34
“It is not the strongest of the species that survives. It is the one that is most adaptable to change” Charles Darwin Contact: 8860456000

Dwarka Expressway - Presentation_8860456000

Embed Size (px)

DESCRIPTION

Progress of Dwarka Expressway, Gurgaon. Complete update on Dwarka Expressway Road offcially called "Northern Periphery Road: or the NPR. 18 kms long road to Delh from NH8

Citation preview

Page 1: Dwarka Expressway - Presentation_8860456000

“It is not the strongest of the species that survives. It

is the one that is most adaptable to change”

Charles Darwin

Contact: 8860456000

Page 2: Dwarka Expressway - Presentation_8860456000
Page 3: Dwarka Expressway - Presentation_8860456000

Connecting Dwarka with the NH8, the Expressway will bring Delhi and Gurgaon closer

Currently, only 2 roads of connectivity between Delhi and Gurgaon-MG Road and the NH8

Not enough to tackle the heavily increasing traffic of daily commuters between Delhi and Gurgaon

A whole new corridor of connectivity

Page 4: Dwarka Expressway - Presentation_8860456000

With Dwarka Expressway, connectivity becomes smoother, faster and so much easier!

IGI airport - a mere 2.5 kms away

Also bridges the gap between 16 new Residential Sectors

A whole new corridor of connectivity

Page 5: Dwarka Expressway - Presentation_8860456000

And this is how Gurgaon will soon look, when the Expressway opens up

The changing face of Gurgaon

Page 6: Dwarka Expressway - Presentation_8860456000
Page 7: Dwarka Expressway - Presentation_8860456000

Planned around a world of opportunities and development

Dwarka Expressway marks the beginning of a golden era in real estate

Acts as a new channel of business and commerce between Delhi and Gurgaon

World-class infrastructure and facilities to transform lives of residents and investors

A catalyst of change and development

Page 8: Dwarka Expressway - Presentation_8860456000

A result of years of planning, research and development by the best brains in real estate

Aided by experts and top professionals in the Corporate and Government sector, a range of exciting projects in the residential and commercial space are already underway

Years of thought and planning

Page 9: Dwarka Expressway - Presentation_8860456000

No more toll for commuters between Delhi and Gurgaon!

No more delays and traffic jams at the toll gate on NH8!

All thanks to the toll plaza moving beyond Manesar shortly

No more toll! No more delays!

Page 10: Dwarka Expressway - Presentation_8860456000

From power-shortage to power-surplus, Haryana’s power supply improving massively

4 new power plants have been set up by the Haryana Government

Power generation capacity of the state has increased from 1587 MW to 5800 MW in the last 5 years

Power cuts are history

Page 11: Dwarka Expressway - Presentation_8860456000

Reputed educational institutions flocking to areas surrounding the Expressway

MatriKiran School under construction

Modern School opening a branch in Sector 91, Gurgaon

Other well-known schools of Delhi are currently looking to expand on this stretch

Exciting opportunities in Education

Page 12: Dwarka Expressway - Presentation_8860456000

Nationally and internationally famous healthcare organizations setting up branches around the Dwarka Expressway

Reputed names in healthcare have/in process of finalizing Dwarka Expressway as the location of establishment

Boom in Healthcare

Page 13: Dwarka Expressway - Presentation_8860456000

All this adds up to making the Dwarka Expressway a new hub of exciting developments in real estate and the Golden Road!

Page 14: Dwarka Expressway - Presentation_8860456000

18 kms long and 150 mtrs wide, with 60 mtrs of greenery on both sides, the Dwarka Expressway is 2x that of the NH8

14 kms out of the 18 kms is already constructed

The widest road in the NCR

Page 15: Dwarka Expressway - Presentation_8860456000

Constructed means black-topped and driveable

The double yellow line indicates the

constructed expressway

Dwarka Expressway

From Haryana

From Delhi

Page 16: Dwarka Expressway - Presentation_8860456000

Gurgaon - Manesar Urban Complex - 2025 AD

Page 17: Dwarka Expressway - Presentation_8860456000

800 mtrs handed over to Indian Railways for construction of Rail over-bridge, with HUDA paying Railways Rs. 38 Crores in advance already (Expected Completion Time: 16 months)

700 mtrs under various HUDA utilities such as HT pillars and water works which HUDA is in the process of shifting (Expected Completion Time: 6 months)

The balance 2.5 kms – has been resolved

The Expressway today: The remaining 4 kms

Page 18: Dwarka Expressway - Presentation_8860456000

On 30.9.2013, HUDA announced a

rehabilitation policy which was published in the

Times of India

The latest on the 2.5 kms under stay order

Page 19: Dwarka Expressway - Presentation_8860456000

People with built up homes / structures are being offered alternative plots in Sectors 110A and 37C

The plots on offer are of the same size as the plots being taken over

HUDA has already acquired 145 acres in the above 2 Sectors for this purpose

Only 15 acres required to re-settle all the petitioners

As Per Policy Published on 30.09.13

Page 20: Dwarka Expressway - Presentation_8860456000

Applicants had till 30.10.2013 to apply under this policy

HUDA has received applications from 80% of the residents on this stretch and is sorting them out

All petitions expected to be resolved under this process in the next 3-4 months

As Per Policy Published on 30.09.13

Page 21: Dwarka Expressway - Presentation_8860456000
Page 22: Dwarka Expressway - Presentation_8860456000

S.No.

Chainage

LengthClear

Length

StatusConstructed/ NOT

RemarksMonth of Handing

OverFrom To

1 0 468 468   Not Executed Built up Area -2 468 750 282 282 Executed   End of Dec 11

3 750 765 15 15 Executed   May-13

4 765 900 135 135 Executed   Dec-11

5 900 960 60 60 Executed   May-13

6 960 2000 1040 1040 Executed   End April 117 2000 2050 50 50 Executed   End April 11

8 2050 2070 20 20 Executed  

9 2070 2120 50 50 Clear WMM II Completed Mid August 13

10 2120 2170 50   Not Executed Stay on Land

11 2170 2260 90 90 Clear WMM II Completed Mid August 13

12 2260 3350 1090 1090 Executed   End April 11

Actual availability of stretches (As per Actual Site condition)

Page 23: Dwarka Expressway - Presentation_8860456000

S.No.

Chainage

LengthClear

Length

StatusConstructe

d/ NOTRemarks

Month of Handing OverFrom To

13 3350 3370 20     HSIIDC drain  

14 3370 3400 30 30 Executed   Jan-13

15 3400 3975 575 575 Executed Reliance SEZ land Jan-13

16 3975 4100 125 125 Executed   Feb 12

17 4100 4300 200 200 Executed    

18 4300 4315 15   Pataudi Road    

19 4315 4425 110 110 Executed  

20 4425 4500 75 75 Executed   End April 11

21 4500 6620 2120 2120 Executed   End April 11

22 6620 7800 1180  Not

Executed/ROB

ROB, Padmini Factory, stay on land

23 7800 8285 485 485 Executed   Mid Sep 11

24 8285 8345 60   Not ExecutedHUDA water sump

house

25 8345 8750 405 405 Executed   Mid Sep 11

Page 24: Dwarka Expressway - Presentation_8860456000

S.No.

Chainage

LengthClear

Length

StatusConstructed

/ NOTRemarks

Month of Handing

OverFrom To

26 8750 8800 50  One side executed

RHS stay on land  

27 8800 9820 1020 1020 Executed   Mid Oct 11

28 9820 9900 80   Not Executed STP Channel  

29 9900 10800 900 900 ExecutedWater logged area

completedLast week of

Jan 13

30 10800 11700 900 900 Executed   end April 11

31 11700 11760 60 60 Executed   Mid Oct 11

32 11760 12850 1090 1090 Executed   Mid Oct 11

33 12850 12900 50 50 Executed   Feb-13

34 12900 13000 100   Not Executed Nipon Factory  

35 13000 13060 60 60 Executed   Feb-13

36 13060 13400 340 340 Executed   Nov-11

37 13400 13520 120 120 Executed   Nov-11

38 13520 13650 130 130 Executed   Nov-11

39 13650 13700 50 50 ClearSlab approach is to be

coming 

Page 25: Dwarka Expressway - Presentation_8860456000

40 13700 13780 80  

Slab culvert over sewer

channel is in progress by

another contractor

Work is stopped from last 2 month i.e on 6th

Sep 2013 

41 13780 14320 540 540 Executed  

42 14320 14900 580 580 ClearWMM 1st layer

completed

43 14900 15300 400   Not Executed New Palam Vihar – R&R

44 15300 15600 300   Not Executed New Palam Vihar – R&R

45 15600 16000 400   Not Executed New Palam Vihar – R&R

46 16000 16740 740   Not Executed New Palam Vihar – R&R

47 16740 18035 1295 1295 Executed   01-Mar

      18035 14092      

Clear Stretch 14,092 mtrs.

S.No.

Chainage

LengthClear

Length

StatusConstructed/

NOTRemarks

Month of Handing

OverFrom To

Page 26: Dwarka Expressway - Presentation_8860456000

Dwarka Expressway: The Delhi update

Page 27: Dwarka Expressway - Presentation_8860456000

Thanks to DDA’s efforts, all issues related to land acquisition on Delhi side, resolved

Remaining stretch of less than a Km to be ready within the next 6 months

Dwarka Expressway: The Delhi update

Page 28: Dwarka Expressway - Presentation_8860456000

All land issues on Delhi side resolved

All issues pertaining to 2.5 kms on Gurgaon side soon to be resolved (Expected Timeline – January’2014)

Soon, no more obstacles preventing investing in the Golden Road!

All obstacles soon to vanish

Page 29: Dwarka Expressway - Presentation_8860456000

Strike while hot!

(Average rate per sq ft)

Page 30: Dwarka Expressway - Presentation_8860456000

Some of the best and most trusted names in real estate singling out the Dwarka Expressway as the preferred location for various visionary projects

Residential or commercial, most of these projects in full swing and nearing completion

Besides, the best developers are building here

Page 31: Dwarka Expressway - Presentation_8860456000

Glimpses of the Expressway

Page 32: Dwarka Expressway - Presentation_8860456000

Glimpses of the Expressway

Page 33: Dwarka Expressway - Presentation_8860456000

The golden road beckons

Members of:

Page 34: Dwarka Expressway - Presentation_8860456000

Ethical Consulting Pvt. Ltd.Corporate off: A24/21, DLF Phase-1,Gurgaon, Haryana Ph No: 8860456000 Email: [email protected] Off: Delhi: F-7, 1st Floor, DDA Shopping Complex, Mayur Vihar Ph-1, New Delhi-110091

Contact Person : Shekhar Pratap Singh Email : [email protected] Ph No: 011-47503631

Ranchi: C-127, Harmu Housing Colony, Ranchi 834002

Contact Person : Prashant Pandey Email : [email protected] Ph No: 0651-2244341 Patna: 301,Narayan Plaza,3rd Floor Opp.Luv

Kush Tower Exhibition Road , Patna – 800001 Contact Person : Chandan Email : [email protected]

Email:  [email protected]: www.ethicalwealth.in