1
Copyright © 2017 Pinnacle Infotech, Inc. Global Leader in BIM Services www.pinnaclecad.com BIM Start Date September, 2017 574,540 sq ft Average Team Size Architect Project Area Perkins + Will DUKE HEALTH NEW BED ADDITION [Hospital] Durham, North Carolina, USA 4 Engineers uke Bed Tower is a new Hospital building D for construction with 13 floors (2 zones) in Durham, NC, USA spread over a project area of 574540 sq. ft. adjacent to the main hospital. The hospital would consist of 328 duke beds for Durham City. The site plans included a new bed tower on the Duke Raleigh Hospital campus, set to open in July 2020. BIM End Date On going Software Used: Autodesk Fab CADMEP 2015, Autocad Fabrication, Naviswork – 2015, Newforma LOD: 400 Trades Covered: Plumbing, Sheet Metal, Mechanical Piping, Domestic Water, Medical Gas Skanska Sub Contractor General Contractor Bernhard MCC* Scope of work Our scope of work for the project included: 1. 3D Model Creation of Sheet Metal, Mechanical Piping, Domestic Water & Medical Gas Fittings with equipment model, additional duct sizes and equipment tags 2. Coordination as per the clash report 3. Preparation of Shop Drawing / 2D Drawing Sheet for every area - Detailed 2D drawings prepared showing the annotations 4. As-Built Updates as per mark-up drawings 5. Facility Management as per available information 6. BOQ Clash Coordination Structural Engineer Owner/Developer CALYX Engineers + Consultants Duke Medicine FPDC Pinnacle's Value Addition 1. Checked title block for shop drawings, overall aesthetics, line width in shop drawing for MP, MG & Plumbing services 2. Drew the model for Sheet Metal (basement level) Mechanical Pipe Clashes with Conduit Challenges & Solutions Challenge - Timeline Challenge - Time frame is too short to complete the 1st draft of the basement level Solution - We have completed the work within stipulated timeframe, employing our expertise.

Duke Bed Tower is a new Hospital building - pinnaclecad€¦ · 1. 3D Model Creation of Sheet Metal, Mechanical Piping, Domestic Water & Medical Gas Fittings with equipment model,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Duke Bed Tower is a new Hospital building - pinnaclecad€¦ · 1. 3D Model Creation of Sheet Metal, Mechanical Piping, Domestic Water & Medical Gas Fittings with equipment model,

Copyright © 2017 Pinnacle Infotech, Inc.

Global Leader in BIM Serviceswww.pinnaclecad.com

BIM Start Date September, 2017

574,540 sq ft

Average Team Size

Architect

Project Area

Perkins + Will

DUKE HEALTH NEW BED

ADDITION[Hospital]

Durham, North Carolina, USA

4 Engineers

uke Bed Tower is a new Hospital building Dfor construction with 13 floors (2 zones) in Durham, NC, USA spread over a project

area of 574540 sq. ft. adjacent to the main hospital. The hospital would consist of 328 duke beds for Durham City. The site plans included a new bed tower on the Duke Raleigh Hospital campus, set to open in July 2020.

BIM End Date On going

Software Used: Autodesk Fab CADMEP 2015, Autocad Fabrication, Naviswork – 2015, Newforma

LOD: 400

Trades Covered: Plumbing, Sheet Metal,

Mechanical Piping, Domestic Water,

Medical Gas

Skanska

Sub Contractor

General Contractor

Bernhard MCC*

Scope of work

Our scope of work for the project included: 1. 3D Model Creation of Sheet Metal, Mechanical Piping, Domestic Water & Medical Gas Fittings with equipment model, additional duct sizes and equipment tags2. Coordination as per the clash report3. Preparation of Shop Drawing / 2D Drawing Sheet for every area - Detailed 2D drawings prepared showing the annotations 4. As-Built Updates as per mark-up drawings 5. Facility Management as per available information 6. BOQ

Clash Coordination

Structural Engineer

Owner/Developer

CALYX Engineers + Consultants

Duke Medicine FPDC

Pinnacle's Value Addition

1. Checked title block for shop drawings, overall aesthetics, line width in shop drawing for MP, MG & Plumbing services2. Drew the model for Sheet Metal (basement level)

Mechanical Pipe Clashes with Conduit

Challenges & Solutions

Challenge - Timeline Challenge - Time frame is too short to complete the 1st draft of the basement level Solution - We have completed the work within stipulated timeframe, employing our expertise.