COMMON ABBREVIATIONS COMMON SYMBOLS CONNECT TO EXISTING EXISTING TO BE REMOVED PLAN NORTH SECTION ID A H1.1 SHEET NO. WHERE SECTION IS DIRECTIONAL VIEW OF SECTION 1 REVISION NUMBER ELEVATION 100.00' 1 KEYNOTE EQUIPMENT TAG SHOWING TYPE AND ID. SEE EQUIPMENT SCHEDULES FOR DETAILS EXISTING TO REMAIN REMOVE EXISTING PROVIDE NEW N TYPE ID REVISION CLOUD DETAIL ID 1 H1.1 SHEET NO. WHERE DETAIL IS 101 ROOM/SPACE NO. 11 H1.1 DIRECTION OF VIEW SHEET NO. WHERE EL. IS DRAWN ELEVATION ID A/E ARCHITECT/ENGINEER AC ABOVE CEILING ABV ABOVE AFF ABOVE FINISHED FLOOR AFI ARC-FAULT INTERRUPTER AFR ABOVE FINISHED ROOF ALT ALTERNATE ATS AUTOMATIC TRANSFER SWITCH ATC AUTOMATIC TEMPERATURE CONTROL - COORDINATE LOCATION C/G COUNTERTOP GFI CD CORD DROP CL CENTERLINE CLG CEILING CM CEILING MOUNT COL COLUMN CT COUNTERTOP HEIGHT-44" AFF UNO OR CURRENT TRANSFORMER CR CORD REEL DBF DOWN BELOW FLOOR DET DETAIL DIA DIAMETER DIM DIMENSION DN DOWN DW DISHWASHER DWG DRAWING EC ELECTRICAL CONTRACTOR EL ELEVATION ELEV ELEVATOR EMER EMERGENCY EO EMERGENCY ONLY (NORMALLY OFF) EWC ELECTRIC WATER COOLER (PROVIDE GFI RECEPTACLE) EQ EQUIPMENT, COORDINATE LOCATION EX EXISTING FA FIRE ALARM FBO FURNISHED BY OWNER FLR FLOOR FPC FIRE PROTECTION CONTRACTOR FSC FOOD SERVICE CONTRACTOR GC GENERAL CONTRACTOR GFI GROUND-FAULT INTERRUPTER GND GROUND HC HVAC CONTRACTOR HCP HANDICAPPED HGT HEIGHT HR HOUR IR INFRARED JB JUNCTION BOX KES KITCHEN EQUIPMENT SUPPLIER LV LOW-VOLTAGE MC MECHANICAL CONTRACTOR MCA MINIMUM CIRCUIT AMPACITY MOCP MAXIMUM OVERCURRENT PROTECTION MT MULTITECHNOLOGY MO MICROWAVE OVEN NA NOT APPLICABLE NE NORMAL/EMERGENCY (NORMALLY ON) NIC NOT IN CONTRACT NTS NOT TO SCALE OFCI OWNER FURNISHED- CONTRACTOR INSTALLED EQ FOR EQUIPMENT, COORDINATE LOCATION P PEDESTAL PC PLUMBING CONTRACTOR PIR PASSIVE INFRARED SE SERVICE ENTRANCE SECT SECTION SHT SHEET SIM SIMILAR SPD SURGE PROTECTION DEVICE SPEC SPECIFICATION SS SERVICE SINK STD STANDARD SUSP SUSPENDED SB SMARTBOARD COORDINATE LOCATION TL TASK LIGHT TR TAMPER RESISTANT TSTAT THERMOSTAT TV FOR TV, COORDINATE LOCATION TVSS TRANSIENT VOLTAGE SURGE SUPPRESSER UNO UNLESS NOTED OTHERWISE US ULTRASONIC USB 2 USB PORTS IN ADDITION TO RECEPTACLES W/ WITH W/O WITHOUT W WALL-MOUNTED WP WEATHERPROOF AV AW ERW ERW AW RW RW PLUMBING ABBREVIATIONS PLUMBING SYMBOLS N EG AR VAC AC LCW CA DE OX WAGD CO2 MA NO2 TW G AT BACKFLOW PREVENTER SOLENOID VALVE THERMOMETER PRESSURE TEMPERATURE RELIEF VALVE STRAINER PIPE CAP PIPE RISE PIPE DROP DOMESTIC COLD WATER DOMESTIC HOT WATER DOMESTIC HOT WATER RETURN TEPID WATER SANITARY/WASTE UNDERGROUND SANITARY/WASTE ABOVEGROUND EXIST RAIN/STORM WATER UNDERGROUND VENT GAS ACID WASTE UNDERGROUND GATE VALVE BALL/BUTTERFLY VALVE WATER HAMMER ARRESTER EXIST RAIN/STORM WATER ABOVEGROUND EXIST SANITARY/WASTE UNDERGROUND EXIST SANITARY/WASTE ABOVEGROUND RAIN/STORM WATER UNDERGROUND RAIN/STORM WATER ABOVE GROUND EXIST GAS LAB COLD WATER ACID WASTE ABOVEGROUND ACID VENT COMPRESSED AIR MEDICAL AIR NITROUS OXIDE OXYGEN VACUUM WASTE ANESTHESIA GAS DISPOSAL EXIST DOMESTIC COLD WATER NITROGEN CARBON DIOXIDE DEIONIZED WATER ACETYLENE ARGON AIRTIGHT CONDUIT TRAP PRIMER FLOOR DRAIN FLOOR SINK GLOBE VALVE CHECK VALVE BALANCING VALVE WITH MEMORY STOP UNION ROOF DRAIN PRESSURE GAUGE GAS SHUT-OFF VALVE MIXING VALVE DIRECTION OF FLOW EXPANSION JOINT FLEXIBLE CONNECTION MOMENT GUIDE PIPE ANCHOR SUPPORT CURB SUPPORT CURB W/ANCHOR EXIST DOMESTIC HOT WATER EXIST DOMESTIC HOT WATER RETURN A1 AIR STATION PIPE CAP PRESSURE REGULATOR PR THERMOSTATIC RECIRCULATION VALVE SELECTIVE DEMOLITION INCLUDES, BUT IS NOT LIMITED TO, REMOVAL AND LEGAL DISPOSAL OF EQUIPMENT AND SYSTEMS MADE OBSOLETE AND/OR REPLACED BY NEW WORK. SELECTIVE DEMOLITION INCLUDES REMOVAL AND RELOCATION OR RE-INSTALLATION, DISCONNECTIONS AND RE-CONNECTIONS OF SERVICES, SUPPORTS AND SUBSEQUENT FINAL SUPPORTS, TEMPORARY CAPPING, AND RE-ROUTING OF TEMPORARY SERVICES TO PERMIT NEW OR RENOVATION WORK TO PROCEED. THE DEMOLITION WORK INDICATED ON THE DRAWINGS IS INTENDED TO ASSIST THE CONTRACTOR AND GIVE GENERAL INFORMATION. NOT ALL DEMOLITION OR TEMPORARY CONNECTIONS ARE SHOWN. PRIOR TO SUBMITTING BID, THE CONTRACTOR SHALL VISIT THE PROJECT SITE AND REVIEW ORIGINAL DRAWINGS IF AVAILABLE. CONTRACTOR IS RESPONSIBLE TO DETERMINE THE FULL EXTENT OF SELECTIVE DEMOLITION, AND INCLUDE ALL REQUIRED SELECTIVE DEMOLITION WORK IN HIS BID, WHETHER OR NOT SPECIFICALLY SHOWN ON DRAWINGS. NO ADDITIONAL COSTS WILL BE GRANTED FOR SELECTIVE DEMOLITION. LEGALLY DISPOSE OF ALL ITEMS AND MATERIALS, EXCEPT ANY ITEMS SPECIFICALLY DESIGNATED BY THE OWNER TO BE SALVAGED. REMOVE AND PLACE THE DESIGNATED SALVAGED EQUIPMENT IN A LOCATION DIRECTED BY THE OWNER. REFER TO GENERAL CONSTRUCTION TRADE DEMOLITION DRAWINGS AS WELL AS THE PLUMBING DRAWINGS FOR EXTENT OF THE AREA TO BE DEMOLISHED AND FOR FIXTURES AND EQUIPMENT REQUIRED TO BE REMOVED DUE TO THE NEW CONSTRUCTION AND RENOVATIONS. PIPING MADE OBSOLETE BY THE NEW CONSTRUCTION SHALL BE REMOVED, INCLUDING INSULATION, HANGERS, AND SUPPORTS, AND CAPPED ABOVE CEILINGS AT ACTIVE MAINS, BELOW FLOORS OR IN WALLS SO THAT IT IS COMPLETELY CONCEALED AT THE COMPLETION OF THE PROJECT. DISCONNECT PIPING FROM OBSOLETE FIXTURES OR EQUIPMENT WHICH IS TO BE REMOVED BY OTHERS INCLUDING KITCHEN EQUIPMENT IF APPLICABLE AND CAP AND REMOVE PIPING IN SAME MANNER. EXISTING FLOOR DRAINS AND CLEANOUTS ARE TO REMAIN UNLESS OTHERWISE NOTED. PIPING REMOVED FROM THE EXISTING PLUMBING SYSTEM SHALL NOT BE USED IN THE INSTALLATION OF THE NEW SYSTEM. IN ALL AREAS WHERE PATCHING IS REQUIRED, THE PLUMBING CONTRACTOR SHALL PATCH THE SUB-SURFACE WHERE THE NEW SURFACE IS TO BE FINISHED BY THE GENERAL CONTRACTOR. THIS SUB-SURFACE MUST BE PROVIDED SO THAT IS DOES NOT INHIBIT THE INSTALLATION OF OR AFFECT THE APPEARANCE OF THE NEW FINISH. IF A NEW FINISH WILL NOT BE PROVIDED BY THE GENERAL CONTRACTOR, THE PLUMBING CONTRACTOR IS RESPONSIBLE TO PATCH THE SURROUNDING FINISHED SURFACE TO MATCH EXISTING. PATCH EXISTING OPENINGS FROM DEMOLISHED PIPING IN FIRE RATED FLOORS AND WALLS AS REQUIRED TO MAINTAIN FIRE RATING. PLUMBING CONTRACTOR SHALL REMOVE/ REPLACE EXISTING CEILING TILES AND GRID AS REQUIRED TO ACCOMPLISH INDICATED PLUMBING WORK, UNLESS SPECIFICALLY INDICATED OTHERWISE. REFER TO THE ARCHITECTURAL DRAWINGS FOR FINISH TREATMENT OF SPACES. WHERE NEW SANITARY, STORM OR WATER SERVICE PIPING IS INSTALLED BELOW NEW OR EXISTING WALL FOOTINGS, PROVIDE SLEEVE AND ENCASE IN CONCRETE AS REQUIRED BY THE STRUCTURAL ENGINEER. VERIFY ALL EXISTING CONDITIONS AND COORDINATE EXACT LOCATION OF NEW OPENINGS FOR PIPING REQUIRED TO PENETRATE EXISTING GRADE BEAMS OR FOUNDATION WALLS WITH THE STRUCTURAL ENGINEER. REMOVE OBSOLETE VENTS THRU ROOF IN THEIR ENTIRETY INCLUDING ALL OBSOLETE VENT PIPING IN ACCESSIBLE CEILING SPACE. PATCH RESULTING OPENINGS IN THE ROOF AS REQUIRED BY THE TYPE OF ROOF CONSTRUCTION . NEW INSULATION AND ROOFING WILL BE INSTALLED BY THE GENERAL CONTRACTOR. TP ID INSIDE DIAMETER INSUL INSULATION INT INTERIOR INV INVERT IW INDIRECT WASTE KW KILOWATT LAV LAVATORY LBS POUNDS LMB LAUNDRY MACHINE BOX MFG MANUFACTURER MB MOP BASIN MBH 1,000 BTU MV MIXING VALVE OD OUTSIDE DIAMETER ORD OVERFLOW ROOF DRAIN P PRESSURE GAUGE PD PRESSURE DROP PRV PRESSURE REDUCING VALVE PSIG POUNDS PER SQUARE INCH GAUGE RCP REINFORCED CONCRETE PIPE RD ROOF DRAIN RP RECIRCULATING PUMP RPM REVOLUTIONS PER MINUTE RWC RAINWATER CONDUCTOR S SOIL LINE/STACK SAN SANITARY SEWER SK SINK SH SHOWER SI SOLIDS INTERCEPTOR SS SERVICE SINK T THERMOMETER TD TRENCH DRAIN TW TEPID WATER UR URINAL V VENT VER VERTICAL VTR VENT THRU ROOF W WASTE WC WATER CLOSET WF WASHFOUNTAIN WH WALL HYDRANT WHA WATER HAMMER ARRESTER WSV WATER SOLENOID VALVE AD AREA DRAIN AFG ABOVE FINISHED GRADE AFR ABOVE FINISHED ROOF AV ACID VENT AW ACID WASTE BFG BELOW FINISHED GRADE BFP BACKFLOW PREVENTER BLW BELOW BOTT BOTTOM BTUB BATHTUB CA COMPRESSED AIR CD CONDENSATE DRAIN CFH CUBIC FEET PER HOUR CIP CAST IRON PIPE CO CLEAN OUT CW COLD WATER DF DRINKING FOUNTAIN DIP DUCTILE IRON PIPE DS DOWNSPOUT DSN DOWNSPOUT NOZZLE EEW EMERGENCY EYEWASH ES EMERGENCY SHOWER ESEW EMERGENCY SHOWER/EYEWASH EWC ELECTRIC WATER COOLER EXT EXTERIOR FD FLOOR DRAIN FDN FOUNDATION FS FLOOR SINK FT FEET FT HD FEET OF HEAD FTG FOOTING GALV GALVANIZED GH GROUND HYDRANT GI GREASE INTERCEPTOR GS GREASE SEPARATOR GSV GAS SOLENOID VALVE HB HOSE BIBB HOR HORIZONTAL HTG HEATING HW HOT WATER HWH HOT WATER HEATER HWR HOT WATER RETURN BACKWATER VALVE 1. PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT REQUIRED FOR THE COMPLETION AND OPERATION OF ALL PLUMBING SYSTEMS IN THIS SECTION OF WORK IN ACCORDANCE WITH ALL APPLICABLE CODES. 2. THE PLUMBING DRAWINGS SHALL BE CONSIDERED AS BEING DIAGRAMMATIC AND ARE NOT TO BE SCALED FOR THE ACCURATE CUTTING OF PIPE OR ITS EXACT PLACEMENT, BUT THEY SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING CONSTRUCTION AND THE WORK OF OTHER TRADES WILL PERMIT. BEFORE ANY PIPING IS INSTALLED, CONFER WITH ALL OTHER CONTRACTORS IN ORDER TO ESTABLISH THE LOCATIONS OF THEIR PIPING, CONDUIT, DUCTWORK, GRILLES, FOUNDATIONS, STRUCTURAL STEEL, LIGHTING FIXTURES AND OTHER EQUIPMENT SO AS TO AVOID INTERFERENCE. FAILURE TO COORDINATE SHALL NOT RESULT IN ANY ADDITIONAL EXPENSE TO THE OWNER. 3. LOCATIONS OF EXISTING PIPING ARE TAKEN FROM EXISTING RECORD DRAWINGS. VERIFY THE EXACT LOCATION OF ALL EXISTING LINES AND ALL INVERTS PRIOR TO THE INSTALLATION OF ANY NEW PIPING. 4. ALL FIXTURES SHALL BE COMPLETE AND INCLUDE SUPPLIES, STOPS, VALVES, FAUCETS, DRAINS, TRAPS, TAILPIECES, ESCUTCHEONS, ETC. TRAPS FOR ALL LAVATORIES AND SINKS SHALL BE REMOVABLE. LOCATE VALVES IN A READILY ACCESSIBLE LOCATION. ALL EXPOSED WASTE AND SUPPLY PIPING LOCATED IN FINISHED AREAS SHALL BE CHROME PLATED BRASS. 5. REFER TO THE RISER DIAGRAMS FOR ALL PIPE SIZES AND PIPING NOT SHOWN ON THE PLANS. UNLESS NOTED OTHERWISE ON THE DRAWINGS, ALL WASTE PIPING BELOW GRADE SHALL BE A MINIMUM OF 2" IN SIZE. 6. ALL MATERIALS SHALL BE NEW AND SHALL FIT THE SPACE AVAILABLE. VERIFY DIMENSIONS AT SITE. 7. ALL PIPING, APPARATUS, EQUIPMENT, ETC. SHALL BE PROPERLY SUPPORTED, BRACED VERTICALLY AND HORIZONTALLY IN ACCORDANCE WITH APPLICABLE CODES AND AS REQUIRED TO PREVENT EXCESSIVE MOVEMENT DURING SEISMIC CONDITIONS. 8. REMOVE EXISTING CEILING TILES AND GRID OR PORTION OF EXISTING PLASTER OR GYPSUM BOARD AS REQUIRED TO OBTAIN ACCESS TO CEILING SPACE TO ACCOMPLISH INDICATED PLUMBING WORK, UNLESS SPECIFICALLY INDICATED OTHERWISE. PROVIDE ADDITIONAL TEMPORARY HANGERS/CABLES REQUIRED TO SUPPORT REMAINING CEILING, LIGHT FIXTURES, DEVICES, ETC. STORE EXISTING CEILING TILES AND GRID IN A SAFE LOCATION AND RE-INSTALL ONCE THE WORK IS COMPLETED. REPLACE DAMAGED TILES AND GRID WITH NEW TO MATCH EXISTING. PATCH/REPLACE DAMAGED PORTION OF PLASTER OR GYPSUM BOARD AND PAINT TO MATCH EXISTING. REMOVE ALL TEMPORARY FACILITIES ONCE THE WORK IS COMPLETED. REFER TO THE ARCHITECTURAL DRAWINGS FOR FINISH TREATMENT OF SPACES. 9. ALL VALVES, CLEANOUTS, ETC., SHALL BE LOCATED AND INSTALLED TO PERMIT ACCESS FOR SERVICE WITHOUT DAMAGE TO BUILDING OR FINISHED MATERIALS. 10. PROVIDE CLEANOUTS ON ALL ACCESSIBLE TRAPS, AT THE BASE OF ALL SOIL/WASTE STACKS AND RAINWATER CONDUCTORS, AT EACH CHANGE OF DIRECTION OF PIPING GREATER THAN 45 DEGREES AND LOCATED AT INTERVALS NOT TO EXCEED THE MAXIMUM PERMITTED BY THE APPLICABLE PLUMBING CODE AND AS INDICATED ON THE DRAWINGS. 11. STERILIZE NEW DOMESTIC WATER PIPING AND PORTIONS OF THE EXISTING PIPING THAT HAVE BEEN ALTERED, EXTENDED, OR REPAIRED PRIOR TO USING. COMPLY WITH PURGING AND DISINFECTING PROCEDURES PRESCRIBED BY AUTHORITIES HAVING JURISDICTION OR, IN THE ABSENCE OF PRESCRIBED METHOD, THE PROCEDURES DESCRIBED IN EITHER AWWA C651 OR AWWA C652, OR AS DESCRIBED IN THE APPLICABLE PLUMBING CODE. FURNISH STERILIZATION REPORT TO ENGINEER UPON COMPLETION. 12. ALL DOMESTIC WATER PIPING SHALL BE HUNG LEVEL WITHOUT PITCH. 13. COPPER PIPING SHALL BE PROTECTED AGAINST CONTACT WITH DISSIMILAR METALS. ALL HANGERS, SUPPORTS, ANCHORS, AND CLIPS SHALL BE COPPER OR COPPER PLATED. WHERE COPPER PIPING IS CARRIED ON IRON TRAPEZE HANGERS WITH OTHER PIPING, SATISFACTORY AND PERMANENT ELECTROLYTIC ISOLATION MATERIAL SHALL PREVENT CONTACT WITH OTHER METALS. 14. WATER PIPING SHALL NOT BE RUN IN AREAS SUBJECT TO FREEZING TEMPERATURES. WATER PIPING IN EXTERIOR WALLS SHALL BE RUN ON CONDITIONED SIDE OF THE INSULATION. 15. ALL WATER PIPING SHALL BE INSULATED AND ALL WATER PIPING INSTALLED ABOVE THE CEILING SHALL BE BELOW THE BUILDING INSULATION. 16. PROVIDE DRAIN VALVES AT ALL LOW POINTS OF DOMESTIC WATER PIPING SYSTEMS FOR COMPLETE DRAINAGE AND INDICATE LOCATION OF SAME ON RECORD DRAWINGS. 17. PROVIDE VACUUM BREAKERS AS REQUIRED BY CODE. 18. ALL PLUMBING FIXTURES MUST BE VENTED IN ACCORDANCE WITH APPLICABLE PLUMBING CODE INCLUDING LOCAL CODES. 19. REFER TO THE ARCHITECTURAL PLANS FOR EXACT LOCATION OF DOORS, WINDOWS, FIXTURES, WALL DIMENSIONS, ETC. 20. THE ARCHITECTURAL DRAWINGS, INCLUDING INTERIOR ELEVATIONS, SHALL GOVERN THE ARRANGEMENT, LOCATION, AND MOUNTING HEIGHTS OF ALL FIXTURES AND EQUIPMENT, BUT NOT TO THE EXTENT OF PERMITTING ANY OMISSIONS OF FIXTURES OR EQUIPMENT SHOWN ON THE PLUMBING DRAWINGS. ANY DISCREPANCY BETWEEN THE DRAWINGS, OR BETWEEN THE DRAWINGS AND SPECIFICATIONS, SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT AND ENGINEER. 21. ALL FIRE RATED FLOOR AND WALL PENETRATIONS SHALL BE SEALED WITH FIRE RESISTANT CAULKING / MATERIALS. PATCH EXISTING OPENINGS FROM DEMOLISHED PIPING IN FIRE RATED FLOORS AND WALLS AS REQUIRED TO MAINTAIN FIRE RATING. 22. COORDINATE FINAL FLOOR DRAIN LOCATIONS WITH ALL EQUIPMENT CONCRETE PADS, TOILET ROOM PARTITIONS, FURNITURE, ETC. OBTAIN EXACT LOCATIONS FROM ALL OTHER CONTRACTORS PRIOR TO INSTALLING DRAINS. 23. CAULK AROUND ALL PLUMBING FIXTURES INSTALLED. CAULK SHALL BE NON-HARDENING, NON-YELLOWING, MILDEW RESISTANT SILICONE AND IN A COLOR SELECTED BY THE ARCHITECT. 24. ANY REFERENCE TO "GC" OR "GENERAL CONTRACTOR" SHALL MEAN THE APPROPRIATE GENERAL TRADES CONTRACTOR. THIS REFERENCE IS NOT TO OUTLINE WORK AMONG GENERAL TRADES CONTRACTORS, BUT TO NOTE WHAT WORK IS NOT A PART OF THE PLUMBING CONTRACT. 25. ALL POTABLE WATER PIPING, DEVICES AND EQUIPMENT SHALL BE NSF-61 COMPLIANT. 26. NO DEAD-LEG SUPPLY (3X PIPE DIA. MAXIMUM) SHALL BE IN PLACE UPON COMPLETION OF PROJECT. 27. INCLUDE PRICE FOR 200' OF 2"COPPER DOMESTIC WATER PIPING INCLUDING INSULATION AND HANGERS PER THE SPECIFICATION. THIS PRICE IS TO BE INCLUDED IN BASE BID. 28. PROVIDE PRICE FOR 50' OF 4" CAST IRON DRAINAGE PIPE BELOW GRADE INCLUDING SAWCUTTING EXCAVATION, BACKFILL, COMPACTION AND PATCHING OF CONCRETE FLOOR. GENERAL PLUMBING NOTES GENERAL DEMOLITION NOTES FULL SHEET SIZE: 30" x 42" SHEET NUMBER PROJECT NUMBER REGISTRATION CURRENT ISSUE COPYRIGHT 2016 SFA DRAWING HISTORY SITE / CIVIL ENGINEER LANDSCAPE ARCHITECT STRUCTURAL ENGINEER MECHANICAL / ELECTRICAL / PLUMBING FIRE PROTECTION ENGINEER TELECOM ENGINEER AUDIO VISUAL ENGINEER SECURITY ENGINEER ACOUSTICAL ENGINEER P0.1 LVE-14179 Cover Sheet BUCKS COUNTY COMMUNITY COLLEGE FOUNDERS HALL RENOVATIONS FOUNDERS HALL RENOVATIONS 100% CD Submission - NOT FOR CONSTRUCTION 08/19/2016 N/A N/A BARRY ISETT ASSOCIATES 85 PA-100, Allentown, PA 18106 LEHIGH VALLEY ENGINEERING 1 W Broad St #500, Bethlehem, PA 18018 LEHIGH VALLEY ENGINEERING N/A N/A N/A N/A DRAWING LIST F0.1 Cover Sheet F2.0 Ground Floor Plan F2.1 First Floor Plan F2.2 Second Floor Plan F2.3 Third Floor Plan P0.1 Cover Sheet P1.0A Ground Floor Plan - Demolition P2.0A Ground Floor Plan - Labs - Drainage P3.0A Ground Floor Plan - Labs - Supply P1.1 First Floor Plan - Demolition P1.2 Second Floor Plan - Demolition P1.3 Roof Plan - Demolition P1.0 Foundation Plan - Demolition P2.1 First Floor Plan - Labs - Drainage P2.2 Second Floor Plan - Labs - Drainage P3.1 First Floor Plan - Labs - Supply P3.2 Second Floor Plan - Labs - Supply P2.3 Roof Plan - Drainage P2.0 Foundation Plan - Labs - Drainage P3.0 Foundation Plan - Labs - Supply P8.1 Details and Schedules P7.1 Riser Diagrams H0.1 Cover Sheet H1.0 Ground Floor Plan - Demolition H1.1 First Floor Plan - Demolition H1.2 Second Floor Plan - Demolition H1.3 Third Floor Plan - Demolition H2.0 Ground Floor Plan - HVAC H2.1 First Floor Plan - HVAC H2.2 Second Floor Plan - HVAC H2.3 Third Floor Plan - HVAC H7.0 Details H7.1 Details H8.0 Schedules H8.1 Schedules H5.1 Enlarged Plans & Sections-HVAC H3.0 Ground Floor - HVAC - Piping H3.1 First Floor - HVAC - Piping H3.2 Second Floor - HVAC - Piping H7.2 Details H5.2 Sections H5.3 Sections H3.3 Third Floor - HVAC - Piping H8.2 Schedules H8.3 Schedules H7.3 Details H7.4 Details E0.1 Cover Sheet E1.0 Ground Floor Plan - Demolition E1.1 First Floor Plan - Demolition E1.2 Second Floor Plan - Demolition E1.3 Third Floor Plan - Demolition E2.0 Ground Floor Plan - Lighting E2.1 First Floor Plan - Lighting E2.2 Second Floor Plan - Lighting E2.3 Third Floor Plan - Lighting E3.0 Ground Floor Plan - Power E3.1 First Floor Plan - Power E3.2 Second Floor Plan - Power E3.3 Third Floor Plan - Power E4.0 Ground Floor Plan - Low-Voltage E4.1 First Floor Plan - Low-Voltage E4.2 Second Floor Plan - Low-Voltage E4.3 Third Floor Plan - Low-Voltage E7.1 Single Line Diagrams E8.1 Schedules E5.1 Enlarged Kitchen Plan E7.2 Details E7.3 Teledata Details E8.2 Schedules E8.3 Schedules E8.4 Schedules E8.5 Schedules NO. ISSUE DATE: DESCRIPTION

twiningconstruction.comtwiningconstruction.com/BCCC-Founders-Hall-Renovation/Plumbing Dwgs... · where el. is drawn elevation ... location p pedestal pc plumbing contractor pir passive

  • Upload
    voquynh

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

COMMON ABBREVIATIONS

COMMON SYMBOLS

CONNECT TO EXISTING

EXISTING TO BE REMOVED

PLAN NORTH

SECTION IDA

H1.1 SHEET NO. WHERE SECTION IS

DIRECTIONAL VIEW OF SECTION

1 REVISION NUMBER

ELEVATION100.00'

1 KEYNOTE

EQUIPMENT TAG SHOWINGTYPE AND ID. SEE EQUIPMENTSCHEDULES FOR DETAILS

EXISTING TO REMAIN

REMOVE EXISTING

PROVIDE NEW

N

TYPEID

REVISION CLOUD

DETAIL ID1

H1.1 SHEET NO. WHERE DETAIL IS

101 ROOM/SPACE NO.

11 H1.1

DIRECTION OF VIEW

SHEET NO. WHERE EL. IS DRAWNELEVATION ID

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

ABV ABOVE

AFF ABOVE FINISHED FLOOR

AFI ARC-FAULT INTERRUPTER

AFR ABOVE FINISHED ROOF

ALT ALTERNATE

ATS AUTOMATIC TRANSFER SWITCH

ATC AUTOMATIC TEMPERATURECONTROL - COORDINATE LOCATION

C/G COUNTERTOP GFI

CD CORD DROP

CL CENTERLINE

CLG CEILING

CM CEILING MOUNT

COL COLUMN

CT COUNTERTOP HEIGHT-44" AFF UNOOR CURRENT TRANSFORMER

CR CORD REEL

DBF DOWN BELOW FLOOR

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DW DISHWASHER

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EL ELEVATION

ELEV ELEVATOR

EMER EMERGENCY

EO EMERGENCY ONLY (NORMALLYOFF)

EWC ELECTRIC WATER COOLER(PROVIDE GFI RECEPTACLE)

EQ EQUIPMENT, COORDINATELOCATION

EX EXISTING

FA FIRE ALARM

FBO FURNISHED BY OWNER

FLR FLOOR

FPC FIRE PROTECTION CONTRACTOR

FSC FOOD SERVICE CONTRACTOR

GC GENERAL CONTRACTOR

GFI GROUND-FAULT INTERRUPTER

GND GROUND

HC HVAC CONTRACTOR

HCP HANDICAPPED

HGT HEIGHT

HR HOUR

IR INFRARED

JB JUNCTION BOX

KES KITCHEN EQUIPMENT SUPPLIER

LV LOW-VOLTAGE

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPACITY

MOCP MAXIMUM OVERCURRENTPROTECTION

MT MULTITECHNOLOGY

MO MICROWAVE OVEN

NA NOT APPLICABLE

NE NORMAL/EMERGENCY(NORMALLY ON)

NIC NOT IN CONTRACT

NTS NOT TO SCALE

OFCI OWNER FURNISHED-CONTRACTOR INSTALLED

EQ FOR EQUIPMENT, COORDINATE LOCATION

P PEDESTAL

PC PLUMBING CONTRACTOR

PIR PASSIVE INFRARED

SE SERVICE ENTRANCE

SECT SECTION

SHT SHEET

SIM SIMILAR

SPD SURGE PROTECTION DEVICE

SPEC SPECIFICATION

SS SERVICE SINK

STD STANDARD

SUSP SUSPENDED

SB SMARTBOARD COORDINATE LOCATION

TL TASK LIGHT

TR TAMPER RESISTANT

TSTAT THERMOSTAT

TV FOR TV, COORDINATE LOCATION

TVSS TRANSIENT VOLTAGESURGE SUPPRESSER

UNO UNLESS NOTED OTHERWISE

US ULTRASONIC

USB 2 USB PORTS IN ADDITION TO RECEPTACLES

W/ WITH

W/O WITHOUT

W WALL-MOUNTED

WP WEATHERPROOF

AV

AW

ERW

ERW

AW

RW

RW

PLUMBING ABBREVIATIONS

PLUMBING SYMBOLS

N

EG

AR

VAC

AC

LCW

CA

DE

OX

WAGD

CO2

MA

NO2

TW

G

AT

BACKFLOW PREVENTER

SOLENOID VALVE

THERMOMETER

PRESSURE TEMPERATURERELIEF VALVE

STRAINER

PIPE CAP

PIPE RISE

PIPE DROP

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

TEPID WATER

SANITARY/WASTE UNDERGROUND

SANITARY/WASTE ABOVEGROUND

EXIST RAIN/STORM WATER UNDERGROUND

VENT

GAS

ACID WASTE UNDERGROUND

GATE VALVE

BALL/BUTTERFLY VALVE

WATER HAMMER ARRESTER

EXIST RAIN/STORM WATER ABOVEGROUND

EXIST SANITARY/WASTE UNDERGROUND

EXIST SANITARY/WASTE ABOVEGROUND

RAIN/STORM WATER UNDERGROUND

RAIN/STORM WATER ABOVE GROUND

EXIST GAS

LAB COLD WATER

ACID WASTE ABOVEGROUND

ACID VENT

COMPRESSED AIR

MEDICAL AIR

NITROUS OXIDE

OXYGEN

VACUUM

WASTE ANESTHESIA GAS DISPOSAL

EXIST DOMESTIC COLD WATER

NITROGEN

CARBON DIOXIDE

DEIONIZED WATER

ACETYLENE

ARGON

AIRTIGHT CONDUIT

TRAP PRIMER

FLOOR DRAIN

FLOOR SINK

GLOBE VALVE

CHECK VALVE

BALANCING VALVE WITHMEMORY STOP

UNION

ROOF DRAIN

PRESSURE GAUGE

GAS SHUT-OFF VALVE

MIXING VALVE

DIRECTION OF FLOW

EXPANSION JOINT

FLEXIBLE CONNECTION

MOMENT GUIDE

PIPE ANCHOR

SUPPORT CURB

SUPPORT CURB W/ANCHOR

EXIST DOMESTIC HOT WATER

EXIST DOMESTIC HOT WATER RETURN

A1 AIR STATION

PIPE CAP

PRESSURE REGULATORPR

THERMOSTATICRECIRCULATION VALVE

SELECTIVE DEMOLITION INCLUDES, BUT IS NOT LIMITED TO,REMOVAL AND LEGAL DISPOSAL OF EQUIPMENT AND SYSTEMSMADE OBSOLETE AND/OR REPLACED BY NEW WORK. SELECTIVEDEMOLITION INCLUDES REMOVAL AND RELOCATION ORRE-INSTALLATION, DISCONNECTIONS AND RE-CONNECTIONS OFSERVICES, SUPPORTS AND SUBSEQUENT FINAL SUPPORTS,TEMPORARY CAPPING, AND RE-ROUTING OF TEMPORARY SERVICESTO PERMIT NEW OR RENOVATION WORK TO PROCEED.

THE DEMOLITION WORK INDICATED ON THE DRAWINGS IS INTENDEDTO ASSIST THE CONTRACTOR AND GIVE GENERAL INFORMATION.NOT ALL DEMOLITION OR TEMPORARY CONNECTIONS ARE SHOWN.PRIOR TO SUBMITTING BID, THE CONTRACTOR SHALL VISIT THEPROJECT SITE AND REVIEW ORIGINAL DRAWINGS IF AVAILABLE.CONTRACTOR IS RESPONSIBLE TO DETERMINE THE FULL EXTENTOF SELECTIVE DEMOLITION, AND INCLUDE ALL REQUIREDSELECTIVE DEMOLITION WORK IN HIS BID, WHETHER OR NOTSPECIFICALLY SHOWN ON DRAWINGS. NO ADDITIONAL COSTS WILLBE GRANTED FOR SELECTIVE DEMOLITION. LEGALLY DISPOSE OFALL ITEMS AND MATERIALS, EXCEPT ANY ITEMS SPECIFICALLYDESIGNATED BY THE OWNER TO BE SALVAGED. REMOVE ANDPLACE THE DESIGNATED SALVAGED EQUIPMENT IN A LOCATIONDIRECTED BY THE OWNER.

REFER TO GENERAL CONSTRUCTION TRADE DEMOLITIONDRAWINGS AS WELL AS THE PLUMBING DRAWINGS FOR EXTENT OFTHE AREA TO BE DEMOLISHED AND FOR FIXTURES AND EQUIPMENTREQUIRED TO BE REMOVED DUE TO THE NEW CONSTRUCTION ANDRENOVATIONS.

PIPING MADE OBSOLETE BY THE NEW CONSTRUCTION SHALL BEREMOVED, INCLUDING INSULATION, HANGERS, AND SUPPORTS, ANDCAPPED ABOVE CEILINGS AT ACTIVE MAINS, BELOW FLOORS OR INWALLS SO THAT IT IS COMPLETELY CONCEALED AT THECOMPLETION OF THE PROJECT. DISCONNECT PIPING FROMOBSOLETE FIXTURES OR EQUIPMENT WHICH IS TO BE REMOVED BYOTHERS INCLUDING KITCHEN EQUIPMENT IF APPLICABLE AND CAPAND REMOVE PIPING IN SAME MANNER. EXISTING FLOOR DRAINSAND CLEANOUTS ARE TO REMAIN UNLESS OTHERWISE NOTED.PIPING REMOVED FROM THE EXISTING PLUMBING SYSTEM SHALLNOT BE USED IN THE INSTALLATION OF THE NEW SYSTEM.

IN ALL AREAS WHERE PATCHING IS REQUIRED, THE PLUMBINGCONTRACTOR SHALL PATCH THE SUB-SURFACE WHERE THE NEWSURFACE IS TO BE FINISHED BY THE GENERAL CONTRACTOR. THISSUB-SURFACE MUST BE PROVIDED SO THAT IS DOES NOT INHIBITTHE INSTALLATION OF OR AFFECT THE APPEARANCE OF THE NEWFINISH. IF A NEW FINISH WILL NOT BE PROVIDED BY THE GENERALCONTRACTOR, THE PLUMBING CONTRACTOR IS RESPONSIBLE TOPATCH THE SURROUNDING FINISHED SURFACE TO MATCHEXISTING. PATCH EXISTING OPENINGS FROM DEMOLISHED PIPINGIN FIRE RATED FLOORS AND WALLS AS REQUIRED TO MAINTAIN FIRERATING.

PLUMBING CONTRACTOR SHALL REMOVE/ REPLACE EXISTINGCEILING TILES AND GRID AS REQUIRED TO ACCOMPLISH INDICATEDPLUMBING WORK, UNLESS SPECIFICALLY INDICATED OTHERWISE.REFER TO THE ARCHITECTURAL DRAWINGS FOR FINISH TREATMENTOF SPACES.

WHERE NEW SANITARY, STORM OR WATER SERVICE PIPING ISINSTALLED BELOW NEW OR EXISTING WALL FOOTINGS, PROVIDESLEEVE AND ENCASE IN CONCRETE AS REQUIRED BY THESTRUCTURAL ENGINEER. VERIFY ALL EXISTING CONDITIONS ANDCOORDINATE EXACT LOCATION OF NEW OPENINGS FOR PIPINGREQUIRED TO PENETRATE EXISTING GRADE BEAMS ORFOUNDATION WALLS WITH THE STRUCTURAL ENGINEER.

REMOVE OBSOLETE VENTS THRU ROOF IN THEIR ENTIRETYINCLUDING ALL OBSOLETE VENT PIPING IN ACCESSIBLE CEILINGSPACE. PATCH RESULTING OPENINGS IN THE ROOF AS REQUIREDBY THE TYPE OF ROOF CONSTRUCTION . NEW INSULATION ANDROOFING WILL BE INSTALLED BY THE GENERAL CONTRACTOR.

TP

ID INSIDE DIAMETER

INSUL INSULATION

INT INTERIOR

INV INVERT

IW INDIRECT WASTE

KW KILOWATT

LAV LAVATORY

LBS POUNDS

LMB LAUNDRY MACHINE BOX

MFG MANUFACTURER

MB MOP BASIN

MBH 1,000 BTU

MV MIXING VALVE

OD OUTSIDE DIAMETER

ORD OVERFLOW ROOF DRAIN

P PRESSURE GAUGE

PD PRESSURE DROP

PRV PRESSURE REDUCING VALVE

PSIG POUNDS PER SQUARE INCH GAUGE

RCP REINFORCED CONCRETE PIPE

RD ROOF DRAIN

RP RECIRCULATING PUMP

RPM REVOLUTIONS PER MINUTE

RWC RAINWATER CONDUCTOR

S SOIL LINE/STACK

SAN SANITARY SEWER

SK SINK

SH SHOWER

SI SOLIDS INTERCEPTOR

SS SERVICE SINK

T THERMOMETER

TD TRENCH DRAIN

TW TEPID WATER

UR URINAL

V VENT

VER VERTICAL

VTR VENT THRU ROOF

W WASTE

WC WATER CLOSET

WF WASHFOUNTAIN

WH WALL HYDRANT

WHA WATER HAMMER ARRESTER

WSV WATER SOLENOID VALVE

AD AREA DRAIN

AFG ABOVE FINISHED GRADE

AFR ABOVE FINISHED ROOF

AV ACID VENT

AW ACID WASTE

BFG BELOW FINISHED GRADE

BFP BACKFLOW PREVENTER

BLW BELOW

BOTT BOTTOM

BTUB BATHTUB

CA COMPRESSED AIR

CD CONDENSATE DRAIN

CFH CUBIC FEET PER HOUR

CIP CAST IRON PIPE

CO CLEAN OUT

CW COLD WATER

DF DRINKING FOUNTAIN

DIP DUCTILE IRON PIPE

DS DOWNSPOUT

DSN DOWNSPOUT NOZZLE

EEW EMERGENCY EYEWASH

ES EMERGENCY SHOWER

ESEW EMERGENCY SHOWER/EYEWASH

EWC ELECTRIC WATER COOLER

EXT EXTERIOR

FD FLOOR DRAIN

FDN FOUNDATION

FS FLOOR SINK

FT FEET

FT HD FEET OF HEAD

FTG FOOTING

GALV GALVANIZED

GH GROUND HYDRANT

GI GREASE INTERCEPTOR

GS GREASE SEPARATOR

GSV GAS SOLENOID VALVE

HB HOSE BIBB

HOR HORIZONTAL

HTG HEATING

HW HOT WATER

HWH HOT WATER HEATER

HWR HOT WATER RETURN

BACKWATER VALVE

1. PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT REQUIRED FOR THE COMPLETIONAND OPERATION OF ALL PLUMBING SYSTEMS IN THIS SECTION OF WORK INACCORDANCE WITH ALL APPLICABLE CODES.

2. THE PLUMBING DRAWINGS SHALL BE CONSIDERED AS BEING DIAGRAMMATIC AND ARENOT TO BE SCALED FOR THE ACCURATE CUTTING OF PIPE OR ITS EXACT PLACEMENT,BUT THEY SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING CONSTRUCTIONAND THE WORK OF OTHER TRADES WILL PERMIT. BEFORE ANY PIPING IS INSTALLED,CONFER WITH ALL OTHER CONTRACTORS IN ORDER TO ESTABLISH THE LOCATIONS OFTHEIR PIPING, CONDUIT, DUCTWORK, GRILLES, FOUNDATIONS, STRUCTURAL STEEL,LIGHTING FIXTURES AND OTHER EQUIPMENT SO AS TO AVOID INTERFERENCE.FAILURE TO COORDINATE SHALL NOT RESULT IN ANY ADDITIONAL EXPENSE TO THEOWNER.

3. LOCATIONS OF EXISTING PIPING ARE TAKEN FROM EXISTING RECORD DRAWINGS.VERIFY THE EXACT LOCATION OF ALL EXISTING LINES AND ALL INVERTS PRIOR TO THEINSTALLATION OF ANY NEW PIPING.

4. ALL FIXTURES SHALL BE COMPLETE AND INCLUDE SUPPLIES, STOPS, VALVES,FAUCETS, DRAINS, TRAPS, TAILPIECES, ESCUTCHEONS, ETC. TRAPS FOR ALLLAVATORIES AND SINKS SHALL BE REMOVABLE. LOCATE VALVES IN A READILYACCESSIBLE LOCATION. ALL EXPOSED WASTE AND SUPPLY PIPING LOCATED INFINISHED AREAS SHALL BE CHROME PLATED BRASS.

5. REFER TO THE RISER DIAGRAMS FOR ALL PIPE SIZES AND PIPING NOT SHOWN ON THEPLANS. UNLESS NOTED OTHERWISE ON THE DRAWINGS, ALL WASTE PIPING BELOWGRADE SHALL BE A MINIMUM OF 2" IN SIZE.

6. ALL MATERIALS SHALL BE NEW AND SHALL FIT THE SPACE AVAILABLE. VERIFYDIMENSIONS AT SITE.

7. ALL PIPING, APPARATUS, EQUIPMENT, ETC. SHALL BE PROPERLY SUPPORTED, BRACEDVERTICALLY AND HORIZONTALLY IN ACCORDANCE WITH APPLICABLE CODES AND ASREQUIRED TO PREVENT EXCESSIVE MOVEMENT DURING SEISMIC CONDITIONS.

8. REMOVE EXISTING CEILING TILES AND GRID OR PORTION OF EXISTING PLASTER ORGYPSUM BOARD AS REQUIRED TO OBTAIN ACCESS TO CEILING SPACE TOACCOMPLISH INDICATED PLUMBING WORK, UNLESS SPECIFICALLY INDICATEDOTHERWISE. PROVIDE ADDITIONAL TEMPORARY HANGERS/CABLES REQUIRED TOSUPPORT REMAINING CEILING, LIGHT FIXTURES, DEVICES, ETC. STORE EXISTINGCEILING TILES AND GRID IN A SAFE LOCATION AND RE-INSTALL ONCE THE WORK ISCOMPLETED. REPLACE DAMAGED TILES AND GRID WITH NEW TO MATCH EXISTING.PATCH/REPLACE DAMAGED PORTION OF PLASTER OR GYPSUM BOARD AND PAINT TOMATCH EXISTING. REMOVE ALL TEMPORARY FACILITIES ONCE THE WORK ISCOMPLETED. REFER TO THE ARCHITECTURAL DRAWINGS FOR FINISH TREATMENT OFSPACES.

9. ALL VALVES, CLEANOUTS, ETC., SHALL BE LOCATED AND INSTALLED TO PERMITACCESS FOR SERVICE WITHOUT DAMAGE TO BUILDING OR FINISHED MATERIALS.

10. PROVIDE CLEANOUTS ON ALL ACCESSIBLE TRAPS, AT THE BASE OF ALL SOIL/WASTESTACKS AND RAINWATER CONDUCTORS, AT EACH CHANGE OF DIRECTION OF PIPINGGREATER THAN 45 DEGREES AND LOCATED AT INTERVALS NOT TO EXCEED THEMAXIMUM PERMITTED BY THE APPLICABLE PLUMBING CODE AND AS INDICATED ONTHE DRAWINGS.

11. STERILIZE NEW DOMESTIC WATER PIPING AND PORTIONS OF THE EXISTING PIPINGTHAT HAVE BEEN ALTERED, EXTENDED, OR REPAIRED PRIOR TO USING. COMPLY WITHPURGING AND DISINFECTING PROCEDURES PRESCRIBED BY AUTHORITIES HAVINGJURISDICTION OR, IN THE ABSENCE OF PRESCRIBED METHOD, THE PROCEDURESDESCRIBED IN EITHER AWWA C651 OR AWWA C652, OR AS DESCRIBED IN THEAPPLICABLE PLUMBING CODE. FURNISH STERILIZATION REPORT TO ENGINEER UPONCOMPLETION.

12. ALL DOMESTIC WATER PIPING SHALL BE HUNG LEVEL WITHOUT PITCH.

13. COPPER PIPING SHALL BE PROTECTED AGAINST CONTACT WITH DISSIMILAR METALS.ALL HANGERS, SUPPORTS, ANCHORS, AND CLIPS SHALL BE COPPER OR COPPERPLATED. WHERE COPPER PIPING IS CARRIED ON IRON TRAPEZE HANGERS WITHOTHER PIPING, SATISFACTORY AND PERMANENT ELECTROLYTIC ISOLATION MATERIALSHALL PREVENT CONTACT WITH OTHER METALS.

14. WATER PIPING SHALL NOT BE RUN IN AREAS SUBJECT TO FREEZING TEMPERATURES.WATER PIPING IN EXTERIOR WALLS SHALL BE RUN ON CONDITIONED SIDE OF THEINSULATION.

15. ALL WATER PIPING SHALL BE INSULATED AND ALL WATER PIPING INSTALLED ABOVETHE CEILING SHALL BE BELOW THE BUILDING INSULATION.

16. PROVIDE DRAIN VALVES AT ALL LOW POINTS OF DOMESTIC WATER PIPING SYSTEMSFOR COMPLETE DRAINAGE AND INDICATE LOCATION OF SAME ON RECORDDRAWINGS.

17. PROVIDE VACUUM BREAKERS AS REQUIRED BY CODE.

18. ALL PLUMBING FIXTURES MUST BE VENTED IN ACCORDANCE WITH APPLICABLEPLUMBING CODE INCLUDING LOCAL CODES.

19. REFER TO THE ARCHITECTURAL PLANS FOR EXACT LOCATION OF DOORS, WINDOWS,FIXTURES, WALL DIMENSIONS, ETC.

20. THE ARCHITECTURAL DRAWINGS, INCLUDING INTERIOR ELEVATIONS, SHALL GOVERNTHE ARRANGEMENT, LOCATION, AND MOUNTING HEIGHTS OF ALL FIXTURES ANDEQUIPMENT, BUT NOT TO THE EXTENT OF PERMITTING ANY OMISSIONS OF FIXTURESOR EQUIPMENT SHOWN ON THE PLUMBING DRAWINGS. ANY DISCREPANCY BETWEENTHE DRAWINGS, OR BETWEEN THE DRAWINGS AND SPECIFICATIONS, SHALL BEBROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT AND ENGINEER.

21. ALL FIRE RATED FLOOR AND WALL PENETRATIONS SHALL BE SEALED WITH FIRERESISTANT CAULKING / MATERIALS. PATCH EXISTING OPENINGS FROM DEMOLISHEDPIPING IN FIRE RATED FLOORS AND WALLS AS REQUIRED TO MAINTAIN FIRE RATING.

22. COORDINATE FINAL FLOOR DRAIN LOCATIONS WITH ALL EQUIPMENT CONCRETE PADS,TOILET ROOM PARTITIONS, FURNITURE, ETC. OBTAIN EXACT LOCATIONS FROM ALLOTHER CONTRACTORS PRIOR TO INSTALLING DRAINS.

23. CAULK AROUND ALL PLUMBING FIXTURES INSTALLED. CAULK SHALL BENON-HARDENING, NON-YELLOWING, MILDEW RESISTANT SILICONE AND IN A COLORSELECTED BY THE ARCHITECT.

24. ANY REFERENCE TO "GC" OR "GENERAL CONTRACTOR" SHALL MEAN THEAPPROPRIATE GENERAL TRADES CONTRACTOR. THIS REFERENCE IS NOT TO OUTLINEWORK AMONG GENERAL TRADES CONTRACTORS, BUT TO NOTE WHAT WORK IS NOT APART OF THE PLUMBING CONTRACT.

25. ALL POTABLE WATER PIPING, DEVICES AND EQUIPMENT SHALL BE NSF-61 COMPLIANT.26. NO DEAD-LEG SUPPLY (3X PIPE DIA. MAXIMUM) SHALL BE IN PLACE UPON COMPLETION

OF PROJECT.

27. INCLUDE PRICE FOR 200' OF 2"COPPER DOMESTIC WATER PIPING INCLUDINGINSULATION AND HANGERS PER THE SPECIFICATION. THIS PRICE IS TO BE INCLUDEDIN BASE BID.

28. PROVIDE PRICE FOR 50' OF 4" CAST IRON DRAINAGE PIPE BELOW GRADE INCLUDINGSAWCUTTING EXCAVATION, BACKFILL, COMPACTION AND PATCHING OF CONCRETEFLOOR.

GENERAL PLUMBING NOTESGENERAL DEMOLITION NOTES

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P0.1LVE-14179

Cover Sheet

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

DRAWING LIST

F0.1 Cover SheetF2.0 Ground Floor PlanF2.1 First Floor PlanF2.2 Second Floor PlanF2.3 Third Floor Plan

P0.1 Cover SheetP1.0A Ground Floor Plan - DemolitionP2.0A Ground Floor Plan - Labs - DrainageP3.0A Ground Floor Plan - Labs - SupplyP1.1 First Floor Plan - DemolitionP1.2 Second Floor Plan - DemolitionP1.3 Roof Plan - DemolitionP1.0 Foundation Plan - DemolitionP2.1 First Floor Plan - Labs - DrainageP2.2 Second Floor Plan - Labs - DrainageP3.1 First Floor Plan - Labs - SupplyP3.2 Second Floor Plan - Labs - SupplyP2.3 Roof Plan - DrainageP2.0 Foundation Plan - Labs - DrainageP3.0 Foundation Plan - Labs - SupplyP8.1 Details and SchedulesP7.1 Riser Diagrams

H0.1 Cover SheetH1.0 Ground Floor Plan - DemolitionH1.1 First Floor Plan - DemolitionH1.2 Second Floor Plan - DemolitionH1.3 Third Floor Plan - DemolitionH2.0 Ground Floor Plan - HVACH2.1 First Floor Plan - HVACH2.2 Second Floor Plan - HVACH2.3 Third Floor Plan - HVACH7.0 DetailsH7.1 DetailsH8.0 SchedulesH8.1 SchedulesH5.1 Enlarged Plans & Sections-HVACH3.0 Ground Floor - HVAC - PipingH3.1 First Floor - HVAC - PipingH3.2 Second Floor - HVAC - PipingH7.2 DetailsH5.2 SectionsH5.3 SectionsH3.3 Third Floor - HVAC - PipingH8.2 SchedulesH8.3 SchedulesH7.3 DetailsH7.4 Details

E0.1 Cover SheetE1.0 Ground Floor Plan - DemolitionE1.1 First Floor Plan - DemolitionE1.2 Second Floor Plan - DemolitionE1.3 Third Floor Plan - DemolitionE2.0 Ground Floor Plan - LightingE2.1 First Floor Plan - LightingE2.2 Second Floor Plan - LightingE2.3 Third Floor Plan - LightingE3.0 Ground Floor Plan - PowerE3.1 First Floor Plan - PowerE3.2 Second Floor Plan - PowerE3.3 Third Floor Plan - PowerE4.0 Ground Floor Plan - Low-VoltageE4.1 First Floor Plan - Low-VoltageE4.2 Second Floor Plan - Low-VoltageE4.3 Third Floor Plan - Low-VoltageE7.1 Single Line DiagramsE8.1 SchedulesE5.1 Enlarged Kitchen PlanE7.2 DetailsE7.3 Teledata DetailsE8.2 SchedulesE8.3 SchedulesE8.4 SchedulesE8.5 Schedules

NO. ISSUE DATE: DESCRIPTION

3 4 5 6 7 8 9 10 11 12 13 14 15

L

K

H

G

F

E

D1

DC

B

A1

A

5.1

8.1

2.1 2.2

C1C2

C3

C4 C5

2"

4"EX. AW TOREMAIN

4"EX. AW TOREMAIN

4"EX. AW TOREMAIN

3"EX. AW TOREMAIN

4"EX. AWSTACK TOREMAIN

4"EX. AWSTACK TOREMAIN

8"EX. AW TOREMAIN

3"EX.AW TOREMAIN

3"EX.AW TOREMAIN

3"EX.AW TOREMAIN

3"EX.AW TOREMAIN

3"EX. AWSTACK TOREMAIN

1

6"W TOREMAIN

5"EX. WTOREMAIN

3"EX. AWTO REMAIN

2

2

2

22

2

2

2

2

2

2

22

2222

2

2

1

1

1

3

3

3

3

33

3

3

44

4

4

5

1

1

1

5"EX. WTOREMAIN

4

6

7

2.1 3 4 5 5.1 6 7 8 8.1 9 10 11 2.2 12 13 14 15

A

A1

B

CD

D1

E

F

G

H

K

L

6"EX. RWSTACK TOREMAIN

6"EX.RW TOREMAIN

4"EX. RWSTACK TOREMAIN

8"EX.RW TOREMAIN

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P1.0LVE-14179

Foundation Plan - Demolition

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

N

2'

Scale: 1/8" = 1'-0"

0 4' 8' 16'

FOUNDATION PLAN - DEMOLITION

NO. ISSUE DATE: DESCRIPTION

KeynotesKey Value Keynote Text

1 DISCONNECT AND REMOVE EXISTING SUPPLY PIPING IN ITS ENTIRETY.2 DISCONNECT AND REMOVE EXISTING WASTE AND SUPPLY PIPING SERVING SINK ON FLOOR ABOVE IN THEIR ENTIRETY.3 DISCONNECT AND REMOVE EXISTING GAS PIPING IN ITS ENTIRETY.4 DISCONNECT AND REMOVE EXISTING WASTE PIPING IN ITS ENTIRETY.5 DISCONNECT AND REMOVE EXISTING WASTE AND SUPPLY PIPING SERVING ELECTRIC WATER COOLER ON FLOOR ABOVE IN THEIR

ENTIRETY.6 PURGE EXISTING UNDERGROUND PROPANE TANK. FILL WITH PEA GRAVEL AND ABANDON IN PLACE.7 DEMOLISH EXISTING ROOF MOUNTED INTAKE/RELIEF ROOF CURB AND PATCH ROOF.

3 4 5 6 7 8 9 10 11 12 13 14 15

L

K

H

G

F

E

D1

DC

B

A1

A

5.1

8.1

2.1 2.2

C1C2

C3

C4 C5

PATIENT CARELAB

11

MEDICALASSISTANCE LAB

09

PHLEBOTOMYLAB

06

STAIR #3

S3-0

CORRIDOR #1

C1-0

M. TOIL

19

JC

18 STAIR #4

S4-0STORAGE

10

STORAGE

17

PATIENT CARELAB

16

STORAGE

12

?

?

W. TOIL

03

(2)G

(2)G

(1)G

(2)G

(4)G

(2)G

(2)G

(4)G

(2)G

(2)G

(4)G

(2)G

(4)G

(2)G

(4)G

(4)G

(2)G

(4)G

(4)G

(2)G

(4)G

(1)CW

(2)G

(4)G

(2)G

(2)G

(4)G

(2)G

(2)G

(4)G

(2)G

(4)G

(2)G

(4)G

(4)G

(2)G

(4)G

(4)G

(2)G

(4)G

(1)CW

11

2 22 3 3

3 3 3

3 3 3

3 3 3

33

3

3 3

3

3

33

3

3

3

3

3

3

3

3

33 3 3

3 3 3

3 3 3

3 3 (1)G

2

2

2

2

2

2

2

2

2

2

2

2

4

2

2

2

2

5

6

777

88

87

9

109

11

12

12

9

12

11

10

10

12

10

8

7

10

11

9

13

14

2.1 3 4 5 5.1 6 7 8 8.1 9 10 11 2.2 12 13 14 15

A

A1

B

CD

D1

E

F

G

H

K

L

5"EX. RWSTACK TOREMAIN

4"EX. RWSTACK TOREMAIN

15

EX. SUPPLY PIPINGTO REMAIN

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P1.0ALVE-14179

Ground Floor Plan -Demolition

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

N

2'

Scale: 1/8" = 1'-0"

0 4' 8' 16'

GROUND FLOOR PLAN - DEMOLITION

NO. ISSUE DATE: DESCRIPTION

KeynotesKey Value Keynote Text

1 DISCONNECT AND REMOVE EXISTING WASTE AND SUPPLY PIPING SERVING HOOD IN THEIR ENTIRETY.2 DISCONNECT AND REMOVE EXISTING SINK, FAUCET, HAND-HELD EMERGENCY EYEWASH, WASTE AND SUPPLY PIPING IN THEIR

ENTIRETY.3 DISCONNECT AND REMOVE EXISTING GAS OUTLETS AND SUPPLY GAS PIPING IN ITS ENTIRETY.4 DISCONNECT AND REMOVE EXISTING ELECTRIC WATER COOLER AND ALL ASSOCIATED COLD WATER SUPPLY PIPING IN ITS

ENTIRETY.5 DISCONNECT AND REMOVE EXISTING DISHWASHER, WASTE AND SUPPLY PIPING IN THEIR ENTIRETY.6 DISCONNECT AND REMOVE EXISTING WASTE AND SUPPLY PIPING SERVING STERILIZATION EQUIPMENT IN THEIR ENTIRETY.7 DISCONNECT AND REMOVE EXISTING SUPPLY BRANCHES, DROPS, AND RISERS IN THEIR ENTIRETY. CAP AT ACTIVE MAINS.8 DISCONNECT AND REMOVE EXISTING WASTE STACK, VENT STACK, COLD WATER, AND HOT WATER RISERS INSIDE OF CHASE IN

THEIR ENTIRETY.9 DISCONNECT AND REMOVE EXISTING SUPPLY PIPING IN ITS ENTIRETY.10 DISCONNECT AND REMOVE EXISTING GAS PIPING IN ITS ENTIRETY.11 DISCONNECT AND REMOVE EXISTING COMPRESSED AIR PIPING IN ITS ENTIRETY.12 DISCONNECT AND REMOVE EXISTING WASTE PIPING IN ITS ENTIRETY.13 DISCONNECT AND REMOVE EXISTING WASTE AND SUPPLY PIPING SERVING SINK ON FLOOR ABOVE IN THEIR ENTIRETY.14 DISCONNECT AND REMOVE EXISTING GAS, COMPRESSED AIR, AND VACUUM RISERS AND PIPING INSIDE CHASE IN THEIR ENTIRETY.15 DISCONNECT AND REMOVE EXISTING SINK, FAUCETS, WASTE AND SUPPLY PIPING IN THEIR ENTIRETY AND CAP AT ACTIVE MAINS.

3 4 5 6 7 8 9 10 11 12 13 14 15

L

K

H

G

F

E

D1

DC

B

A1

A

5.1

8.1

2.1 2.2

C1C2

C3

C4 C5

ELECTRICAL LAB

148

COMPUTER LAB

152

PROJECT ROOM

157

STEM LEARNINGCENTER

156

?

?

CLASSROOM

106

OFFICE

110A

CLASSROOM

115CLASSROOM

117

CLASSROOM

120

OFFICE

121

IDF

122

OFFICE

123

OFFICE

124

OFFICE

125

CONF. RM.

127

OFFICE

128

OFFICE

130

OFFICE

133

OFFICE

134

CLASSROOM

135

MECHANICAL

111

MECHANICAL

153

STAIR #3

S3-1

M. TOIL

159

STOR

160

STAIR #4

S4-1

?

?

CORRIDOR

C5-1

CORRIDOR

C4-1

UPPER LECTUREHALL

140

LECTURE HALL

141

LOBBY

142

STAIR #5

S5-1

?

?

?

?

CORRIDOR

C2-1

ELEV LOBBY

003

W. TOIL

102

MECH ROOM

101

W. TOIL

146

MECH PREP

155

MECHANICAL LAB

154

?

?

MECH STOR

151

OFFICE

110B

KITCHENETTE

110C

OFFICE

110F

OFFICE

110G

OFFICE

110H

OFFICE

110D

OFFICE

110E

STEM/PS OFFICES

110

OFFICE

122A

OFFICE

126

OFFICE

131

OFFICE

132A

OFFICE

132

?

?

OFFICE

129

ELECTRICAL LAB

148

LOBBY

142

(1)G

(2)G

(2)G

(2)G

(2)G

(2)G

(2)G

(2)G

(2)G

DW (1)G

(1)G

(1)VAC

(1)VAC

(1)VAC

DI WATER

1

2 32 3

44

4

4

44

4

4

4

4

5

5

5

5

5

5 5

6 6 6

7

8

9

EXISTING WASTE & VENTSTACK TO REMAIN

EXISTING WASTE & VENTSTACK TO REMAIN

EXISTING WASTE & VENTSTACK TO REMAIN

10 11

12

13

13

12

1111

13

11 1111

13

13

13

13

13

14

15

15

15

15

15

13

13

13

13

13

13

13

16 17

18

19

14

19

15

15

17

16

19

17

18

15

15

15

19

16

18

2.1 3 4 5 5.1 6 7 8 8.1 9 10 11 2.2 12 13 14 15

A

A1

B

CD

D1

E

F

G

H

K

L

5"EX. RWSTACK TOREMAIN

4"EX. RWSTACK TOREMAIN

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P1.1LVE-14179

First Floor Plan - Demolition

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

N

2'

Scale: 1/8" = 1'-0"

0 4' 8' 16'

FIRST FLOOR PLAN - DEMOLITION

NO. ISSUE DATE: DESCRIPTION

KeynotesKey Value Keynote Text

1 DISCONNECT AND REMOVE EXISTING ELECTRIC WATER COOLER AND ALL ASSOCIATED COLD WATER SUPPLY PIPING IN ITSENTIRETY.

2 DISCONNECT AND REMOVE EXISTING EMERGENCY SHOWER AND SUPPLY PIPING IN ITS ENTIRETY.3 DISCONNECT AND REMOVE EXISTING FLOOR DRAIN AND ALL ASSOCIATED WASTE PIPING. CUT AND PATCH EXISTING FLOOR AS

REQUIRED PER GENERAL DEMOLITION NOTES.4 DISCONNECT AND REMOVE EXISTING GAS OUTLETS AND SUPPLY GAS PIPING IN ITS ENTIRETY.5 DISCONNECT AND REMOVE EXISTING SINK, FAUCETS, WASTE AND SUPPLY PIPING IN THEIR ENTIRETY AND CAP AT ACTIVE MAINS.6 DISCONNECT AND REMOVE EXISTING VACUUM PIPING SERVING HOOD IN ITS ENTIRETY.7 DISCONNECT AND REMOVE EXISTING DISHWASHER, WASTE AND SUPPLY PIPING IN THEIR ENTIRETY.8 DISCONNECT AND REMOVE EXISTING SINK, FAUCETS, WASTE, SUPPLY AND DEIONIZED WATER PIPING IN THEIR ENTIRETY.9 DISCONNECT AND REMOVE EXISTING DEIONIZED WATER SYSTEM, TANKS, FILTER AND PIPING IN THEIR ENTIRETY.10 DISCONNECT AND REMOVE EXISTING GAS, COMPRESSED AIR, AND VACUUM RISERS AND PIPING INSIDE CHASE IN THEIR ENTIRETY.11 DISCONNECT AND REMOVE EXISTING WASTE STACK, VENT STACK, COLD WATER, AND HOT WATER RISERS INSIDE OF CHASE IN

THEIR ENTIRETY.12 EXISTING TANKS SHALL BE REMOVED AND HANDED OVER TO LAB TECHS.13 DISCONNECT AND REMOVE EXISTING WASTE AND SUPPLY PIPING SERVING SINK ON FLOOR ABOVE IN THEIR ENTIRETY.14 DISCONNECT AND REMOVE EXISTING VENT PIPING IN ITS ENTIRETY.15 DISCONNECT AND REMOVE EXISTING WASTE PIPING IN ITS ENTIRETY.16 DISCONNECT AND REMOVE EXISTING GAS PIPING IN ITS ENTIRETY.17 DISCONNECT AND REMOVE EXISTING COMPRESSED AIR PIPING IN ITS ENTIRETY.18 DISCONNECT AND REMOVE EXISTING VACUUM PIPING IN ITS ENTIRETY.19 DISCONNECT AND REMOVE EXISTING SUPPLY PIPING IN ITS ENTIRETY.

3 4 5 6 7 8 9 10 11 12 13 14 15

L

K

H

G

F

E

D1

DC

B

A1

A

5.1

8.1

2.1 2.2

C1C2

C3

C4 C5

COOKING ANDBAKING

CULINARYINSTRUCTIONAL

LAB

244

VOCATIONALCLASSROOM

247

COMPUTER LAB

250

ELEC.

221A

OFFICE

220

OFFICE

221

OFFICE

222

OFFICE

223

OFFICE

224

OFFICE

225

OFFICE

226

OFFICE

227

OFFICE

229

OFFICE

230

OFFICE

231

OFFICE

232

OFFICE

233

CLASSROOM

234

OFFICE

231A

CLASSROOM

212

CLASSROOM

214

CLASSROOM

216

CLASSROOM

218

OFFICE

205A

OFFICE

206

OFFICE

207

OFFICE

208

OFFICE

209

OFFICE

210

OFFICE

211

OFFICE

210A

OFFICE

205

CLASSROOM

204

ELEV VEST

203

W. TOIL

202

MECH ROOM

201

UPPER LECTUREHALL

239

CORRIDOR

C4-2

CORRIDOR

C5-2

CORRIDOR

C3-2 STAIR #4

S4-2

M. TOIL

255

STOR

256

CORRIDOR

C1-2

STAIR #5

S5-2

CORRIDOR #2

C2-2

?

?

W. TOIL

243

OBSERVATION /CONTROL ROOM

253C

?

?

?

?

OFFICE

228

STAIR #3

S3-2

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)A,G,V

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)A,G,V

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)G,V,A

(1)A,G,V

(2)G,V,A

(2)G,V,A

(2)G,V,A

(2)G,V,A

(2)G,V,A

(2)G,V,A

(2)G,V,A

(2)G,V,A

(2)G,V,A

(1)CW,G,V,A

(1)CW,G,V,A

CA TANK

He TANK

H TANK

He TANK

12

3

4

5

6

7

8

9

1 1

1 1 1 1 1 1

6

6

6

6

6

6

6

6

5

5

5

5

5

5

55

5

5

5

5

55

5

5

5

55

3

2

3

2

7 7

4

10 11 11

12 12

13 13

11

12

11

11

11

EXISTING WASTE/VENTSTACK TO REMAIN

EXISTING WASTE/VENTSTACK TO REMAIN

EXISTING WASTE/VENTSTACK TO REMAIN

2.1 3 4 5 5.1 6 7 8 8.1 9 10 11 2.2 12 13 14 15

A

A1

B

CD

D1

E

F

G

H

K

L

FOR CONTINUATION,REFER TOMECHANICAL RM 4XXON DWG P1.3.

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P1.2LVE-14179

Second Floor Plan -Demolition

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

N

2'

Scale: 1/8" = 1'-0"

0 4' 8' 16'

SECOND FLOOR PLAN - DEMOLITION

NO. ISSUE DATE: DESCRIPTION

KeynotesKey Value Keynote Text

1 DISCONNECT AND REMOVE EXISTING GAS, VACUUM, AIR OUTLETS AND ALL ASSOCIATED PIPING SERVING HOOD IN THEIR ENTIRETY.2 DISCONNECT AND REMOVE EXISTING EMERGENCY SHOWER AND SUPPLY PIPING IN ITS ENTIRETY.3 DISCONNECT AND REMOVE EXISTING FLOOR DRAIN AND ALL ASSOCIATED WASTE PIPING. CUT AND PATCH EXISTING FLOOR AS

REQUIRED PER GENERAL DEMOLITION NOTES.4 DISCONNECT AND REMOVE EXISTING GAS, VACUUM, AIR, COLD WATER AND ALL ASSOCIATED PIPING SERVING HOOD IN THEIR

ENTIRETY.5 DISCONNECT AND REMOVE EXISTING SINK, FAUCET, HAND-HELD EMERGENCY EYEWASH, WASTE AND SUPPLY PIPING IN THEIR

ENTIRETY.6 DISCONNECT AND REMOVE EXISTING GAS, VACUUM, AND AIR OUTLET STATIONS, COLD WATER OUTLETS, AND ALL ASSOCIATED

SUPPLY PIPING IN THEIR ENTIRETY.7 DISCONNECT AND REMOVE EXISTING GAS, VACUUM, AIR OUTLETS AND ALL ASSOCIATED SUPPLY PIPING IN THEIR ENTIRETY.8 DISCONNECT AND REMOVE EXISTING SINK, FAUCET, WASTE AND SUPPLY PIPING IN THEIR ENTIRETY.9 DISCONNECT AND REMOVE EXISTING ELECTRIC WATER COOLER AND ALL ASSOCIATED COLD WATER SUPPLY PIPING IN ITS

ENTIRETY.10 DISCONNECT AND REMOVE EXISTING GAS, COMPRESSED AIR, AND VACUUM RISERS AND PIPING INSIDE CHASE IN THEIR ENTIRETY.11 DISCONNECT AND REMOVE EXISTING WASTE STACK, VENT STACK, COLD WATER, AND HOT WATER RISERS INSIDE OF CHASE IN

THEIR ENTIRETY.12 EXISTING TANKS SHALL BE REMOVED AND HANDED OVER TO LAB TECHS.13 DISCONNECT AND REMOVE EXISTING VENT PIPING IN ITS ENTIRETY.

3 4 5 6 7 8 9 10 11 12 13 14 15

L

K

H

G

F

E

D1

DC

B

A1

A

5.1

8.1

2.1 2.2

C1C2

C3

C4 C5

CLASSROOM

306

CLASSROOM

307

CLASSROOM

308

CLASSROOM

309

CLASSROOM

310

CLASSROOM

311

CLASSROOM

312

CLASSROOM

313

CLASSROOM

314

CLASSROOM

315

CLASSROOM

316

CLASSROOM

317

CORRIDOR

C1-3

STAIR #5

S5-3

?

?

JC

304

MECH ROOM

305

MECH ROOM

320

VAC

CA

EX.FD

3"V FROM BLW

1 1

1

EXISTING VTR TOREMAIN

EXISTING VTR TOREMAIN

EXISTING VTR TOREMAIN

EXISTING VTR TOREMAIN

2

3

EXISTING VTRTO REMAIN

4

EXISTING VTR TOREMAIN

2.1 3 4 5 5.1 6 7 8 8.1 9 10 11 2.2 12 13 14 15

A

A1

B

CD

D1

E

F

G

H

K

L

5"EX. RW DN4"EX. RW DN

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P1.3LVE-14179

Roof Plan - Demolition

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

N

2'

Scale: 1/8" = 1'-0"

0 4' 8' 16'

ROOF PLAN - DEMOLITION

NO. ISSUE DATE: DESCRIPTION

KeynotesKey Value Keynote Text

1 DISCONNECT AND REMOVE EXISTING ROOF DRAIN AND ASSOCIATED PIPING DOWN TO AND INCLUDING FIRST ELBOW.2 DISCONNECT AND REMOVE EXISTING VENT THRU ROOF. CUT AND PATCH ROOF AS REQUIRED PER GENERAL DEMOLITION NOTES.3 DISCONNECT AND REMOVE EXISTING AIR COMPRESSOR, PIPING, AND ALL RELATED DEVICES IN THEIR ENTIRETY.4 DISCONNECT AND REMOVE EXISTING VACUUM PUMP PIPING AND ALL RELATED DEVICES IN THEIR ENTIRETY.

4 5 6 7 8 9 10

L

K

H

G

5.1 8.1

1

2"W FROMABV

2"W FROMSK-2 ABV

2" W2" W

2" W

2" W

2" W

2" W

2" W

2"W FROMSK-3 ABV

2"W FROMSK-4 ABV

2"W FROMSK-3 ABV

2"W FROMSK-1 ABV

2"W FROMSK-1 ABV

2"W FROMSK-1 ABV

2"W FROMSK-2 ABV

5" W5" W

6" W

3"EX. AW 3"EX. AW

3"EX. AW3"EX. AW

4"EX. AW 4"EX. AW 4"EX. AW 4"EX. AW

8"EX. AW

4"EX. AWFROM ABVTO REMAIN

1/8" / 1'-0"

2" W

1

1

1

1

1

1

2"W FROMLMB-1 ABV

2" W 1

EX. SANITARYMANHOLE

4" W

2

GI-1

3

4 5 5.1 6 7 8 8.1 9 10

G

H

K

L 4"EX. AWFROM ABV

4"W UP TOFCO

1/8" / 1'-0"

4" W

4" W

2"W FROMSK-1ABV

2" W1

1

3" V

4

REFER TO GREASEINTERCEPTOR DETAILON DWG. P8.1

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P2.0LVE-14179

Foundation Plan - Labs -Drainage

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

N

1'

Scale: 1/4" = 1'-0"

0 2' 4' 8'

FOUNDATION PLAN - LABS - DRAINAGE

NO. ISSUE DATE: DESCRIPTION

KeynotesKey Value Keynote Text

1 CONNECT NEW 2"WASTE TO EXISTING WASTE PIPING. VERIFY EXACT SIZE, INVERT, AND LOCATION OF CONNECTION POINT IN FIELD.2 CONNECT NEW 4"GREASE WASTE TO EXISTING WASTE/VENT STACK. VERIFY EXACT SIZE AND LOCATION OF CONNECTION POINT IN

FIELD.3 CONNECT NEW 4"WASTE TO EXISTING SANITARY MANHOLE. VERIFY EXACT SIZE, INVERT AND LOCATION OF CONNECTION POINT IN

FIELD.4 CONNECT NEW 3"VENT FROM GREASE INTERCEPTOR TO EXISTING WASTE AND VENT STACK IN CRAWL SPACE. VERIFY EXACT SIZE

AND LOCATION OF CONNECTION POINT IN FIELD.

4 5 6 7 8 9 10

L

K

H

G

5.1 8.1

PATIENT CARELAB

11

MEDICALASSISTANCE LAB

09

PHLEBOTOMYLAB

06

CORRIDOR #1

C1-0

M. TOIL

19

STORAGE

10

STORAGE

17

PATIENT CARELAB

16

STORAGE

12

W. TOIL

032"W FROM ABV

2" W

2"W DBF. FOR VENT PIPING,REFER TO AIR ADMITTANCEVALVE DETAIL ON DWG. P8.1.

2"W DBF

EX. WASTE ANDVENT STACK TOREMAIN

EX. WASTE ANDVENT STACK TOREMAIN

SK-3

SK-3

SK-1

SK-1

SK-1 SK-1

SK-2SK-2

SK-4

M. TOIL

19

STORAGE

04

2"W DBF. FOR VENT PIPING,REFER TO AIR ADMITTANCEVALVE DETAIL ON DWG. P8.1.

2"W DBF. FOR VENT PIPING,REFER TO AIR ADMITTANCEVALVE DETAIL ON DWG. P8.1.

2"W DBF. FOR VENT PIPING,REFER TO AIR ADMITTANCEVALVE DETAIL ON DWG. P8.1.

2"W DBF. FOR VENT PIPING,REFER TO AIR ADMITTANCEVALVE DETAIL ON DWG. P8.1.

2"W DBF. FOR VENT PIPING,REFER TO AIR ADMITTANCEVALVE DETAIL ON DWG. P8.1.

2"W DBF. FOR VENT PIPING,REFER TO AIR ADMITTANCEVALVE DETAIL ON DWG. P8.1.

2"W DBF 2"W DBF

2"W DBF, 2"V UP TO AIRADMITTANCE VALVE.

LMB-1

1/8" / 1'-0"2"V UP

2"V UP

2" V

FCO

FCO

GI-1

EX. WASTE ANDVENT STACK TOREMAIN

4 5 5.1 6 7 8 8.1 9 10

G

H

K

L

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P2.0ALVE-14179

Ground Floor Plan - Labs -Drainage

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

NO. ISSUE DATE: DESCRIPTION

N

1'

Scale: 1/4" = 1'-0"

0 2' 4' 8'

GROUND FLOOR PLAN - LABS - DRAINAGE

4 5 6 7 8 9 10

L

K

H

G

5.1 8.1

ELECTRICAL LAB

148

COMPUTER LAB

152

PROJECT ROOM

157

STEM LEARNINGCENTER

156

MECHANICAL

153

?

?

CORRIDOR

C5-1

MECH PREP

155

MECHANICAL LAB

154

?

?

MECH STOR

151

2"W FROMABV

2"W DBF

2" W 1/8" / 1'-0"

2"VUP 2" W

2" V

2"V UP

SK-1

SK-1

SK-5

1 1/2" W

MEETING RM 4

161

STG

156A

INSTALL WASTE PIPINGTHRU REAR OF BASECABINETS, TIGHT TOWALL.

3" W

3" W

3" W

3" W

3" W

3" W

2" W

3" W

3" W

3" W

2" W

VERTICAL 2"VENT UP OFFWASTE PIPING.

VERTICAL 2"VENT UP OFFWASTE PIPING.

3"W DNFROM FD-1ABV

3"W DNFROM FD-1ABV

3"W DNFROM FS-1ABV

2"W DNFROM ABV

2"W DNFROM ABV

3"W DNFROM FS-1ABV

3"W DNFROM FD-1ABV

3"W DNFROM FS-1ABV

3"W DNFROM FD-1ABV

3"W DNFROM FS-1ABV

2"V FROMBLW

2" V

2"VFROMBLW

3" W

3" W

3" W

EX. WASTE ANDVENT STACK

EX. WASTE ANDVENT STACK TOREMAIN

EX. WASTE ANDVENT STACK

1

4 5 5.1 6 7 8 8.1 9 10

G

H

K

L

2

3

2" W

2" V

3"W DNFROM FS-1ABV

3"W DNFROM FS-1ABV

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P2.1LVE-14179

First Floor Plan - Labs -Drainage

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

NO. ISSUE DATE: DESCRIPTION

KeynotesKey Value Keynote Text

1 CONNECT NEW 3"GREASE WASTE TO EXISTING WASTE/VENT STACK. VERIFY EXACT SIZE AND LOCATION OF CONNECTION POINT INFIELD.

2 CONNECT NEW 2"VENT TO EXISTING WASTE AND VENT STACK. VERIFY EXACT SIZE AND LOCATION OF CONNECTION POINT IN FIELD.3 CONNECT NEW 2"WASTE TO EXISTING WASTE AND VENT STACK. VERIFY EXACT SIZE AND LOCATION OF CONNECTION POINT IN FIELD.

N

1'

Scale: 1/4" = 1'-0"

0 2' 4' 8'

FIRST FLOOR PLAN - LABS - DRAINAGE

KETTLE, COUNTER-TOPE8 2"

ITEMNO.

DESCRIPTION

KITCHEN FIXTURE CONNECTION SCHEDULE

E17 14" 2"

DISHTABLE, STRAIGHT

18"

14"

--

E19 14" 1-1/2"14"

OVEN, CONVECTIONE12 18" --

-

-

-

-

1/2"

1/2"

COMBI-OVENE13 1-1/2"18" --

FILTER SYSTEM, STEAMERE14 -60" --

-

-

E20 16" 1-1/2"

SINK, HAND, WALL-MOUNT

16"

E22 -

WAREWASHER, DOOR TYPE, HIGH TEMP

18"

-

1-1/2"

1/2"

SINK, SCULLERY, 2-COMPARTMENTE25 14" 2"14" -1/2"

SINK, SCULLERY, 3-COMPARTMENT

CWROUGH-IN

HEIGHT

HWSIZE(B)

IDWSIZE(C)

DWSIZE(D)

HWROUGH-IN

HEIGHT

-

-

-

-

-

-

-

20"

-

DWROUGH-IN

HEIGHT

1/2"

(2) 1/2"

1/2"

1/2"

1/2"

CWSIZE(B)

1/2"

1/2"

1/2"

1/2"

-

18"1/2"

E20c - -12"WAREWASHER DRAIN TEMPERING -- -1/2"

E8

E1

E1

E4

E1

E1

E1

E1

E23

E4

E1

E8

E12

E1

E27

E15

E10

E11

E9

E28

E20

E13

24X60

24X6024X60

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

4 5 6 7 8 9 10

L

K

H

G

5.1 8.1

COOKING ANDBAKING

CULINARYINSTRUCTIONAL

LAB

244

VOCATIONALCLASSROOM

247

COMPUTER LAB

250

CORRIDOR

C5-2

CORRIDOR

C3-2

M. TOIL

255

STOR

256

OBSERVATION /CONTROL ROOM

253C

?

?

2" V

EX. WASTE DN,WASTE VENTTHRU ROOF

EX. VENT UPTO EX. 3"VTR

SK-2

STOR

256

SIM. LOBBY

253

ICU

253B

SIMULATION

253D

STORAGE

253F

SIMULATION

253E

SIMULATION

253A

FS-1

FS-1

FS-1

FD-1

FD-1

FD-1

FD-1

FS-1

FCO

FCO

FCO

2"W DBF,1-1/2"V UP

2"V FROM BLW1

2"V FROM BLW

2"W DBF,2"V UP

2"W DBF,2"V UP

2"V FROMBLW

1

2" V

2" V1

2" V

2" V

EX. VENT UPTO EX. 3"VTR

EX. VENT UPTO EX. 3"VTR

EX. WASTE DN,WASTE VENTTHRU ROOF

4 5 5.1 6 7 8 8.1 9 10

G

H

K

L

FS-1

FS-1

1/8" / 1'-0"

4" RW

2

2

34

3

5

4"RW FROMRD-1 ABV

4"RW FROMRD-1 ABV4"RW FROM

RD-1 ABV

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P2.2LVE-14179

Second Floor Plan - Labs -Drainage

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

NO. ISSUE DATE: DESCRIPTION

KeynotesKey Value Keynote Text

1 CONNECT NEW 2"VENT TO EXISTING VENT PIPING IN CEILING SPACE. VERIFY EXACT SIZE AND LOCATION OF CONNECTION POINT INFIELD.

2 CONNECT NEW 4"RW PIPING TO EXISTING RAINWATER PIPING IN CEILING. VERIFY EXACT SIZE, INVERT AND LOCATION OFCONNECTION POINT IN FIELD.

345 CONNECT NEW 4"RW PIPING TO EXISITING RAINWATER STACK IN MEN'S TOILET ROOM 255 CHASE. VERIFY EXACT SIZE, INVERT, AND

LOCATION OF CONNECTION POINT IN FIELD. CUT AND PATCH EXISTING WALL AS REQUIRED PER THE GENERAL DEMOLITION NOTES.

N

1'

Scale: 1/4" = 1'-0"

0 2' 4' 8'

SECOND FLOOR PLAN - LABS - DRAINAGE

3 4 5 6 7 8 9 10 11 12 13 14 15

L

K

H

G

F

E

D1

DC

B

A1

A

5.1

8.1

2.1 2.2

C1C2

C3

C4 C5

EX. VTR TOREMAIN

11

1

RD-1

EX. VTR TOREMAIN

EX. VTR TOREMAIN

RD-1

RD-1

EX. VTR TOREMAIN

EX. VTR TOREMAIN

EX. VTR TOREMAIN

2.1 3 4 5 5.1 6 7 8 8.1 9 10 11 2.2 12 13 14 15

A

A1

B

CD

D1

E

F

G

H

K

L

EX. VTR TOREMAIN

RD-1 RD-1RD-1

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P2.3LVE-14179

Roof Plan - Drainage

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

N

2'

Scale: 1/8" = 1'-0"

0 4' 8' 16'

ROOF PLAN - DRAINAGE

NO. ISSUE DATE: DESCRIPTION

KeynotesKey Value Keynote Text

1 PROVIDE NEW RD-1 AND CONNECT NEW RW PIPING TO EXISTING RAINWATER CONDUCTOR DOWN TO AND INCLUDING FIRST ELBOWIN CEILING SPACE. PROVIDE INSULATION ON DRAIN BODY AND PIPING AS REQUIRED.

P.C. TO FURNISH AND HAND OVER ROOF DRAINS TO G.C. FOR INSTALLATION.P.C. IS RESPONSIBLE FOR NEW PIPE CONNECTIONS FOR UNDERSIDE OFROOF.

4 5 6 7 8 9 10

L

K

H

G

5.1 8.1

1/2" HWR1/2" HW

1/2" CW1/2" CW1/2" HW

1/2" HW

1/2" CW

1/2" CW

1/2" HW

1/2" HWR3/4" HW3/4" CW

1/2" HWR1/2" HW

1/2" CW

1/2" CW

1/2" HWR1/2" HW

1/2" HW1/2" CW

1/2" HWR3/4" HW3/4" CW

1/2" HW

1/2" CW

1/2" HWR

1/2" CW1/2" HW

1/2" HWR

1/2"CW & HW UP1/2"CW & HW UP1/2"CW & HW UP

1/2"CW & HW UP

1/2"CW & HW UP

1/2"CW & HW UP

1/2"CW & HW UP1/2"CW & HW UP

1/2"CW & HW UP

1/2"CW & HW UP

1/2"CW & HW FROM ABV

1/2"HWR UP 1/2"HWR UP 3/4"CW & HW FROM ABV

1/2"HWR UP

1/2"HWR UP

3/4" CW

3/4" HW

3/4"CW & HWFROM ABV

4 5 5.1 6 7 8 8.1 9 10

G

H

K

L

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P3.0LVE-14179

Foundation Plan - Labs -Supply

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

N

1'

Scale: 1/4" = 1'-0"

0 2' 4' 8'

FOUNDATION PLAN - LABS - SUPPLY

NO. ISSUE DATE: DESCRIPTION

4 5 6 7 8 9 10

L

K

H

5.1 8.1

PATIENT CARELAB

11

MEDICALASSISTANCE LAB

09

PHLEBOTOMYLAB

06

CORRIDOR #1

C1-0

STORAGE

10

STORAGE

17

PATIENT CARELAB

16

STORAGE

12

3/4" CW

3/4" HW1/2" HWR

1/2" HWR1/2" HW1/2" CW

1/2"CW & HW FROMBLW

1/2"CW & HW FROMBLW

1/2"CW & HW FROMBLW

1/2"CW & HW FROMBLW

1/2"CW & HW FROMBLW

1/2"CW & HW UP

1/2"CW & HW FROMBLW

1/2"CW & HW FROMBLW

1/2"CW & HW FROMBLW

1/2"CW & HW FROMBLW1"CW, 1" HW &

1/2"HWR UP1/2" CW, HW &HWR DN

3/4" CW & HW DN1/2"HWR FROM BLW

1/2" CW, HW &HWR DN

3/4"CW & HW, AND1/2"HWR UP

1/2"CW & HWFROM BLW TOSERVE LMB-1

11212

31

INSTALL SUPPLY RISERS ALONGREAR OF BASE CABINET

INSTALL SUPPLY RISERS ALONGREAR OF BASE CABINET

INSTALL SUPPLY RISERS ALONGREAR OF BASE CABINET

INSTALL SUPPLY RISERS ALONGREAR OF BASE CABINET

INSTALL SUPPLY RISERS ALONGREAR OF BASE CABINET

INSTALL SUPPLY RISERS ALONGREAR OF BASE CABINET

INSTALL SUPPLY RISERS ALONGREAR OF BASE CABINET

LMB-1

SK-3

SK-1

SK-1

SK-3 SK-1 SK-1

SK-2SK-2

SK-4

1/2"CW & HW DN1/2"HWR FROM BLW

EXISTING SUPPLYMAINS IN CEILINGSPACE

MV-1 MV-1 MV-1

EXISTING SUPPLYMAINS IN CEILINGSPACE

4 5 5.1 6 7 8 8.1 9 10

H

K

L

EEW-1

EEW-1 EEW-1 EEW-1

MV-1

2.1 3 4

A1

B

C

D

1 1/2" CW

2 1/2" CW

?

?

BFP-1

4

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P3.0ALVE-14179

Ground Floor Plan - Labs -Supply

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

N

1'

Scale: 1/4" = 1'-0"

0 2' 4' 8'

GROUND FLOOR PLAN - LABS - SUPPLY

NO. ISSUE DATE: DESCRIPTION

KeynotesKey Value Keynote Text

1 CONNECT NEW 1/2"CW, HW AND HWR TO EXISTING SUPPLY MAINS IN CEILING SPACE. VERIFY EXACT SIZE AND LOCATION OFCONNECTION POINTS IN FIELD.

2 CONNECT NEW 3/4"CW & HW, 1/2"HWR TO EXISTING SUPPLY MAINS IN CEILING SPACE. VERIFY EXACT SIZE AND LOCATION OFCONNECTION POINTS IN FIELD.

3 CONNECT NEW 1"CW & HW, 1/2"HWR TO EXISTING SUPPLY MAINS IN CEILING SPACE. VERIFY EXACT SIZE AND LOCATION OFCONNECTION POINTS IN FIELD.

4 PROVIDE 1-1/2"CW CONNECTION FOR H.C.

N

1'

Scale: 1/4" = 1'-0"

0 2' 4' 8'

ENLARGED PLAN - MECH RM 21 - SUPPLY

4 5 6 7 8 9 10

L

K

H

G

5.1 8.1

ELECTRICAL LAB

148

COMPUTER LAB

152

PROJECT ROOM

157

STEM LEARNINGCENTER

156

MECHANICAL

153

M. TOIL

159

?

?

CORRIDOR

C5-1

W. TOIL

146

MECH PREP

155

MECHANICAL LAB

154

?

?

MECH STOR

151

?

?

3/4"CW & HW FROMBLW & 1/2"HWR DN

1/2"CW & HW UP

1/2" CW1/2" HW

1/2" HWR

1/2"CW & HWFROM BLW

INSTALL SUPPLY RISERS ALONGREAR OF BASE CABINET

1"CW & HW FROMBLW & 1/2"HWR DBF

SK-1

SK-1

SK-5

MEETING RM 4

161

MEETING RM 3

118

STG

156A

?

?

1"CW & HW UP &1/2"HWR FROM ABV

MV-1

MV-1

4 5 5.1 6 7 8 8.1 9 10

G

H

K

L

EEW-1MV-1

EEW-1

EEW-1

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P3.1LVE-14179

First Floor Plan - Labs -Supply

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

N

1'

Scale: 1/4" = 1'-0"

0 2' 4' 8'

FIRST FLOOR PLAN - LABS - SUPPLY

NO. ISSUE DATE: DESCRIPTION

KeynotesKey Value Keynote Text

KETTLE, COUNTER-TOPE8 2"

ITEMNO.

DESCRIPTION

KITCHEN FIXTURE CONNECTION SCHEDULE

E17 14" 2"

DISHTABLE, STRAIGHT

18"

14"

--

E19 14" 1-1/2"14"

OVEN, CONVECTIONE12 18" --

-

-

-

-

1/2"

1/2"

COMBI-OVENE13 1-1/2"18" --

FILTER SYSTEM, STEAMERE14 -60" --

-

-

E20 16" 1-1/2"

SINK, HAND, WALL-MOUNT

16"

E22 -

WAREWASHER, DOOR TYPE, HIGH TEMP

18"

-

1-1/2"

1/2"

SINK, SCULLERY, 2-COMPARTMENTE25 14" 2"14" -1/2"

SINK, SCULLERY, 3-COMPARTMENT

CWROUGH-IN

HEIGHT

HWSIZE(B)

IDWSIZE(C)

DWSIZE(D)

HWROUGH-IN

HEIGHT

-

-

-

-

-

-

-

20"

-

DWROUGH-IN

HEIGHT

1/2"

(2) 1/2"

1/2"

1/2"

1/2"

CWSIZE(B)

1/2"

1/2"

1/2"

1/2"

-

18"1/2"

E20c - -12"WAREWASHER DRAIN TEMPERING -- -1/2"

E8

E1

E1

E4

E1

E1

E1

E1

E23

E4

E1

E8

E12

E1

E27

E15

E10

E11

E9

E28

E20

E13

24X60

24X6024X60

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

Mag

naW

ave

TM

4 5 6 7 8 9 10

L

K

H

G

5.1 8.1

COOKING ANDBAKING

CULINARYINSTRUCTIONAL

LAB

244

VOCATIONALCLASSROOM

247

COMPUTER LAB

250

CORRIDOR

C5-2

CORRIDOR

C3-2

M. TOIL

255W. TOIL

243

OBSERVATION /CONTROL ROOM

253C

1/2"CW & HW FROMBLW

SK-2

SIM. LOBBY

253

ICU

253B

SIMULATION

253D

STORAGE

253F

SIMULATION

253E

SIMULATION

253A

1/2" HWR

1" HW

1" CW

1"CW & HW FROMBLW, 1/2"HWR DBF

3/4" CW3/4" HW

1/2" HWR

3/4" CW3/4" HW

1/2" HWR

3/4" HW

3/4" CW

3/4" CW

3/4" HW

4 5 5.1 6 7 8 8.1 9 10

G

H

K

L

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P3.2LVE-14179

Second Floor Plan - Labs -Supply

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

N

1'

Scale: 1/4" = 1'-0"

0 2' 4' 8'

SECOND FLOOR PLAN - LABS - SUPPLY

NO. ISSUE DATE: DESCRIPTION

GROUND FLOOR

CEILING

FIRST FLOOR

CEILING

SECOND FLOORFS-1

SK-1

FS-1FS-1FS-1

SK-1

FS-1FS-1CO FD-1 FD-1 CO CO FD-1 FD-1

CEILING

ROOF

EX. VTR EX. VTR

2" 2"2" 2"

3" 3" 3"3" 3"

3"

EXISTINGSANITARYMANHOLE

GI-14"

4"

3"COCO

3"

GROUND FLOOR

CEILING

FIRST FLOOR

CEILING

SECOND FLOOR

CEILING

ROOF

SK-3SK-1SK-1

EX. 3"

SK-4SK-3

EX. 6" EX. 8"

EX. 3"EX. 4"

EX. 4"

EX. VENT STACK

LMB-1

SK-1

EX. 4"

SK-2 SK-2SK-1

EX. 8"

EX. VTR EX. VTR

SK-5

SK-2

EX. VTR

SK-1SK-1

EX. VENT STACK

EX. 4"AW STACK

EX. 3"EX. 4"

2"

2"

2"

2"

2"

2"

2"

2"

2"

2"

1611

090906

154155 157

253B

2"

244

KITCHEN RISER DIAGRAM - DRAINAGENO SCALE

RISER DIAGRAM - DRAINAGENO SCALE

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P7.1LVE-14179

Riser Diagrams

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

NO. ISSUE DATE: DESCRIPTION

FLOOR

COUNTERTOP

1. EXCAVATE TO THE REQUIRED DEPTH, LENGTH AND WIDTH IN ACCORDANCE WITH OSHA PRACTICES, PROVIDE 12" OF FREE SPACE AROUND THE UNIT AT THE BOTTOM.2. INSTALL & LEVEL 6" LAYER OF PEA GRAVEL OR APPROVED EQUIVALENT BACKFILL COMPACTED TO 98% S.P.D.3. IF USING APPROVED BACKFILL MATERIAL INSTEAD OF PEA GRAVEL, INSTALL GEOTEXTILE FILTER FABRIC TO PREVENT MIGRATION AND COMPACT BACKFILL IN 6" TO 8" LAYERS TO 98% S.P.D.4. INSTALL AND LEVEL TANK5. FILL THE SEPARATOR WITH WATER UP TO THE HEIGHT OF THE BUOYANCY SLAB6. POUR CONCRETE READY MIX ANTI-BUOYANCY SLAB 12" ALL AROUND THE SEPARATOR CELLS TO HEIGHT OF BUOYANCY SLAB.7. FILL SEPARATOR WITH WATER UP TO THE INLET/OUTLET PIPES.8. BACKFILL UP TO THE INLET/OUTLET PIPES WITH PEA GRAVEL OR APPROVED EQUIVALENT IN 6" TO 8" LAYERS. COMPACT BACKFILL TO 98% S.P.D.9. CONNECT THE INLET, OUTLET AND VENT PIPING.10. INSTALL EXTENSION COLLAR AND FIBERGLASS SIKAFLEX CAULKING FOR WATERTIGHT SEAL11. BACKFILL WITH PEA GRAVEL, COURSE SAND OR APPROVED EQUIVALENT TO MINIMUM 18" ABOVE THE BASE OF THE EXTENSION COLLAR FOR TRAFFIC LOADING SLAB FOR TRAFFIC CONDITIONS OR SURFACE COVER OF PAVEMENT SUBSURFACE COMPACT BACKFILL TO 98% S.P.D.12. INSTALL COVER13. POUR REINFORCED BEARING SLAB AT SURFACE GRADE. FOR TRAFFIC LOADING CONSULT WITH STRUCTURAL ENGINEER.14. US PATENT #5,746,912; CDN PATENT #2,195,822

NOTES:

INSTALL FLOW CONTROLAT INLET; USE ADAPTORSWHERE REQUIRED

12"

MIN. 6" PEA GRAVELOR APPROVED BACKFILLCOMPACTED TO 98% SPD

3000 psi CONCRETE READY MIX POUR 12" ALL AROUNDBASE OF UNIT TO HEIGHT OF BUOYANCY SLAB(82" LENGTH X 52" WIDTH X HEIGHT OF SLAB)

19"20"

LENGTH 62" WIDTH 32"

INLETOUTLET

PEA GRAVEL ORAPPROVEDEQUIVALENTCOMPACTED TO98% SPD

VENTING PER LOCALPLUMBING CODE

TWO VENT PORTS SUPPLIEDONE CAN BE CAPPED.

EXTENSION COLLAR ASREQUIRED

24" DIA. LIGHTDUTY FRAMECOVER

TERMINATE WITHVENT CAP

GRADEC/O C/O

(PROCEPTOR SEPARATORS MUST BE INSTALLEDIN ACCORDANCE WITH ALL RELEVANT FEDERAL,PROVINCIAL/STATE, AND LOCAL CODES INCLUDINGLOCAL PLUMBING CODE)* ACTUAL HEIGHT MAY VARY SLIGHTLY.

REFER TO FLOORPLANS FOR 3"VENTCONTINUATION

GREASE TRAPPROCEPTOR, Mo. GMC-100 WITH EXTENSION IF REQUIRED AND FLOWCONTROL FITTING. 42 GALLON GREASE CAPACITY, 100 GPM FLOW RATE.GREASE TRAP DESIGN SHALL BE IN ACCORDANCE WITH SEWERAUTHORITY REQUIREMENTS.

NO SCALE

ADA COMPLIANT SINK (SK-1)ELKAY LUSTERTONE, MODEL ELUHAD211555, SINGLE BOWL, 18 GAUGE TYPE 304STAINLESS STEEL, 5 1/2" DEEP, UNDERMOUNT WITH:a. CHICAGO MODEL 895-317GN8AE29VAB DECK MOUNTED SINK FAUCET WITH 8"

RIGID/SWING PLAIN END GOOSENECK SPOUT WITH 2.2 GPM LAMINAR FLOWCONTROL DEVICE IN SPOUT, 4" WRIST BLADE HANDLES AND QUATURNOPERATING CARTRIDGE;

b. LK-99 STAINLESS STEEL DRAIN OUTLET FITTING WITH CONICAL STRAINERBASKET WITH BALL BEARING LOCKING STEM AND RUBBER STOPPER AND 1 1/2"O.D. STAINLESS STEEL TAILPIECE;

c. McGUIRE CHROME PLATED HEAVY CAST BRASS P-TRAP TO WALL WITHCLEANOUT;

d. McGUIRE E-Z TURN MINI BALL VALVE STOPS WITH PREMIERE LINE HEAVYFLEXIBLE CHROME PLATED SUPPLY RISERS. (SWEAT WITH EXTENSION TOCOMPRESSION OR COMPRESSION TO COMPRESSION PREFERRED).

e. FURNISH A TEMPLATE TO THE GENERAL CONTRACTOR FOR THE ACCURATECUTTING OF THE COUNTERTOP AND COORDINATE EXACT LOCATION OFOPENING IN CASEWORK TO ENSURE SINK INSTALLATION WILL BE ADACOMPLIANT.

NOTE: INSULATE ALL EXPOSED DRAIN AND WATER PIPING ON ADA COMPLIANTFIXTURES WITH MODEL #102 E-Z LAV GUARD INSULATION KITS ASMANUFACTURED BY TRUEBRO, INC.

ADA COMPLIANT SINK (SK-3)ELKAY LUSTERTONE, MODEL ELUHAD311855, DOUBLE BOWL, 18 GAUGE TYPE 304STAINLESS STEEL, 5 1/2" DEEP, UNDERMOUNT WITH:a. CHICAGO MODEL 895-317GN8AE29VAB DECK MOUNTED SINK FAUCET WITH 8"

RIGID/SWING PLAIN END GOOSENECK SPOUT WITH 2.2 GPM LAMINAR FLOWCONTROL DEVICE IN SPOUT, 4" WRIST BLADE HANDLES AND QUATURNOPERATING CARTRIDGE;

b. LK-99 STAINLESS STEEL DRAIN OUTLET FITTING WITH CONICAL STRAINERBASKET WITH BALL BEARING LOCKING STEM AND RUBBER STOPPER AND 1 1/2"O.D. STAINLESS STEEL TAILPIECE;

c. McGUIRE CHROME PLATED HEAVY CAST BRASS P-TRAP TO WALL WITHCLEANOUT;

d. McGUIRE E-Z TURN MINI BALL VALVE STOPS WITH PREMIERE LINE HEAVYFLEXIBLE CHROME PLATED SUPPLY RISERS. (SWEAT WITH EXTENSION TOCOMPRESSION OR COMPRESSION TO COMPRESSION PREFERRED).

e. FURNISH A TEMPLATE TO THE GENERAL CONTRACTOR FOR THE ACCURATECUTTING OF THE COUNTERTOP AND COORDINATE EXACT LOCATION OFOPENING IN CASEWORK TO ENSURE SINK INSTALLATION WILL BE ADACOMPLIANT.

NOTE: INSULATE ALL EXPOSED DRAIN AND WATER PIPING ON ADA COMPLIANTFIXTURES WITH MODEL #102 E-Z LAV GUARD INSULATION KITS ASMANUFACTURED BY TRUEBRO, INC.

SINK (SK-4)ELKAY LUSTERTONE, MODEL ELUH4221L, DOUBLE BOWL, 18 GAUGE TYPE 304STAINLESS STEEL, UNDERMOUNT WITH:a. CHICAGO MODEL 895-317GN8AE29VAB DECK MOUNTED SINK FAUCET WITH 8"

RIGID/SWING PLAIN END GOOSENECK SPOUT WITH 2.2 GPM LAMINAR FLOWCONTROL DEVICE IN SPOUT, 4" WRIST BLADE HANDLES AND QUATURNOPERATING CARTRIDGE;

b. LK-99 STAINLESS STEEL DRAIN OUTLET FITTING WITH CONICAL STRAINERBASKET WITH BALL BEARING LOCKING STEM AND RUBBER STOPPER AND 1 1/2"O.D. STAINLESS STEEL TAILPIECE;

c. McGUIRE CHROME PLATED HEAVY CAST BRASS P-TRAP TO WALL WITHCLEANOUT;

d. McGUIRE E-Z TURN MINI BALL VALVE STOPS WITH PREMIERE LINE HEAVYFLEXIBLE CHROME PLATED SUPPLY RISERS. (SWEAT WITH EXTENSION TOCOMPRESSION OR COMPRESSION TO COMPRESSION PREFERRED).

e. FURNISH A TEMPLATE TO THE GENERAL CONTRACTOR FOR THE ACCURATECUTTING OF THE COUNTERTOP AND COORDINATE EXACT LOCATION OFOPENING IN CASEWORK TO ENSURE SINK INSTALLATION WILL BE ADACOMPLIANT.

NOTE: INSULATE ALL EXPOSED DRAIN AND WATER PIPING ON ADA COMPLIANTFIXTURES WITH MODEL #102 E-Z LAV GUARD INSULATION KITS ASMANUFACTURED BY TRUEBRO, INC.

ITEMNO.

FIXTURE

PLUMBING FIXTURE CONNECTIONS

MINIMUM PIPING CONNECTIONS

WASTETRAP & TRAP ARM VENT C.W. H.W.

LAVATORY (WALL HUNG - ADA)

SK-1

SK-2 1/2" 1/2"2"1-1/4" x 1-1/2"

T.W.

-

-

-

LMB-1 LAUNDRY MACHINE BOX 2" 1/2"2" 1/2"1-1/2" -

FD-1 FLOOR DRAIN - FINISHED AREAS 3" --3" NOTE 1

2" 1/2"1-1/2"1-1/2"COUNTERTOP SINK (ADA) -1/2"

3. CONNECTION SIZES ARE TO BE AS SHOWN ON SCHEDULE, EXCEPT ASOTHERWISE NOTED OR SHOWN ON PLANS.

1. WET VENT OR COMBINATION DRAIN AND VENT. REFER TO FLOOR PLAN.2. 1-1/2" UNLESS NOTED OTHERWISE.

NOTE 2

FIGURE NO.SMITHFIXTURE UNITSSYMBOL

FIGURE NO.

503061-113

5050155-330

5040114-154

D

F

E

A

B

C

WATER HAMMER ARRESTER SCHEDULE

SYMBOL

5020

5010

5005

SMITH

33-60

12-32

1-11

FIXTURE UNITS

SK-3 2" 1/2"1-1/2"1-1/2"COUNTERTOP DOUBLE BOWL SINK (ADA) -1/2"

SK-4 2" 1/2"1-1/2"1-1/2"COUNTERTOP DOUBLE BOWL SINK -1/2"

MIXING VALVE (MV-1)POWERS, MODEL LFLM-490, LEAD FREE, WITH INTEGRAL CHECKS ANDSCREENS, TEMPERATURE LOCKING MECHANISM AND UNION CONNECTIONS.

PLUMBING FIXTURE AND EQUIPMENT SCHEDULE

FLOOR DRAIN (FD-1)SMITH, FIG. 2005Y-A WITH 6" DIA. NICKEL BRONZE STRAINER. PROVIDE PROSETSYSTEMS INC. TRAP GUARD IN FLOOR DRAIN STRAINER AND DEEP SEAL P-TRAP ONDRAIN OUTLET. PROVIDE DEEP SEAL P-TRAP WITH CLEANOUT WHERE TRAPS ARELOCATED ABOVE ACCESSIBLE CEILINGS OR EXPOSED IN MECHANICAL ROOMS.

INTERIOR CLEANOUT (FLOOR TYPE)SMITH, FIG. 4028C, INSIDE CAULK OR SPEEDI-SET OUTLET WITH ROUND SCORIATEDNICKEL-BRONZE TOP AND TAPER THREAD BRONZE PLUG. PROVIDE CARPET CLAMPINGFRAME IN CARPETED FLOORS;

VENTS THRU ROOFALL VENTS PASSING THRU THE ROOF SHALL BE A MINIMUM OF 3" IN SIZE. CUT HOLESIN THE ROOF 1" IN DIAMETER LARGER THAN THE OUTSIDE DIAMETER OF THE VENTPIPE. EXTEND VENT PIPES A MINIMUM OF 12" ABOVE THE SURFACE OF THE ROOF.FLASHING FOR ALL VENTS WILL BE INSTALLED BY THE GENERAL CONTRACTOR.

NOTE: CONTRACTOR HAS THE OPTION TO RE-USE EXIST OPENINGS FROM OBSOLETEVENTS IF ADEQUATE SIZE AND LOCATED WITHIN A REASONABLE DISTANCE TO THENEW VENT THRU ROOF LOCATION AS SHOWN ON THE DRAWINGS AND DOES NOTINTERFERE WITH NEW EQUIPMENT ON ROOF.

LOCATE ALL VENTS A MINIMUM OF 15' FROM ANY AIR INTAKE OR ROOFTOP UNITINSTALLED BY THE HEATING CONTRACTOR.

FLOOR SINK (FS-1)SMITH, FIG. 3003-12 F-C(FLANGE AND FLASHING CLAMP), STAINLESS STEEL WITH DOMEBOTTOM STRAINER AND STAINLESS STEEL HALF-OPEN GRATE. OPEN PORTION OFGRATE SHALL BE POSITIONED TOWARD THE REAR OF THE PIECE OF EQUIPMENT ITSERVES. PROVIDE DEEP SEAL P-TRAP ON DRAIN OUTLET. PROVIDE DEEP SEAL P-TRAPWITH CLEANOUT WHERE TRAPS ARE LOCATED ABOVE ACCESSIBLE CEILINGS OREXPOSED IN MECHANICAL ROOMS.

PRIMARY ROOF DRAINPRIMARY DRAIN (RD-1): SMITH, FIG. 1010-C-R-CID;

LAUNDRY MACHINE BOX (LMB-1) WATTS, MODEL 2M2-DWB, DUOCLOZURE WITH WATTS DUOCLOZ SINGLE LEVER

SHUT-OFF VALVE, 2" DRAIN, TOP OR BOTTOM SUPPLIES AS REQUIRED AND WHITEFACEPLATE. PAINT FACEPLATE WITH A COLOR SELECTED BY THE ARCHITECT.PROVIDE WATTS FLEXIBLE BRAIDED STAINLESS STEEL WASHING MACHINE SUPPLYCONNECTORS, WATER HAMMER ARRESTORS ON SUPPLY PIPING AND PVC P-TRAP INWALL.

EMERGENCY EYEWASH (EEW-1)SPEAKMAN MODEL SE-570 DECK MOUNTED EYESAVER EYEWASH, SWING OPERATED,TWIN SPRAYS AND FLIP-TOP DUST COVERS. VERIFY EXACT LOCATION IN COUNTERTOPWITH OWNER INCLUDING LEFT HAND OR RIGHT HAND OPERATION AND COORDINATEEXACT LOCATION WITH SINK AND FAUCET.

ADA COMPLIANT WALL HUNG SINK (SK-2)AMERICAN STANDARD 0355.012 LUCERNE WITH:a. CHICAGO, MODEL 895-317E2805-5CP CHROME PLATED DECK MOUNT FAUCET, 5-3/8"

RIGID/SWING GOOSENECK SPOUT WITH 0.5 GPM VANDAL RESISTANT ECONO-FLOAERATOR, 4" INDEXED WRIST BLADE HANDLES AND QUATURN OPERATINGCARTRIDGES;

b. McGUIRE GRID DRAIN WITH TAILPIECE, (PROWRAP SERIES) MOLDED CLOSED CELLVINYL, ANTIMICROBIAL;

c. McGUIRE (PROWRAP SERIES) MOLDED, CLOSED CELL VINYL, ANTIMICROBIAL 'P'TRAP (1 1/4" x 1 1/2") TO WALL WITH CLEANOUT;

d. McGUIRE, MODEL LF-BV170 CHROME PLATED ALL BRASS QUARTER-TURN BALLVALVE STOPS WITH CHROME BRAIDED SUPPLIES. (SWEAT WITH EXTENSION TOCOMPRESSION OR COMPRESSION TO COMPRESSION PREFERRED);

e. SMITH, SERIES 700-M31 LAVATORY SUPPORT. BOLT SUPPORT TO FLOOR INACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS;

f. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND SPACING.VERIFY LOCATION ADA COMPLIANT FIXTURES SHOWN ON THE PLUMBINGDRAWINGS WITH THE ARCHITECTURAL DRAWINGS.

NOTE: INSULATE ALL EXPOSED DRAIN AND WATER PIPING ON ADA COMPLIANTFIXTURES WITH MODEL #102 E-Z LAV GUARD INSULATION KITS AS MANUFACTURED BYTRUEBRO, INC.

4"MINIMUM ABV.CROWN OF TRAP

TYP. SINK AND FAUCET

1-1/2"WASTE DOWNBELOW FLOOR

BALL VALVE STOP

1/2"SUPPLY PIPINGFROM BELOW

AIR ADMITTANCEVALVE

MV-1

EEW-1

1/2"SUPPLYPIPING

1/2" TEPIDWATER

TYPICAL PIPING HANGER DETAILNO SCALE

PIPE18 GAUGE PIPE

WITH FLARED ENDSSHIELD (MIN 12" LONG)

FIBERGLASS INSULATIONWITH PVC FITTING COVERS(REFER TO SPECIFICATIONSFOR INSULATION THICKNESS)

CLEVIS HANGER WITH THREADED ROD

REFER TO SPECIFICATIONS FORSPACING

ATTACHED TO BUILDING STRUCTURE.

TYPICAL SINK PIPING DETAILNO SCALE

GREASE INTERCEPTOR DETAIL

FULL SHEET SIZE: 30" x 42"

SHEET NUMBER

PROJECT NUMBER

REGISTRATION

CURRENT ISSUE

COPYRIGHT 2016 SFA

DRAWING HISTORY

SITE / CIVIL ENGINEER

LANDSCAPE ARCHITECT

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL / PLUMBING

FIRE PROTECTION ENGINEER

TELECOM ENGINEER

AUDIO VISUAL ENGINEER

SECURITY ENGINEER

ACOUSTICAL ENGINEER

P8.1LVE-14179

Details and Schedules

BUCKS COUNTYCOMMUNITY COLLEGE

FOUNDERS HALLRENOVATIONS

FOUNDERS HALL RENOVATIONS

100% CD Submission -

NOT FOR CONSTRUCTION08/19/2016

N/A

N/A

BARRY ISETT ASSOCIATES85 PA-100,

Allentown, PA 18106

LEHIGH VALLEY ENGINEERING1 W Broad St #500,Bethlehem, PA 18018

LEHIGH VALLEY ENGINEERING

N/A

N/A

N/A

N/A

NO. ISSUE DATE: DESCRIPTION