12
e-Project Report Supervisor : Vo Duc Thien Curriculum: ACCP i7.1 Semester: 2 – DISM. Batch Code: 0907E Team Leader: Tran Chi Hung Members : Nguyen Kim Hoang Pham Le Minh

E-Project Report Supervisor :Vo Duc Thien Curriculum: ACCP i7.1 Semester: 2 – DISM. Batch Code: 0907E Team Leader:Tran Chi Hung Members :Nguyen Kim Hoang

Embed Size (px)

Citation preview

Page 1: E-Project Report Supervisor :Vo Duc Thien Curriculum: ACCP i7.1 Semester: 2 – DISM. Batch Code: 0907E Team Leader:Tran Chi Hung Members :Nguyen Kim Hoang

e-ProjectReport

Supervisor : Vo Duc ThienCurriculum: ACCP i7.1Semester: 2 – DISM.Batch Code: 0907ETeam Leader: Tran Chi HungMembers : Nguyen Kim Hoang

Pham Le Minh

Page 2: E-Project Report Supervisor :Vo Duc Thien Curriculum: ACCP i7.1 Semester: 2 – DISM. Batch Code: 0907E Team Leader:Tran Chi Hung Members :Nguyen Kim Hoang

Problem StatementProblem Statement

• Our client is a doctor who wants a stand alone application to be developed so that the details of the doctors can be tracked down at an ease. Also in case of any emergencies or for some special cases one can go through the website based on the specialization and the location which ever is suitable so that so many people’s lives can be saved.

• Customer Expectations• The customer wants the application to include the

following tasks.• There should be a logo common to all the pages of the

application which should include the symbol of the cross.

Page 3: E-Project Report Supervisor :Vo Duc Thien Curriculum: ACCP i7.1 Semester: 2 – DISM. Batch Code: 0907E Team Leader:Tran Chi Hung Members :Nguyen Kim Hoang

Problem Statement(cont)Problem Statement(cont)

• The application is to hold the specialists (doctors) information who visit the hospital on some week days for service, also they maintain the details of some more specialists all over the world, for easy reference.

• The details should include the contact details, personal, professional, qualification, experience, and as well the achievement details.

• The Advanced search option is to be included that includes the location, specialization, and as well it can also include the experience.

• There should be separate login for the admin and as well the employee.

• The employees should only be able to access the details, i.e., can only retrieve the details, but the updating of the details will be taken care of by the administrator

Page 4: E-Project Report Supervisor :Vo Duc Thien Curriculum: ACCP i7.1 Semester: 2 – DISM. Batch Code: 0907E Team Leader:Tran Chi Hung Members :Nguyen Kim Hoang

Use-Case Use-Case DiagramDiagram

Actor Admin

Admin

Login,Logout

View all Manager

Insert all Manager

Update all Manager

View all Doctor

Insert all Doctor

Update all Doctor

View all HospitalInsert all Hospital

Update all Hospital

View his Profile

Update his Profile

View all Schedule

Insert all Schedule

Update all Schedule

Delete Schedule

Manage Authority

Page 5: E-Project Report Supervisor :Vo Duc Thien Curriculum: ACCP i7.1 Semester: 2 – DISM. Batch Code: 0907E Team Leader:Tran Chi Hung Members :Nguyen Kim Hoang

Use-Case Use-Case DiagramDiagram

Actor Manager

Manager

Login,Logout

View all Doctor

Insert all Doctor

Update all Doctor

View all Hospital

Insert all Hospital

Update all Hospital

View his Profile

Update his Profile

View all Schedule

Insert all Schedule

Update all Schedule

Delete Schedule

Page 6: E-Project Report Supervisor :Vo Duc Thien Curriculum: ACCP i7.1 Semester: 2 – DISM. Batch Code: 0907E Team Leader:Tran Chi Hung Members :Nguyen Kim Hoang

Use-Case Use-Case DiagramDiagram

Actor Doctor

Doctor

Login,Logout

View Hospital

View his Profile

Update his Profile

View Schedule

Page 7: E-Project Report Supervisor :Vo Duc Thien Curriculum: ACCP i7.1 Semester: 2 – DISM. Batch Code: 0907E Team Leader:Tran Chi Hung Members :Nguyen Kim Hoang

Database Design

Page 8: E-Project Report Supervisor :Vo Duc Thien Curriculum: ACCP i7.1 Semester: 2 – DISM. Batch Code: 0907E Team Leader:Tran Chi Hung Members :Nguyen Kim Hoang

Site Map

Page 9: E-Project Report Supervisor :Vo Duc Thien Curriculum: ACCP i7.1 Semester: 2 – DISM. Batch Code: 0907E Team Leader:Tran Chi Hung Members :Nguyen Kim Hoang

The programs used

• Microsoft SQL Server 2005 :Build database and read store procedure

• Eclipse :Design interface and compiled java command for the program

• iReport:Output information of the program from PC out printer

Page 10: E-Project Report Supervisor :Vo Duc Thien Curriculum: ACCP i7.1 Semester: 2 – DISM. Batch Code: 0907E Team Leader:Tran Chi Hung Members :Nguyen Kim Hoang

Completion rate • 1 . Prepare for Project

Tasks Percentage job(%)

Establish group

Plan

• 2. Reseach Project

Tasks Percentage job(%)

Collect Informations

Research Informations

Analyse requirements

Page 11: E-Project Report Supervisor :Vo Duc Thien Curriculum: ACCP i7.1 Semester: 2 – DISM. Batch Code: 0907E Team Leader:Tran Chi Hung Members :Nguyen Kim Hoang

Completion rate

• 4. Implementation

Tasks Percentage job(%)

Design Database

Interface

Coding

Complete

• 3. Progress

Tasks Percentage job(%)

Instructions

Report

Page 12: E-Project Report Supervisor :Vo Duc Thien Curriculum: ACCP i7.1 Semester: 2 – DISM. Batch Code: 0907E Team Leader:Tran Chi Hung Members :Nguyen Kim Hoang

Reviews

• Pros:– Complete report on schedule – The main functions of the program relatively complete – Friendly interface for users

• Cons :– Ability to work in groups is not high – Not uniform in the initial database construction