1
Melbourne University Melbourne Museum Yarra Bend Park Melbourne Zoo Melbourne Cemetery Royal Park RACECOURSE RD MACAULAY RD D KENSINGTON RD FLEMINGTON RD PEEL ST CURZON ST NICHOLSON ST LYGON ST JOHNSTON ST GOLD ST SMITH ST WELLINGTON ST HOTHAM ST ROSENEATH ST HODDLE ST QUEENS PDE ST GEORGES RD HIGH ST ROYAL PDE BRUNSWICK RD DAWSON ST CARLTON PARKVILLE KENSINGTON NORTH MELBOURNE FITZROY FITZROY NORTH COLLINGWOOD ABBOTSFORD STUBBS ST MOOLTAN ST Melbourne Zoo FLEMING ITH T ST S LINGTON ST ST LI GT DE DE ST R LTON N CARL L Melbourne Cemetery Royal Park FL QUEENS PD EENS PD LD ST T S HOTHAM ST S AM T H HOTHAM S S AM T H WE W LL L WE W LL LEGEND East West Link surface connection East West Link tunnel CityLink to Port area (planning) E C ( (p ( ( ( E s E C QUE QUE ROSENEA S Melbourne VIL LLE Z There will be some redesign of the Eastern Freeway to allow for connections to the local area and the tunnel. A new ramp would take northbound Hoddle Street traffic onto the Eastern Freeway and the old ‘loop’ would be removed to make space for the new tunnel lanes. This would also include a bus line to improve Doncaster services. The pedestrian bridge would be relocated because the current bridge is too low to accommodate the new ramp. During construction, land would be required to enable the construction of the tunnel portal. A temporary side track will be required to ensure Alexandra Parade traffic can flow freely during construction. Improvements will be made to the north-south from routes of Lygon Street, Nicholson Street, Brunswick Road and Smith Street to improve travel times and safety. Elliott Avenue provides an important access point to and from the tunnels. The entry and exit points remain below ground level until they meet with the existing road surface, minimising the footprint on Royal Park. Access to the State Netball and Hockey Centre and Urban Camp would be maintained at all times. There would be no loss of parking spaces and construction vehicles would not be permitted to use these parking areas. A construction area in Royal Park near the Upfield railway line allows for storage of materials and equipment and construction personnel parking. Tunnel boring machines would probably start boring the tunnel from here. Ross Straw Field would be occupied for construction. The sporting clubs and other park users have been invited to be directly involved in discussions about the best ways to manage the short term impacts and long term planning. MELBOURNE O ELBO N ME NORTH RT ELBOURNE O ELBO N The Upfield railway line would be maintained where the tunnel passes beneath it. The tram line crossing Elliott Avenue would be realigned to pass over the tunnel entrance. Any disruption to these important public transport routes would be kept to a minimum. MOOLTAN ST M Traffic travelling north from the East West Link would follow a new ramp on the west side of CityLink, near the Moonee Ponds Creek. N NG GT TO ON N K K K KE EN NS SI IN I IN TON N O ON There would eventually be a new four lane road west of the existing CityLink structure. The CityLink sound tunnel would remain and a separate noise treatment would be applied to the new section. East West Link Project design

East West Link LEGENDimages.theage.com.au/file/2013/07/16/4574085/East... · from routes of Lygon Street, Nicholson Street, Brunswick Road and Smith Street to improve travel times

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: East West Link LEGENDimages.theage.com.au/file/2013/07/16/4574085/East... · from routes of Lygon Street, Nicholson Street, Brunswick Road and Smith Street to improve travel times

MelbourneUniversity

MelbourneMuseum

Yarra Bend Park

MelbourneZoo

MelbourneCemetery

Royal Park

RACECOURSE RD

MACAULAY RD

D

KENSINGTON RDFLEMINGTON RD

PEE

L ST

CU

RZO

N S

T

NIC

HO

LSO

N S

T

LYG

ON

ST

JOHNSTON ST

GO

LD S

T

SMIT

H S

T

WEL

LIN

GTO

N S

T

HOTHAM ST

ROSENEATH ST

HO

DD

LE S

T

QUEENS PDE

ST G

EORGES

RD

HIG

H S

T

RO

YAL

PD

E

BRUNSWICK RD

DAWSON ST

CARLTON

PARKVILLE

KENSINGTON

NORTHMELBOURNE

FITZROY

FITZROYNORTH

COLLINGWOODABBOTSFORD

STU

BB

S ST

MOOLTAN ST

Melbourne

Zoo

FLEMING ITH

TSTS

LIN

GTO

N S

TSTLI

GT

DEDE

ST R

LTONNCARLL

MelbourneCemetery

Royal Park

FL

QUEENS PD

EENS PD

LD S

TTS

HOTHAM STSAMTHHOTHAM SSAMTH

WE

WLLL

WE

WLL

LEGEND East West Link surface connection

East West Link tunnel

CityLink to Port area (planning)

E

C ( (p( ((

E

s

E

C

QUEQUE

ROSENEAS

Melbourne

VILLLE

Z

There will be some redesign of the Eastern Freeway to allow for connections to the local area and the tunnel. A new ramp would take northbound Hoddle Street traffi c onto the Eastern Freeway and the old ‘loop’ would be removed to make space for the new tunnel lanes. This would also include a bus line to improve Doncaster services. The pedestrian bridge would be relocated because the current bridge is too low to accommodate the new ramp.

During construction, land would be required to enable the construction of the tunnel portal. A temporary side track will be required to ensure Alexandra Parade traffi c can fl ow freely during construction.

Improvements will be made to the north-south from routes of Lygon Street, Nicholson Street, Brunswick Road and Smith Street to improve travel times and safety.

Elliott Avenue provides an important access point to and from the tunnels. The entry and exit points remain below ground level until they meet with the existing road surface, minimising the footprint on Royal Park.

Access to the State Netball and Hockey Centre and Urban Camp would be maintained at all times. There would be no loss of parking spaces and construction vehicles would not be permitted to use these parking areas.

A construction area in Royal Park near the Upfi eld railway line allows for storage of materials and equipment and construction personnel parking. Tunnel boring machines would probably start boring the tunnel from here.

Ross Straw Field would be occupied for construction. The sporting clubs and other park users have been invited to be directly involved in discussions about the best ways to manage the short term impacts and long term planning.

MELBOURNEOELBO NMENORTHRT

ELBOURNEOELBO N

The Upfi eld railway line would be maintained where the tunnel passes beneath it. The tram line crossing Elliott Avenue would be realigned to pass over the tunnel entrance. Any disruption to these important public transport routes would be kept to a minimum.

MOOLTAN ST

M

Traffi c travelling north from the East West Link would follow a new ramp on the west side of CityLink, near the Moonee Ponds Creek.

NNGGTTOONNKKKKEENNSSIINIIN TONNOONThere would eventually be a new four lane road west of the existing CityLink structure. The CityLink sound tunnel would remain and a separate noise treatment would be applied to the new section.

East West Link Project design