BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 2
CHAPTER-2
LOCATION
A. Detail of the Area
State Chhattisgarh
District Surajpur
Taluka Surajpur
Village Ramnagar
Khasra No. 1397
Forest Range No
Forest Division/Circle No
Lease area (hectares) 2.40ha
Whether the area is recorded to be in forest (please specify whether protected, reserve etc.)
No.
Ownership/Occupancy Govt. land --Private land 2.40haForest land --
Existence of public Road/ railway line, if any, nearby and approximate distance
The area is about 18km from District HQSurajpur. The nearest railway station Bishrampur is about 8km.
Toposheet No with Latitude/ Longitude
Toposheet No. 64 I/16
BP. No. LATITUDE LONGITUDE
A 23°13'47.25"N 82°56'53.67"E
B 23°13'44.70"N 82°56'52.22"E
C 23°13'45.08"N 82°56'50.86"E
D 23°13'42.95"N 82°56'49.44"E
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 3
E 23°13'44.23"N 82°56'44.82"E
F 23°13'43.72"N 82°56'44.04"E
G 23°13'45.55"N 82°56'43.05"E
H 23°13'45.63"N 82°56'44.67"E
I 23°13'46.51"N 82°56'45.19"E
J 23°13'46.46"N 82°56'45.75"E
K 23°13'47.57"N 82°56'46.05"E
Land Use Pattern
(Forest, agricultural, grading, barren, etc.)
Area of quarry lease is 2.40ha on the owner's private land.
It is non forest, non agriculture area.
The Khasra-wise detail of the applied lease area is as under:
Khasra No. Area Type of land
(ha) (acres)
1397 2.40 5.93 Private ownedland
B. Attach a map showing boundaries of the mining lease, adjoining area, roadways, railways, natural drainage system and other surface features,
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 4
if any. It is preferred that the area be marked on a Survey of India topographical map or a cadastral map or forest map as the case may be. However if none of these are available, the area should be marked on a plan prepared especially for the purpose on a scale of 1: 50000 linking it with any important reference point available in and around the area.
Key plan with demarcated area in Survey of India topographical map on
scale 1:50,000 is enclosed as Plate No.1
Ground Control Point:
Road crossing at about 50m in east direction from the area. GPS co-
ordinate23°13'47.00"N 82°56'58.61"E shown in the Google map.
Infrastructure Facilities:
Sr. No.
Available Facilities Village Distance from the Area
1. District headquarter Surajpur About18 km
2. Nearest Railway Station
Bishrampur About 8 km
3. Tehsil Surajpur About 18 km
4. Nearest Airport Raipur About 330km
5. Nearest Forest Protected Forest About 0.4 km
6. Nearest River / Nala Rehar river About 2 km south of the area
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 5
CHAPTER-3
GEOLOGY AND EXPLORATION
A. Briefly describe the general topography explaining whether it is a Plain
land or hilly area and local geology of the mineral deposit within the
leasehold. Attach a geological plan on 1:1,000 / 1:2,000 scale with 1-2 m
contour intervals.
Topography and Drainage
The area is almost a horizontal plain with scanty vegetation. It is about 1.5km from
the village Ramnagar in the north east direction.
The area is almost flat and elevation is about 544m from M.S.L., accordingly it has
been shown in the map/plan. The lease area has been surveyed on a scale of
1:1,000.
The drainage pattern is dendritic to sub dendritic.
Climate
Surajpur district has a warm and temperate climate and receives an average rainfall
of 130 cm. Temperate records show the maximum temperate is about 32.9 °C in
May and minimum temperature is 16.7 °C in December.
Regional Geology
The area comes under consideration is occupied by the Barakar formation of
Gondwana Supergroup. The Barakar Formation comprises of coarse to medium
grained feldspathic sandstone, grey shale, carbonaceous shales and coal seams.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 6
The geological succession of Gondwana Supergroup is as below:
Deccan trap Dykes, Sills and Basalt flows
Upper Gondwana
----------------------------------------- Unconformity -------------------------------------------------
Lower Gondwana
Local Geology:
The area around Ramnagar village comes under Barakar Formation of
Gondwana Supergroup. The Barakar Formation comprises of coarse to medium
grained feldspathic sandstone, grey shale, carbonaceous shales and coal seams.
A Surface Geological Plan and Geological Cross Section on a scale of 1: 1000
are attached, showing general topography and geology of the area.
Sandstone, siltstone, shale with
coal streaks
Sandstone, shale, carbonaceous
shale with coal bands
Sandstone, shale, carbonaceous
shale with coal seams
[
Shale, sandstone, tillite
Raniganj formation
Barren measures
Barakar Formation
Talchir Formation
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 7
B. Describe briefly prospecting / exploration work done to date viz.
geological mapping with the evidence already existing about the mineral
deposit in the area or in the vicinity.
Not applicable.
C. Describe briefly, exploration proposed to be carried out year wise, for
the next five years indicating same on the geological plan.
Not applicable.
D. Spot or spots where the Quarrying operation is proposed and proposed
maximum depth of quarrying operation.
The lease area is almost flat and covered by soil. The thickness of soil in this
area is more than 2m as it is seen exposed in a pit nearby the quarry area. The
depth has been considered 2m from top surface for quarrying as per MoEF
guideline dated 24.06.2013.About 0.2 m thick upper A0 part of soil is humus
hence after removal of this specific part of humus and preserving it separately
1.8mdepth of soil will be considered for excavation and production. The
proposed method of quarrying will be open cast.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 8
CHAPTER-4
RESERVES
The thickness of soil is more than 2 meters in this area. As the humus part of soil is
about 0.2 m, therefore only 1.8 m depth of soil is taken for reserve calculation. The
reserve of brick earth is calculated by volumetric method.
Geological Reserve of Brick Earth Quarry
Area (m2) x depth = Volume (m3)
24000 x1.8 = 43200cubic meter
Total geological reserve comes to 43200m3
Blockage of Reserve
A. Reserve Blocked in Mine Limit
900x 1.8 =1620 cubic meter
B. Reserve Blocked in Benches
Brick earth blocked in bench slopes considering the pit slope to be 450
= (Perimeter x Cross section area of bench)
= 782x 1.8 x 1.8 x 0.5
=1266.84cubic meter
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 9
C. Reserve Blocked in Chimney (Proposed within lease)
1756 x 1.8 = 3160.8 cubic meter
Total Blocked Reserve (A+B+C) = 6047.64cubic meter
Mineable Reserve= (Geological reserve– Blocked reserve)
=43200–6047.64
= 37152.36cubic meter
Recoverable Reserve = 37152.36x 0.95(0.5% mining loss)
= 35294.74cubic meter
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 10
CHAPTER- 5
DEVELOPMENT AND PRODUCTION PROGRAMME
QUARRYING
a) Method of quarrying
Quarrying will be carried out by manually open-cast method adopting a system of
benches labors are deployed for quarrying.
Proposed five year quarrying layout plan has been shown in Plate No. - 7 (Five
year development and production plan) and Cross sections in plate-8.
b) A tentative scheme of quarrying, annual program and plan for excavation from year to year for five year
Quarry development and production work by means of removal of top humus layer
about 0.2m will be taken up from western part of the area of 1.07 ha taken for
exploitation in 1st five year plan period, simultaneously quarrying will be started
from this part during the 1st year and will continue in the presiding years of 1stfive
year plan period. The proposed method of quarrying will be open cast.
In first year of this plan period, removal of top soil (humus layer) over an area
of2162m2 will be taken up from western part. The humus soil generation will be
about 432.4cubic meters which will be stacked in lease boundary for afforestation.
The area for excavation of brick earth will be2125m2 in 1st bench of having 0.8m
and 1953 m2 in 2nd bench having 1.0 m depth. Total production quantity of brick
earth in this area will be 3653cubic meter, shown in the Plate no7.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 11
The Bench RL will gradually be reduced RL 543.8mto the bottom RL542m.
In Second year of this plan period, removal of top soil (humus layer) over an area
of 2125m2 will be taken up from western part. The humus soil generation will be
about 425 cubic meters which will be reclaimed in 0.09 ha area with waste material
generated during brick making in western part of lease area. The area for
excavation of brick earth will be 2106 m2 in 1st bench of having 0.8 m and 2021 m2
in 2nd bench having 1.0 m depth. Total production quantity of brick earth in this
area will be 3705.8 cubic meter.
The Bench RL will gradually be reduced RL 543.8m to the bottom RL 542m.
In Third year of this plan period, removal of top soil (humus layer) over an area
of 2120m2 will be taken up from western part. The humus soil generation will be
about 424cubic meters which will be reclaimed in 0.09 ha area with waste material
generated during brick making in western part of lease area. The areas for
excavation of brick earth will be2110 m2 in 1st bench having 0.8m and 2071m2 in
2nd bench having 1.0 m depth. Total production quantity of brick earth in this area
will be 3759cubic meter.
The Bench RL will gradually be reduced RL 543.8m to the bottom RL 542m.
In Fourth year of this plan period, removal of top soil (humus layer) over an area
of 2122m2 will be taken up from central part. The humus soil generation will be
about 424.4 cubic meters which will be reclaimed in 0.09 ha area with waste
material generated during brick making in western part of lease area. The area for
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 12
excavation of brick earth will be 2112 m2 in 1st bench having 0.8m and 2091m2 in
2nd bench having 1.0 m depth. Total production quantity of brick earth in this area
will be 3780.6 cubic meter.
The Bench RL will gradually be reduced RL 543.8m to the bottom RL 542m.
In Fifth year of this plan period, removal of top soil (humus layer) over an area of
2196m2 will be taken up from central part. The humus soil generation will be about
439.2 cubic meters which will be reclaimed in 0.8 ha area with waste material
generated during brick making in western part of lease area. The area for
excavation of brick earth will be 2187 m2 in 1st bench having 0.8m and 2031m2 in
2nd bench having 1.0 m depth. Total production quantity of brick earth in this area
will be 3780.6 cubic meter.
The Bench RL will gradually be reduced RL 543.8m to the bottom RL 542m.
Year wise 5 year’s development and production plan and sections attached as
Plates no. 7 & 8.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 13
Plate No. - 7 (Five year development and production plan) and Cross sections
in plate-8.
Summary of year wise working program of five year
YEARWISE PRODUCTION
AREA in m2
DEPTH in (m)
VOLUME(m3)
VOLUME PER YEAR
(Brick Earth + 25% Fly ash)
Gross Brick
Production(in Nos.)
Ultimate depth of pit
1st year 1st bench 2125 0.8 1700.00 (3653.00+913.25)=4566.25
2054812.5543.8 – 543.0
1st year 2nd bench 1953 1.0 1953.00 543.0 – 542.0
2nd year 1st bench 2106 0.8 1684.80 (3705.80+926.25)=4632.05
2084422.5543.8 – 543.0
2nd year 2nd bench 2021 1.0 2021.00 543.0 – 542.0
3rd year 1st bench 2110 0.8 1688.00 (3759.00+939.75)=4698.75
2114437.5543.8 – 543.0
3rd year 2nd bench 2071 1.0 2071.00 543.0 – 542.0
4th year 1st bench 2112 0.8 1689.60 (3780.60+945.15)=4725.75 2126587.5
543.8 – 543.0
4th year 2nd bench 2091 1.0 2091.00 543.0 – 542.0
5th year 1st bench 2187 0.8 1749.60 (3780.60+945.15)=4725.75
2126587.5543.8 – 543.0
5th year 2nd bench 2031 1.0 2031.00 543.0 – 542.0
Total - - 18679.00 23348.55-
-
The production of soil as shown in the above table will manufacture around
21,26, 587 bricks (with 25% fly ash) per year.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 14
c) A tentative scheme of quarrying, annual program and plan for excavation after five year
In the 2nd five year plan period the quarry development and production work by
means of removal of top humus layer about0.2m will be taken up in the area of
1.07 ha. Simultaneously quarrying will be started from this part during 2nd Five
year of this plan period and will continue in the presiding years of plan period. The
proposed method of quarrying will be open cast.
In Sixth year of this plan period, removal of top soil (humus layer) over an area of
2169m2 will be taken up from central part. The humus soil generation will be about
433.8 cubic meters which will be reclaimed in 0.10 ha area with waste material
generated during brick making in western part of lease area. The area for
excavation of brick earth will be 2160 m2 in 1st bench of having 0.8 m and 2124 m2
in 2nd bench having 1.0 m depth. Total production quantity of brick earth in this
area will be 3852 cubic meter.
The Bench RL will gradually be reduced RL 543.8m to the bottom RL 542m.
In Seventh year of this plan period, removal of top soil (humus layer) over an area
of 2216m2 will be taken up from central part. The humus soil generation will be
about 443.2 cubic meters which will be reclaimed in 0.10 ha area with waste
material generated during brick making in western part of lease area. The area for
excavation of brick earth will be 2206 m2 in 1st bench of having 0.8 m and 2124 m2
in 2nd bench having 1.0 m depth. Total production quantity of brick earth in this
area will be 3888.8 cubic meter.
The Bench RL will gradually be reduced RL 543.8m to the bottom RL 542m.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 15
In Eighth year of this plan period, removal of top soil (humus layer) over an area
of 2279m2 will be taken up from eastern part. The humus soil generation will be
about 455.8 cubic meters which will be reclaimed in 0.10 ha area with waste
material generated during brick making in western part of lease area. The area for
excavation of brick earth will be 2259 m2 in 1st bench of having 0.8 m and 2117 m2
in 2nd bench having 1.0 m depth. Total production quantity of brick earth in this
area will be 3924.2 cubic meter.
The Bench RL will gradually be reduced RL 543.8m to the bottom RL 542m.
In Ninth year of this plan period, removal of top soil (humus layer) over an area
of 2023m2 will be taken up from eastern part. The humus soil generation will be
about 404.8 cubic meters which will be reclaimed in 0.10 ha area with waste
material generated during brick making in western part of lease area. The area for
excavation of brick earth will be 2002 m2 in 1st bench of having 0.8 m and 1816 m2
in 2nd bench having 1.0 m depth. Total production quantity of brick earth in this
area will be 3417.6 cubic meter.
The Bench RL will gradually be reduced RL 543.8m to the bottom RL 542m.
In Tenth year of this plan period, removal of top soil (humus layer) over an area
of 1980m2 will be taken up from eastern part. The humus soil generation will be
about 936 cubic meters which will be reclaimed in 0.10 ha area with waste material
generated during brick making in western part of lease area. The area for
excavation of brick earth will be 1953 m2 in 1st bench of having 0.8 m and 1821 m2
in 2nd bench having 1.0 m depth. Total production quantity of brick earth in this
area will be 3383.4 cubic meter.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 16
The Bench RL will gradually be reduced RL 543.8m to the bottom RL 542m.
Year wise after 5 year’s development and production plan and sections attached
as Plates no. 9 & 10.
Plate No. - 9 (Development & Production Plan after 5 year) and Cross sections
in plate-10.
Summary of year wise working program after five year
YEARWISE PRODUCTION
AREA in m2
DEPTH in (m)
VOLUME
(m3)
VOLUME PER YEAR
(Brick Earth + 25% Fly ash)
Gross Brick
Production(in Nos.)
Ultimate depth of pit
6th year 1st bench 2160 0.8 1728.00 (3852.00+963)
= 48152166750
543.8 – 543.0
6th year 2nd bench 2124 1.0 2124.00 543.0 – 542.0
7th year 1st bench 2206 0.8 1764.80 (3888.80+972.2)
= 48612187450
543.8 – 543.0
7th year 2nd bench 2124 1.0 2124.00 543.0 – 542.0
8th year 1st bench 2259 0.8 1807.20 (3924.20+981.05)
= 4905.252207363
543.8 – 543.0
8th year 2nd bench 2117 1.0 2117.00 543.0 – 542.0
9th year 1st bench 2002 0.8 1601.60 (3417.60+854.4)
= 42721922400
543.8 – 543.0
9th year 2nd bench 1816 1.0 1816.00 543.0 – 542.0
10th year 1st bench 1953 0.8 1562.40 (3383.40+845.85)
= 42291903163
543.8 – 543.0
10th year 2nd bench 1821 1.0 1821.00 543.0 – 542.0
Total - - 18466.00 23082.2 - -
The production of soil as shown in the above table will manufacture around
2207363 bricks (including 25% fly ash) per year.
The following steps are involved in the brick manufacturing:
i) The basic raw material is brick earth with requisite plastic properties. The
requirement for 100000 bricks is as follows:
Brick Earth: about 180 cubic meters (including 25 % fly ash)
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 17
Coal: About 20 tones
Water: 50-60KL.
ii)Tempering: The Brick Earth is mixed with water to get right consisting either
manually or with pug mills.
iii) Moulding : The tempered Brick Earth is then rolled in sand and shaped into
mould. The sand prevents the Brick Earth from sticking to mould.
iv) Drying: Sun drying in open air is carried for 10 days or so.
v) Firing: The sun dried bricks are arranged in the kiln and insulation is done by
mud pack. The firing is done through the fire hole and the kiln is kept in sealed
condition to keep the heat inside for about a week.
vi) Sorting: The sorting is done on basis of coloration which is an indication of
level of burning.
d) Conceptual Quarry plan:
The estimated minable reserves from this area are of the order of 3
7152.36 cubic meters and recoverable reserve (0.95%) is 35294.74 cubic
meters up to a depth of 2m from the top surface. The conceptual quarry plan is
prepared for the lease period of 10 years and anticipated life of mine is about 10
years. As shown in the conceptual plan plate no. 11.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 18
Ultimate pit limit is fixed keeping final pit slope at the angle of 45o. This will
cover about 2.15ha area and the ultimate depth will be 2m from the surface as
per MoEF guideline dated 24.06.2013.
This plate also shows proposed dumping and program of afforestation. As post
quarrying land use, it will be reclaimed with humus part of soil. After
reclamation it will be used for afforestation.
No any type of rehabilitation will be required in the proposed area because there is
no any important monument, structure or villages come in the core zone.
Exploration:
Exploration is not required.
Drilling:
Drilling will not be required.
Dumping of Waste materials:
Not required in conceptual period.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 19
Afforestation:
Afforestation will be taken up in 0.09 ha on lease boundary of the quarry lease and
0.19ha in reclaimed area. Yearly approx 700 saplings of the local species will be
planted in the proposed area.
The following table describes the area proposed for quarrying as a part of the
Conceptual Quarry Plan (lease applied for 10 years)-
Particulars Area required in hect. During
First five Years Second Five years
Quarrying 1.07 1.07
Dumping (soil) 0.09 (on lease
boundary)
0.09(reclaimed area)
0.10 (reclaimed area)
Afforestation 0.09 (on lease
boundary)
0.09(reclaimed area)
0.10(reclaimed area)
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 20
Open-cast Quarrying
Quarrying method is a manually Open- cast quarrying by a system of
benches. The depth of bench will be maintained at 1.0m and 0.8m.
Loading:
Loading of brick earth are done by local labours.
Haulage and Transporting:
Mostly trucks/ tippers will be used for transportation of loadable brick from
the area to consumers.
e) Underground Workings:
Not applicable
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 21
CHAPTER- 6
MANPOWER DEPLOYMENT
State average daily employment and statutory personals:
The quarrying activity has fare chances of employment of local people. In this
quarry also about 30 unskilled labors will be required for quarrying of brick earth
and for loading the bricks on trucks/tippers etc. At least one skilled person will be
required for supervision purpose, maintenance of record of production and
dispatch etc.
CHAPTER- 7
USE OF MINERAL
Describe the utilization of mineral and type of industry.
The area under study has brick earth. This brick earth can be very well exploited as
ordinary clay as per Part C 5 of Schedule – I Specified Minerals of
Chhattisgarh Minor Mineral Rules, 2015, for making bricks to be used as
building material
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 22
CHAPTER-8
WASTE DISPOSAL ARRANGEMENTS
a) Selection of dumping site:
The area selected for dumping is on lease boundary0.09haand 0.19 ha area will
be reclaimed with waste material generated during brick making in western
part of lease area. Location of the proposed dumping site is shown in five year
development and production plan (Plate no. 7).
b) Maximum height and spread of dump:
About 0.09ha area along lease boundary and about 0.19ha (reclaimed area)will
be proposed to accommodate this soil material. Dumping of soil will be
stacking up the height of 0.5m along lease boundary and 2m in reclaimed area.
c) Stacking of sub-grade materials:
Sub grade material is nothing but crushed material of bricks which will be used
for reclamation purpose.
d) Selection of site for stacking:
Not required.
e) Height and spread of stacks:
Height of soil dump shall be maintained by 0.5m with angle of repose 30 to
35 degrees.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 23
CHAPTER-9
ENVIRONMENT MANAGEMENT PLAN
Measures of protection of environment, especially against air and water pollution due to Quarrying operation
Land use pattern:
Articles Land use at the end of 5 years in
Hect.
Forest Land
Private own Land
Stony waste Land
Land use at the end of 10 years
in Hect.
A. Lease Area 2.40 - 2.40 Nil 2.40
B. Quarrying & allied
1. Area under pits1.07 - 1.07 Nil 2.14
2. Area for dumping 0.09(Along lease boundary)
0.09(reclaimed area)
- 0.09(Along lease boundary)
0.09(reclaimedarea)
Nil 0.09(Along lease boundary)
0.19(reclaimed area)
3. Area for road - - - - -
4. Area for Infrastructure
- - - - -
5. Plantation 0.09(Along lease boundary)
0.09(reclaimed area)
- 0.09(Along lease boundary)
0.09(reclaimed area)
- 0.09(Along lease boundary)
0.19(reclaimed area)
6. Storage of Mineral - - - - -
7. Restricted area - - - - -
8. Chimney 0.17 - 0.17 - 0.17
9. Unused area 1.07 - 1.07 - -
Total 2.40 2.40 2.40
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 24
Quarrying Area:
The quarry lease area is 2.40 ha. It is a non forest, non agricultural private own
land. The area is flat terrain with scanty vegetation.
No any area of archaeological important structure, sanctuaries is lying within 10
km radius.
Human Settlement:
Nearest village Ramnagar is present about 1.5 km south west of the lease area.
No villages or human dwelling are within the quarry lease. So there will not be
any need for re-settlement. The human settlement in the buffer zone is given
below. (Within the radius of 5km)
Environment Impact Assessment Statement:
Mining / quarrying in general affects the environment by way of breaking and
defacing the land, removing vegetation, generating dust etc. Following are some of
the major impacts of this quarrying on environment.
Sr. No.
Name of village Distance(km) Direction
1 Ramnagar 1.5 SW2 Laxmanpur 2.0 NE3 Kumda 2.7 E4 Govindpur 2.8 NE5 Rampur 3.1 NW
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 25
Land Environment:
The proposed quarrying operations will only be confined to the applied area of
2.40ha and it is not going to affect the surrounding areas. Inside the area, the
proposed production will be carried out by removing soil and dumping of humus
part of soil will be stacked on lease boundary. The extents of land use in hectare
for mining purposes in each 5 year plan periods are given below-
Air Environment:
Source of Air Pollution
Quarrying of brick earth does not have any activity which becomes the source of
air pollution. Only vehicles used for transportation purpose may cause moderate
emissions, within the permissible norm of limit. Haulage road also generate dust
due to movement of transport vehicles.
Particulars Area required in hect. During
First five Years Second Five years
Quarrying 1.07 1.07
Dumping (soil) 0.09 (on lease boundary)
0.09 (reclaimed area)
0.10 (reclaimed area)
Afforestation 0.09 (on lease boundary)
0.09 (reclaimed area)
0.10 (reclaimed area)
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 26
Mitigation Measure:
1. Development of green belt along quarrying area boundary and Humus
part of soil.
2. Water sprayers shall be installed and operated at strategic locations.
3. The approach road to site of quarry area (including the storage site if it is at
different place) from the nearest public road for the transportation of raw
material/final products must be paved or hard surfaced.
4. Active haul roads inside the works should be adequately wetted with water
(Preferably recycled and treated waste water).
5. Exhausts of trucks for transportation of materials within the site should be
directed upward.
6. Wheel cleaning facilities should be provided, for delivery trucks leaving
the works, for the removal of mud.
Water Environment:
Likely impact of mining on water table
The area does not falls in notified area under Water Act 1974. The quarrying
activity will be confined to the lease area and there are no perennial streams. No
ground water pollution will be there as the waste/soil dump.
Water will not be used for any processing applications in the present quarrying
area. Hence, there is no question of effluent generation. The water will be used
only for sprinkling on haul roads, dust suppression purposes at loading,
afforestation purposes and domestic use like washing/drinking etc.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 27
Details of modification/diversion of natural drainage system /Obstruction of water channels and measures taken
No modification / diversion are required.
Measures taken for minimizing silting and contamination of water
Not required.Requirement of water for quarrying operations
Water storage facility (minimum 3000 liters) will be provided at the quarry site
for the making brick and also small quantity of water is required for drinking
and dust suppression purpose which will be meet out from the bore well/river
nearby.
Source of water
Not available.Noise & Vibration:
No generation of noise and vibration as the quarrying activity and loading of bricks
will be done manually. Transport vehicles may generate noise which will be within
the permissible norm of limit.
Storage of explosive (like capacity and type of explosive magazine)
Not applicable.
Human Environment:
The contributing factors that affect the health of people are dust, gaseous
pollutants in the quarry. These are categorized as occupational hazards.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 28
Social Infrastructure
It is expected that the project will lead to much needed employment opportunities
in the villages which will contribute to the socio-economic development of this
area.
Rehabilitation and Resettlement (R & R) Plan
Not required as the area is away from village and free from rehabilitation.
Stabilization and Vegetation of dumps:
Dump slopes will be stabilized by planting saplings, grass and good root
bearing saplings such as local species. Afforestation will be done along the
lease boundary.
Development of green belt by planting about 700 trees during this plan period.
Sewerage System
In view of the personals engaged in the project the movable type of sewerage
system may be installed /deployed nearby the quarry area. This may avoid
polluting the land / water / air of the area.
Environmental Monitoring:
To assess the prevailing quality of the air, water etc. a regular monitoring of
these parameters will be made to arrive at improvement/ protection measures.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 29
CHAPTER-10
Measures to be taken for reclamation of land
Mined out land
The estimated mineable reserve in the area is 37152.4cubic meter up to depth of
2m from the top surface. A total of 1.07ha area has been earmarked for quarry
workings in fist five year. Whereas, by the end of this plan period, a production
level of about 3780.60 cubic meter (About 21.26 Lack bricks including 25% fly
ash)) will be achieved. Part of the first five year dump will be taken up for
afforestation.
In 2nd five year plan period a total of 1.07ha area has been earmarked for quarry
workings. Whereas, by the end of this plan period, a production level of about
3924.2 cubic meter (About 22.07 Lack bricks including 25% fly ash) will be
achieved. Ultimate pit limit is fixed keeping pit slope at the angle of 45o.
Storage and prevention of topsoil
The top humus soil to be encountered in this plan period will be selectively
removed and stacked in the area of 0.09ha along the lease boundary. After 2nd year
production top humus soil will be dump in 0.19 ha on western part of lease area.
Further this will be planned to utilize for afforestation purposes. Height of dump
will be maintained up to 0.5m along lease boundary.
Proposal for reclamation of land affected by quarrying activities during
and at the end of the lease:
At the cessation of quarrying operations the removed humus part of soil will be
reclaimed in excavated area than plantation will be taken up above them.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 30
CHAPTER-11
Quarrying Closure Plan
Introduction
The area applied of 2.40 hectare falls between the Latitude23°13'42.95"N to
23°13'47.57"N and Longitude 82°56'43.05"E to 82°56'53.67"E, in the survey of
India Toposheet No. 64 I/16. The area comes under Surajpur District (C.G.).
This Quarry Plan is prepared along with Progressive Quarry Closure Plan.
Land Use:
Area of quarry lease is 2.40ha on the owner's private land. The area for quarrying
is covered by soil with scanty vegetation. A private own land is 1.07 ha fully
utilized for quarrying purpose in 1st five year.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 31
Land use distribution proposed for quarrying and its allied works and ultimate land use details are given:
Articles Land use at the end of 5 years in
Hect.
Forest Land
Private own Land
Stony waste Land
Land use at the end of 10 years
in Hect.
A. Lease Area 2.40 - 2.40 Nil 2.40
B. Quarrying & allied1. Area under pits
1.07 - 1.07 Nil 2.14
2. Area for dumping 0.09 (Along lease boundary)
0.09(reclaimed area)
- 0.09(Along lease boundary) 0.09 (reclaimed
area)
Nil 0.09 (Along lease boundary)
0.19(reclaimed area)
3. Area for road - - - - -
4. Area for Infrastructure
- - - - -
5. Plantation 0.09(Along lease boundary)
0.09(reclaimed area)
- 0.09(Along lease boundary)
0.09(reclaimed area)
- 0.09(Along lease boundary)
0.19(reclaimed area)
6. Storage of Mineral - - - - -
7. Restricted area - - - - -
8. Chimney 0.17 - 0.17 - 0.17
9. Unused area 1.07 - 1.07 - -
Total 2.40 2.40 2.40
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 32
Quarrying Method:
Quarrying will be carried out by manually open-cast method adopting a system
of benches. Manual labors are deployed for quarrying operation. Bricks will be
loaded by labors. Trucks and tippers will be used for transportation of Bricks.
Reasons for closure:
Quarry depth is to be restricted to 2 m from the surface as per MoEF guidelines
/ directions dated 24.06.2013, hence the quarry will be closed at the end of this
plan period as per the restrictions mentioned above.
Statutory Obligation:
Any legal statutory obligations from State Government, Mineral Resource
Department, Ministry of Environment & Forest, State and Central Pollution
Control Board or by any other Govt. Organization will be implemented.
Closure Plan Preparation:Applicant
Shri Babulal Yadav
Tehsil - Surajpur
District- Surajpur
(Chhattisgarh)
RQP:
Bhupendra Kumar Kashyap
RQP/DGMCG/37/2015
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 33
Mine Description
Geology: Please refer chapter 3.0 of the Quarry plan.
Reserves: Please refer chapter 4.0 of the Quarry plan.
Mined out land
The estimated mineable reserve in the area is 37152.4 cubic meter up to depth of
2m from the top surface. A total of 1.07 ha area has been earmarked for quarry
workings in fist five year. Whereas, by the end of this plan period, a production
level of about 3780.6 cubic meter (About 17 Lack bricks) will be achieved. Part of
the first five year dump will be taken up for afforestation.
In 2nd five year plan period a total of 1.07 ha area has been earmarked for quarry
workings. Whereas, by the end of this plan period, a production level of about
3924.2cubic meter (About 17.6 Lack bricks) will be achieved.
Environmental Parameters:
1. Water Quality Management
The level of water table is about 10m depth, therefore chance of encountering
the same during proposed quarrying is nil.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 34
2. Air Quality Management
It is proposed to deploy Water Tankers to suppress the dust by regular water
spraying on all the roads used for haulage.
3. Top Soil Management:
Top humus part of soil wherever encountered will selectively be removed and
stacked for further use in reclamation and afforestation purposes on dumps.
4. Tailing Dam Management:
No tailing dam is proposed
Infrastructure:
Statutory Buildings will be built of Temporary structures, which can be
dismantled easily and sold as scrap at the final stage of closure.
Quarrying Machinery:
Not required as quarrying will be carried out by manually open-cast method
adopting. Only trucks and tippers will be hired for transporting of brick.
BRICK EARTH QUARRY& BRICK KILN PROJECTArea – 2.40 Ha. Village – Ramnagar
Tehsil -Surajpur, District – Surajpur (C.G.)
Page | 35
Safety and Security:
The total area excavated will be fenced properly with single opening left for the
workers engaged in closure plan work.
Disaster Management & Risk Assessment:
No high risk accidents are anticipated, as the project is an open cast semi
mechanized type of operation in a fairly stable area and free from land
subsidence, earthquake etc. no tailing dam is proposed and risks associated with
it will not come into picture.
However, in case anything happens then the designated Quarry Manager will
take care and manage the situation. A communication and transport facility
owner will be provided to them at their disposal which will help in evacuating
persons involved in any accidents.
Care and maintenance during temporary discontinuance:
During such time, the area will be fenced and temporary staff will be arranged
for taking care and maintenance.
Financial Assurance
Financial Assurance of Rs. 75000.00/- will be submitted to the authorities as the
lease area is 2.40 ha. (25000.00 Rs. Per hectare as per Rule 29 (1) of
Chhattisgarh Minor Mineral Rules 2015).