Upload
nguyenphuc
View
215
Download
0
Embed Size (px)
Citation preview
Due to the second phase of the project, art for this project needs to be in this area (see additional drawings).
Drawing North
5420 LBJ FreewaySuite 1100Dallas, TX 75240Telephone 214.276.1500Facsimile 217.273.1505
Date Description
Seal/Signature
Project Name
Project Number
Description
Scale
2015 Gensler
Civil Engineering
JQ ENGINEERING100 Glass St.Dallas, TX 75207Telephone 214.752.9098
MEP Engineering
SSR2995 Sidco Dr.Nashville, TN 37204Telephone 615.353.1113
Structural Engineering
ROGERS MOORE17950 Preston Rd.Suite 950Dallas, TX 75252Telephone 214.420.0110
Assoc. MEP Engineering
CHAMBERS ENGINEERING5501 Spur 327Lubbock, TX 79424Telephone 806.867.9999
Landscape Architecture
PRAIRIE WORKSHOPPO Box 93583Lubbock, TX 79493Telephone 806.773.1508
AV/Security/IT/Data
WJHW3424 Midcourt RdSuite 124Carrolton, TX 75006Telephone 972.934.1700
Code Consultant
FP&C CONSULTANTS3770 BroadwayKansas City, MO 64111Telephone 816.931.3377
Food Services
CARUSO & ASSOC.8055 East Tuffs Ave.Suite 1320Denver, CO 80237Telephone 303.649.1600
ADA Consultant
ED ROETHER CONSULTING25950 Mission BelleviewLouisburg, KS 66053Telephone 913.549.6479
BOX 42014LUBBOCK, TX 79409
6/19/2015 Schematic Design
8/21/2015 Design Development
11/20/2015 25% CD Set
2/4/2016 90% CD Set
2/5/2016 DEMO/MASS EX
3/4/2016 STRUCT. PKG.
4/6/2016 CD Set
A5.02
OVERALL AXON VIEWS
27.6923.000
Texas Tech SportsPerformance Center
TEXAS TECH FACILITIESPLANNING & CONSTRUCTION
SCALE:
NORTHEAST VIEW3SCALE:NORTHWEST VIEW4
SCALE:
SOUTHEAST VIEW1SCALE:SOUTHWEST VIEW2
4.6.2016
1A6.01____________2 4 5 6 7 8 9 10 11 12 13 14 15
7A6.13____________ 5
A6.13____________6
A6.13____________8
A6.13____________
3.2 5.10.8
9A6.13____________
FALSE DOWNSPOUTAND FALSE CONDUCTORHEAD, PTD EPT02
DS DS DS DSFALSE DOWNSPOUT ANDFALSE CONDUCTORHEAD, PTD EPT02
SNOWGUARDS, REFERTO ROOF PLANS
BRICKH.M. DOOR,EPT01
CAST STONE MEDALLION
CJCJCJCJCJCJ
CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ
CJ
16
1A6.11____________
1.9
BI-DIRECTIONALWALL SCONCE, TYP.REF: ELEC.
EQ EQ
PCP02
PCP01
PCP02
PCP01
B.O. SHELF ANGLE
LEVEL 01 - GROUND
100' - 0"
LOW ROOF
121' - 4"
HIGH ROOF
185' - 0"
2A6.01____________ 3
A6.01____________1
A6.13____________ 4
A6.12____________ 3
A6.12____________4
A6.13____________
C D E F G H J K L M N P Q R3
A6.13____________ 5
A6.12____________
3' - 10"3' - 0"
OVERHEADCOILING DOOR
H.M. DOOR, EPT01
BRICK
SINGLE PLYMEMBRANE ROOF
SNOWGUARDS, REFERTO ROOF PLAN
8"18
' - 8"
CJCJ
CJCJ
CJCJ
CJ CJCJ CJ
CJ CJ
CJ
CJ
CJ CJ CJ CJCJ CJ
CJ CJ
CJCJ
CJCJ
CJ
CJ
CJ
CJ
E.1 E.9 M.1 M.9
44' - 0"
PCP02
PCP01
PCP02
PCP01
BRICK
B.O. SHELF ANGLE B.O. SHELF ANGLE
23' - 4"
LEVEL 01 - GROUND
100' - 0"
LOW ROOF
121' - 4"
HIGH ROOF
185' - 0"
1A6.10____________2
A6.10____________
2A6.11____________
7A6.10____________
ACDEFGHJKLMNPQR
8A6.10____________
3A6.10____________
6A6.10____________
31' - 0" 4' - 0" 28' - 0" 4' - 0" 28' - 0" 4' - 0" 28' - 0" 4' - 0" 28' - 0" 4' - 0" 28' - 0" 4' - 0"3' - 10" 3' - 8 5/8"
2' - 0" 28' - 0" 4' - 0" 28' - 0" 4' - 0" 28' - 0" 4' - 0" 28' - 0" 4' - 0" 57' - 0" 6' - 0"
C.9D.4G.1G.9H.9K.5Q.1 B.4
4A6.10____________
CLAY TILEROOFING SYSTEM
SINGLE PLYMEMBRANE ROOF
PCP01PC01
CURTAIN WALLBRICK
CAST STONE MEDALLION
CJCJ
CJCJ
CJ CJCJ CJ
CJ CJCJ CJ
CJ
CJ
CJ
CJ CJ CJ CJCJ CJ
CJCJ
CJ
CJ
_______1A6.22
_______2A5.21
_______1A5.23
BI-DIRECTIONALWALL SCONCE, TYP.REF: ELEC.
8' - 0"
H.5
44' - 0"
CJ
CJ
_______10A5.23
LEVEL 01 - GROUND
100' - 0"
LOW ROOF
121' - 4"
HIGH ROOF
185' - 0"
4A6.11____________
7A6.11____________8
A6.11____________1
A6.12____________ 6
A6.11____________
456789101112131415
5A6.11____________
2A6.12____________
3.2 0.8
DS DS
SINGLE PLY MEMBRANE ROOF
SNOWGUARDS, REFER TOROOF PLANS FORADDITIONAL INFORMATION
CURTAIN WALL
BRICK
GFRC SURROUND
CLAY TILE ROOF
CLAY TILE ROOF
ALUMINUM VERTICAL LIFT OVERHEADSECTIONAL DOOR W/ EGL02 GLAZEDPANELS (5 DOORS ON THIS ELEVATION)
CURTAIN WALLOVERHEADCOILING DOOR
H.M. DOOR, EPT 01
GUTTER W/ HEAT TRACINGCJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ
CJ
CJCJCJ
16
5A6.10____________
1.9
3A6.11____________
_______2A5.23
BI-DIRECTIONALWALL SCONCE, TYP.REF: ELEC.
10' - 0"
EQ EQ
44' - 0"
44' - 0"
PCP02
PCP01
H.M. DOOR, EPT 01 _______11A5.23
2A6.13____________
B.O. SHELF ANGLE
23' - 4"
Drawing North
5420 LBJ FreewaySuite 1100Dallas, TX 75240Telephone 214.276.1500Facsimile 217.273.1505
Date Description
Seal/Signature
Project Name
Project Number
Description
Scale
2015 Gensler
Civil Engineering
JQ ENGINEERING100 Glass St.Dallas, TX 75207Telephone 214.752.9098
MEP Engineering
SSR2995 Sidco Dr.Nashville, TN 37204Telephone 615.353.1113
Structural Engineering
ROGERS MOORE17950 Preston Rd.Suite 950Dallas, TX 75252Telephone 214.420.0110
Assoc. MEP Engineering
CHAMBERS ENGINEERING5501 Spur 327Lubbock, TX 79424Telephone 806.867.9999
Landscape Architecture
PRAIRIE WORKSHOPPO Box 93583Lubbock, TX 79493Telephone 806.773.1508
AV/Security/IT/Data
WJHW3424 Midcourt RdSuite 124Carrolton, TX 75006Telephone 972.934.1700
Code Consultant
FP&C CONSULTANTS3770 BroadwayKansas City, MO 64111Telephone 816.931.3377
Food Services
CARUSO & ASSOC.8055 East Tuffs Ave.Suite 1320Denver, CO 80237Telephone 303.649.1600
ADA Consultant
ED ROETHER CONSULTING25950 Mission BelleviewLouisburg, KS 66053Telephone 913.549.6479
BOX 42014LUBBOCK, TX 79409
1 2
34
6/19/2015 Schematic Design
8/21/2015 Design Development
11/20/2015 25% CD Set
2/4/2016 90% CD Set
2/5/2016 DEMO/MASS EX
3/4/2016 STRUCT. PKG.
4/6/2016 CD Set
1/16" = 1'-0"
A5.10
OVERALL ELEVATIONS
27.6923.000
Texas Tech SportsPerformance Center
TEXAS TECH FACILITIESPLANNING & CONSTRUCTION
SCALE: 1/16" = 1'-0"
BUILDING ELEVATION - WEST4
SCALE: 1/16" = 1'-0"
BUILDING ELEVATION - SOUTH3
SCALE: 1/16" = 1'-0"
BUILDING ELEVATION - NORTH1
SCALE: 1/16" = 1'-0"
BUILDING ELEVATION - EAST2
4.6.2016
Universal Signs by Barbara Grygutis, located outside of the stadiums west entrance.
Masked Rider by Grant Speed, located to the west of the stadium.
Murals by Mike Mandel: Four Positions, Half Time Show, Team Spirit, The Masked Rider, located on the west side of the stadium
Visions of the Matador Song by Kenneth Pirtle, located on the east side of the stadium
SPC RFQ AttachmentsSlide Number 1Slide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9
A5.02 Overall Exterior ViewsA5.10 Exterior ElevationsSPC RFQ AttachmentsTU SPC - CD Landscape Plans Issued 4-6-16