Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Eastwood and Elmwood Park Neighbourhood Renewal Exploring Options and Tradeoffs
Building Great Neighbourhoods - Working together to make the most out of your neighbourhood.
This is your city and your neighbourhood. We want to understand how you experience your neighbourhood and ask for your input on what we might do to make it better. We will engage and work with you on the renewal of roads, sidewalks, street lights, and park spaces, and promote other community opportunities to enhance how people live and interact in your neighbourhood. We commit to being open and transparent about how your input is used. Let’s make the most out of your neighbourhood.
At the end of the workshop please turn in your completed workbook at the welcome table to be entered into a draw!
How We Engaged
A public workshop including a guided neighbourhood walk was held December 1, 2018 at the Eastwood Community League.
Two online surveys gathering input on Visioning and Local Knowledge were available from December 1, 2018 to January 15, 2019.
A community pop-up was held at the St. Gerard School Christmas Concert on December 12, 2018 to promote the online surveys.
St. Gerard School students from grades 4 to 6 answered questions about Visioning and Local Knowledge in a classroom handout.
A community pop-up was held at Safeway Coliseum on January 10, 2019 where shoppers completed the surveys.
A pop-up event on January 31, 2019 at Crystal Kids allowed youth to give feedback through both a handout and table exercises.
A survey exploring specific design options and features was available online from February 19 to March 4, 2019.
Starting the Conversation
Building a Project Vision Together
Exploring Opportunities
Creating a Design for Your Neighbourhood
Community Feedback on Draft Design
Construction on Your Streets
Celebratewith Us
Cost SharingOpportunities
Community Feedback on Final Design
Exploring Options and Tradeoffs
Completing Construction
Drawings
Preparing forConstruction
Updating Design Using Input
Street LightExpression of Interest
legend
Public Engagement and Communications Opportunities
Concept Phase
Design Phase
Build Phase
Operate Phase
You are here
Event OverviewWe ask for you to share your level of support for an idea so we can better prioritize the needs and wants of the community. We will use your priorities to guide the decision making process where we can.
What do the different levels of support mean?
Support - I would like to see this option carried forward in the neighbourhood design.
Do not support - I do not agree with this option being part of the neighbourhood design.
Neutral - I would be satisfied if this design was a part of the design or not part of the design.
Please also leave comments! The more information you can provide around why you support or do not support an option, the better!
PUBLIC INPUT
TECHNICAL REQUIREMENTS
CITY POLICIES AND PROGRAMS
PROJECT DECISION
Event Overview Vision and Guiding Principles
Please indicate whether you are in support, neutral or do not support the following:
Vision: “Eastwood and Elmwood Park are proud to be safe, prosperous, and self-reliant neighbourhoods. Many generations will have the opportunity to set down roots in this quiet and inviting area of Edmonton, known for its vibrant parks and greenery.”
Support Neutral Do not support
Comments:
Guiding Principles:
Eastwood and Elmwood Park:
+ are safe areas where residents feel comfortable walking throughout the neighbourhoods at any time of day.
Support Neutral Do not support
+ residents have access to a range of amenities, businesses, and resources located within the community.
Support Neutral Do not support
+ feature a natural beauty within their parks, open spaces, and a community garden.
Support Neutral Do not support
+ are both connected and accessible while offering a peaceful and serene quality.
Support Neutral Do not support
+ are multi-generational where families can grow with the community.
Support Neutral Do not support
Comments:
1 Eastwood Park - Open Field Space Existing Conditions
Toboggan Hill
New Sidewalk With Benches
Public Art (Option A and B)
Design Option Examples
Option A: Pathway and Toboggan Hill
Option B: Pathway
1 Eastwood Park - Open Field Space Option A: Pathway and Toboggan Hill
Do you support this option? Support Neutral Do not support
Comments:
Option B: Pathway
Do you support this option? Support Neutral Do not support
Comments:
2 Eastwood Park - Along 119 Avenue
(Between the east edge of the park and 85 Street)
Existing Conditions
Design Option Examples
Option A: Shared Roadway
Shared Roadway Surface
2 Eastwood Park - Along 119 Avenue (Between the east edge of the park and 85 Street)
Option A: Shared Roadway
Do you support this option? Support Neutral Do not support
Comments:
Option B: Adjust Curb Line
Do you support this option? Support Neutral Do not support
Comments:
3 Off-Leash Dog Park Existing Conditions
Design Option Examples
Fenced Off-Leash Dog Park (Entrance) Fenced Off-Leash Dog Park
Drinking Fountain (Option A and B)
Option A: Fence and Natural Material Agility Course
Option B: Landscape Barrier
3 Off-Leash Dog Park Option A: Fence and Natural Material Agility Course
Do you support this option? Support Neutral Do not support
Comments:
Option B: Landscape Barrier
Do you support this option? Support Neutral Do not support
Comments:
4 James Kidney ParkExisting Conditions
Design Option Examples
Option A: Pathways
Option B: Pathways and Gathering Spaces
Pathway Within Park with Pedestrian Oriented Lights
Pergola/Trellis Structure Meeting Area with Benches
Bench Shrubs
4 James Kidney ParkOption A: Pathways
Do you support this option? Support Neutral Do not support
Comments:
Option B: Pathways and Gathering Spaces
Do you support this option? Support Neutral Do not support
Comments:
5 Izena Ross ParkExisting Conditions
Design Option Examples
Option A: North-south Pathway
Option B: Bus Pad and Landscaping
Sidewalk and Bench
Seating Area Shrubs
5 Izena Ross ParkOption A: North-south Pathway
Do you support this option? Support Neutral Do not support
Comments:
Option B: Bus Pad and Landscaping
Do you support this option? Support Neutral Do not support
Comments:
6 Elmwood Park - Park 2Existing Conditions
Option A: Closure of 75 Street Access Option B: Closure of 123 Avenue Access
Sidewalk and BenchRoad Closure
Design Option Examples
6 Elmwood Park - Park 2Option A: Closure of 75 Street Access
Do you support this option? Support Neutral Do not support
Comments:
Option B: Closure of 123 Avenue Access
Do you support this option? Support Neutral Do not support
Comments:
7 Elmwood Park - Park 1Existing Conditions
Design Option Examples
Option A: Off-Leash Dog Park
Option B: Walking Loop
Off-Leash Dog Park (Entrance)
Sidewalk in Park Area
7 Elmwood Park - Park 1 Option A: Off-Leash Dog Park
Do you support this option? Support Neutral Do not support
Comments:
Option B: Walking Loop
Do you support this option? Support Neutral Do not support
Comments:
8 East-west Grassed Area South of the Yellowhead Trail Noise Wall
Existing Conditions
Design Option Examples Option: Shared-Use Path/Sidewalk
Shared-Use Path
8 East-west Grassed Area South of the Yellowhead Trail Noise Wall
Option: Shared-Use Path/Sidewalk
Do you support this option? Support Neutral Do not support
Comments:
9 St. Gerard School and ParkExisting Conditions
Design Option Examples
Option A: New Drop-off Road Option B: Car Drop-off Area
Bus Drop-off Pads Drop-off Area
9 St. Gerard School and Park Option A: New Drop-off Road
Do you support this option? Support Neutral Do not support
Comments:
Option B: Car Drop-off Area
Do you support this option? Support Neutral Do not support
Comments:
10 Inner Neighbourhood Seating/ Meeting Areas
Design Option Example
Benches, Bike Rack and Waste Receptacle
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St 82
St
82 S
t
80 S
t80
St
79 S
t79
St
78 S
t78
St
77 S
t77
St
118 Ave118 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
82 S
t82
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
77 S
t77
St
76 S
t76
St
75 S
t75
St
81 S
t81
St
89 S
t89
St
90 S
t90
St
124 Ave124 Ave
Yellowhead HighwayYellowhead Highway
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
118 Ave118 Ave
117 Ave117 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
78 S
t78
St
83 S
t83
St
82 S
t82
St
84 S
t84
St
81 S
t81
St
117 Ave117 Ave
89 S
t89
St
89 S
t89
St
90 S
t90
St
90 S
t90
St
119 Ave119 Ave
125 Ave125 Ave
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
119 Ave119 Ave
124 Ave124 Ave
Yellowhead HighwayYellowhead Highway
Way
ne G
retz
ky D
rive
Way
ne G
retz
ky D
rive
Fort
RdFo
rt Rd
Fort
RdFo
rt Rd
Willi
am Sh
ort R
d
Willi
am Sh
ort R
d
Mount
Lawn R
d
Mount
Lawn R
d
124 Ave124 Ave
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
118 Ave118 Ave
117 Ave117 Ave
119 Ave119 Ave
125 Ave125 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
82 S
t82
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
77 S
t77
St
81 S
t81
St
89 S
t89
St
90 S
t90
St
200mNBike Route Concept
Capital Line LRT & Station
Inner Neighbourhood Seating/Meeting Areas Concept (Item 10)
Pedestrian Route
St. Gerard School Park
Delton Park
Delton School Park
Eastwood Park
Eastwood School Park
Parkdale School Park
St. Alphonsus School Park
Parkdale Park 1
Parkdale Park
Eastwood Park 1
James Kidney Park
Izena Ross Park
Elmwood Park Park 2
Elmwood Park Park 1
Elmwood Park Community League
Eastwood Community League
Parkdale Square
I N D U S T R I A L A R E A
(part of Yellowhead Corridor East Neighbourhood)
10 Inner Neighbourhood Seating/ Meeting Areas
Do you support this option? Support Neutral Do not support
Comments:
Park Prioritization Upgrading City-owned outdoor park spaces are subject to funding. The City will explore potential partnerships with other City programs, community partners and initiatives to leverage potential funding opportunities.
On the following page, please indicate with a check mark if it’s important to you for the park to built in the:
Short Term (1-3 years)Medium Term (3-10 years) Long Term (10+ years)
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
82 S
t82
St
80 S
t80
St
79 S
t79
St
78 S
t78
St
77 S
t77
St
118 Ave118 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
82 S
t82
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
77 S
t77
St
76 S
t76
St
75 S
t75
St
81 S
t81
St
89 S
t89
St
90 S
t90
St
124 Ave124 Ave
Yellowhead HighwayYellowhead Highway
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
118 Ave118 Ave
117 Ave117 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
78 S
t78
St
83 S
t83
St
82 S
t82
St
84 S
t84
St
81 S
t81
St
117 Ave117 Ave
89 S
t89
St
89 S
t89
St
90 S
t90
St
90 S
t90
St
119 Ave119 Ave
125 Ave125 Ave
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
119 Ave119 Ave
124 Ave124 Ave
Yellowhead HighwayYellowhead Highway
Way
ne G
retz
ky D
rive
Way
ne G
retz
ky D
rive
Fort
Rd
Fort
Rd
Fort
Rd
Fort
Rd
Willi
am Sh
ort Rd
Willi
am Sh
ort Rd
Mount L
awn Rd
Mount L
awn Rd
124 Ave124 Ave
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
118 Ave118 Ave
117 Ave117 Ave
119 Ave119 Ave
125 Ave125 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
82 S
t82
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
77 S
t77
St
81 S
t81
St
89 S
t89
St
90 S
t90
St
200mNOpen Space Concept
Pathway Option Capital Line LRT & Station
Inner Neighbourhood Seating/Meeting Areas Concept (Item 10)
1-3
4
5
6
78
9St. Gerard School Park
Delton Park
Delton School Park
Eastwood Park
Eastwood School Park
Parkdale School Park
St. Alphonsus School Park
Parkdale Park 1
Parkdale Park
Eastwood Park 1
James Kidney Park
Izena Ross Park
Elmwood Park Park 2
Elmwood Park Park 1
Elmwood Park Community League
Eastwood Community League
Parkdale Square
I N D U S T R I A L A R E A
(part of Yellowhead Corridor East Neighbourhood)
7 Elmwood Park - Park 18 East-West Grassed Area South of the
Yellowhead Trail Noise Wall9 St. Gerard School and Park10 Inner Neighbourhood Seating/
Meeting Areas
1 Eastwood Park - Open Field Space2 Eastwood Park - along 119 Avenue3 Off-Leash Dog Park4 James Kidney Park5 Izena Ross Park6 Elmwood Park - Park 2
Short Term (1-3 years)
Medium Term (3-10 years)
Long Term (10+ years)
1 Eastwood Park - Open Field Space
2 Eastwood Park - Along 119 Avenue
3 Off-Leash Dog Park
4 James Kidney Park
5 Izena Ross Park
6 Elmwood Park - Park 2
7 Elmwood Park - Park 1
8 East-West Grassed Area South of the Yellowhead Trail Noise Wall
9 St. Gerard School and Park
10 Inner Neighbourhood Seating/Meeting Areas
11 120 Avenue Enhancements
Existing Conditions
Design Option Examples
Trees in boulevard Painted/Textured Crosswalk
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St 82
St
82 S
t
80 S
t80
St
79 S
t79
St
78 S
t78
St
77 S
t77
St
118 Ave118 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
82 S
t82
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
77 S
t77
St
76 S
t76
St
75 S
t75
St
81 S
t81
St
89 S
t89
St
90 S
t90
St
124 Ave124 Ave
Yellowhead HighwayYellowhead Highway
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
118 Ave118 Ave
117 Ave117 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
78 S
t78
St
83 S
t83
St
82 S
t82
St
84 S
t84
St
81 S
t81
St
117 Ave117 Ave
89 S
t89
St
89 S
t89
St
90 S
t90
St
90 S
t90
St
119 Ave119 Ave
125 Ave125 Ave
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
119 Ave119 Ave
124 Ave124 Ave
Yellowhead HighwayYellowhead Highway
Way
ne G
retz
ky D
rive
Way
ne G
retz
ky D
rive
Fort
Rd
Fort
Rd
Fort
Rd
Fort
Rd
Willi
am Sh
ort R
d
Willi
am Sh
ort R
d
Mou
nt La
wn Rd
Mou
nt La
wn Rd
124 Ave124 Ave
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
118 Ave118 Ave
117 Ave117 Ave
119 Ave119 Ave
125 Ave125 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
82 S
t82
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
77 S
t77
St
81 S
t81
St
89 S
t89
St
90 S
t90
St
200mN
Capital Line LRT & Station
Pedestrian Route
Direction of Curb Extension
Painted/Textured CrosswalkExample (Not to scale)
80 S
t80
St
120 Ave120 Ave
St. Gerard School Park
Delton Park
Delton School Park
Eastwood Park
Eastwood School Park
Parkdale School Park
St. Alphonsus School Park
Parkdale Park 1
Parkdale Park
Eastwood Park 1
James Kidney Park
Izena Ross Park
Elmwood Park Park 2
Elmwood Park Park 1
Elmwood Park Community League
Eastwood Community League
Parkdale Square
I N D U S T R I A L A R E A
(part of Yellowhead Corridor East Neighbourhood)
11 120 Avenue Enhancements
Do you support this option? Support Neutral Do not support
Comments:
12 Potential New Sidewalks
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St 82
St
82 S
t
80 S
t80
St
79 S
t79
St
78 S
t78
St
77 S
t77
St
118 Ave118 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
82 S
t82
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
77 S
t77
St
76 S
t76
St
75 S
t75
St
81 S
t81
St
89 S
t89
St
90 S
t90
St
124 Ave124 Ave
Yellowhead HighwayYellowhead Highway
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
118 Ave118 Ave
117 Ave117 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
78 S
t78
St
83 S
t83
St
82 S
t82
St
84 S
t84
St
81 S
t81
St
117 Ave117 Ave
89 S
t89
St
89 S
t89
St
90 S
t90
St
90 S
t90
St
119 Ave119 Ave
125 Ave125 Ave
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
119 Ave119 Ave
124 Ave124 Ave
Yellowhead HighwayYellowhead Highway
Way
ne G
retz
ky D
rive
Way
ne G
retz
ky D
rive
Fort
RdFo
rt Rd
Fort
RdFo
rt Rd
Willi
am Sh
ort R
d
Willi
am Sh
ort R
d
Mount
Lawn R
d
Mount
Lawn R
d
124 Ave124 Ave
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
118 Ave118 Ave
117 Ave117 Ave
119 Ave119 Ave
125 Ave125 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
82 S
t82
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
77 S
t77
St
81 S
t81
St
89 S
t89
St
90 S
t90
St
200mNPotential New Sidewalks (Item 12)
Capital Line LRT & Station
St. Gerard School Park
Delton Park
Delton School Park
Eastwood Park
Eastwood School Park
Parkdale School Park
St. Alphonsus School Park
Parkdale Park 1
Parkdale Park
Eastwood Park 1
James Kidney Park
Izena Ross Park
Elmwood Park Park 2
Elmwood Park Park 1
Elmwood Park Community League
Eastwood Community League
Parkdale Square
I N D U S T R I A L A R E A
(part of Yellowhead Corridor East Neighbourhood)
12 Potential New SidewalksDo you support this option? Support Neutral Do not support
Comments:
13 83 Street Enhanced Pedestrian Route
Design Option Examples
Curb Extension Painted/Textured Crosswalk
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St 82
St
82 S
t
80 S
t80
St
79 S
t79
St
78 S
t78
St
77 S
t77
St
118 Ave118 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
82 S
t82
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
77 S
t77
St
76 S
t76
St
75 S
t75
St
81 S
t81
St
89 S
t89
St
90 S
t90
St
124 Ave124 Ave
Yellowhead HighwayYellowhead Highway
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
118 Ave118 Ave
117 Ave117 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
83 S
t83
St
80 S
t80
St 79
St
79 S
t
78 S
t78
St
83 S
t83
St
82 S
t82
St
84 S
t84
St
81 S
t81
St
117 Ave117 Ave
89 S
t89
St
89 S
t89
St
90 S
t90
St
90 S
t90
St
119 Ave119 Ave
125 Ave125 Ave
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
119 Ave119 Ave
124 Ave124 Ave
Yellowhead HighwayYellowhead Highway
Way
ne G
retz
ky D
rive
Way
ne G
retz
ky D
rive
Fort
Rd
Fort
Rd
Fort
Rd
Fort
Rd
Willi
am Sh
ort R
d
Willi
am Sh
ort R
d
Mou
nt La
wn Rd
Mou
nt La
wn Rd
124 Ave124 Ave
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
118 Ave118 Ave
117 Ave117 Ave
119 Ave119 Ave
125 Ave125 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
82 S
t82
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
77 S
t77
St
81 S
t81
St
89 S
t89
St
90 S
t90
St
200mN
Capital Line LRT & Station
Pedestrian Route
Direction of Curb Extension
Painted/Textured CrosswalkExample (Not to scale)
83 S
t83
St
121 Ave121 Ave
St. Gerard School Park
Delton Park
Delton School Park
Eastwood Park
Eastwood School Park
Parkdale School Park
St. Alphonsus School Park
Parkdale Park 1
Parkdale Park
Eastwood Park 1
James Kidney Park
Izena Ross Park
Elmwood Park Park 2
Elmwood Park Park 1
Elmwood Park Community League
Eastwood Community League
Parkdale Square
I N D U S T R I A L A R E A
(part of Yellowhead Corridor East Neighbourhood)
13 83 Street Enhanced Pedestrian RouteDo you support this option? Support Neutral Do not support
Comments:
14 121 Avenue Enhanced Pedestrian Route
Design Option Examples
Curb Extension Painted/Textured Crosswalk
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St 82
St
82 S
t
80 S
t80
St
79 S
t79
St
78 S
t78
St
77 S
t77
St
118 Ave118 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
82 S
t82
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
77 S
t77
St
76 S
t76
St
75 S
t75
St
81 S
t81
St
89 S
t89
St
90 S
t90
St
124 Ave124 Ave
Yellowhead HighwayYellowhead Highway
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
118 Ave118 Ave
117 Ave117 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
83 S
t83
St
80 S
t80
St 79
St
79 S
t
78 S
t78
St
83 S
t83
St
82 S
t82
St
84 S
t84
St
81 S
t81
St
117 Ave117 Ave
89 S
t89
St
89 S
t89
St
90 S
t90
St
90 S
t90
St
119 Ave119 Ave
125 Ave125 Ave
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
119 Ave119 Ave
124 Ave124 Ave
Yellowhead HighwayYellowhead Highway
Way
ne G
retz
ky D
rive
Way
ne G
retz
ky D
rive
Fort
RdFo
rt Rd
Fort
RdFo
rt Rd
Willi
am Sh
ort R
d
Willi
am Sh
ort R
d
Mount
Lawn R
d
Mount
Lawn R
d
124 Ave124 Ave
123 Ave123 Ave
122 Ave122 Ave
121 Ave121 Ave
120 Ave120 Ave
118 Ave118 Ave
117 Ave117 Ave
119 Ave119 Ave
125 Ave125 Ave
88 S
t88
St
87 S
t87
St
86 S
t86
St
85 S
t85
St
82 S
t82
St
83 S
t83
St
80 S
t80
St
79 S
t79
St
77 S
t77
St
81 S
t81
St
89 S
t89
St
90 S
t90
St
200mN
Capital Line LRT & Station
Pedestrian Route
Direction of Curb Extension
Painted/Textured CrosswalkExample (Not to scale)
81 S
t81
St
121 Ave121 Ave
St. Gerard School Park
Delton Park
Delton School Park
Eastwood Park
Eastwood School Park
Parkdale School Park
St. Alphonsus School Park
Parkdale Park 1
Parkdale Park
Eastwood Park 1
James Kidney Park
Izena Ross Park
Elmwood Park Park 2
Elmwood Park Park 1
Elmwood Park Community League
Eastwood Community League
Parkdale Square
I N D U S T R I A L A R E A
(part of Yellowhead Corridor East Neighbourhood)
14 121 Avenue Enhanced Pedestrian Route
Do you support this option? Support Neutral Do not support
Comments:
15 119 Avenue Bike Route Option A: Two One-Way Protected Bike Lane
15 119 Avenue Bike Route Option B: Shared-Use Path
Bike Infrastructure:
Bike Infrastructure:
Considerations:
Considerations:
People Walking, Biking and Driving Interactions:+ All users would have their own
space
Winter Maintenance+ Bike lanes are snow cleared
to bare pavement within 24 hours of the end of a snowfall event*
+ Median provides location for snow storage to split the size of the windrows
Protected one-way
*As per the City’s current Snow and Ice Policy
People Walking, Biking and Driving Interactions:+ People who walk and bike
would share the space
Winter Maintenance+ Snow cleared to bare
pavement and within 48 hours of the end of a snowfall event clearing starts*
Shared-Use Path
15 119 Avenue Bike Route Option A: Two One-Way Protected Bike Lanes
Do you support this option? Support Neutral Do not support
Comments:
15 119 Avenue Bike Route Option B: Shared-Use Path
Do you support this option? Support Neutral Do not support
Comments:
15 119 Avenue Bike Route Option C: Shared Roadway and Painted
Bike Lanes
Bike Infrastructure: Considerations:
People Walking, Biking and Driving Interactions:+ People who bike and drive
would share the space
+ Additional traffic calming to slow traffic
Winter Maintenance+ Snow cleared at the same
frequency of the local road clearance*- Typically within 48 hours
after a snowfall event ends clearing starts
- Not cleared to bare pavement but maintained to a level snowpack
People Walking, Biking and Driving Interactions:+ People on bikes and driving
would share the roadway and travel single-file
+ Additional traffic calming to slow traffic
Winter Maintenance+ Snow cleared at the same
frequency of the local road clearance*- Typically within 48 hours
after a snowfall event ends clearing starts
- Not cleared to bare pavement but maintained to a level snowpack
Painted Contraflow
Shared Roadway
*As per the City’s current Snow and Ice Policy
15 119 Avenue Bike Route Option C: Shared Roadway and Painted Bike Lanes
Do you support this option? Support Neutral Do not support
Comments:
16 81 Street Bike and Pedestrian Route
Bike Infrastructure: Considerations:
People Walking, Biking and Driving Interactions:+ People who bike and drive
would share the space
+ Additional traffic calming to slow traffic
Winter Maintenance+ Snow cleared at the same
frequency of the local road clearance*- Typically within 48 hours
after a snowfall event ends clearing starts
- Not cleared to bare pavement but maintained to a level snowpack
Painted Contraflow
People Walking, Biking and Driving Interactions:+ People on bikes and driving
would share the roadway and travel single-file
+ Additional traffic calming to slow traffic
Winter Maintenance+ Snow cleared at the same
frequency of the local road clearance*- Typically within 48 hours
after a snowfall event ends clearing starts
- Not cleared to bare pavement but maintained to a level snowpack
Shared Roadway
People Walking, Biking and Driving Interactions:+ All users would have their own
space
Winter Maintenance+ Bike lanes are snow cleared
to bare pavement within 24 hours of the end of a snowfall event*
+ Median provides location for snow storage to split the size of the windrows
Protected Two-way
*As per the City’s current Snow and Ice Policy
16 81 Street Bike and Pedestrian Route
Option A: Shared Roadway
Do you support this option? Support Neutral Do not support
Comments:
Option B: Shared Roadway with Painted Contraflow Lane
Do you support this option? Support Neutral Do not support
Comments:
Option C: Two-way Protected Bike Lane
Do you support this option? Support Neutral Do not support
Comments:
edmonton.ca/BuildingEastwoodElmwoodPark