East Link ExtensionJudkins Park Station
Open House
October 2016
Tonight’s agenda• 5-7 p.m. – Open house
– Meet the team– View design plans– Tell us what you think
• 5:30 – Presentation – Welcome and introductions (Zack Ambrose) – East Link overview (Tia Raamot)– Station design update (David Hewitt & Tanja Wilcox)– STart (Kurt Kiefer) – Upcoming construction (Zack Ambrose)– Question and answer
• 6:00 – Return to open house • 7:00 - Close
2
Link light rail system
• 19 miles of light rail with 16 stations currently in service
• University Link and Angle Lake opened in 2016
• ST2 Plan funded extensions to Overlake, South King County, and Lynnwood
• 50+ mile system
3
East Link overviewLength: 14 miles
Ride times: • International District / Chinatown: 5
min• University of Washington = 15 min
• Bellevue Transit Center: 15 min
• SeaTac Airport = 40 min (with
transfer at International District)
Rider projection: 50,000 daily riders
by 2030
Budget: $3.7 billion (YOE $)
Start of Service: Targeted 2023 4
East Link timeline & recent progress
30% design 60% design Completion of
Final Design
Downtown Bellevue Tunnel
I-90: Construction• Sound Transit is working
with WSDOT to provide full-time HOV lanes in the outer roadways, in preparation for light rail in the center roadway
• The center roadway closes and East Link construction begins June 2017
• Station construction begins mid-2018 6
What we’ve heardKey Themes:• Station design
• Bike and pedestrian access
• Safety and security
Public Involvement:• 30% & 60% design open houses• Project briefings• Umojafest• Feet First Walk• Lighthouse for the Blind• Find it, Fix It with City of Seattle
Supporting structures
8
Judkins Park Station
Contextual Plan
10
Aerial Perspective
11
NAAM
RAINIER AVENUE (WEST)ENTRANCES
WEST ENTRY TICKETING AND WALKWAY
STATION PLATFORM
23RD AVENUE (EAST)ENTRANCE
Site Plan
12
Longitudinal Site Section
13
West Pedestrian Bridge Access – West of Rainier
14
Artwork at Rainier Ave S
15
West Entry – Contextual Site Plan
16
West Entry – Lower Plaza
17
West Entry – Cross Sections
18
West Pedestrian Bridge Access – West of Rainier
19
West Entry – Contextual Landscape Plan
20
Artwork at Rainier Ave S
21
Aerial Perspective
22
WEST ENTRY TICKETING AND WALKWAY
STATION PLATFORM
West Entry - Upper Plaza Level
23
Pedestrian Bridge Access – Looking West
24
West Entry – Looking at Pedestrian Bridge
25
West Entry – North Elevations
26
Ticketing Area and Walkway – Looking East
27
West Entry – Looking at Pedestrian Bridge
28
Platform - Plan
29
Platform Canopy Looking West
30
Platform – Landscape Plan
31
Artwork at Platform
32
Artwork at Platform
33
Aerial Perspective
34
23RD AVENUE (EAST)ENTRANCE
East Entry – Upper Plaza Plan
35
East Entry – Landscape Plan
36
East Entry – Upper Plaza at Ticketing Area
37
Artwork at 23rd Avenue South
38
What’s next?
Upcoming Construction• Meet the Contractor Open House
Spring 2017 • Construction: June 1, 2017
– I-90 Two-way Transit– I-90 HOV lane closures
• Mid-2018: Judkins Park Station construction
40
Stay in touch• Contact Community Outreach staff:
[email protected] or 206-903-7176
• 24 hour construction hotline: 888-298-2395• Sign-up to receive email updates:
www.soundtransit.org/subscribe
Visit the project website: www.soundtransit.org/eastlink
41