E S I PMISSIO NCRITICAL
SOFTWARE
Collaborative Support for Process Improvement:Measurement in Capability Maturity Model Integration
Joe Jarzombek, Lt Col, USAFESIP DirectorOgden Air Logistics Center/TI-3Hill AFB, UT 84056-5609
Voice: (801)-777-2435, DSN 777-2435Fax: (801) 777-9034Email: [email protected] Site: http://esip.hill.af.mil
Embedded Computer Resources (ECR) Support Improvement Program
Pg. 2
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Why Have a PSM Users’ Group Conference?
Facilitates Communications• Sharing Solutions• Sharing Lessons Learned• Networking with Professionals• Exploring New Technologies
Directly Serves Multi-discipline Needs of the DoD support community (govn & industry)
Facilities ofbelonging
facilities ofexplorationfacilities ofexploration
facilities ofengagementfacilities ofengagement
facilities ofalignment
facilities ofalignment
When we do something together over time,we create shared practices:
we learn to do what needs doing;we learn about each other, andwe developed shared ways ofdoing things
We form communities of practice.
Measurement Mafia
Pg. 3
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
National Security System Challenges
InformationTechnology isvital to missioneffectiveness foroperationsinvolvingnational securitysystems
Softwareprovidesincreasedsystemcapability &flexibility
Mission Critical Software in National Security Systems
Pg. 4
Measurement in CMMIMeasurement in CMMIMeasurement in CMMINational Security Systems Challenges
l The quantity of software innational security systems isincreasing dramatically
l Increases in programschedules & cost (both inacquisition & sustainment)prompt need for softwaresolutions in InformationTechnology (IT) in NationalSecurity Systems (NSS =MCCR)
DoD Computer Hardware & Software Costs
2.9 3.4 3.9 4.5 5.1 5.6 5.9 6.1 6.3 6.5 6.8
11.413.6
16.5
23.125.6
27.329.1
3133
35.7
20.4
0
510
15202530
354045
84 85 86 87 89 90 91 92 93 94 95Year
Bill
ion
s o
f D
olla
rsSoftware
Hardware
Pg. 5
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
The Software Challenge & Potential
Sources: The Healthy Software Project,Mark Norris, Wiley: 1995
Guidelines for Successful Acquisition and Management ofSoftware-Intensive Systems, Version 2.0, STSC,1996
Poor Success Rate• 1% projects on time, on budget, and meet expectations• 33% never finish
Unacceptable Schedule Variance• Average is one year behind schedule• Average schedule missed by 50%
75% are “Operational Failures”
1% improvement saves $300M+ CMM-based improvement shows a 4- 19% potential gain *
The Challenge
The Potential
* Depends on amount of reuse
* CMM Level 5 findings as reportedin May 99 CrossTalk
Pg. 6
Measurement in CMMIMeasurement in CMMIMeasurement in CMMIUS Government Acquisition Role: Evolving from Oversight to Insight
Where we’ve been: Where we’re going:Observe
ManageTrack
Reduction ofGovernmentResources
Observe
Manage
Risk Avoidance
i System Specificationi Mil Spec/Standardsi Government in designi Government Baselinei Design-to-Cost/Life Cycle Costi Program Controli CDRLs (Contract Deliverables)i SOW (Statement of Work)
Risk Management
i Performance Based Contractingi Best Practices not Mil-Specsi Bilateral Technical System Baselinei Cost as an Independent Variable (CAIV) and Cost-Riski IPTs and IMP/IMS/EVMS Controli Metrics and TPMsi Data availability - minimize CDRLsi SOO (Statement of Obj) -- CSOW
Pg. 7
Measurement in CMMIMeasurement in CMMIMeasurement in CMMICoping with Business Challenges & Need forPerformance Improvement
Which technologiesshould I adopt now or track for future investment?
How do I remain cognizant of changes to
laws, directives & policies?What’s the impact of
complying with them?
How effective ismy organization in meeting
business & mission objectives?
How do I prioritize and fund competing
projects andimprovements?
How do I recruit andretain technical expertise
on my staff?
How do I measure, monitor and
manage program risks?
Where we’re going:Observe
ManageTrack
Reduction ofGovernmentResources
Observe
Manage
Risk Avoidance Risk Management
Where we’ve been:
Pg. 8
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Steps to Enterprise-wide Organizational Maturity:
MetricsCapture
MetricsCapture
ActivityBased
Costing
ActivityBased
Costing
ProcessLevel
Evolution
ProcessLevel
EvolutionProject
Management
ProjectManagement SimulationSimulation
Section name Section name Section name Section name
Org name
1. Vision, Goals, Buy-in
NODE: TITLE: NUMBER:APPROVE VCN2.3
2.3.1
GET DRAFT VCNAPPROVAL
2.3.2
REVIEWCCB PACKAGE
2.3.3
DRY-RUNCCB
2.3.4
MODIFY CCB
SLIDES
2.3.5
REVIEWCCB
PACKAGE
2.3.6
REVIEW VCNBY CCB
CCBpackage
CCB VCNapproval
Draft of VCNstaff summarysheet
Final CCB package
SSM
ProposedCCB agenda
Conditionallyapproved CCBpackage
Delayed CCBpackage
DisapprovedCCBpackage
Draft VCN approval
PMCustomer
CCBminutes
Final CCBagenda
Personnel
ConfigurationManagement
Configuration Management
Delayed CCB package
ApprovedCCBpackage
4. Process Transformation From Process,
all good things flow!
NODE: TITLE: NUMBER:MAINTAIN AIR FORCE SPACE COMMANDSENSOR SOFTWARE0
1
PROCESS RCPPHASE 1
2
PLAN, COORDINATEAND APPROVE AMAINTENANCE
SOFTWARE PROJECTPACKAGEPHASE 2
3
PUT THE MAINTENANCE
SOFTWARE PROJECTON CONTRACT
PHASE 3
4
MANAGE THE EXECUTION OF
THE MAINTENANCE SOFTWARE PROJECT
PHASE 4
5
CLOSEOUT THE MAINTENANCE
SOFTWARE PROJECTPHASE 5
RCPValidatedRCP
Personnel
Operational acceptance message
CCB VCNapproval
CAT2 Deficiencies
AwardedContract
ContractorReports
Rejectedcontractor costproposal
MWSSS OI 21-7
Distributedsignedprojectcloseoutreport
Final CCB package2. Process Capture
OrganizationProcesses
NODE: TITLE: NUMBER:PLAN PROJECT2.1
2.1.1
PERFORM VCNANALYSIS
2.1.2
CONSULT WITHSOFTWARE IPT
2.1.3
PREPARECCB
PACKAGE
2.1.4
PREPARE ACQUISITIONSTRATEGY BRIEFING
2.1.5
CONDUCT ACQUISITIONSTRATEGY
2.1.6
PREPARE AND COORDINATE
DRAFT VCN
OASB minutes
Sensor IPT
21ST SW21-10401
OARB minutes
Release Factors
CCB package templateValidatedRCP
Draft VCN
DelayedCCBpackage
Mystic Algorithms
CCB package
Acquisitionstrategy briefing
Informal assessmentof Release Factors
Approvedacquisitionstrategy
Validated RCP
Rejectedcontractorcostproposal
3. Gap Analysis BestPractices
Pg. 9
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Process Improvement Business Case
Software Process Improvement (SPI)Demonstrated Return on Investment (ROI)
SPI efforts quantifiably justify funding (based on several projects)• Demonstrated Return on Investment of 4:1 - 19:1• Earlier detection of software defects from 22% - 90%• Reduction in post-release defects from 39% - 84%• Reduction in schedule time from 19% - 23%• Reduction in projected schedule variance down to 2%• Increased productivity (less rework) of 35% - 75%• Reduced sustainment costs by 30% - 55%
Several programs have improved their capabilities based on theSoftware Capability Maturity Model (CMM)• Enabled effective communication between separate business units;• Reporting improved customer satisfaction
Pg. 10
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
The Current Situation
Explosion of CMMsand CMM-like models
Multiple models withinan organization
Multiple assessments Multiple training Duplicated expenses
Pg. 11
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
S W -CM M
A lso see w w w .software.org/quagm ire
The Frameworks Quagm ireThe Frameworks Quagm ireM IL-Q -9858
Trillium B a ldrige
IEEE Stds. 730,828829, 830,1012,1016
1028,1058,1063ISO 15504*(SPICE)
People C M M
IPD-C M M *
D O DIPPD
S E C A MA F IPD G u ide
S D C C R
S C E
N A T O A Q A P 1 ,4,9
B S5750
M IL-STD-498
D O D -STD -2167A
D O D -STD -7935A
M IL-STD-499B*
ISO/IEC12207
IEEE1220
ISO 10011
S D C E
S E - C M MS E C M *(EIA/IS 731)
E IA/IS632
ISO 9000Series
E IA/IEEEJ-STD-016
IEEE/EIA12207
E IA 632*
M IL-STD-1679
IEEE 1074
TickITSSE-C M M
ISO 15288*
E Q A
* Not yet released
C M M I*
P S P
S A - C M M
Q9000
D O D -STD-2168
quag14d: 5 June 1998
F A A -iCM M
D O -178B
S W -CM M
Courtesy Sarah Sheard, SPCDocumented in CrossTalk, the Journal of Defense Software Engineering
Pg. 12
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Why is this a problem?
Similar process improvement concepts, but... Different model representations (e.g. staged,continuous, questionnaire, hybrid)
Different terminology Different content Different appraisal methods Different conclusions
Pg. 13
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Common Basis for Model-based Process Improvement
Improvement in any discipline is a function of performing: implementing practices that reflect the fundamentals of aparticular topic (e.g. configuration management)
institutionalizing practices that lead to sustainment andimprovement of an implementation
Pg. 14
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Thus all CMMI source models contain:
Implementing practices grouped by affinity
Institutionalizing practices that vary from model tomodel, however all models specify levels thatdescribe increasing capability to perform
Pg. 15
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
ImprovementLevels
Initial (1)
Managed (2)
Defined (3)
QuantitativelyManaged
(4)
Optimizing (5)
Disciplined
process
Standard,
consistent
process
Predictable
process
Continuously
improving
process
Not performed (0)
(performed)
(planned and tracked)
(standard)
(measured)
...
Pg. 16
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Eliminate inconsistencies
Reduce duplication
Reduce the cost of implementing model-basedprocess improvement
Increase clarity and understanding• Common terminology• Consistent style• Uniform construction rules• Common components
Minimal impact on legacy efforts
CMMI Design Goals
Pg. 17
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Benefits
Efficient, effective assessment and improvement acrossmultiple process disciplines in an organization
Reduced training and assessment costs
A common, integrated vision of improvement for all elementsof an organization
A means of representing new discipline-specific informationin a standard, proven process improvement context
Pg. 18
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
The Challenge
Given the input models, extract thecommon and/or best features
Provide users the ability to producesingle or multiple discipline models,both continuous and staged, tailoredto their organizations needs.
Provide users the ability to assessand train based on these outputmodels.
Pg. 19
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
CMMI Source Models
Capability Maturity Model for Software V2, draftC (SW-CMM V2C)
EIA Interim Standard 731, System EngineeringCapability Model (SECM)
Integrated Product Development CapabilityMaturity Model, draft V0.98 (IPD-CMM)
Pg. 20
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Source Models
SW-CMMV2C
EIA IS 731SECM
IPD-CMMV0.98
Staged Continuous HybridMaturity Levels Capability Levels
CategoriesMaturity andCapability Levels
Key Process Areas Focus Areas Process AreasKey Process AreaGoals
Themes Capability andProcess Area Goals
Activities CommonFeature
Specific Practices Base Practices
Common Features Generic Practices Generic PracticesGeneric Attributes
Pg. 21
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Example Map of Input Process Areas To Source Models
CMMI PA SW-CMMV2C
EIA SECMV1.0
IPD-CMMV0.98
RequirementsManagement
X X
SupplierAgreementManagement
X X X
ConfigurationManagement
X X X
DataManagement
X
Training X X X
Pg. 22
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Staged Representations
Key Process Areas are grouped in the stages (levels)from 2 to 5
A Key Process Area contains specific practices(activities) to achieve the purpose of the process area.
For a Key Process Area at a given stage,institutionalization practices are integral to the processarea.
Pg. 23
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Staged Model
RiskRework
1 Initial
Competent people and heroics
Org Improvement DeploymentOrg Process and Tech InnovationDefect Prevention
5 Optimizing
4 Quantitatively
Managed
3 Defined
2 Repeatable
Continuous process improvement
Quantitativemanagement
ProcessStandardization
Organization Process PerformanceStatistical Process ManagementOrg Software Asset Commonality
Peer ReviewsProject Interface CoordinationSoftware Product EngineeringOrganization Training ProgramOrganization Process DefinitionOrganization Process Focus
Level Focus Key Process Areas
BasicProjectManagement
Software Configuration ManagementSoftware Quality AssuranceSoftware Acquisition ManagementSoftware Project ControlSoftware Project PlanningRequirements Management
Pg. 24
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Continuous Representations
A process area contains specific practices to achievethe purpose of the process area.
Generic practices are grouped in Capability Levels
Generic practices are added to the specific practices ofeach process area to attain a capability level for theprocess area.
The order in which Process Areas are addressed canfollow a recommended staging.
Pg. 25
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Continuous ModelCL5 GP
GPGP
CL4 GPGPGP
CL3 GPGPGPGPGP
CL2 GPGPGPGPGP
Implemented NI NA NRProcess Area NE RQ OS TR PM KM QA VS … SR FD IN
PA - Process AreaCLn - Capability Level n institutionalized (Level n GPs satisfied for PA)
GP - Generic PracticeImp - Implemented Base PracticesNI - Not ImplementedNA - Not ApplicableNR - Not Rated
Pg. 26
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
The CMMI Product Line
The CMMI product line is a product suite sharing acommon, managed set of features that satisfyspecific needs of a selected domain.
Domain
Architecture
Components
pertain to
share an
are built from
is satisfied by
guides development of
Products
Pg. 27
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
CMMI Product Suite
Input• Common content• Discipline content• Criteria for content
Transform• Rules for generating products-Model-Assessment-Training
Framework
Repository
Output
• Integrated model(s)• Assessment method(s)• Training materials
Pg. 28
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Decision Analysis and Resolution (Eng)Integrated Project Management (PM)Organizational Process Definition (PM)Organizational Process Focus (PM)Organizational Training (PM)Product Verification (Eng)Risk Management (PM)Validation (Eng)Customer Requirements (SE)System Integration (SE)Technical Problem (SE)Technical Solution (Eng)
Decision Analysis and Resolution (Eng)Integrated Project Management (PM)Organizational Process Definition (PM)Organizational Process Focus (PM)Organizational Training (PM)Product Verification (Eng)Risk Management (PM)Validation (Eng)Customer Requirements (SE)System Integration (SE)Technical Problem (SE)Technical Solution (Eng)
Causal Analysis and Resolution (PM)Org Process Technology Innovation (PM)Process Innovation Deployment (PM)
Causal Analysis and Resolution (PM)Org Process Technology Innovation (PM)Process Innovation Deployment (PM)
Quantitative Process and Quality Mgmt (PM)Organizational Process Capability (PM)
Quantitative Process and Quality Mgmt (PM)Organizational Process Capability (PM)
Managed (2)
Defined (3)
Quantitative (4)
Optimizing (5)
Initial (1)
Basic project management
Processstandardization
Quantitativemanagement
Continuous processimprovement
Configuration Management (PM)Data Management (Eng)Project Planning (PM)Measurement and Analysis (PM)Project Monitoring and Control (PM)Product and Process Quality Assurance (PM)Requirements Management (Eng)Supplier Agreement Management (Eng)
Draft CMMI-SW/SEProcess Areas Listed by Levels
Pg. 29
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Harmonization with ISO Standards
15504 is reviewed prior to each draft release byauthors and an ISO IPT within CMMI PDT
For CMMI Measurement & Analysis Process Area,15939 & 15504 were used as the primary sourceinputs in addition to the Measurement & AnalysisCommon Feature of the Software CMM
Pg. 30
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
ISO 15504 / CMMI-SW/SE V0.1 Alignment
Pg. 31
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
SpecificPractices
SpecificGoals
Outcomes(end-states
or workproducts)
Purpose
is successfully implementedthrough
CMMIProcess Areas
TR 15504Processes
assists indeveloping one or
more
one or more ofwhich produce
demonstrate
achievement of
are successfully achievedby one or more
AssuringCompatibilitybetweenCMMI andISO/IECTR15504
Pg. 32
Measurement in CMMIMeasurement in CMMIMeasurement in CMMIProcess Capability Relationships
GenericPractices
orCommonFeatures
GenericGoals
Achieve-ments
(ratings ofpractices inevidence)
ProcessAttributes
are successfullydemonstrated through
CMMICapability Levels
TR 15504Processes
assist in developingone or more
one or more ofwhich produce
demonstrate
achievement of
are successfully achievedby one or more
AssuringCompatibilitybetweenCMMI andISO/IECTR15504
Pg. 33
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
ISO 15504 / CMMI V0.1 Map-1
15504Process
ID
15504 Process Name CMMI V0.1 Process Area
CUS.1 Acquisition
CUS.2 Supply
CUS.3 RequirementsElicitation
RequirementsDevelopment andManagement
CUS.4 Operation
Pg. 34
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
ISO 15504 / CMMI V0.1 Map-2
15504Process
ID
15504 Process Name CMMI V0.1 Process Area
ENG.1 Development Software ProductEngineering
ENG.2 System and SoftwareMaintenance
Software ProductEngineering
Pg. 35
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
ISO 15504 / CMMI V0.1 Map-3
15504Process
ID
15504 Process Name CMMI V0.1 Process Area
MAN.1 Management Organizational ProcessFocusOrganizational ProcessCapability
MAN.2 Project Management Project Planning
Project Monitoring andControl
MAN.3 Quality Management Quantitative Process andQuality Management
MAN.4 Risk Management Risk Management
Pg. 36
Measurement in CMMIMeasurement in CMMIMeasurement in CMMIISO 15504 / CMMI V0.1 Map-4
15504Process
ID
15504 Process Name CMMI V0.1 Process Area
ORG.1 OrganizationalAlignment
ORG.2 Improvement Organizational Process Focus
Organizational ProcessDefinitionDefined Project Management
ORG.3 Human ResourceManagement
Organizational Training
ORG.4 InfrastructureORG.5 Measurement Measurement and Analysis
ORG.6 Reuse
Pg. 37
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
ISO 15504 / CMMI V0.1 Map-515504
ProcessID
15504 Process Name CMMI V0.1 Process Area
SUP.1 Documentation Data ManagementSUP.2 Configuration
ManagementConfiguration Management
SUP.3 Quality Assurance Process and Product QualityAssurance
SUP.4 Verification Product VerificationSUP.5 Validation ValidationSUP.6 Joint Review Validation
SUP.7 Audit Product VerificationSUP.8 Problem Resolution Casual analysis and
Resolution
Pg. 38
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
CMMI Schedule
Release CMMI SW/SE V0.2 for Public Review Aug ‘99Pilot CMMI products Nov ‘99-May ‘00Publish CMMI SW/SE V1.0 Jun ‘00Publish CMMI SW/SE/IPPD V1.0 Aug ‘00
Pg. 39
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Need for a Measurement Process Area
Recognition by Congress through law for the needfor measurement across software-intensive systems
Need for performance based management specifiedin the Information Technology Management ReformAct (ITMRA)
Need for more explicit measurement guidancerecognized by lead assessors in organizations usingexisting CMM to guide process improvement
Pg. 40
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Measurement and Analysis -Summary
Measurement and Analysis involves :
• Selection and documentation of measures andindicators that meet organizational unit needs.
• Collection, analysis, and management ofmeasurement data is conducted according to ameasurement plan.
• Output of the measurement and analysisprocess is communicated to users in a timelyand usable fashion.
Pg. 41
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Measurement & Analysis Process Area–Level 2
PA Purpose The purpose of Measurement and Analysis is to developand sustain a measurement capability in support ofmanagement information needs.
Measurement involves:• identifying the goals and issues regarding the scope of measurement
and analysis such that it is aligned to the business goals of theorganization
• defining the measures to be used, the collection process, the storagemechanism, the analysis process, the reporting process and thefeedback process
• collecting and storing data
• analyzing the data
• presenting the data
Pg. 42
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Measurement & Analysis Process Area
Integration of Measurement and Analysis activitiesinto the project’s life cycle processes supports theproject to:
• plan and estimate, at the project and organizational level, in anobjective manner
• track actual project and organizational performance againstestablished plans and objectives, and.identify and resolve process-related issues.
The terms "measure" and “measurement” are used here ina manner consistent with the definitions of these termsfound in ISO 15939 working draft, Software MeasurementProcess Framework.
Pg. 43
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Measurement & Analysis Process Area
Goal 1. Measurement components areestablished in alignment with informationneeds and objectives.
• SP 1.1. Establish and maintain measurementobjectives.
• SP 1.2. Identify and define measures and indicators.
• SP 1.3. Define how primitive and derived measureswill be obtained (produced and collected) and stored.
• SP 1.4. Define how measures will be analyzed andreported.
Pg. 44
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Measurement & Analysis Process Area
Goal 2. Measurement results that fulfillinformation needs are available.• SP 2.1. Obtain measurement data in accordance with
the plan.
• SP 2.2. Manage and store data, indicators, andresults.
• SP 2.3. Analyze measurement data according toplans and refine or derive additional indicators asnecessary.
• SP 2.4. Report results of measurement and analysisactivities to appropriate users to support decisionmaking and assist in taking corrective action.
Pg. 45
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Maturing the M & A Process Area
CMMI Process ManagementCMMI Process Management Capability Level Descriptions,
Generic Goals, And Generic Practices (Draft Version in development for Public
Review Package) (6 July 1999)
Pg. 46
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Maturing the M & A Process Area
Capability Level 0 Description:- (Level 0 PcM, Incomplete) An incomplete process is a process
that is not performed or only performed partially. One or more ofthe specific goals of the process area are not satisfied.
Capability Level 0 Generic Goal:• (None.)
Capability Level 0 Generic Practices:• (None.)
Capability Level Descriptions,Capability Level Descriptions,Generic Goals and Generic PracticesGeneric Goals and Generic Practices
Pg. 47
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Maturing the M & A Process Area
Capability Level 1 Description:- (Level 1 PcM, Performed) A performed process is a process that
completes the needed work and transforms the identified input workproducts to produce identified output work products. The definition,planning, monitoring, or controlling of the process may beincomplete, thereby resulting in an unstable and inconsistentlyimplemented process.
Capability Level 1 Generic Goal:- (Level 1 PcM-GG 1.1) (Achieve Specific Goals) The in-use process
achieves the specific goals of the process area.
Capability Level 1 Generic Practices:
- (PcM-GP 1.1) (Perform Basic Activities) Perform the basic activitiesof the process.
Pg. 48
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Maturing the M & A Process Area
Capability Level 2 Description:
• (Level 2 PcM, Managed) A managed process is a process that isplanned, documented, performed, monitored, and controlled at thelevel of an individual project, group, or standalone process toachieve a given purpose. Management of the process is concernedwith both the achievement of the specific goals of the process areaand the achievement of other specific objectives for the process,such as cost, schedule, and quality objectives.
Capability Level 2 Generic Goal: (Level 2 PcM-GG 2.1) (Institutionalize a Managed Process) The process is institutionalized as a managed process.
Pg. 49
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Maturing the M & A Process Area
Capability Level 2 Generic Practices:
- (PcM-GP 2.1) (Establish Organizational Policy) Establish andmaintain a written organizational policy for planning andperforming the process.
- (PcM-GP 2.2) (Plan the Process) Establish and maintain the planfor performing the process.
- (PcM-GP 2.3) (Provide Resources) Provide adequate resourcesfor performing the planned process.
- (PcM-GP 2.4) (Assign Responsibility) Assign responsibility andauthority for performing the planned process.
- (PcM-GP 2.5) (Train people) Train the people performing orsupporting the planned process as needed.
Pg. 50
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Maturing the M & A Process Area
Capability Level 2 Generic Practices (cont.):
- (PcM-GP 2.6) (Perform Managed Process) Perform the process asa managed process.
- (PcM-GP 2.7) (Monitor and Control the Process) Monitor andcontrol the performing of the in-use process against the plannedprocess, and take appropriate corrective action.
- (PcM-GP 2.8) (Manage Configurations) Place the designated workproducts of the in-use process under appropriate levels ofconfiguration management.
-
Pg. 51
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Maturing the M & A Process Area
Capability Level 2 Generic Practices (cont.):
- (PcM-GP 2.9) (Objectively Verify Adherence) Objectively verifyadherence of the planned process, in-use process, and their workproducts to the applicable requirements and standards, andaddress non-compliance.
- (PcM-GP 2.10) (Review Activities and Results with Management)Review the activities, status, and results of the in-use processwith management and resolve issues.
Pg. 52
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Maturing the M & A Process Area
Capability Level 3 Description:
- (Level 3 PM, Defined) A defined process is a managed processthat is tailored from the organization’s set of standard processes.Tailoring the organization’s set of standard processes yields adefined process that is specifically suited for the circumstances inwhich it will be performed.
Capability Level 3 Generic Goal:
- (Level 3 PcM-GG 3.1) (Institutionalize a Defined Process) The process is institutionalized as a defined process.
Pg. 53
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Maturing the M & A Process Area
Capability Level 3 Generic Practices:
(PcM-GP 3.1) (Establish Defined Process) Establish and maintainthe description of the defined process to meet specific local andorganizational needs.
(PcM-GP 3.2) (Perform Defined Process) Perform the process as adefined process.
(PcM-GP 3.3) (Collect Improvement Information) Collect workproducts, measures, and improvement information derived fromplanning and performing the process to support the future use andimprovement of the organization’s process assets.
Pg. 54
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Maturing the M & A Process Area
Capability Level 4 Description:
(Level 4 PcM, Quantitatively Managed) A quantitativelymanaged process is a defined process that is controlled usingstatistical and other quantitative techniques. The productquality, service quality, and process performance areunderstood in statistical terms and are controlled throughoutthe life of the process.
Capability Level 4 Generic Goal:
(Level 4 PcM-GG 4.1) (Institutionalize a Quantitatively ManagedProcess) The process is institutionalized as a quantitativelymanaged process.
Pg. 55
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Maturing the M & A Process Area
Capability Level 4 Generic Practices:
(PcM-GP 4.1) (Establish Quality Goals) Establish andmaintain quantitative goals for product quality, servicequality, and process performance.
(PcM-GP 4.2) (Quantitatively Manage ProcessPerformance) Quantitatively manage the performanceof the process to satisfy the established quantitativeproduct quality, service quality, and processperformance goals.
Pg. 56
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Maturing the M & A Process Area
Capability Level 5 Description:
- (Level 5 PcM, Optimizing) An optimizing process is aquantitatively managed process that is improved based on anunderstanding of the common causes of variation inherent inthe process. An optimizing process focuses on continuallyimproving the range of process performance through bothincremental and innovative improvements.
Capability Level 5 Generic Goal:
- (Level 5 PcM-GG 5.1) (Institutionalize an Optimizing Process)The process is institutionalized as an optimizing process.
Pg. 57
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Maturing the M & A Process Area
Capability Level 5 Generic Practices:
- (PcM-GP 5.1) (Establish Process Improvement Goals) Establishand maintain quantitative process improvement goals that supportthe organization’s business objectives.
- (PcM-GP 5.2) (Address Common Cause of Problems) Identify andaddress common causes of actual and potential defects and otherproblems in the process.
- (PcM-GP 5.3) (Identify Process and Technology Improvements)Identify process and technology improvements that would result insignificant and measurable improvements to process performance.
- (PcM-GP 5.4) (Deploy Improvements) Manage the deployment ofthe selected process and technology improvements based on thequantified expected benefits and the estimated costs and impacts.
Pg. 58
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
CMMI Measurement Workshop
PSM Workshop Purpose: Develop a draft Measurement Plan Template that canserve as a basis to guide an organization inimplementing a CMMI-compatible MeasurementProgram
PSM Workshop Process: 1. Review CMMI measurement-related practices inProcess Areas and Generic Practices
2. Recommend structure and content of aMeasurement Plan template
Pg. 60
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Framework
Components
Construction rules
Conceptual architecture
Pg. 61
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Discipline Z
Discipline Y
The CMMI FrameworkFramework General•Glossary•Development Standards and Guidelines•Document Templates•Assessment Methodology•Framework Training Materials
Process Management Core (PMC)PMC Generic Practices/TemplatesPMC Process AreasPMC Assessment MaterialPMC Model Training MaterialPMC Assessment Training Material
Integration Core (IC)IPPD EnvironmentIC Generic Practices/TemplatesIC Process AreasIC Assessment MaterialIC Model Training MaterialIC Assessment Training Material
Discipline X (DX)
DX AmplificationsDX Process AreasDX Assessment MaterialDX Model Training MaterialDX Assessment Training Material
+
OutputModelsAssessment MethodsModel Training MaterialsAssessment Training Materials
Pg. 63
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
CMMI Models
Staged and Continuous Representations (withrecommended staging) of:• Software Engineering• Systems Engineering• Software+Systems Engineering• Software+Systems Engineering with IPPD
NODE: TITLE: NUMBER:PLAN PROJECT2.1
2.1.1
PERFORM VCNANALYSIS
2.1.2
CONSULT WITHSOFTWARE IPT
2.1.3
PREPARECCB
PACKAGE
2.1.4
PREPARE ACQUISITIONSTRATEGY BRIEFING
2.1.5
CONDUCT ACQUISITIONSTRATEGY
2.1.6
PREPARE AND COORDINATE
DRAFT VCN
OASB minutes
Sensor IPT
21ST SW21-10401
OARB minutes
Release Factors
CCB package templateValidatedRCP
Draft VCN
DelayedCCBpackage
Mystic Algorithms
CCB package
Acquisitionstrategy briefing
Informal assessmentof Release Factors
Approvedacquisitionstrategy
Validated RCP
Rejectedcontractorcostproposal
BestPractices
Pg. 64
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Assessment Material
•Assessment requirements•Assessment methodology•Assessment data collection methods and tools(e.g., questionnaires, interviews)
•Assessment Team qualifications
Pg. 65
Measurement in CMMIMeasurement in CMMIMeasurement in CMMI
Training Material
•Model Training•Assessment Training