    Government of The Republic of Indonesia

    Ministry of Public Works

    Directorate General of Water Resources

    PIRIMPParticipatory Irrigation Rehabilitation-Improvement

    Management Project

    (JICA Loan No. IP-5!"

    #raining Material$

    o%

    & lit C t l

  • 7/26/2019 E10 Earth Wk

    2/102

    & lit C t l

    PIRIMP

    #raining Material$o%

    &'ality Control

    +arth ,or$

  • 7/26/2019 E10 Earth Wk

    3/102

    1 Excavation Criteria

    - Cutting slope gradient

    - Judgment of excavated material as embankment material

    - Judgment of soft foundation

    1) Cutting Slope Gradient TS B-3!

    Structure in common soil areaSlope "1 # m) $

    Condition for %xcavation&imension

    - 1 # '( non sand and gravel

    1 # 1' sand and gravel

    - ermanent exposed slope1 # 1' to 1 # 1( above *ater

    1 # !' under *ater

    -'(m

    -

    '(m

    !) Judgment of excavated material as embankment material

    TS B-3+1, +!3

    - &max 1'' mm

    - lastic .ndex ".) / 1( 0

    - oisture content

    2 (0 2 2 30

    Cutting slope for temporar6 exposedsurface

    7ori8ontal distance from bottomoutside edge of foundation

    Berm *idt9 at ever6 3'm dept9 ofexcavation

    &1''

    &

  • 7/26/2019 E10 Earth Wk

    4/102

  • 7/26/2019 E10 Earth Wk

    5/102

    2opt

  • 7/26/2019 E10 Earth Wk

    6/102

  • 7/26/2019 E10 Earth Wk

    7/102

    !erial "o #

    C6+C LI7# 18R CANAL97#R:C#:R+ 18:N2A#I8N

    Date$Month$%ear # $ $ Weather # &ine' (loudy' Rai

    (ontractor# (ontract "o) #

    "ame of (anal$!tructure# *ocation#

    + , -

    - + +

    - .

    7e= "2$>)$1Eust moisture

    (

  • 7/26/2019 E10 Earth Wk

    20/102

  • 7/26/2019 E10 Earth Wk

    21/102

    Procedure of Trial Emban

    Borro !rea ("tock#ile)

    $aborator% Test

    Com#action

    of foundation to a"less t9an 1(cm)

    content

    OMC

    +3%

    OM

    C

    MDD 2n

    DryDensity Gr

    P75>7%

    oints $ anel

  • 7/26/2019 E10 Earth Wk

    22/102

    %-(

    ;os

  • 7/26/2019 E10 Earth Wk

    23/102

    kment (2/2)

    :C anual T-B31

    .

    etc

    Dmax

  • 7/26/2019 E10 Earth Wk

    24/102

    %-

    f assing

  • 7/26/2019 E10 Earth Wk

    25/102

    &@ ;),) &re1uency E Timin/ of &ield$*aboratory Test

    &ta.1

    &ta.2

    &ta.3

    3rd 'ayer

    2nd 'ayer1st 'ayer

    !chematic *on/itudinal !ection

    #ime 7che*'le

    3rd 'ayer

    2nd 'ayer

    1st 'ayer

    F() * * * * * * * * * * * * + + + , , , + + +

    F)

    2/1/0 May

    Comaction * + ,

    ermea!ility * + ,

    article sie * + ,

    '' ' * + ,

    &ecific 4ty * + ,

    =orro< Area > A

    =orro< Area > =

    Note : Comaction

    ermea!ility F(): 1 test 5 3 samles 6 shift

    article sie once 6 a month F): once 6 % samles

    once 6 $/0/// m6

    2

    ,

    6 +

    2

    ,

    6 +

    - .

    - .

    A

    d

    Test

  • 7/26/2019 E10 Earth Wk

    26/102

    '' ' at each chan7e of material

    &ecific 4ty

    E-8

    ;

  • 7/26/2019 E10 Earth Wk

    27/102

    &ta.9

    + + + + + +

    2/1/0 une

    A

    Test

  • 7/26/2019 E10 Earth Wk

    28/102

    :

  • 7/26/2019 E10 Earth Wk

    29/102

    4ield Test "&ensit6 F ermeabilit6)

    about !'cm

    !'G3'cm

    Sand @eplacement

    2ater @eplacement

    lastic bag

  • 7/26/2019 E10 Earth Wk

    30/102

    %-D

  • 7/26/2019 E10 Earth Wk

    31/102

    4ieldermeabilit6Test

  • 7/26/2019 E10 Earth Wk

    32/102

  • 7/26/2019 E10 Earth Wk

    33/102

    4&T "4ield &ensit6 Test)

    Sand @eplace et9od 1$!

    reof s

  • 7/26/2019 E10 Earth Wk

    34/102

  • 7/26/2019 E10 Earth Wk

    35/102

    paration urface

  • 7/26/2019 E10 Earth Wk

    36/102

  • 7/26/2019 E10 Earth Wk

    37/102

    San

    4&T "4ield &ensit6 Test)

    Sand @eplace et9od !$!

  • 7/26/2019 E10 Earth Wk

    38/102

  • 7/26/2019 E10 Earth Wk

    39/102

    d replace

  • 7/26/2019 E10 Earth Wk

    40/102

  • 7/26/2019 E10 Earth Wk

    41/102

    1)

    !) 4T "4ield ermeabilit6 Test) !$3

    !r

    d Gravel

    ipe

    ing-pongball "4loat)

    Stick

    A "cm3)

    : = A $ t "cm3$sec)t # duration "sec)

    1 liter

    C6linder

    arking

    Simple et9odSimple et9od

    4T "4ield ermeabilit6 Test) 1$3

  • 7/26/2019 E10 Earth Wk

    42/102

    3)

    +)kv, k9 "Haborator6) and k "4ield)

    Haborator6 4ield

    Simple et9odSimple et9od

    4T "4ield ermeabilit6 Test) 3$3

  • 7/26/2019 E10 Earth Wk

    43/102

    () >nisotropic C9aracteristics in Compacted 4ill

    ) Target -value in Haborator6

    !(!' 3'Tire @oller

    "4lat @oller)

    (! 1'Tamping @oller

    averagek9 $ kvT6pe of @oller

    >ssumption k9 $ kv = ("average of tamping roller)

    kv 13 x 1'-(cm$sec

    k=khkv=5kv

  • 7/26/2019 E10 Earth Wk

    44/102

    T9in la6er is observed clea

  • 7/26/2019 E10 Earth Wk

    45/102

  • 7/26/2019 E10 Earth Wk

    46/102

    rl6

  • 7/26/2019 E10 Earth Wk

    47/102

    Procedure of Embankment Works

    1) Before it *ill rain

    !) Before commence next la6er

    or *ait untill dr6-up

    3) Scarif6ing

    2et Surface &r6 Surface

    @emove looseF *et la6er

    Spr

    4lat @oller

    @emed6 for @ainfallusing 4lat @oller

  • 7/26/2019 E10 Earth Wk

    48/102

    &'T &PT

    ) return to 1)

  • 7/26/2019 E10 Earth Wk

    49/102

    a6ing

  • 7/26/2019 E10 Earth Wk

    50/102

  • 7/26/2019 E10 Earth Wk

    51/102

    Con$tr'ction Joint

    &ta.1

    &ta.2

    &ta.3

    3rd 'ayer

    2nd 'ayer

    1st 'ayer

    !chematic *on/itudinal !ection

    a)

    b)

    c)

    2

    ,

    6 +

    - .

    A

    Constructed Ha6er ;e* Ha6er Constructed Ha6er ;e* Ha6er

    1

    !( 3'

  • 7/26/2019 E10 Earth Wk

    52/102

    %-1(

  • 7/26/2019 E10 Earth Wk

    53/102

    &ta.9

    Trimming

    about 3 m

    Confirmation of &ensit6

    4&T

    lacing F Compaction

    ;e* Ha6er

  • 7/26/2019 E10 Earth Wk

    54/102

  • 7/26/2019 E10 Earth Wk

    55/102

    ,emed% for "um# Water

    RC ie!>50"m#

    Pum uP

    Ground $ura"e

    Coma"tion$ura"e

    &ater 'a()e

    .nEection ipe

    @eturn ipe">1L)

  • 7/26/2019 E10 Earth Wk

    56/102

    7ite Laboratory

    Fptimum moisture c

    4 test B 6 samples$shift7

    Ma

  • 7/26/2019 E10 Earth Wk

    57/102

    &i/ure ;),) uality (ontrol of 8arthfill Materials

  • 7/26/2019 E10 Earth Wk

    58/102

    ntent

    D

    k

    :n

    :

    :opt

    dma P45 (Percentage o% %ine particle"(#o be prepare* by each canal) $tr'ct're) or borro< area"

    P/0 %ude1t

    P/0

    2 /t 3

    )m*

    =./

    C./

    /

    2

    9

    =

    C

  • 7/26/2019 E10 Earth Wk

    73/102

  • 7/26/2019 E10 Earth Wk

    74/102

    1/./

    12./

    19./

    1=./

    1C./

    2/./

    P.+ 47

  • 7/26/2019 E10 Earth Wk

    75/102

  • 7/26/2019 E10 Earth Wk

    76/102

    PIRIMP (F"TR(T "F)#

    &u! ro?ect: (F"TR(TFR #

    Name of Canal: Name of Borro@ "rea:

    &ide of Em!anAment: or ' eriod of the em!anAment @orA:

    "o) DAT" 'tation "le(ation )m* PI

    D++- rom To rom To ayer 47

    1 6 6 1/.12 1/.92 1 /.3 22.

    2 6 6 1%.$

    3 6 6 2$.=

    9 6 6 21.3

    $ 6 6 18.

    = 6 6 2/.3

    8 6 6 18.%

    6 6 23.9

    PLA7#IC IN2+B R+C8R2 > PI(#o be prepare* by each canal) $tr'ct're) or borro< area"

    %ude1t

    PI 2 40t 3

    )m*

    1/./

    12./

    19./

    /

    2

    9

    =

    C

  • 7/26/2019 E10 Earth Wk

    77/102

  • 7/26/2019 E10 Earth Wk

    78/102

    1=./

    1C./

    2/./

    22./

    29./

    2=./

    2C./

    PI

  • 7/26/2019 E10 Earth Wk

    79/102

  • 7/26/2019 E10 Earth Wk

    80/102

    PIRIMP (F"TR(T "F)#

    &u! ro?ect: (F"TR(TFR #

    Name of Canal: Name of Borro@ "rea:

    &ide of Em!anAment: or ' eriod of the em!anAment @orA:

    "o) DAT" 'tation "le(ation )m* a5oratory ield Test

    D++- rom To rom To ayer

    Q Q2 Q6 Q Q2 Q6

    1 6 6 1/.12 1/.92 1 /.3 23.$ 1.$=2 29.%% 29.9 23.%8 1.9% /.% /.98

    2 6 6 23.$ 1.$=2 2$.$/ 29.%% 29.9 2.// 1.9% /.%

    3 6 6 23.$ 1.$8 2$.$/ 2$.$/ 29.9 2.// 2.// /.%9 6 6 23.9 1.$8 29.9 2$.$/ 29.%% 1./ 2.1/ 1.$%

    $ 6 6 23.9 1.$8 29.%% 29.9 29.9 1.$% 1./ 1./

    = 6 6 23.9 1.$8 29.%% 29.%% 29.9 1.$% 1.$% 1./

    8 6 6 23.9 1.$8 2$.$/ 29.%% 2$.$/ 2.1/ 1.$% 2.1/

    6 6 23.9 1.$8 2$.$/ 2$.$/ 29.%% 2.1/ 2.1/ 1.$%

    % 6 6 23.9 1.$=% 2$.$/ 2$.$/ 29.9 2.1/ 2.1/ 1./

    1I+L2 2+N7I#? #+7# R+C8R2 (/" >