Park Workbook

12 Potential New Sidewalks

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St 82

St

82 S

t

80 S

t80

St

79 S

t79

St

78 S

t78

St

77 S

t77

St

118 Ave118 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

82 S

t82

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

77 S

t77

St

76 S

t76

St

75 S

t75

St

81 S

t81

St

89 S

t89

St

90 S

t90

St

124 Ave124 Ave

Yellowhead HighwayYellowhead Highway

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

118 Ave118 Ave

117 Ave117 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

78 S

t78

St

83 S

t83

St

82 S

t82

St

84 S

t84

St

81 S

t81

St

117 Ave117 Ave

89 S

t89

St

89 S

t89

St

90 S

t90

St

90 S

t90

St

119 Ave119 Ave

125 Ave125 Ave

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

119 Ave119 Ave

124 Ave124 Ave

Yellowhead HighwayYellowhead Highway

Way

ne G

retz

ky D

rive

Way

ne G

retz

ky D

rive

Fort

RdFo

rt Rd

Fort

RdFo

rt Rd

Willi

am Sh

ort R

d

Willi

am Sh

ort R

d

Mount

Lawn R

d

Mount

Lawn R

d

124 Ave124 Ave

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

118 Ave118 Ave

117 Ave117 Ave

119 Ave119 Ave

125 Ave125 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

82 S

t82

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

77 S

t77

St

81 S

t81

St

89 S

t89

St

90 S

t90

St

200mNPotential New Sidewalks (Item 12)

Capital Line LRT & Station

St. Gerard School Park

Delton Park

Delton School Park

Eastwood Park

Eastwood School Park

Parkdale School Park

St. Alphonsus School Park

Parkdale Park 1

Parkdale Park

Eastwood Park 1

James Kidney Park

Izena Ross Park

Elmwood Park Park 2

Elmwood Park Park 1

Elmwood Park Community League

Eastwood Community League

Parkdale Square

I N D U S T R I A L A R E A

(part of Yellowhead Corridor East Neighbourhood)

Page 33: Eastwood and Elmwood Park Workbook

12 Potential New SidewalksDo you support this option? Support Neutral Do not support

Comments:

Page 34: Eastwood and Elmwood Park Workbook

13 83 Street Enhanced Pedestrian Route

Design Option Examples

Curb Extension Painted/Textured Crosswalk

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St 82

St

82 S

t

80 S

t80

St

79 S

t79

St

78 S

t78

St

77 S

t77

St

118 Ave118 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

82 S

t82

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

77 S

t77

St

76 S

t76

St

75 S

t75

St

81 S

t81

St

89 S

t89

St

90 S

t90

St

124 Ave124 Ave

Yellowhead HighwayYellowhead Highway

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

118 Ave118 Ave

117 Ave117 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

83 S

t83

St

80 S

t80

St 79

St

79 S

t

78 S

t78

St

83 S

t83

St

82 S

t82

St

84 S

t84

St

81 S

t81

St

117 Ave117 Ave

89 S

t89

St

89 S

t89

St

90 S

t90

St

90 S

t90

St

119 Ave119 Ave

125 Ave125 Ave

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

119 Ave119 Ave

124 Ave124 Ave

Yellowhead HighwayYellowhead Highway

Way

ne G

retz

ky D

rive

Way

ne G

retz

ky D

rive

Fort

Rd

Fort

Rd

Fort

Rd

Fort

Rd

Willi

am Sh

ort R

d

Willi

am Sh

ort R

d

Mou

nt La

wn Rd

Mou

nt La

wn Rd

124 Ave124 Ave

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

118 Ave118 Ave

117 Ave117 Ave

119 Ave119 Ave

125 Ave125 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

82 S

t82

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

77 S

t77

St

81 S

t81

St

89 S

t89

St

90 S

t90

St

200mN

Capital Line LRT & Station

Pedestrian Route

Direction of Curb Extension

Painted/Textured CrosswalkExample (Not to scale)

83 S

t83

St

121 Ave121 Ave

St. Gerard School Park

Delton Park

Delton School Park

Eastwood Park

Eastwood School Park

Parkdale School Park

St. Alphonsus School Park

Parkdale Park 1

Parkdale Park

Eastwood Park 1

James Kidney Park

Izena Ross Park

Elmwood Park Park 2

Elmwood Park Park 1

Elmwood Park Community League

Eastwood Community League

Parkdale Square

I N D U S T R I A L A R E A

(part of Yellowhead Corridor East Neighbourhood)

Page 35: Eastwood and Elmwood Park Workbook

13 83 Street Enhanced Pedestrian RouteDo you support this option? Support Neutral Do not support

Comments:

Page 36: Eastwood and Elmwood Park Workbook

14 121 Avenue Enhanced Pedestrian Route

Design Option Examples

Curb Extension Painted/Textured Crosswalk

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St 82

St

82 S

t

80 S

t80

St

79 S

t79

St

78 S

t78

St

77 S

t77

St

118 Ave118 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

82 S

t82

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

77 S

t77

St

76 S

t76

St

75 S

t75

St

81 S

t81

St

89 S

t89

St

90 S

t90

St

124 Ave124 Ave

Yellowhead HighwayYellowhead Highway

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

118 Ave118 Ave

117 Ave117 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

83 S

t83

St

80 S

t80

St 79

St

79 S

t

78 S

t78

St

83 S

t83

St

82 S

t82

St

84 S

t84

St

81 S

t81

St

117 Ave117 Ave

89 S

t89

St

89 S

t89

St

90 S

t90

St

90 S

t90

St

119 Ave119 Ave

125 Ave125 Ave

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

119 Ave119 Ave

124 Ave124 Ave

Yellowhead HighwayYellowhead Highway

Way

ne G

retz

ky D

rive

Way

ne G

retz

ky D

rive

Fort

RdFo

rt Rd

Fort

RdFo

rt Rd

Willi

am Sh

ort R

d

Willi

am Sh

ort R

d

Mount

Lawn R

d

Mount

Lawn R

d

124 Ave124 Ave

123 Ave123 Ave

122 Ave122 Ave

121 Ave121 Ave

120 Ave120 Ave

118 Ave118 Ave

117 Ave117 Ave

119 Ave119 Ave

125 Ave125 Ave

88 S

t88

St

87 S

t87

St

86 S

t86

St

85 S

t85

St

82 S

t82

St

83 S

t83

St

80 S

t80

St

79 S

t79

St

77 S

t77

St

81 S

t81

St

89 S

t89

St

90 S

t90

St

200mN

Capital Line LRT & Station

Pedestrian Route

Direction of Curb Extension

Painted/Textured CrosswalkExample (Not to scale)

81 S

t81

St

121 Ave121 Ave

St. Gerard School Park

Delton Park

Delton School Park

Eastwood Park

Eastwood School Park

Parkdale School Park

St. Alphonsus School Park

Parkdale Park 1

Parkdale Park

Eastwood Park 1

James Kidney Park

Izena Ross Park

Elmwood Park Park 2

Elmwood Park Park 1

Elmwood Park Community League

Eastwood Community League

Parkdale Square

I N D U S T R I A L A R E A

(part of Yellowhead Corridor East Neighbourhood)

Page 37: Eastwood and Elmwood Park Workbook

14 121 Avenue Enhanced Pedestrian Route

Do you support this option? Support Neutral Do not support

Comments:

Page 38: Eastwood and Elmwood Park Workbook

15 119 Avenue Bike Route Option A: Two One-Way Protected Bike Lane

15 119 Avenue Bike Route Option B: Shared-Use Path

Bike Infrastructure:

Bike Infrastructure:

Considerations:

Considerations:

People Walking, Biking and Driving Interactions:+ All users would have their own

space

Winter Maintenance+ Bike lanes are snow cleared

to bare pavement within 24 hours of the end of a snowfall event*

+ Median provides location for snow storage to split the size of the windrows

Protected one-way

*As per the City’s current Snow and Ice Policy

People Walking, Biking and Driving Interactions:+ People who walk and bike

would share the space

Winter Maintenance+ Snow cleared to bare

pavement and within 48 hours of the end of a snowfall event clearing starts*

Shared-Use Path

Page 39: Eastwood and Elmwood Park Workbook

15 119 Avenue Bike Route Option A: Two One-Way Protected Bike Lanes

Do you support this option? Support Neutral Do not support

Comments:

15 119 Avenue Bike Route Option B: Shared-Use Path

Do you support this option? Support Neutral Do not support

Comments:

Page 40: Eastwood and Elmwood Park Workbook

15 119 Avenue Bike Route Option C: Shared Roadway and Painted

Bike Lanes

Bike Infrastructure: Considerations:

People Walking, Biking and Driving Interactions:+ People who bike and drive

would share the space

+ Additional traffic calming to slow traffic

Winter Maintenance+ Snow cleared at the same

frequency of the local road clearance*- Typically within 48 hours

after a snowfall event ends clearing starts

- Not cleared to bare pavement but maintained to a level snowpack

People Walking, Biking and Driving Interactions:+ People on bikes and driving

would share the roadway and travel single-file

+ Additional traffic calming to slow traffic

Winter Maintenance+ Snow cleared at the same

frequency of the local road clearance*- Typically within 48 hours

after a snowfall event ends clearing starts

- Not cleared to bare pavement but maintained to a level snowpack

Painted Contraflow

Shared Roadway

*As per the City’s current Snow and Ice Policy

Page 41: Eastwood and Elmwood Park Workbook

15 119 Avenue Bike Route Option C: Shared Roadway and Painted Bike Lanes

Do you support this option? Support Neutral Do not support

Comments:

Page 42: Eastwood and Elmwood Park Workbook

16 81 Street Bike and Pedestrian Route

Bike Infrastructure: Considerations:

People Walking, Biking and Driving Interactions:+ People who bike and drive

would share the space

+ Additional traffic calming to slow traffic

Winter Maintenance+ Snow cleared at the same

frequency of the local road clearance*- Typically within 48 hours

after a snowfall event ends clearing starts

- Not cleared to bare pavement but maintained to a level snowpack

Painted Contraflow

People Walking, Biking and Driving Interactions:+ People on bikes and driving

would share the roadway and travel single-file

+ Additional traffic calming to slow traffic

Winter Maintenance+ Snow cleared at the same

frequency of the local road clearance*- Typically within 48 hours

after a snowfall event ends clearing starts

- Not cleared to bare pavement but maintained to a level snowpack

Shared Roadway

People Walking, Biking and Driving Interactions:+ All users would have their own

space

Winter Maintenance+ Bike lanes are snow cleared

to bare pavement within 24 hours of the end of a snowfall event*

+ Median provides location for snow storage to split the size of the windrows

Protected Two-way

*As per the City’s current Snow and Ice Policy

Page 43: Eastwood and Elmwood Park Workbook

16 81 Street Bike and Pedestrian Route

Option A: Shared Roadway

Do you support this option? Support Neutral Do not support

Comments:

Option B: Shared Roadway with Painted Contraflow Lane

Do you support this option? Support Neutral Do not support

Comments:

Option C: Two-way Protected Bike Lane

Do you support this option? Support Neutral Do not support

Comments:

Page 44: Eastwood and Elmwood Park Workbook

edmonton.ca/BuildingEastwoodElmwoodPark