Argyle Park Ascot Earthworks Supervision Report for A&B Earthmoving Report 17C 0543 July, 2017

Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

Argyle ParkAscotEarthworks Supervision Report for A&B EarthmovingReport 17C 0543July, 2017

Page 2: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

Sandhurst Geotech Pty Ltd, Trading as Geotechnical Testing Services – Southern. ABN: 18 169 924 109 ACN: 169 924 109 Email: [email protected]; Ph: 03 5441 4881; Fax: 03 5441 5089; Mail Address: PO Box 13, STRATHDALE, Vic, 3550 Offices: • La Trobe University Applied Science 2 Building 7 Sharon Street, Flora Hill, VIC 3550; • Shed 3, 140 Ogilvie Avenue, Echuca , VIC 3654,

• Geotechnical Investigations • Contract Drilling • Land Capability Assessments • Contamination Assessments • Compaction Control Testing • On-site Wastewater Management • Site Classifications • Residential and Industrial • Soil, Concrete and Aggregate Testing Laboratories • Site Laboratory • Construction Material Testing Services • www.geotestsouthern.com.au

Argyle Park Sullivan St, Ascot Earthworks Supervision Report for A&B Earthmoving Revision Revision Date Authorised 17C 0543 24/7/17 SEH Distribution (this revision only) Recipient Format Date GTSS On file 24/7/17 A&B Earthmoving Contact: Adam Storey Email PDF [email protected] 24/7/17

Page 3: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

Geotechnical Testing Services – Southern Page 3 Report: 17C 0543 Report.docx

TABLE OF CONTENTS 1 INTRODUCTION ......................................................................................................... 4 2 SCOPE OF WORKS .................................................................................................... 4 2.1 AREA OF WORK .................................................................................................. 4 2.2 PLACEMENT SPECIFICATION ........................................................................... 4 3 INSPECTION AND TESTING ...................................................................................... 5 4 SUMMARY OF TEST RESULTS ................................................................................. 5 5 STATEMENT OF COMPLIANCE ................................................................................ 6 APPENDIX Site Plan Test Reports

Page 4: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

Geotechnical Testing Services (Southern) Report: 17C 0543 Report.docx Page 4

1 INTRODUCTION A & B Earthmoving commissioned Geotechnical Testing Services (GTS) to undertake Level 1 Supervision and testing (AS3798-2007) for the earthworks at Argyle Estate on Sullivan Street, Ascot. Level 1 Testing was generally performed in line with AS3798-2007 “Guidelines on Earthworks for Commercial and Residential Development” and provides inspection of the construction of controlled fill and compaction testing in accordance with AS1289 “Methods of Testing Soils for Engineering Purposes”. The Level 1 testing was undertaken by Geotechnicians with supervision provided by a Geotechnical Engineer from GTS. 2 SCOPE OF WORKS 2.1 AREA OF WORK Geotechnical Testing Services provided Level 1 inspection and testing of the engineered fill placed across Lots 1 to 13. The depth of fill across the site varied from less than 300mm to around 0.8 metres in the with the approximate locations shown on the attached site plan. It is noted that the sites with 300mm or less of fill were not included in the inspection and testing. 2.2 PLACEMENT SPECIFICATION Whilst there was no earthworks specification compiled for this project, the placement of the fill and associated works generally followed the recommendations outlined in AS3798-2007 “Guidelines for Earthworks for Commercial and Residential Developments” and the construction specification. In summary, the earthworks comply with the following: • The layers for residential lots are to be compacted to at least 95% of the density ratio in accordance with AS1289 5.1.1 (or 5.7.1), based on Standard compaction. In accordance with Table 8.1 of AS3798-2007, the site would be considered large scale (greater than 1500m2) and therefore a minimum of 1 test per 2500m2 or 3 tests per visit are required. It is noted that based on the size of the earthworks, that 1 test per lot is not required, however, all lots were tested at some stage through the filling process.

Page 5: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

Geotechnical Testing Services (Southern) Report: 17C 0543 Report.docx Page 5

3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical Engineer and it was observed that the unsuitable material (vegetation, top soil/silt) had been removed with the base consisting of a Sandy Silty Clay material of good strength. Level 1 inspection and testing was undertaken by a geotechnician from GTS who nominated the timing and location of the in-situ density tests. The approximate location of each test is recorded on the test reports and attached fill plan. Laboratory compaction testing was undertaken on a one to one basis at our Bendigo laboratory. A summary of the results of the compaction control testing is presented in a table below with the full NATA endorsed test reports included in the Appendix. 4 SUMMARY OF TEST RESULTS A summary of the test results is included in the following table with full NATA accredited reports included in the Appendix. Project No. Report No. Test Date. Location. Reduced Level (mm) Moisture Variation %O.M.C Hilf Density Ratio % 1 17B 0054A 31/1/17 Lot 11 FSL 4.5 dry 101.0 2 17B 0054B 31/1/17 Lot 12 FSL 0.0 98.0 3 17B 0054C 31/1/17 Lot 13 FSL 1.0 wet 95.0 4 17B 0094A 9/2/17 Lot 7 400 0.0 104.0 5 17B 0094B 9/2/17 Lot 8 400 0.0 100.0 6 17B 0121A 15/2/17 Lot 10 FSL 0.5 wet 97.5 7 17B 0121B 15/2/17 Lot 9 FSL 0.0 99.0 8 17B 0121C 15/2/17 Lot 8 FSL 0.0 100.0 9 17B 0218A 8/3/17 Lot 5 FSL 0.5 dry 97.0 10 17B 0218B 8/3/17 Lot 4 FSL 0.0 95.0 11 17B 0218C 8/3/17 Lot 3 FSL 3.0 wet 95.5 12 17B 0238A 10/3/17 Lot 1 FSL 0.5 wet 102.5 13 17B 0238B 10/3/17 Lot 2 FSL 3.0 wet 97.5

Page 6: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

Geotechnical Testing Services (Southern) Report: 17C 0543 Report.docx Page 6

5 STATEMENT OF COMPLIANCE GTS personnel have provided Level 1 inspection and testing services during the placement of material for the filling of Lots 1 to 13. The placement of fill and construction techniques adopted was observed throughout the project. Based on observations made by GTS personnel and the results of field and laboratory tests, we consider that the fill has been placed and compacted and is considered to be engineered or controlled fill. Therefore, subject to residential site classifications, the controlled fill material is deemed a suitable founding medium for future residential buildings. It is noted that top soil material may be spread across the sites following completion of these earthworks and that this top soil material is not considered controlled fill. Shane Hampton (BE (Hons)) Senior Geotechnical Engineer Telephone: (03) 5441 4881 Mobile: 0437 496 215 Email: [email protected]

Page 7: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

Geotechnical Testing Services (Southern) Report: 17C 0543 Report.docx Page 7

APPENDIX

Page 8: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

Geotechnical Testing Services – Southern Page 8 Report: 17C 0543 Report.docx Fig 1: Site Plan 1 3 2 4 5 6 10 9 8 7

13 12 11

Page 9: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

R53 Version: 02 April 2016

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client:

/A

/B

/C

As Per: AS1289 5.7.1 5.8.1

*

*101.0

17B0054B

300

A & B Earthmoving

4 Stanson Place

MAIDEN GULLY

VICTORIA 3551

98.0

17B0054C

95.0

AS1289.1.2.1 part 6.4b

Silty Gravelly Clay Brown

Silty Gravelly Clay Brown

Silty Gravelly Clay Brown

Hilf Density Ratio (%):

Date Sampled: 31/01/2017

Material Description:

C.J.Milne

Project:

Location:

Test Request No / Lot No:

Layer Thickness: (mm)

Depth Below FSL/CSL:

Compaction Type:

Sampling Method:

*

*

Revision Nº: REV 0

17B0054

1 of 2

Report Nº:

Sheet:

FSL

Date of Report: 1/02/2017

*

Standard

Approved Signatory:

Argyle Park Stage 1, Ascot

House Block

No If Stabilised Time from

Stabilisation to Lab Test:

*

17B0054A *

*

Material Stabilised:

17B0054

17B0054

17B0054

Test Number:

Print Date: 1/02/2017. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 10: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

R53 Version: 02 April 2016

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client: A & B Earthmoving

4 Stanson Place

MAIDEN GULLY

VICTORIA 3551

55H26

593

As Per: AS1289 5.7.1 5.8.1

C.J.Milne

2 of 2

Report Nº:

Sheet:

Date of Report: 1/02/2017

Revision Nº: REV 0

Approved Signatory:

*

Adj. Moist. Variation: % (Wet/Dry)

*

*

*

Lot 11 Lot 12 Lot 13 *

Probe Depth: (mm) 275

Moisture Content: % * * *

17B0054

HILF DENSITY RATIO (%): 101.0 98.0 95.0 *

* * * * * *

* * *

*

4.5Dry 0.0Dry 1.0Wet * * *

* * *

* *

* *

FSL FSL FSL * * *

Chainage:

Reduced Level: (mm)

2.16 2.16 *

2.07 2.12 2.05 *

19 19 19 *

*

Time of Test: 9.14am 9.18am 9.20am * * *

*

*

0.0 0.0

* *

Test Number: 17B0054A 17B0054B 17B0054C

46754676 4677

Adj. Peak Conv. Wet Density: t/m3 * *

Centre

1064

Centre

1055

Centre

1044

275 275

Moisture Variation: % (Wet/Dry)

#Eastings:

Project Test Number:

#Northings:

* * * * * *

*Percentage Oversize Wet:

*Oversize Sieve Size: (mm)

* * *

Offset / Centre Line:

#Map Datum AUS84

Peak Conv. Wet Density: t/m3

Field Wet Density: t/m3

*0.0

*

*

*

*

*

*

* *

*

2.05

Print Date: 1/02/2017. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 11: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

R53 Version: 02 April 2016

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client:

/A

/B

As Per: AS1289 5.7.1 5.8.1

*

*104.0

17B0094B

300mm

A & B Earthmoving

4 Stanson Place

MAIDEN GULLY

VICTORIA 3551

100.0

*

*

AS1289.1.2.1 part 6.4b

Silty Clay Grey Brown Some Gravel

Silty Clay Grey Brown Some Gravel

Hilf Density Ratio (%):

Date Sampled: 9/02/2017

Material Description:

B.P.Mott

Project:

Location:

Test Request No / Lot No:

Layer Thickness: (mm)

Depth Below FSL/CSL:

Compaction Type:

Sampling Method:

*

*

Revision Nº: REV 0

17B0094

1 of 2

Report Nº:

Sheet:

400mm

Date of Report: 14/02/2017

*

Standard

Approved Signatory:

Argyle Park Stage 1, Ascot

House Lots

No If Stabilised Time from

Stabilisation to Lab Test:

*

17B0094A *

*

Material Stabilised:

17B0094

17B0094

Test Number:

Print Date: 14/02/2017. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 12: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

R53 Version: 02 April 2016

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client: A & B Earthmoving

4 Stanson Place

MAIDEN GULLY

VICTORIA 3551

55H26

593

As Per: AS1289 5.7.1 5.8.1

B.P.Mott

2 of 2

Report Nº:

Sheet:

Date of Report: 14/02/2017

Revision Nº: REV 0

Approved Signatory:

*

Adj. Moist. Variation: % (Wet/Dry)

*

*

*

Lot 7 Lot 6 * *

Probe Depth: (mm) 275

Moisture Content: % * * *

17B0094

HILF DENSITY RATIO (%): 104.0 100.0 * *

* * * * * *

* * *

*

0.0Wet 0.0Wet * * * *

* * *

* *

* *

400.0 400.0 * * * *

Chainage:

Reduced Level: (mm)

2.11 * *

2.24 2.11 * *

19 19 * *

*

Time of Test: 12.35pm 12.45pm * * * *

*

*

0.0 0.0

* *

Test Number: 17B0094A 17B0094B *

*4703 4710

Adj. Peak Conv. Wet Density: t/m3 * *

*

1092

*

1111

*

*

275 *

Moisture Variation: % (Wet/Dry)

#Eastings:

Project Test Number:

#Northings:

* * * * * *

*Percentage Oversize Wet:

*Oversize Sieve Size: (mm)

* * *

Offset / Centre Line:

#Map Datum AUS84

Peak Conv. Wet Density: t/m3

Field Wet Density: t/m3

**

*

*

*

*

*

*

* *

*

2.15

Print Date: 14/02/2017. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 13: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

R53 Version: 02 April 2016

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client:

/A

/B

/C

As Per: AS1289 5.7.1 5.8.1

*

*97.5

17B0121B

300

A & B Earthmoving

4 Stanson Place

MAIDEN GULLY

VICTORIA 3551

99.0

17B0121C

100.0

AS1289.1.2.1 part 6.4b

Brown Silt Stone Gravel

Brown Silt Stone Gravel

Brown Silt Stone Gravel

Hilf Density Ratio (%):

Date Sampled: 15/02/2017

Material Description:

C.J.Milne

Project:

Location:

Test Request No / Lot No:

Layer Thickness: (mm)

Depth Below FSL/CSL:

Compaction Type:

Sampling Method:

*

*

Revision Nº: REV 0

17B0121

1 of 2

Report Nº:

Sheet:

Layer 1

Date of Report: 17/02/2017

*

Standard

Approved Signatory:

Argyle Park, Ascot

House Blocks

No If Stabilised Time from

Stabilisation to Lab Test:

*

17B0121A *

*

Material Stabilised:

17B0121

17B0121

17B0121

Test Number:

Print Date: 17/02/2017. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 14: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

R53 Version: 02 April 2016

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client: A & B Earthmoving

4 Stanson Place

MAIDEN GULLY

VICTORIA 3551

55H26

593

As Per: AS1289 5.7.1 5.8.1

C.J.Milne

2 of 2

Report Nº:

Sheet:

Date of Report: 17/02/2017

Revision Nº: REV 0

Approved Signatory:

*

Adj. Moist. Variation: % (Wet/Dry)

*

*

*

10 9 8 *

Probe Depth: (mm) 300

Moisture Content: % * * *

17B0121

HILF DENSITY RATIO (%): 97.5 99.0 100.0 *

* * * * * *

* * *

*

0.5Wet 0.0Dry 0.0Wet * * *

* * *

* *

* *

Layer 1 Layer 1 Layer 1 * * *

Chainage:

Reduced Level: (mm)

2.17 2.11 *

2.13 2.15 2.11 *

19 19 19 *

*

Time of Test: 1.15pm 1.20pm 1.25pm * * *

*

*

0.0 0.0

* *

Test Number: 17B0121A 17B0121B 17B0121C

47004662 4676

Adj. Peak Conv. Wet Density: t/m3 * *

Centre Of Block

1103

Centre Of Block

1106

Centre Of Block

1097

300 300

Moisture Variation: % (Wet/Dry)

#Eastings:

Project Test Number:

#Northings:

* * * * * *

*Percentage Oversize Wet:

*Oversize Sieve Size: (mm)

* * *

Offset / Centre Line:

#Map Datum AUS84

Peak Conv. Wet Density: t/m3

Field Wet Density: t/m3

*0.0

*

*

*

*

*

*

* *

*

2.18

Print Date: 17/02/2017. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 15: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

R53 Version: 02 April 2016

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client:

/A

/B

/C

As Per: AS1289 5.7.1 5.8.1

*

*97.0

17B0218B

300mm

A & B Earthmoving

4 Stanson Place

MAIDEN GULLY

VICTORIA 3551

95.0

17B0218C

95.5

AS1289.1.2.1 part 6.4b

Silty Gravelly Clay Brown Grey

Silty Gravelly Clay Brown Grey

Silty Gravelly Clay Brown Grey

Hilf Density Ratio (%):

Date Sampled: 8/03/2017

Material Description:

B.P.Mott

Project:

Location:

Test Request No / Lot No:

Layer Thickness: (mm)

Depth Below FSL/CSL:

Compaction Type:

Sampling Method:

*

*

Revision Nº: REV 0

17B0218

1 of 2

Report Nº:

Sheet:

FSL

Date of Report: 10/03/2017

*

Standard

Approved Signatory:

Argyle Park, Ascot

House Blocks

No If Stabilised Time from

Stabilisation to Lab Test:

*

17B0218A *

*

Material Stabilised:

17B0218

17B0218

17B0218

Test Number:

Print Date: 10/03/2017. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 16: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

R53 Version: 02 April 2016

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client: A & B Earthmoving

4 Stanson Place

MAIDEN GULLY

VICTORIA 3551

55H26

593

As Per: AS1289 5.7.1 5.8.1

B.P.Mott

2 of 2

Report Nº:

Sheet:

Date of Report: 10/03/2017

Revision Nº: REV 0

Approved Signatory:

*

Adj. Moist. Variation: % (Wet/Dry)

*

*

*

Lot 5 Lot 4 Lot 3 *

Probe Depth: (mm) 250

Moisture Content: % * * *

17B0218

HILF DENSITY RATIO (%): 97.0 95.0 95.5 *

* * * * * *

* * *

*

0.5Dry 0.0Dry 3.0Wet * * *

* * *

* *

* *

FSL FSL FSL * * *

Chainage:

Reduced Level: (mm)

2.14 2.15 *

2.06 2.03 2.05 *

19 19 19 *

*

Time of Test: 3.00pm 3.08pm 3.14pm * * *

*

*

0.0 0.0

* *

Test Number: 17B0218A 17B0218B 17B0218C

47434716 4728

Adj. Peak Conv. Wet Density: t/m3 * *

Refer to Map

1112

Refer to Map

1112

Refer to Map

1112

250 250

Moisture Variation: % (Wet/Dry)

#Eastings:

Project Test Number:

#Northings:

* * * * * *

*Percentage Oversize Wet:

*Oversize Sieve Size: (mm)

* * *

Offset / Centre Line:

#Map Datum AUS84

Peak Conv. Wet Density: t/m3

Field Wet Density: t/m3

*0.0

*

*

*

*

*

*

* *

*

2.12

Print Date: 10/03/2017. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 17: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

R53 Version: 02 April 2016

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client:

/A

/B

As Per: AS1289 5.7.1 5.8.1

*

*102.5

17B0238B

300mm

A & B Earthmoving

4 Stanson Place

MAIDEN GULLY

VICTORIA 3551

97.5

*

*

AS1289.1.2.1 part 6.4b

Silty Gravelly Clay Brown Grey

Silty Gravelly Clay Brown Grey

Hilf Density Ratio (%):

Date Sampled: 10/03/2017

Material Description:

B.P.Mott

Project:

Location:

Test Request No / Lot No:

Layer Thickness: (mm)

Depth Below FSL/CSL:

Compaction Type:

Sampling Method:

*

*

Revision Nº: REV 0

17B0238

1 of 2

Report Nº:

Sheet:

FSL

Date of Report: 16/03/2017

*

Standard

Approved Signatory:

Argyle Park Estate, Ascot

House Blocks

No If Stabilised Time from

Stabilisation to Lab Test:

*

17B0238A *

*

Material Stabilised:

17B0238

17B0238

Test Number:

Print Date: 16/03/2017. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.

Page 18: Earthworks Supervision Report for A&B Earthmoving · Report: 17C 0543 Report.docx Page 5 3 INSPECTION AND TESTING Inspection of the excavated bases were conducted by a Senior Geotechnical

R53 Version: 02 April 2016

COMPACTION ASSESSMENT

Nuclear Gauge Method Hilf (Wet) Density Ratio

TEST REPORT:

Client: A & B Earthmoving

4 Stanson Place

MAIDEN GULLY

VICTORIA 3551

55H26

593

As Per: AS1289 5.7.1 5.8.1

B.P.Mott

2 of 2

Report Nº:

Sheet:

Date of Report: 16/03/2017

Revision Nº: REV 0

Approved Signatory:

*

Adj. Moist. Variation: % (Wet/Dry)

*

*

*

Lot 1 Lot 2 * *

Probe Depth: (mm) 275

Moisture Content: % * * *

17B0238

HILF DENSITY RATIO (%): 102.5 97.5 * *

* * * * * *

* * *

*

0.5Wet 3.0Wet * * * *

* * *

* *

* *

FSL FSL * * * *

Chainage:

Reduced Level: (mm)

2.16 * *

2.18 2.11 * *

19 19 * *

*

Time of Test: 1.09pm 1.17pm * * * *

*

*

0.0 0.0

* *

Test Number: 17B0238A 17B0238B *

*4783 4768

Adj. Peak Conv. Wet Density: t/m3 * *

Refer to Map

1103

Refer to Map

1101

*

*

275 *

Moisture Variation: % (Wet/Dry)

#Eastings:

Project Test Number:

#Northings:

* * * * * *

*Percentage Oversize Wet:

*Oversize Sieve Size: (mm)

* * *

Offset / Centre Line:

#Map Datum AUS84

Peak Conv. Wet Density: t/m3

Field Wet Density: t/m3

**

*

*

*

*

*

*

* *

*

2.13

Print Date: 16/03/2017. The controlled version of this document is on the Sandhurst Geotech P/L computer. This document is only controlled for the date shown on the bottom of the page.