    SITE ANALYSISUNIVERSITYSQUARE

  • 8/13/2019 DV Project 3A

    2/45

  • 8/13/2019 DV Project 3A

    3/45

    LOCATION PLAN

    TAYLORS UNIVERSITYLAKESIDE CAMPUS

    No.1 Jalan Taylors,47500 Subang Jaya,

    Selangor DarulEhsan.

  • 8/13/2019 DV Project 3A

    4/45

    KEY

    PLANUNIVERSITY SQUARE

    n

    w e

    s

  • 8/13/2019 DV Project 3A

    5/45

  • 8/13/2019 DV Project 3A

    6/45

    n

    w e

    s

  • 8/13/2019 DV Project 3A

    7/45

    What can uunderstandabout the site

    when youlooking at thefloor plan?

    FLOOR PLAN

  • 8/13/2019 DV Project 3A

    8/45

    Actual size of the siteTypes of material of the site

    The context of the siteSome greenery of the site

  • 8/13/2019 DV Project 3A

    9/45

  • 8/13/2019 DV Project 3A

    10/45

    Pedestrian Flow

    Pedestrian flowdata provideskey evidenceabout the

    potentials andproblems of asite.

  • 8/13/2019 DV Project 3A

    11/45

    Pedestrian flowGrand hall

    Educationblock

    lake

    Commercial

    block

    From commercial block study blockFrom temptation commercial blockFrom commercial block roundabout

    From roundabout temptationFrom roundabout lakeFrom lake education block

    n

    w e

    s

  • 8/13/2019 DV Project 3A

    12/45

    7am-9am

    6pm- 11pm

    2pm-4pm

    12am-5am

    12pm-1pm

    4pm-5pm

    5pm-6pm

    9pm-10pm

    - Number of peoples walk through the side

  • 8/13/2019 DV Project 3A

    13/45

    4%

    27%

    4%

    19%

    23%

    15%

    8%

    reasons

  • 8/13/2019 DV Project 3A

    14/45

    SECTION OFUNIVERSITY SQUARE

  • 8/13/2019 DV Project 3A

    15/45

    SEC TION nw e

    s

  • 8/13/2019 DV Project 3A

    16/45

    PHYSICALATTRIBUTESSUN PATH-TOPOGRAPHY-HYDROLOGY

    -WIND-TEMPERATURE ZONING

  • 8/13/2019 DV Project 3A

    17/45

    SUN PATH DIAGRAM

    9:00 A.

    Shadow

    THE SUNRISES FROMEAST,THEREFORESHADOWSFALL INFRONTOF THEBUILDING.

    n

    w e

    s

  • 8/13/2019 DV Project 3A

    18/45

    SUN PATH DIAGRAM

    12:00 P.M.WHEN THE SUNREACHES THE

    HIGHEST POINT,THE SHADOWsONLY APPEARat THE AREAUNDERTHE TREE & THEAREACOVEREDBY THE ROOF.

    n

    w e

    s

  • 8/13/2019 DV Project 3A

    19/45

    SUN PATH DIAGRAm

    4:00 p.M. THE SUNSETS FROMThe WEST,

    THEREFORETHE SHADOW

    WILL FALLFROM THE

    EAST.

    Shadow

    n

    w e

    s

  • 8/13/2019 DV Project 3A

    20/45

  • 8/13/2019 DV Project 3A

    21/45

    hydrology

    Rain waterwould flowdown thestairs

    Direction ofwater flow

    drain

    Flowdown thestairs

    To the lake

    Water flows downto the universitysquare from theamphitheatre

    Accumulationpoint ofwater

    Accumulation points of water are mostly onthe tiles while grass absorb the water.

    There werent much drainage systems on

    University square

    Indicationsn

    w e

    s

  • 8/13/2019 DV Project 3A

    22/45

    windn

    w e

    s

    At 9.00a.m., there are small breeze for a short while.Around12.00p.m., moderate strong wind can be detectedfrom the south-east direction and north-east direction.At 3.00p.pm., strongest wind is blown from 115 degreesouth-eaSt to 184 degree south.

    A

    CB

    A.B.

    C.

  • 8/13/2019 DV Project 3A

    23/45

    Temperature zoning

    Cool zone as labeled inyellow are mainlyaround the plants areawhich the plants acts asshade and blocks thesunlight consequently.

    Coolest zone as labeled

    in a lighter yellow arecompletely shaded underthe plants and is locatedat a higher slope which isexposed to the breezefrom the south-eastdirection.

    Hot zone as labeled inorange which is mainlynear the commercialblock. The buildingsblock the sunlightpartially.

    Hottest zone as labeledin red which is thelargest area of the site.It is directly exposed tothe sunlight entirelywithout any blockage ofsunlight.

    n

    w e

    s

  • 8/13/2019 DV Project 3A

    24/45

    5

    SEEHEAR

    TASTE TOUCH

    SM

  • 8/13/2019 DV Project 3A

    25/45

  • 8/13/2019 DV Project 3A

    26/45

    1 : windy

    When its windy, wind blows from thelake towards the university squarewhich causes that area to havefishy smell

    During hot weather, the heatfrom the sun causes the grassto produce a kind of

    unpleasant smell

    2 : hot climate

    5 senses : smell

    1

    n

    w e

    s

    n

    w e

    s

  • 8/13/2019 DV Project 3A

    27/45

    Granite

    paving

    grass

    Handra

    il

    Roughsurface

    Pricklingfeel

    Scorching

    pain duringhotweather

    5 senses : touch

    12

    3

    n

    w e

    s

  • 8/13/2019 DV Project 3A

    28/45

    Tables & chairs

    Block c block d

    temptation

    lakeCommercial block

    Waiting area

    5 senses : view

    Stairs

    1

    2

    1

    2

    n

    w e

    s

  • 8/13/2019 DV Project 3A

    29/45

    BIOLOGICAL

    ATTRIBUTESVEGETATION

  • 8/13/2019 DV Project 3A

    30/45

    For decorationpurpose

    To act as aborder for thestaircase

    For landscape purpose Can absorb rain water

    so that it does not remainstagnant in the University

    Square

    Fordecoration purpose

    Canprovideshare forthestudents

    Leaves thatare wide-spread canprovideshade forstudents

    For decoration purpose Yellow flowers add

    color to the universitysquare

    Fordecorationpurpose

    vegetationn

    w e

    s

  • 8/13/2019 DV Project 3A

    31/45

    CULTURAL

    ATTRIBUTESHUMAN ACTIVITY-FACILITIES

  • 8/13/2019 DV Project 3A

    32/45

    Human activityn

    w e

    s

    Has a large space for the water-themed games

    The students do not have to cleanup the place after the gamesbecause the grass will absorb thewater.

    Indicates thedirection ofthe flow ofthe crowdinto the site.The thickerthe arrow,the largerthe crowd.

  • 8/13/2019 DV Project 3A

    33/45

    Has a space largeenough tocontain over a thousand people

    Due to its open-aircharacteristic, it isa very suitable venue for a concert asits continuous air flow would be idealfor a crowded situation.

  • 8/13/2019 DV Project 3A

    34/45

    Has a large space that can containthe large-sized projects.

    Due to its location in between thecampus and the commercial block,many people will pass by to look attheir projects.

  • 8/13/2019 DV Project 3A

    35/45

    The surroundingenvironment is verysuitable for apeaceful wedding.

    The lake viewemphasizes theromantic atmosphere

    of the wedding.

  • 8/13/2019 DV Project 3A

    36/45

    Has a large space for the water-themed games

    The students do not have to clean upthe place after the games because thegrass will absorb the water.

    a l

  • 8/13/2019 DV Project 3A

    37/45

    -Can light upthe path for

    studentspassing by.

    -Act aslighting forthe treesduring nighttime.

    -

    Allowsrainwatertoflow induringrainydays.

    -Light up thepath forpasser-by

    -A shadyplace forstudents tochill orstudy.

    -For decorationpurpose

    facilitiesn

    w e

    s

  • 8/13/2019 DV Project 3A

    38/45

    S.W.O.T

  • 8/13/2019 DV Project 3A

    39/45

    s.w.o.t.

    s

    w

    o

    t

    S

  • 8/13/2019 DV Project 3A

    40/45

    The surrounding of the proposedsite is planted with various kindsof plants

    It is suitable foractivities such aswedding, concert and

    parties.

    The design of the landscapebeautifies the campus

    S

    w

  • 8/13/2019 DV Project 3A

    41/45

    Large areas of the site is exposedto sunlight as there are only fewtrees at the site, which make it quite

    hot in the day.

    Rain water will remain stagnantin the grass patches.

    w

    o

  • 8/13/2019 DV Project 3A

    42/45

    Provide more benches forstudents to sit on

    Plants various type offlowers to light up the

    place.

    Plants more shadytrees.

    Install art structure todecorate thesurrounding.

    Set up food stalls.

    o

  • 8/13/2019 DV Project 3A

    43/45

  • 8/13/2019 DV Project 3A

    44/45

    52%

    8%

    7%

    33%

    improvement ideas