DUNE CABLING MOCKUPInstallation and Integration Workshop
Feb 4, 2020, Zurich
Manhong ZhaoBrookhaven National Lab
2 Feb 4, 2020 Installation and Integration Workshop
Outline:
Mockup design
Mockup construction
What we can do with the mockup
3
Mockup Design
A corner of DUNE-SP detector DUNE Cabling Mockup at BNL
Feb 4, 2020 Installation and Integration Workshop
4
Mockup Design
Feb 4, 2020 Installation and Integration Workshop
Distance from signal feedthrough to APA can be adjusted
5
Mockup Design
Feb 4, 2020 Installation and Integration Workshop
Plywood sheets to mockup the membrane roof and wall
6
Mockup Design APA head tube section supported upside down to practice CE box installation and cable routing on lower APA
Feb 4, 2020 Installation and Integration Workshop
7
Mockup Design Commercial mezzanine
Feb 4, 2020 Installation and Integration Workshop
8
Mockup Design DSS beam supported on Unistrut frames
Feb 4, 2020 Installation and Integration Workshop
9
Mockup Design Plywood structure represents steel beams on cryostat
Feb 4, 2020 Installation and Integration Workshop
10
Mockup Design Signal feedthrough: Cross-shaped spool piece
Feb 4, 2020 Installation and Integration Workshop
11
Mockup Design CERN crossing tube
Feb 4, 2020 Installation and Integration Workshop
12
Mockup Construction Assemble Unistrut frames
Feb 4, 2020 Installation and Integration Workshop
13
Mockup Construction Install DSS beam
Feb 4, 2020 Installation and Integration Workshop
14
Mockup Construction Assemble APA head tube and yoke
Feb 4, 2020 Installation and Integration Workshop
15
Mockup Construction Attach APA + yoke to DSS beam
Feb 4, 2020 Installation and Integration Workshop
16
Mockup Construction Install cable tray system
Feb 4, 2020 Installation and Integration Workshop
17
Mockup Construction Construct mezzanine: 1st two columns and 1st beam
Feb 4, 2020 Installation and Integration Workshop
18
Mockup Construction Construct mezzanine
Feb 4, 2020 Installation and Integration Workshop
19
Mockup Construction Construct mezzanine
Feb 4, 2020 Installation and Integration Workshop
20
Mockup Construction Construct mezzanine
Feb 4, 2020 Installation and Integration Workshop
21
Mockup Construction
Feb 4, 2020 Installation and Integration Workshop
Signal feedthrough to be installed…
22
What we can do with the mockup:CE box installation on upper APA
CE box installation on lower APA
Cable routing on upper APA
Cable routing on lower APA
Cabling through signal feedthrough and feedthrough design verification
Cable bundle support on upper APA head tube
Interference check among components installed on the APA
CE flange and PD flange installation
New trolley design verification
Cold Box patch panel design
……
Feb 4, 2020 Installation and Integration Workshop
23 Feb 4, 2020 Installation and Integration Workshop
24
Backup slides
Feb 4, 2020 Installation and Integration Workshop
25 Feb 4, 2020 Installation and Integration Workshop
Cable routing on upper APA and lower APA
26
Temporary cable
support
Laser asm
Solution 1: Wider cable tray on the front side of the APASolution 2: Temporary cable support installed underneath the front cable tray
Alternative solutions to support cables
Laser asm
Laser asm
Wider cable tray interferences with laser asm.
Current cable tray doesn’t interference with laser asm.
Feb 4, 2020 Installation and Integration Workshop
27
Temporary cable support
Temporary cable supports are attached underneath the cable tray by coupling nuts.
Coupling nuts
Temporary cable supports are removed after cabling completed and will be reused for the next APA cabling.
Feb 4, 2020 Installation and Integration Workshop
28 Feb 4, 2020 Installation and Integration Workshop
During cable routing, a board temporarily installed underneath the cable tray to prevent cables from falling to the APA wire level.
CE crate and flange
CE crate and flange
CE cable strain relief bracket
PDS flange
PDS cable
CE cableCE cable strain relief bracket
PDS cable strain relief
bracket
29 Feb 4, 2020 Installation and Integration Workshop
30 Feb 4, 2020 Installation and Integration Workshop