BIM Start Date September, 2017
574,540 sq ft
Average Team Size
Architect
Project Area
Perkins + Will
DUKE HEALTH NEW BED
ADDITION[Hospital]
Durham, North Carolina, USA
4 Engineers
uke Bed Tower is a new Hospital building Dfor construction with 13 floors (2 zones) in Durham, NC, USA spread over a project
area of 574540 sq. ft. adjacent to the main hospital. The hospital would consist of 328 duke beds for Durham City. The site plans included a new bed tower on the Duke Raleigh Hospital campus, set to open in July 2020.
BIM End Date On going
Software Used: Autodesk Fab CADMEP 2015, Autocad Fabrication, Naviswork – 2015, Newforma
LOD: 400
Trades Covered: Plumbing, Sheet Metal,
Mechanical Piping, Domestic Water,
Medical Gas
Skanska
Sub Contractor
General Contractor
Bernhard MCC*
Scope of work
Our scope of work for the project included: 1. 3D Model Creation of Sheet Metal, Mechanical Piping, Domestic Water & Medical Gas Fittings with equipment model, additional duct sizes and equipment tags2. Coordination as per the clash report3. Preparation of Shop Drawing / 2D Drawing Sheet for every area - Detailed 2D drawings prepared showing the annotations 4. As-Built Updates as per mark-up drawings 5. Facility Management as per available information 6. BOQ
Clash Coordination
Structural Engineer
Owner/Developer
CALYX Engineers + Consultants
Duke Medicine FPDC
Pinnacle's Value Addition
1. Checked title block for shop drawings, overall aesthetics, line width in shop drawing for MP, MG & Plumbing services2. Drew the model for Sheet Metal (basement level)
Mechanical Pipe Clashes with Conduit
Challenges & Solutions
Challenge - Timeline Challenge - Time frame is too short to complete the 1st draft of the basement level Solution - We have completed the work within stipulated timeframe, employing our expertise.