BOARD OF EDUCATION Office of Capital Programs
440 North Broad Street, 3rd Floor – Suite 371 Philadelphia, PA 19130
TELEPHONE: (215) 400-4730
Page 1 of 6
Addendum No. 2
Subject: Duckrey Flood Remediation: B-075C, B-076C, B-077C, and B-087C OF 2018/2019 Location: Duckrey Elementary School This Addendum, dated April 22, 2020, shall modify and become part of the Bid Documents. Any items not mentioned herein, or affected by, shall remain strictly in accordance with the original document. 1.VIRTUAL WALK THROUGH See the following link: https:/aec.cintoo.com/0C192F17380D29143C38 2. BID SUBMISSION AND VIDEO BID OPENING Due to restrictions in place for COVID-19 by Governor Wolf’s “stay at home” order including
practicing personal distancing the School District has decided to conduct the opening of the bids virtually through a live stream until further notice. (a) BID SUBMISSION: Fully executed original copies of the complete required bid proposals will be delivered to the address below. The School District of Philadelphia 15th Street Entrance (15th and Hamilton) Philadelphia, PA 19130-4015
From 1:00 p.m. to 2:00 p.m. on Tuesday, April 28, 2020. NOTE: Bidders are required to comply with social distancing and other CDC and Department of Health mitigation measures when delivering bids. (b) VIDEO BID OPENING: All proposals received will be opened and read aloud by live video stream at 2:30 p.m.
Addendum No. 2 (cont’d)
Page 2 of 6
The link to the video bid opening is: Join Zoom Meeting https://zoom.us/j/92485775356?pwd=SVRoN1h4SFhNbStqZWJjajFFOW1rZz09 Meeting ID: 924 8577 5356 Password: 7c86Vi
3. REVISED ELECTRICAL BID PROPOSAL FORM: Bidders for Electrical Construction must use the attached Revised Bid Proposal Form, which includes new unit price items. 4. QUESTIONS AND ANSWERS 1. Question:
Note no. 20 on drawing EP-001 states that “all areas of this contract are considered corrosive” and calls for the use of all PVC coated “conduit, supports, fittings” and the use of stainless steel hardware in all such areas. Please confirm that this is the intent of the design. If so, please revise conduit and hardware specifications to include all stainless steel hardware and replace RGS conduit with PVC Coated RGS. Response: PVC Coating is not required. Note 20 has been deleted from EP-001.
2. Question: Specification section 260528 calls for the use of SS-316 hardware and PVC Coated U Channel in multiple areas applicable to this project. Please note that SS-316 hardware is, on average, 30% more expensive than standard SS-304. The use of the SS-316 hardware along with PVC coated U Channel will significantly increase the cost of the electrical construction. Please confirm that the materials are specified correctly. Response: Provide 316 Stainless Steel hardware per specification section 26 0528.
3. Question: Specification section 260533 calls for the use of RGS conduit for the entire project. Is the EMT conduit allowed?
Response: Refer to electrical drawings for application of RGS conduit. All conduits in Electrical Rooms, Boiler Rooms, and Mechanical Rooms shall be galvanized rigid steel. EMT conduit will only be considered for substitution in lieu of RGS if not subjectable to physical damage and not specifically noted to be RGS or other type of conduit.
4. Question: Can MTU generators be an approved manufacturer for the emergency generator? This generator manufacturer is currently in use in numerous schools.
Response: No substitutions will be evaluated during bidding. Refer to the General Conditions and Supplementary Conditions.
5. Question Is there a section 26 3600 Transfer Switches available?
Addendum No. 2 (cont’d)
Page 3 of 6
Response: See attached Specification Section 26 3600.
6. Question Drawing E-001 as well as other E series drawings did not print out correctly as the symbols were distorted. Please re-issue the drawings in a PDF format.
Response: See attached resubmission of “E” Series Drawings.
7. Question: Please confirm that all conduits in the boiler room and mechanical rooms are required to be galvanized rigid steel.
Response:
Refer to question #3. 8. Question:
Drawing E-105 #2 Partial Single Line: Should the power wiring from the emergency generator be “4 #1 and a #6 ground?”
Response: Power wiring from the generator shall be 4#1 + 1#6 GND
9. Question
Can SDP re-issue Electrical Drawings? From the download link provided on the School District website it appears to be corrupted.
Response: See attached re-issued Electrical Drawings.
10. Question
Is it the designer's intent to provide a new BAS for the building or only the new mechanical equipment? If only the new equipment, is it stand alone or tied to a network? I don't see any notes mentioning an existing BAS system that new controls would tie to. What is controlling the HVAC equipment serving occupied spaces? There must be some way to coordinate the operating mode (summer/winter) of the terminal equipment with the main supply, and for schedules, setbacks, etc.
Response: No Building Automation System (BAS) currently exists and the scope of this work will not include a BAS. All equipment provided by the Mechanical Contractor per this scope of work will be standalone, unitary equipment. Provide future BAS connectivity capability on the new Chiller per Specification Section 23 6426 2.07 D.
11. Question
Will school be in session or occupied during construction? Response: We currently anticipate that school will resume as scheduled at the end of August.
12. Question
Drawing EP-102, Keyed Work Note #10: What size conduit for data entrance? Where is the Verizon equipment located. Response:
Addendum No. 2 (cont’d)
Page 4 of 6
Provide one (1) 4” Conduit for Verizon Service. Provide a unit price for 300 linear feet of 4” Conduit. Coordinate routing with SDP Construction Manager, Verizon, and SDP IT Group. See Unit Price No 1 on Revised Electrical Bid Proposal Form,
13. Question
EP-102, Keyed New Work Note #22: What is the starter/disconnect on the west wall adjacent to Panels PB-1 & PB-2 feeding? Response: Boiler Room exhaust fan. Refer to M-102.
14. Question Drawing EP-102, Keyed New Work Note #26: What are the two VFDs on the south wall feeding? Response: HHWP-1 & HHWP-2. Refer to M-102.
15. Question EP-402: What does “Feeder Legend #9” on single line feed. Response: Refer to revised drawing EP-402.
16. Question Drawing EP-202, Key Note #3: What is the required amperage for the safety switches feeding the passenger and freight elevators? Response: 110A Minimum.
17. Question Drawing EP-402, Feeder Legend: What is the 4th current carrying conductor used for and where do we connect? Response: Refer to revised EP-402.
18. Question All Drawings: Can you provide electrical drawings showing the mechanical equipment disconnect? L&I requires all electrical devices shown on the “E” drawings and not buried on the mechanical drawings. Which contractor is required for load side wiring of disconnects to mechanical equipment? Response: Permit drawings will be coordinated with the awarded contractors. The electrical contractor is responsible for load side wire and conduit.
19. Question Drawing EP-104, Key Notes 8,9,10: Where do data wires terminate? Do you have a location of the IT closet in the building? Response: Provide CAT6 cable, conduit, and raceways per drawing notes. Provide 6,500 linear Provide two hundred (200) linear feet of 1” conduit for data drops. Provide three hundred (300) linear feet of 2x2x10 cable tray for data drops. Coordinate termination of CAT6 cable with SDP IT Group and SDP Construction Manager. ee Unit Prices 2, 3, and 4 on Revised Electrical Bid Proposal Form.
Addendum No. 2 (cont’d)
Page 5 of 6
20. Question Drawing EP-104, EP-301 & M-601. Does DWP-1A & 1B come with a control panel or VFDs? I cannot locate this piece of equipment on Drawing M-601. Circuit calls for three #10 wires to be connected to a 50 amp, one pole circuit breaker. Is this correct? Response: Integral control panel provided with the pump skid. Refer to P-104 and P-501. Refer to revised EP-301
5. SPECIFICATIONS CHANGES ADD the following Specification Sections to the Contract Documents. 26 3600 Transfer Switches 6. DRAWING CHANGES REVISE the following Drawings. EP-001
• DELETE General Note #20.
EP-102 • REVISE DELETE Keynote #18. • DELETE Keynote #27. • Keynote #10 to “PROVIDE ONE (1) 4” CONDUIT FOR VERIZON SERVICE. PROVIDE A UNIT
PRICE FOR THREE HUNDRED (300) LINEAR FEET OF 4” CONDUIT. COORDINATE ROUTING WITH SDP CONSTRUCTION MANAGER, VERIZON, AND SDP IT GROUP.”
EP-104 • ADD Keynote #13 near northwest exit door: “INSTALL NEW EMERGENCY STOP SWITCH
FOR THE BOILER, FURNISHED BY MECHANICAL CONTRACTOR. REFERENCE DETAIL 4/EP-301.
• ADD Keynote #14 near northwest exit door: “INSTALL NEW EMERGENCY STOP SWITCH FOR THE CHILLER FURNISHED BY MECHANICAL CONTRACTOR.”
• ADD General Note #5: “PROVIDE SIX THOUSAND FIVE HUNDRED (6,500) LINEAR FEET OF CAT6 CABLE FOR DATA DROPS. PROVIDE TWO HUNDRED (200) LINEAR FEET OF 1" CONDUIT FOR DATA DROPS. PROVIDE THREE HUNDRED (300) LINEAR FEET OF 2x2x10 CABLE TRAY FOR DATA DROPS. COORDINATE TERMINATION OF CAT6 CABLE WITH SDP IT GROUP AND SDP CONSTRUCTION MANAGER.”
EP-202 • REVISE Keynote #6 from “PROVIDE TELEPHONE CONNECTION AT ELEVATOR MACHINE
ROOM…” TO “PROVIDE TELEPHONE CONNECTION AT ELEVATOR CONTOLLER…”
EP-301 • ADD Circuit 57 to NEW PANEL PB1 Schedule. • REVISE PB2 25/27/29 and 26/28/30 pole requirements.
EP-401 • ADD clarification notes. See attached drawing.
Addendum No. 2 (cont’d)
Page 6 of 6
EP-402 • ADD clarification notes. See attached drawing.
“E” Series • REISSUED to correct formatting corruption.
END OF ADDENDUM #2
ATTACHMENTS: Revised Electrical Bid Form, 6 pages Added Specifications and Revised Drawings, 28 pages
BID PROPOSAL FORM-ELECTRICAL (Rev) Page 1 of 6
BID PROPOSAL FORM (Revised) FLOOD REMEDIATION
DR. TANNER G. DUCKREY ELEMENTARY SCHOOL
Contract No. B-077C of 2018/19 Electrical Construction
TO: The School District of Philadelphia OWNER Board of Education Office of Capital Programs ADDRESS
The School District of Philadelphia 440 North Broad Street Third Floor - Suite 371 Philadelphia, PA 19130-4015
FROM: __________________________________________ CONTRACTOR
__________________________________________ ADDRESS __________________________________________ __________________________________________ CITY/STATE __________________________________________ CONTACT NAME __________________________________________ PHONE NO.
BASE CONTRACT PROPOSAL:
1. Having become completely familiar with the local conditions affecting the cost of Work at the place where Work is to be executed, and having carefully examined the site conditions as they currently exist, and having carefully examined the Bidding and Contract Documents prepared for this project, together with any Addenda to such Bidding and Contract Documents as listed hereinafter, the Undersigned hereby proposes and agrees to provide all labor, materials, plant, equipment, transportation and other facilities as necessary and/or required to execute all of the Work described by the Contract Documents for the lump sum consideration of: ________________________________________ __________Dollars ($______________), said amount being hereinafter referred to as the Base Proposal Amount. Base proposal Amount includes any Allowances, Alternates or Unit Price Items listed below, if applicable.
BID PROPOSAL FORM-ELECTRICAL (Rev) Page 2 of 6
ALLOWANCES: ALLOWANCE NO.1- This Allowance is for PECO work described in Section 01 1000 Summary of Work and shown on the Electrical Drawings, to be paid in accordance with Section 01 1650 ALLOWANCES.
AMOUNT OF ALLOWANCE INCLUDED IN BASE BID: $25,000.
BID ALTERNATES (Not applicable to this Contract – No Alternates)
UNIT PRICES:
UNIT PRICE NO. 1: 4” CONDUIT FOR VERIZON SERVICE 1. Provide one (1) 4” Conduit for Verizon Service. Provide a unit price for 300 linear feet of 4” Conduit per Keyed Note # 10 on Drawing EP-102. Coordinate routing with SDP Construction Manager, Verizon, and SDP IT Group. 2. Unit of Measurement: per linear foot (LF) 3. Payment: Payment to be made for the actual quantities in accordance with Section 01 1600-UNIT PRICES. 4. Estimated Quantity included in Base Bid: 300 LF 5. Unit Price Calculation (to be included in Base Bid Amount): 300 LF @ $ per LF = $ Total* *This amount included in Base Bid Amount
UNIT PRICE NO. 2: CAT 6 CABLE 1. Provide 6,500 linear of CAT 6 Cable per Keynotes 8, 9 and 10 on Drawing EP-104. Coordinate termination of CAT6 cable with SDP IT Group and SDP Construction Manager. 2. Unit of Measurement: per Linear Foot (LF) 3. Payment: Payment to be made for the actual quantities in accordance with Section 01 1600-UNIT PRICES. 4. Estimated Quantity included in Base Bid: 6,500 LF 5. Unit Price Calculation (to be included in Base Bid Amount): 6,500 LF @ $ per LF =
BID PROPOSAL FORM-ELECTRICAL (Rev) Page 3 of 6
$ Total* *This amount included in Base Bid Amount
UNIT PRICE NO. 3: 1” CONDUIT FOR DATA DROPS 1. Provide two hundred (200) linear feet of 1” conduit for data drops per Keynotes 8, 9 and 10 on Drawing EP-104. Coordinate termination of CAT6 cable with SDP IT Group and SDP Construction Manager. 2. Unit of Measurement: per linear foot (LF) 3. Payment: Payment to be made for the actual quantities in accordance with Section 01 1600-UNIT PRICES. 4. Estimated Quantity included in Base Bid: 200 LF 5. Unit Price Calculation (to be included in Base Bid Amount): 200 LF @ $ per LF = $ Total* *This amount included in Base Bid Amount UNIT PRICE NO. 4: CABLE TRAY FOR DATA DROPS 1. Provide three hundred (300) linear feet of 2x2x10 cable tray for data drops per Keynotes 8, 9 and 10 on Drawing EP-104.. Coordinate termination of CAT6 cable with SDP IT Group and SDP Construction Manager. 2. Unit of Measurement: per linear foot (LF) 3. Payment: Payment to be made for the actual quantities in accordance with Section 01 1600-UNIT PRICES. 4. Estimated Quantity included in Base Bid: 300 LF 5. Unit Price Calculation (to be included in Base Bid Amount): 300 LF @ $ per LF = $ Total* *This amount included in Base Bid Amount
BID PROPOSAL FORM-ELECTRICAL (Rev) Page 4 of 6
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDA:
2. The Undersigned acknowledges receipt of the following Addenda (list by
number and date appearing on Addenda): Addendum No. Date Addendum No. Date ____________ ___________ ______________ _________ ____________ ___________ ______________ _________ ____________ ___________ ______________ _________ ____________ ___________ ______________ _________ TIME OF COMPLETION:
3. The Undersigned agrees to Substantially Complete all Work under this Contract within the time periods specified in Division 1, General Requirements, Section 00 1300 entitled “Time of Completion, Milestones and Phasing or Sequencing Requirements”. INSURANCE:
4. All Bidders are instructed to refer to Article GC-11 of the General Conditions. All Contractors or Subcontractors bidding Work on the Project shall include in their bids the costs of Workers Compensation and Employer’s Liability Insurance, Commercial General Liability Insurance, Automobile Liability Insurance, Excess Umbrella Liability Insurance (Commercial Umbrella Liability Insurance) and any other types of insurance identified in Division 1- General Requirements, Section 01200 (or 01 1200) entitled “ Special Insurance Requirements”. LIQUIDATED DAMAGES:
5. Upon failure by the Contractor to achieve Substantial Completion within the time specified in Article GC-8 of the General Conditions from the Date of Commencement as set forth in the Notice to Proceed, the Contractor shall pay to the School District, as liquidated damages and not as a penalty, the sum of One Thousand Dollars ($1,000.00) per day for each consecutive calendar day of delay until such time as Substantial Completion of the Work is achieved.
BID PROPOSAL FORM-ELECTRICAL (Rev) Page 5 of 6
6. In addition, the Contractor shall be responsible for and pay for the cost of completion of construction of the Work, as well as for any and all additional charges of the School District, Architect/Engineer, other Project Contractors, and any other Consultants to the School District relating to the Contractor's failure to achieve Substantial Completion on a timely basis, including, but not limited to, delay damages, disruption damages, acceleration costs or expenses, investigative expenses, consulting fees, experts’ fees, and attorneys’ fees.
7. The Contractor and the School District agree that the amounts so fixed herein as liquidated damages are reasonable forecasts of just compensation for the harm that will be caused to the School District by the Contractor's breach. GENERAL STATEMENT:
8. The Undersigned declares that the person or persons signing this Proposal is/are fully authorized to sign on behalf of the firm listed and to fully bind the firm listed to all the Proposal's conditions and provisions thereof.
9. It is agreed that the Undersigned has complied or will comply with all requirements of local, state, and federal laws, and that no legal requirement has been or will be violated in making or accepting this Proposal, in awarding the Contract to it and/or in prosecution of the Work.
10. Bid Security in the amount of ten percent (10%) of the Base Bid, plus all additive Alternates Proposal amounts, is attached hereto and made a part hereof, without endorsement, in the sum of __________________ Dollars ($_________________), which shall become the property of the School District in the event the Contract and Performance Bond and Labor and Materialmen's Bond are not executed within the time set forth, as liquidated damages.
11. The Undersigned further agrees within five (5) calendar days from date of Notice of Acceptance of this Proposal or Contract award, to sign and deliver to the School District, all required copies of the School District/Contractor Agreement, the Performance Bond, the Labor and Materialmen's Bond, and the Maintenance Bond, in the forms included in the Bidding Documents, and the policies of insurance or insurance certificates as required by the General Conditions. In case the undersigned fails or neglects to deliver within the specified time the School District/Contractor Agreement, the Performance Bond, the Labor and Materialmen's Bond, and the Maintenance Bond, and the insurance policies or certificates, all as aforesaid, the undersigned shall be considered as having abandoned the Contract, and the Bid Bond accompanying this Proposal shall be forfeited to the School District by reason of such failure on the part of the undersigned, as liquidated damages and not as a penalty.
12. The Undersigned further agrees that the Bid Security may be retained by the School District and shall remain with the School District until the School
BID PROPOSAL FORM-ELECTRICAL (Rev) Page 6 of 6
District/Contractor Agreement has been signed and delivered to the School District and the Performance Bond, the Labor and Materialmen's Bond, and the Maintenance Bond, and insurance policies or certificates have been made and delivered to the School District. Respectfully submitted this _____day of ____________, 201_.
Individual Proprietorship or Partnership If Contractor is an individual proprietorship or is a partnership, sign here: __________________________ (Trade Name of Firm) By: _______________________ By: ______________________ (SEAL) (Witness) (Owner or Partner)
Corporation If Contractor is a corporation, sign here: ______________________________ (Name of Corporation) ATTEST: By: _______________________ By: ______________________ (SEAL) (Secretary or Treasurer) (President or Vice President) (CORPORATE SEAL) Signature by anyone other than the President or Vice President and the Secretary or Treasurer of the Corporation must be accompanied by a power of attorney, executed by the proper corporate officers under the corporate seal indicating authority to execute this Bid.
DR. TANNER G. DUCKREY ELEMENTARY SCHOOL - FLOOD REMEDIATION PROJECT SDP CONTRACT NO. B-075c, B-076c, B-077c and B-078c of 2018/2019
TRANSFER SWITCHES 26
3600 - 1
SECTION 26 3600
TRANSFER SWITCHES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes automatic transfer switches rated 600 V and less.
B. See Division 21 Section "Electric-Drive, Centrifugal Fire Pumps" for automatic transfer switches for fire pumps.
C. See Division 21 Section "Electric-Drive, Vertical-Turbine Fire Pumps" for automatic transfer switches for fire pumps.
1.2 SUBMITTALS
A. Product Data: Include rated capacities, weights, operating characteristics, furnished specialties, and accessories.
B. Shop Drawings: Dimensioned plans, elevations, sections, and details showing minimum clearances, conductor entry provisions, gutter space, installed features and devices, and material lists for each switch specified.
1. Dimensioned Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions.
2. Detailed description of equipment anchorage devices on which the certification is based.
C. Field quality-control test reports.
D. Operation and maintenance data.
1.3 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
B. Comply with NEMA ICS 1.
C. Comply with NFPA 70.
D. Comply with NFPA 99.
E. Comply with NFPA 110.
F. Comply with UL 1008 unless requirements of these Specifications are stricter.
DR. TANNER G. DUCKREY ELEMENTARY SCHOOL - FLOOD REMEDIATION PROJECT SDP CONTRACT NO. B-075c, B-076c, B-077c and B-078c of 2018/2019
TRANSFER SWITCHES 26
3600 - 2
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Contactor Transfer Switches:
a. AC Data Systems, Inc. b. Caterpillar; Engine Div. c. Emerson; ASCO Power Technologies, LP. d. Generac Power Systems, Inc. e. GE Zenith Controls. f. Kohler Power Systems; Generator Division. g. Onan/Cummins Power Generation; Industrial Business Group. h. Russelectric, Inc. i. Spectrum Detroit Diesel. j. Kato Light
2. Transfer Switches Using Molded-Case Switches or Circuit Breakers:
a. AC Data Systems, Inc. b. Eaton Electrical Inc.; Cutler-Hammer. c. GE Zenith Controls. d. Hubbell Industrial Controls, Inc. e. Lake Shore Electric Corporation. f. APC
2.2 GENERAL TRANSFER-SWITCH PRODUCT REQUIREMENTS
A. Indicated Current Ratings: Apply as defined in UL 1008 for continuous loading and total system transfer, including tungsten filament lamp loads not exceeding 30 percent of switch ampere rating, unless otherwise indicated.
B. Tested Fault-Current Closing and Withstand Ratings: Adequate for duty imposed by protective devices at installation locations in Project under the fault conditions indicated, based on testing according to UL 1008.
1. Where transfer switch includes internal fault-current protection, rating of switch and trip unit combination shall exceed indicated fault-current value at installation location.
C. Solid-State Controls: Repetitive accuracy of all settings shall be plus or minus 2 percent or better over an operating temperature range of minus 20 to plus 70 deg C.
D. Resistance to Damage by Voltage Transients: Components shall meet or exceed voltage-surge withstand capability requirements when tested according to IEEE C62.41. Components shall meet or exceed voltage-impulse withstand test of NEMA ICS 1.
DR. TANNER G. DUCKREY ELEMENTARY SCHOOL - FLOOD REMEDIATION PROJECT SDP CONTRACT NO. B-075c, B-076c, B-077c and B-078c of 2018/2019
TRANSFER SWITCHES 26
3600 - 3
E. Electrical Operation: Accomplish by a nonfused, momentarily energized solenoid or electric-motor-operated mechanism, mechanically and electrically interlocked in both directions.
F. Switch Characteristics: Designed for continuous-duty repetitive transfer of full-rated current between active power sources.
1. Limitation: Switches using molded-case switches or circuit breakers or insulated-case circuit-breaker components are not acceptable.
2. Switch Action: Double throw; mechanically held in both directions. 3. Contacts: Silver composition or silver alloy for load-current switching. Conventional
automatic transfer-switch units, rated 225 A and higher, shall have separate arcing contacts.
G. Neutral Switching. Where four-pole switches are indicated, provide neutral pole switched simultaneously with phase poles.
H. Neutral Terminal: Solid and fully rated, unless otherwise indicated.
I. Oversize Neutral: Ampacity and switch rating of neutral path through units indicated for oversize neutral shall be double the nominal rating of circuit in which switch is installed.
J. Battery Charger: For generator starting batteries.
1. Float type rated 10 A. 2. Ammeter to display charging current. 3. Fused ac inputs and dc outputs.
K. Enclosures: General-purpose NEMA 250, Type 1, complying with NEMA ICS 6 and UL 508, unless otherwise indicated.
2.3 AUTOMATIC TRANSFER SWITCHES
A. Comply with Level 1 equipment according to NFPA 110.
B. Switching Arrangement: Double-throw type, incapable of pauses or intermediate position stops during normal functioning, unless otherwise indicated.
C. Signal-Before-Transfer Contacts: A set of normally open/normally closed dry contacts operates in advance of retransfer to normal source. Interval is adjustable from 1 to 30 seconds.
D. Transfer Switches Based on Molded-Case-Switch Components: Comply with NEMA AB 1, UL 489, and UL 869A.
E. In-Phase Monitor: Factory-wired, internal relay controls transfer so it occurs only when the two sources are synchronized in phase.
F. Motor Disconnect and Timing Relay: Controls designate starters so they disconnect motors before transfer and reconnect them selectively at an adjustable time interval after transfer. Time delay for reconnecting individual motor loads is adjustable between 1 and 60 seconds, and settings are as indicated.
DR. TANNER G. DUCKREY ELEMENTARY SCHOOL - FLOOD REMEDIATION PROJECT SDP CONTRACT NO. B-075c, B-076c, B-077c and B-078c of 2018/2019
TRANSFER SWITCHES 26
3600 - 4
G. Programmed Neutral Switch Position: Switch operator has a programmed neutral position arranged to provide a midpoint between the two working switch positions, with an intentional, time-controlled pause at midpoint during transfer.
H. Automatic Transfer-Switch Features:
1. Undervoltage Sensing for Each Phase of Normal Source: Sense low phase-to-ground voltage on each phase. Pickup voltage shall be adjustable from 85 to 100 percent of nominal, and dropout voltage is adjustable from 75 to 98 percent of pickup value. Factory set for pickup at 90 percent and dropout at 85 percent.
2. Adjustable Time Delay: For override of normal-source voltage sensing to delay transfer and engine start signals. Adjustable from zero to six seconds, and factory set for one second.
3. Voltage/Frequency Lockout Relay: Prevent premature transfer to generator. Pickup voltage shall be adjustable from 85 to 100 percent of nominal. Factory set for pickup at 90 percent. Pickup frequency shall be adjustable from 90 to 100 percent of nominal. Factory set for pickup at 95 percent.
4. Time Delay for Retransfer to Normal Source: Adjustable from 0 to 30 minutes, and factory set for 10 minutes to automatically defeat delay on loss of voltage or sustained undervoltage of emergency source, provided normal supply has been restored.
5. Test Switch: Simulate normal-source failure. 6. Switch-Position Pilot Lights: Indicate source to which load is connected. 7. Source-Available Indicating Lights: Supervise sources via transfer-switch normal- and
emergency-source sensing circuits.
a. Normal Power Supervision: Green light with nameplate engraved "Normal Source Available."
b. Emergency Power Supervision: Red light with nameplate engraved "Emergency Source Available."
8. Unassigned Auxiliary Contacts: Two normally open, single-pole, double-throw contacts for each switch position, rated 10 A at 240-V ac.
9. Transfer Override Switch: Overrides automatic retransfer control so automatic transfer switch will remain connected to emergency power source regardless of condition of normal source. Pilot light indicates override status.
10. Engine Starting Contacts: One isolated and normally closed, and one isolated and normally open; rated 10 A at 32-V dc minimum.
11. Engine Shutdown Contacts: Instantaneous; shall initiate shutdown sequence at remote engine-generator controls after retransfer of load to normal source.
12. Engine Shutdown Contacts: Time delay adjustable from zero to five minutes, and factory set for five minutes. Contacts shall initiate shutdown at remote engine-generator controls after retransfer of load to normal source.
13. Engine-Generator Exerciser: Solid-state, programmable-time switch starts engine generator and transfers load to it from normal source for a preset time, then retransfers and shuts down engine after a preset cool-down period. Initiates exercise cycle at preset intervals adjustable from 7 to 30 days. Running periods are adjustable from 10 to 30 minutes. Factory settings are for 7-day exercise cycle, 20-minute running period, and 5-minute cool-down period. Exerciser features include the following:
a. Exerciser Transfer Selector Switch: Permits selection of exercise with and without load transfer.
b. Push-button programming control with digital display of settings. c. Integral battery operation of time switch when normal control power is not
available.
DR. TANNER G. DUCKREY ELEMENTARY SCHOOL - FLOOD REMEDIATION PROJECT SDP CONTRACT NO. B-075c, B-076c, B-077c and B-078c of 2018/2019
TRANSFER SWITCHES 26
3600 - 5
2.4 SOURCE QUALITY CONTROL
A. Factory test and inspect components, assembled switches, and associated equipment. Ensure proper operation. Check transfer time and voltage, frequency, and time-delay settings for compliance with specified requirements. Perform dielectric strength test complying with NEMA ICS 1.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Design each fastener and support to carry load indicated by seismic requirements and according to seismic-restraint details. See Division 26 Section "Vibration and Seismic Controls for Electrical Systems."
B. Floor-Mounting Switch: Anchor to floor by bolting.
1. Concrete Bases: 4 inches (100 mm) high, reinforced, with chamfered edges. Extend base no more than 4 inches (100 mm) in all directions beyond the maximum dimensions of switch, unless otherwise indicated or unless required for seismic support. Construct concrete bases according to Division 26 Section "Hangers and Supports for Electrical Systems."
C. Identify components according to Division 26 Section "Identification for Electrical Systems."
D. Set field-adjustable intervals and delays, relays, and engine exerciser clock.
3.2 CONNECTIONS
A. Ground equipment according to Division 26 Section "Grounding and Bonding for Electrical Systems."
B. Connect wiring according to Division 26 Section "Low-Voltage Electrical Power Conductors and Cables."
3.3 FIELD QUALITY CONTROL
A. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust components, assemblies, and equipment installations, including connections. Report results in writing.
B. Perform tests and inspections and prepare test reports.
1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installation, including connections, and to assist in testing.
2. After installing equipment and after electrical circuitry has been energized, test for compliance with requirements.
3. Perform each visual and mechanical inspection and electrical test stated in NETA Acceptance Testing Specification. Certify compliance with test parameters.
DR. TANNER G. DUCKREY ELEMENTARY SCHOOL - FLOOD REMEDIATION PROJECT SDP CONTRACT NO. B-075c, B-076c, B-077c and B-078c of 2018/2019
TRANSFER SWITCHES 26
3600 - 6
4. Measure insulation resistance phase-to-phase and phase-to-ground with insulation-resistance tester. Use test voltages and procedure recommended by manufacturer. Comply with manufacturer's specified minimum resistance.
a. Check for electrical continuity of circuits and for short circuits. b. Inspect for physical damage, proper installation and connection, and integrity of
barriers, covers, and safety features. c. Verify that manual transfer warnings are properly placed. d. Perform manual transfer operation.
5. After energizing circuits, demonstrate interlocking sequence and operational function for each switch at least three times.
a. Simulate power failures of normal source to automatic transfer switches and of emergency source with normal source available.
b. Simulate loss of phase-to-ground voltage for each phase of normal source. c. Verify time-delay settings. d. Verify pickup and dropout voltages by data readout or inspection of control
settings. e. Perform contact-resistance test across main contacts and correct values
exceeding 500 microhms and values for 1 pole deviating by more than 50 percent from other poles.
f. Verify proper sequence and correct timing of automatic engine starting, transfer time delay, retransfer time delay on restoration of normal power, and engine cool-down and shutdown.
6. Ground-Fault Tests: Coordinate with testing of ground-fault protective devices for power delivery from both sources.
a. Verify grounding connections and locations and ratings of sensors.
C. Coordinate tests with tests of generator and run them concurrently.
D. Report results of tests and inspections in writing. Record adjustable relay settings and measured insulation and contact resistances and time delays. Attach a label or tag to each tested component indicating satisfactory completion of tests.
E. Remove and replace malfunctioning units and retest as specified above.
F. Infrared Scanning: After Substantial Completion, but not more than 60 days after Final Acceptance, perform an infrared scan of each switch. Remove all access panels so joints and connections are accessible to portable scanner.
1. Follow-up Infrared Scanning: Perform an additional follow-up infrared scan of each switch 11 months after date of Substantial Completion.
2. Instrument: Use an infrared scanning device designed to measure temperature or to detect significant deviations from normal values. Provide calibration record for device.
3. Record of Infrared Scanning: Prepare a certified report that identifies switches checked and that describes scanning results. Include notation of deficiencies detected, remedial action taken, and observations after remedial action.
DR. TANNER G. DUCKREY ELEMENTARY SCHOOL - FLOOD REMEDIATION PROJECT SDP CONTRACT NO. B-075c, B-076c, B-077c and B-078c of 2018/2019
TRANSFER SWITCHES 26
3600 - 7
3.4 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain transfer switches and related equipment as specified below. Refer to Division 01 Section "Demonstration and Training."
B. Coordinate this training with that for generator equipment.
END OF SECTION 263600
1. ALL ELECTRICAL WORK SHALL BE PROPERLY GROUNDED AND SHALL MEET ALL REQUIREMENTS OF THE APPLICABLE SECTION OF THE NATIONAL ELECTRICAL CODE (NEC) AND ANY AUTHORITIES HAVING JURISDICTION.
2. ALL WORK SHALL BE PERFORMED AS REQUIRED BY APPLICABLE SECTION OF THE NATIONAL ELECTRICAL CODE, LATEST EDITION, AND ALL GOVERNING LOCAL CODES, LAWS, AND/OR REGULATIONS.
3. FURNISH, INSTALL, TEST AND TURNOVER ALL ELECTRICAL EQUIPMENT, COMPONENTS, FITTINGS, DEVICES, WIRES, CABLES, RACEWAYS AND APPURTENANCES AS SHOWN ON THE DRAWINGS AND AS SPECIFIED. ANY REQUIRED ITEMS NOT SPECIFIED OR SHOWN SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL.
4. DRAWINGS ARE DIAGRAMMATIC IN NATURE, CONTRACTOR SHALL VERIFY DIMENSIONS PRIOR TO INSTALLATION. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER DIVISION TRADES TO PROVIDE A COMPLETE AND OPERABLE SYSTEM. CONTRACTOR SHALL COORDINATE LOCATION OF FIXTURES, DEVICES, ETC. WITH OTHER TRADES IN ORDER TO AVOID INTERFERENCES.
5. ARCHITECTURAL FEATURES SHOWN ON THESE DRAWINGS ARE FOR BACKGROUND INFORMATION ONLY. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR ACTUAL BUILDING CONSTRUCTION OF WALLS AND CURBS. REFER TO EQUIPMENT DRAWINGS FOR ACTUAL LOCATION OF EQUIPMENT.
6. ALL CIRCUITS SHALL CONTAIN A GROUND CONDUCTOR, WHETHER OR NOT IT IS INDICATED ON THE DRAWINGS.
7. EXACT CONDUIT STUB-UP LOCATIONS ARE TO BE DETERMINED BY THE ELECTRICAL CONTRACTOR BASED ON THE CERTIFIED MANUFACTURER'S DRAWINGS OF THE RESPECTIVE EQUIPMENT. CONDUITS SHALL BE INSTALLED TO AGREE WITH THE EQUIPMENT FURNISHED.
8. WALL & FLOOR PENETRATIONS SHALL BE BY THE ELECTRICAL CONTRACTOR. PROVIDE FIRESTOP AS REQUIRED FOR ALL PENETRATIONS MADE FOR ELECTRICAL WORK.
9. ANY ELECTRICAL CABLES, WIRING DEVICES, COMPONENTS OR APPURTENANCES THAT ARE NOT SHOWN OR SPECIFIED BUT ARE REQUIRED FOR PROPER OPERATION OF A SYSTEM, SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO PURCHASING.
10. PROVIDE CONDUIT SLEEVES AND SEALS FOR ALL CONDUITS PENETRATING FLOORS OR WALLS BELOW GRADE.
11. ALL POWER AND LIGHTING CONDUITS ARE SHOWN DIAGRAMATICALLY. EXACT RUNS SHALL BE DETERMINED BY THE ELECTRICAL CONTRACTOR IN THE FIELD, EXCEPT WHERE SPECIFICALLY DIMENSIONED ON PLANS. ALL CABLE, CONDUITS, PULL BOXES, JUNCTION BOXES AND SUPPORTING DEVICES SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICAL CONTRACTOR AS REQUIRED TO COMPLETE EACH RUN OF CONDUIT BASED ON FIELD CONDITIONS.
12. THE ELECTRICAL CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO PREPARING HIS BID IN ORDER TO FAMILIARIZE HIMSELF WITH DIFFICULTIES TO THIS PROJECT FROM THE STANDPOINT OF UNDERSTANDING ALL FIELD CONDITIONS. WHENEVER A CONFLICT OCCURS BETWEEN THE CONTRACT DRAWINGS, SPECIFICATIONS, AND THE REQUIREMENTS OF THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL BID ON THE MOST EXPENSIVE METHOD OF CONSTRUCTION AND WILL NOT BE ENTITLED TO AN EXTRA COST UNLESS MATERIALS OR EQUIPMENT NOT SHOWN ON THE DRAWINGS OR SPECIFICATIONS OR REQUIRED BY FIELD CONDITIONS MUST BE INSTALLED.
13. ALL EXPOSED CONDUIT SHALL BE RUN PARALLEL TO BUILDING WALLS AND BEAMS EXCEPT WHERE OTHERWISE SHOWN ON PLANS.
14. EXPOSED CONDUIT SHALL BE SUPPORTED FROM WALLS AND/OR CEILING BY APPROVED HANGERS OF ANGLE OR CHANNEL CONSTRUCTION.
15. EXPANSION FITTINGS OF THE APPROVED TYPE SHALL BE FURNISHED AND INSTALLED WHERE CONDUITS EXPOSED OR CONCEALED PASS THROUGH STRUCTURAL JOINTS.
16. ALL SINGLE PHASE POWER AND LIGHTING CONDUITS SHALL BE 3/4" WITH 2#12 AWG WIRE, UNLESS NOTED OTHERWISE. IN ADDITION, ALL SUCH CONDUITS SHALL CONTAIN A SEPARATE GROUND CONDUCTOR (SIZE AS REQ'D). ALL CONTROL WIRING SHALL BE A MINIMUM OF #16 AWG.
17. ALL 3 PHASE POWER CONDUITS SHALL BE 3/4" WITH 3#12 AWG WIRE UNLESS NOTED OTHERWISE. IN ADDITION, ALL SUCH CONDUITS SHALL CONTAIN A SEPARATE GROUND CONDUCTOR (SIZE AS REQUIRED).
18. ALL CIRCUIT PROTECTIVE DEVICES SHALL HAVE THE REQUIRED RATING INTERRUPTING CAPACITY EQUAL TO OR GREATER THAN THE AVAILABLESHORT-CIRCUIT CURRENT AT ITS SUPPLY TERMINAL; MINIMUM INTERRUPTING CAPACITY SHALL BE 10,000 AMPS, SYMMETRICAL A.I.C. FOR 120/240V SYSTEMS AND 14,000 AMPS, SYMMETRICAL A.I.C. FOR 277/480V SYSTEMS. REFER TO PANEL SCHEDULES FOR A.I.C. RATINGS.
19. IN GENERAL THE FOLLOWING MOUNTING DIMENSIONS ABOVE FINISHED FLOOR SHALL BE ADHERED TO UNLESS OTHERWISE NOTED ON PLANS OR SPECIFICATIONS:
LIGHTING SWITCHES, DISCONNECT SWITCHES AND MANUAL MOTOR STARTERS 4'-0".DIMENSION SHALL BE TAKEN AT THE HIGHEST POINT OF THE OPERATING HANDLE IN IT'S UPPERMOST POSITION.
20. NOT USED.
21. ALL OUTDOOR ENCLOSURES SHALL BE TYPE NEMA 4X STAINLESS STEEL.
22. ALL CONDUCTORS AND ALL BUSES ON THIS PROJECT SHALL BE COPPER.
23. ALL SWITCHES, CIRCUIT BREAKERS AND MCC CUBICLES SHALL BE INDENTIFIED VIA NAMEPLATE.
24. ALL ANCILLARY COMPONENTS SUCH AS AUXILIARY CONTACTS, CONTACTORS, RELAYS, COILS, TERMINAL BLOCKS, TIMERS, WIRES, ETC., SHALL BE FULLY RATED IN TERMS OF VOLTAGE, AMPERAGE, VA AND INSULATION RATINGS TO OPERATE CONTINUOUSLY AND UNDER ALL MAKE/BREAK CONDITIONS AS THEY ARE INSTALLED IN THEIR ASSOCIATED SYSTEM CONFIGURATIONS, WHETHER OR NOT ALL COMPONENTS ARE SHOWN OR SPECIFIED. ANY COMPONENT FOUND PRIOR TO OR DURING THE WARRANTY PERIOD TO BE INADEQUATELY RATED TO PERFORM ITS CONTROL FUNCTION, AS INSTALLED, SHALL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. THE INTENT OF THIS CLAUSE IS TO HOLD THE CONTRACTOR LIABLE FOR PROVIDING FULLY INTEGRATED SYSTEMS, MADE UP OF FULLY RATED COMPONENTS THAT WILL WORK TOGETHER RELIABLY. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, ANY ANCILLARY DEVICES DESIGNED TO FUNCTION INTEGRALLY WITHIN GIVEN LARGER COMPONENTS.
25. ALL DISTRIBUTION PANELS, POWER PANELS, LIGHTING PANELS, ETC., SHALL HAVE COPPER BUSSES, BOLT-ON CIRCUIT BREAKERS, AND MAIN AND FEEDER BREAKERS AS SHOWN ON PANELBOARD SCHEDULES.
26. THE SYMBOLS AND ABBREVIATIONS LISTED REPRESENT A COMPREHENSIVE STANDARD GUIDE INTENDED FOR GENERAL USE ON THE PROJECT. THEREFORE, NOT ALL OF THE SYMBOLS AND ABBREVIATIONS CONTAINED IN THIS LIST ARE NECESSARILY USED ON THIS PARTICULAR CONTRACT.
27. DARKENED & DASHED LINES INDICATE DEMOLITION AND REMOVAL BY ELECTRICAL CONTRACTOR.
28. WHEREVER THE INSTALLATION OF ELECTRICAL EQUIPMENT AS SHOWN ON THE DRAWINGS IS IMPRACTICAL DUE TO LOCAL INTERFERENCE OR OTHER REASONS, THE CONTRACTOR SHALL INSTALL THE EQUIPMENT AT NEW LOCATIONS AS DIRECTED BY THE ENGINEER, AT NO EXTRA COST, PROVIDED DISTANCES AND REQUIRED INSTALLATION EFFORT IS EQUIVALENT.
29. ALL 3 PHASE MOTOR STARTERS SHALL BE NEMA SIZE 1 MINIMUM.
30. UNDERGROUND ELECTRICAL DUCT BANKS SHALL BE REINFORCED AS INDICATED IN DRAWING DETAILS.
31. CONTRACTOR SHALL MOUNT DISCONNECT SWITCHES, MOTOR STARTERS AND PUMP CONTROL PANELS ON KINDORF CHANNEL STANDS WHERE REQUIRED.
32. ALL EXISTING ELECTRICAL EQUIPMENT AND ASSOCIATED WIRING AND CONDUITS INDICATED AS DEMOLITION WORK SHALL BE REMOVED ENTIRELY BACK TO THE SOURCE UNLESS OTHERWISE NOTED.
33. CONTRACTOR SHALL FURNISH AND INSTALL ALL ELECTRIC WIRE AND CABLE FOR ALL ELECTRICAL EQUIPMENT AND ALL INTERCONNECTING WIRES FOR COMPONENTS PROVIDED UNDER ALL SECTIONS OF THIS CONTRACT.
34. ALL WIRING SHALL BE INSTALLED IN CONDUIT UNLESS OTHERWISE NOTED. CONDUIT SHALL BE OF TYPE AND MATERIAL AS INDICATED IN THE SPECIFICATIONS.
35. THE CONTRACTOR SHALL ENSURE THAT NO MECHANICAL DUCTWORK OR PIPING IS LOCATED OVER ELECTRICAL PANELS.
GENERAL NOTES:
S
S4
SD
S
S3
S
T
S
SM
S T
MISCELLANEOUS:
CONDUIT FEEDERS & BRANCH CIRCUITS:
EMERGENCY BATTERY PACK FIXTURE WITH
TWO HEADS
REMOTE HEAD FOR EMERGENCY BATTERY
PACK UNIT
D
ACCESS/INTRUSION ALARM CONTROL PANEL
DOOR CONTACT
ACCESS KEYPAD
ACCESS CARD READER
ELECTRIC DOOR STRIKE
GATE RELEASE
REQUEST TO EXIT
CLOSED CIRCUIT TELEVISION CAMERA
ACR
KP
ACCESS CONTROL/INTRUSION ALARM:
COMMUNICATIONS:PANELBOARD-208/120V, 3-PHASE
PANELBOARD-480/277V, 3-PHASE
PANELBOARD-120/240V
CEILING SPEAKER
WALL MOUNTED SPEAKER
WALL MOUNTED DOUBLE SPEAKER
POLE MOUNTED SPEAKER
POLE MOUNTED DOUBLE SPEAKER
DATA OUTLET
TELEPHONE OUTLET
PAY TELEPHONE OUTLET
TELEPHONE TERMINAL CABINET
DESKTOP HAND SET
WALL MOUNTED HAND SET
TTC
D
AICP
P
S S
PANELBOARDS:
S
S
S
S
S
(NOTE: LETTER @ SYMBOL DENOTES FIXTURE TYPE, TYPICAL)
CEILING MOUNT 2x2 LED FIXTURE
CEILING MOUNT 2x4 LED FIXTURE
4' CEILING MOUNT LED FIXTURE
8' CEILING MOUNT LED FIXTURE
WALL MOUNT LED FIXTURE
LED LIGHT FIXTURE DEDICATED FOR
EMERGENCY/STANDBY ILLUMINATION
CEILING MOUNT LED FIXTURE
WALL MOUNT LED FIXTURE
LED SPOT/FLOOD LIGHT FIXTURE
WALL MOUNT LED SPOT/FLOOD LIGHT FIXTURE
LED LIGHT FIXTURE DEDICATED FOR
EMERGENCY/STANDBY ILLUMINATION
POLE STANDARD LIGHT FIXTURE (ONE LUMINAIRE INDICATED)
EXIT SIGN FIXTURE (SINGLE FACE UNIVERSAL MOUNT INDICATED)
EXIT SIGN FIXTURE W/DIRECTIONAL ARROWS (DOUBLE FACE UNIVERSAL
MOUNT INDICATED)
SWITCH, SINGLE POLE
SWITCH, 3-WAY
SWITCH, 4-WAY
SWITCH, DIMMER
DIRECTIONAL MOTION DETECTOR LIGHT CONTROL
MULTI-DIRECTIONAL MOTION DETECTOR LIGHT CONTROL
SPECIAL PURPOSE LIGHT SWITCH; DESCRIPTION OF
SWITCH WILL BE AS NOTED ON DRAWINGS
PHOTOELECTRIC CONTROL
LIGHTING CONTACTOR:
REPRESENTS LIGHTING CONTACTOR IDENTIFICATION
LIGHTING CONTACTOR REMOTE CONTROL:
REPRESENTS LIGHTING CONTACTOR TO BE CONTROLLED
EMERGENCY LIGHTING:
LC1
LC1
LIGHTING:
OHE
DENOTES MOUNTED 6" ABOVE COUNTER TOP
SINGLE RECEPTACLE
GROUND FAULT CIRCUIT INTERRUPTER
WEATHER RESISTANT RECEPTACLE W/IN-USE COVER (WET LOCATION)
DUPLEX RECEPTACLE, 20 AMP RATED
QUADRUPLEX RECEPTACLE
DUPLEX RECEPTACLE DEDICATED FOR EMERGENCY/STANDBY
POWER
SPECIAL PURPOSE RECEPTACLE (AMPACITY AS NOTED)
DUPLEX RECEPTACLE FLOOR MOUNTED
SPECIAL PURPOSE RECEPTACLE FLOOR MOUNTED (AMPACITY
AS NOTED)
PLUGMOLD DEVICE; LENGTH AND QUANTITY OF RECEPTACLES
AS NOTED
JUNCTION BOX
NON FUSED DISCONNECT SWITCH
FUSED DISCONNECT SWITCH
MOTOR STARTER
COMBINATION MOTOR STARTER
CONTACTOR
TIME CLOCK SWITCH CONTROL
TIME SWITCH
MANUAL MOTOR STARTER SWITCH WITHOUT OVERLOADS
MANUAL MOTOR STARTER SWITCH WITH THERMAL OVERLOADS
MANUAL MOTOR STARTER SWITCH WITHOUT OVERLOADS WITH
PILOT LIGHT
PUSHBUTTON STATION TYPE AS NOTED
MUSHROOM SWITCH
MOTOR (HORSEPOWER INDICATED ON PLANS)
TRANSFORMER
GENERATOR
MOTOR OPERATED DAMPER
THERMOSTAT
UNINTERRUPTIBLE POWER SUPPLY
SURGE PROTECTION DEVICE
UNIT HEATER
UPS
SPD
MOD
T
PB
J
TS
F
10
MH-x
HH-x
OHT
G
GENERAL POWER:
WP
C
T
E
E
C
CONDUIT - EXPOSED
CONDUIT - CONCEALED IN WALL OR CEILING
CONDUIT - EMBEDDED IN FLOOR OR EARTH
CONDUIT TURNED
CONDUIT TURNED UP
CONDUIT TURNED DOWN
CONDUIT CAPPED
CIRCUIT HOME RUN
CONDUIT FEEDER IDENTIFICATION
(SEE FEEDER LEGEND ON DRAWING)
CONDUIT FEEDER IDENTIFICATION
TYPICAL FEEDER WITH NO SIZE IDENTIFICATION....
BY DEFAULT; (2)#12, (1)#12 GRD-3/4"
CONDUIT FOR SINGLE PHASE CIRCUITS.
-OR-
BY DEFAULT; (3)#12, (1)#12 GRD-3/4"
CONDUIT FOR THREE PHASE CIRCUITS.
ALL OTHER FEEDERS WILL BE INDENTIFIED.
COMMUNICATION
ELECTRIC
ELECTRIC SERVICE/DUCTBANK-UNDERGROUND
TELEPHONE
OVERHEAD ELECTRIC
OVERHEAD TELEPHONE
GROUNDING
UTILITY POLE
HANDHOLE
MANHOLE
(3)#8, (1)#10 GRD-1"C.
JUNCTION BOX INDICATION; ON POWER AND LIGHTINGJUNCTION BOX SIZED IN ACCORDANCE WITH NATIONALELECTRICAL CODE
CONDUIT FEEDERS (TYP)
THIS DRAWING REFLECTS A GANNETT FLEMING STANDARD SYMBOL ANDABBREVIATIONS DRAWING. SYMBOLS AND ABBREVIATIONS ON THISDRAWING MAY OR MAY NOT REFLECT EVERY CONDITION OF THIS PROJECT.
REX
GR
ES
ABBREVIATIONS
A OR AMP AMPEREAFF/A.F.F. ABOVE FINISHED FLOORAIC AMPERE INTERRUPTING CAPACITYBMS BUILDING MANAGEMENT SYSTEMC./CND CONDUITCB CIRCUIT BREAKERCKT CIRCUITCTRL CONTROLDISC. DISCONNECTEC/E.C. ELECTRICAL CONTRACTORGND GROUNDIG ISOLATED GROUNDJB JUNCTION BOXKVA KILOVOLT AMPEREKW KILOWATTLCP LOCAL CONTROL PANELMF MAIN FUSENEC/N.E.C. NATIONAL ELECTRIC CODEPVC POLYVINAL CHLORIDE CONDUIT, SCHEDULE 40PH PHASESB SPLICE BOXSEB SERVICE ENTRANCE BOXSPD SURGE PROTECTION DEVICESW SWITCHSWBD SWITCHBOARDTYP/TYP. TYPICALUL UNDERWRITER LABORATORIESUON/U.O.N. UNLESS OTHERWISE NOTEDUPS UNINTERRUPTIBLE POWER SUPPLYV VOLTVFD VARIABLE FREQUENCY DRIVEW WIREWP WATERPROOFXFMR TRANSFORMER
GFCI
DATE
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,
PHILADELPHIA, PA 19121
PERMIT SET
25 MARCH 2020
ARCHITECTURAL
GANNETT FLEMING, INC.
ONE PENN PLAZA, SUITE 630
250 WEST 34TH STREET
NEW YORK, NY 10119
Phone: 212.967.9833
Fax: 212.232.5791
Email: [email protected]
Attn: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.
232 CECELIA ACRES DRIVE
IVYLAND, PA 18974
Phone: 215.354.9161
Fax: 215.354.9163
Email: [email protected]
Attn: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.
1010 ADAMS AVENUE
VALLEY FORGE, PA 19403
Phone: 610.650.8156
Fax: 610.650.8190
Email: [email protected]
Attn: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.
1801 MARKET STREET, SUITE 2600
PHILADELPHIA, PA 19103
Phone: 215.557.0106
Fax: 215.557.0337
Email: [email protected]
Attn: Mark D. DeCocinis, CEI
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)
www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
B-075c OF 2018/19B-076c OF 2018/19B-077c OF 2018/19B-087c OF 2018/19
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.
207 SENATE AVENUE
CAMP HILL, PA 17011
Phone: 717.763.7211
Fax: 717.763.8150
Email: [email protected]
Attn: Brian Seip, PE
SHEET OF
As indicated
ELECTRICAL POWERSYMBOLS, GENERAL NOTES
AND ABBREVIATIONS
Author CJG
EP-00149 58
1 4-17-2020 ADDENDUM 1
1
2
ADDENDUM #220 APRIL 2020
T
PB
PB
T
PB
PB
T
NEWPANEL'PB-1'
DTWP-2
CWP-2
CWP-1
DTWP-1
SP-1A
SP-1B
HHWP-1 HHWP-2
FOP-1A
CH-1
(E)WH
(TEMP)WH
(E)EF
B-1 B-2
GUH-1
CO NG
CKTS: PB2-1,3,5
CKTS: PB2-7,9,11
CKTS: PB2-13,15,17
CKTS: PB2-14,16,18
CKTS: PB2-8,10,12
CKTS: PB2-19,21,23
CKTS: PB2-20,22,24
CKTS: PB1-11
JOCKEY PUMPCKT: PB1-13
JOCKEY PUMPCKT: PB1-14
BOILER ROOM
TELECOM ROOM
FREIGHT ELEVATORMACHINE ROOM
FREIGHT ELEVATOR
CKTS: PB1-18,20,22
CKTS: PB1-12
CK
T: P
B1-2
8
CK
T: P
B1-1
0
CK
T: P
B1-9
NEWPANEL'PB-2'
CKTS: PB2-31,33,35
CKT: PB1-27GFCI
CKT: PB1-27
GFCI
CKT: PB1-27
GFCI
CKT: PB1-16
GFCI
CKT: PB1-38
CKT: PB1-40
GFCIGFCI
MOD
CKT: PB1-39
MBCP
CKT: SA (MAIN SWITCHBOARD)
CKT: PB1-27
CKT: PB1-27GFCI
CKT: PB1-27
GFCI
CKT: PB1-41
MODCKT: PB1-41
BOILER BURNERCKT: PB1-1,3,5
BOILER BURNERCKT: PB1-2,4,6
REFER TO SHEET EP-202 FOR ENLARGEDFREIGHT ELEVATOR NEW WORK PLAN.
FOP-1B
CK
T: P
B1-5
0
MCP
(BELOW)
(BELOW)
CKTS: PB1-17,19,21
DATE
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,
PHILADELPHIA, PA 19121
PERMIT SET
25 MARCH 2020
ARCHITECTURAL
GANNETT FLEMING, INC.
ONE PENN PLAZA, SUITE 630
250 WEST 34TH STREET
NEW YORK, NY 10119
Phone: 212.967.9833
Fax: 212.232.5791
Email: [email protected]
Attn: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.
232 CECELIA ACRES DRIVE
IVYLAND, PA 18974
Phone: 215.354.9161
Fax: 215.354.9163
Email: [email protected]
Attn: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.
1010 ADAMS AVENUE
VALLEY FORGE, PA 19403
Phone: 610.650.8156
Fax: 610.650.8190
Email: [email protected]
Attn: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.
1801 MARKET STREET, SUITE 2600
PHILADELPHIA, PA 19103
Phone: 215.557.0106
Fax: 215.557.0337
Email: [email protected]
Attn: Mark D. DeCocinis, CEI
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)
www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DIAMOND ST.N. 16
TH S
T.
N. 15
TH S
T.
N
KEYPLAN
B-075c OF 2018/19
B-076c OF 2018/19B-077c OF 2018/19
B-087c OF 2018/19
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.
207 SENATE AVENUE
CAMP HILL, PA 17011
Phone: 717.763.7211
Fax: 717.763.8150
Email: [email protected]
Attn: Brian Seip, PE
SHEET OF
1/4" = 1'-0"
ELECTRICAL POWERSUB-BASEMENT NEW WORK
PLAN
FJR CJG
EP-10251 58
SCALE: 1/4" = 1'-0"
ELECTRICAL SUB-BASEMENT NEW WORK PLAN1
KEYED NEW WORK NOTES
NEW DUPLEX SUMP PUMP CONTROL PANEL.
NEW DUAL TEMPERATURE PUMPS.
NEW CONDENSER WATER PUMPS.
NEW HEATING HOT WATER PUMPS.
NEW DUPLEX FUEL OIL PUMPSET CONTROL PANEL (BELOW).
NEW WATER-COOLED CHILLER.
NEW PANELBOARDS 'PB1' & 'PB2'. REFER TO PANEL SCHEDULES AND ONE-LINE DIAGRAM.
PROVIDE NEW ELEVATOR CIRCUIT. PROVIDE CONDUIT AND WIRING FROM NEW PANEL.
PROVIDE NEW GFCI RECEPTACLE, WIRING AND CONDUIT.
PROVIDE RACEWAY BETWEEN BUILDING ENTRANCE AND LOCATION OF VERIZON'S EQUIPMENT.
NOT USED.
NEW GAS-FIRED UNIT HEATER.
NEW BOILER BURNER.
NEW FUEL OIL JOCKEY PUMP.
NEW BOILER CONTROL PANEL.
NEW REFRIGERANT DETECTION PANEL.
NEW GAS DETECTOR PANEL.
NOT USED.
NEW TEMPORARY WATER HEATER.
NEW DOMESTIC HOT WATER CIRCULATOR.
NEW COMBUSTION AIR MOTOR OPERATED DAMPER.
COMBINATION MOTOR STARTER/ DISCONNECT SWITCH, FURNISHED BY MECHANICAL CONTRACTOR, INSTALLED AND WIRED BY EC.
WIRE SUMP PUMPS SP-1A & SP-1B TO DUPLEX SUMP PUMP CONTROL PANEL.
WIRE FUEL OIL PUMPS FOP-1A & FOP-1B TO DUPLEX FUEL OIL PUMP CONTROL PANEL.
PROVIDE NEW QUAD RECEPTACLE, WIRING AND CONDUIT.
VARIABLE FREQUENCY DRIVE (VFD), FURNISHED BY MECHANICAL CONTRACTOR, INSTALLED AND WIRED BY EC.
1
GENERAL NOTES:
1. REFER TO CONCEPTUAL FIRE ALARM LAYOUTS ON DRAWING E-204 FOR ADDITIONAL INFORMATION ON FIRE ALARM DEVICE LOCATIONS AND REQUIRED OPERATION OF THE FIRE ALARM SYSTEM IN CONJUNCTION WITH ELEVATOR OPERATIONS.
2. SEE DRAWING EP-001 FOR SYMBOLS, ABBREVIATIONS AND GENERAL NOTES.
3. INSTALL ALL DISCONNECT SWITCHES AND MOTOR STARTERS FURNISHED BY MECHANICAL CONTRACTOR. PROVIDE WIRING AND CONDUIT THROUGH DISCONNECT SWITCHES AND MOTOR STARTERS TO EQUIPMENT.
4. PERFORM SHORT CIRCUIT COORDINATION AND ARC FLASH STUDIES. FURNISH REPORT TO OWNER.
2
3
4
5
8
10
9
26
4 4
6
9
2
3
3
2
1
7
12
5
6
7
8
9
10
11
12
21
21
19
20
16
9
9
13
14
15
16
17
18
19
20
21
18
15 15 15
13 13
14 14
18
26
22
26
26
26
26
17
99
25
23
24
24
24
25
23 23
22
22
22 2222 22
26
27
27
15
9
22
1
1
1
1 4-17-2020ADDENDUM 1 MOVED ITEMS TO ANOTHER SHEET1 4-17-2020 ADDENDUM 1 2
ADDENDUM #220 APRIL 2020
PROVIDE ONE (1) 4” CONDUIT FOR VERIZON SERVICE. PROVIDE A UNITPRICE FOR THREE HUNDRED (300) LINEAR FEET OF 4” CONDUIT.COORDINATE ROUTING WITH SDP CONSTRUCTION MANAGER,VERIZON, AND SDP IT GROUP.VERIZON'S EQUIPMENT.
NOT USED.
NEW GAS-FIRED UNIT HEATER.
NEW BOILER BURNER.
NEW FUEL OIL JOCKEY PUMP.
NEW BOILER CONTROL PANEL.
NEW REFRIGERANT DETECTION PANEL.
NEW GAS DETECTOR PANEL.
NOT USED.
NEW TEMPORARY WATER HEATER.
NEW DOMESTIC HOT WATER CIRCULATOR.
NEW COMBUSTION AIR MOTOR OPERATED DAMPER.
COMBINATION MOTOR STARTER/ DISCONNECT SWITCH, FURNISHED BY MECHANICAL CONTRACTOR, INSTALLED AND WIRED BY EC.
WIRE SUMP PUMPS SP-1A & SP-1B TO DUPLEX SUMP PUMP CONTROL PANEL.
WIRE FUEL OIL PUMPS FOP-1A & FOP-1B TO DUPLEX FUEL OIL PUMP CONTROL PANEL.
PROVIDE NEW QUAD RECEPTACLE, WIRING AND CONDUIT.
VARIABLE FREQUENCY DRIVE (VFD), FURNISHED BY MECHANICAL CONTRACTOR, INSTALLED AND WIRED BY EC.
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
1
1
T
PB
PB
DWBP-1A
NGBP-1
NGBP-2
SSOU-1
SSOU-2
FCU-B15
CKTS: PB1-23,25
CKTS: PB1-24,26
CKTS: PB2-25,27,29
CKTS: PB1-30,32,34
CKTS: PB1-29,31,33
REFER TO SHEET EP-201 FOR ENLARGED TRANSFORMER ROOM NEW WORK PLANS
CKT: PB1-15
CKTS: PB2-26,28,30
DWP-1B
CKT: PB1-37
CKT: PB1-35
GFCI
LTG. PNL 'LA'
(E)
MUSIC ROOM
MUSIC EQUIPMENT
INSTRUMENTS
ENSEMBLE PRACTICE
TEACHERS' LOUNGE
STAIRS
STORAGE
TEACHER STORAGE
CLASSROOM
PRACTICE ROOM NO.1
PRACTICE ROOM NO.2
MUSIC OFFICE
CORRIDOR NO.2
PASSAGE
TRANSFORMER &SWITCH ROOM
AREAWAY
PUPIL EQUIP'T
RECEIVING AREA
CORRIDOR NO.1
PASSENGERELEVATOR
PASS. ELEV. MACHINEROOM
STORAGE
BR
LOCKER ROOM
JANITOR SUPPLIES
LOCKER ROOM
BLDG ENGINEER'SOFFICE
METER ROOM
UNEXCAVATED
CRAWL SPACE 'C'
UNEXCAVATED
CRAWL SPACE 'A'
POWER PNL 'PA'
(E)
REFER TO SHEET EP-202 FOR ENLARGED PASSENGER ELEVATOR NEW WORK PLAN.
GFCI
WP/GFCI
WP/GFCI
REFER TO ENLARGEDPLAN ON THIS SHEET
REFER TO ENLARGEDPLAN ON THIS SHEET
CKTS: PB1-57
CKTS: PB1-57
1
GFCICKT: PB1-55
CKT: PB1-55
GFCI
CKT: PB1-53
GFCI
CKT: PB1-53
GFCI
GFCI
CKT: PB1-51
HOUSE PHONE
CLASSROOMB-21
LAPTOP CART CHARGING
WIRELESS ACCESSPOINT AT CEILING
MUSIC ROOMB-3
HOUSE PHONE
CKT:PB1-56
GFCI GFCI
CKT:PB1-56
CKT: PB1-52GFCI
CKT: PB1-54
GFCI
CKT: PB1-54
GFCI
LAPTOP CARTCHARGING
WIRELESS ACCESS POINT AT CEILING
DATE
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,
PHILADELPHIA, PA 19121
PERMIT SET
25 MARCH 2020
ARCHITECTURAL
GANNETT FLEMING, INC.
ONE PENN PLAZA, SUITE 630
250 WEST 34TH STREET
NEW YORK, NY 10119
Phone: 212.967.9833
Fax: 212.232.5791
Email: [email protected]
Attn: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.
232 CECELIA ACRES DRIVE
IVYLAND, PA 18974
Phone: 215.354.9161
Fax: 215.354.9163
Email: [email protected]
Attn: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.
1010 ADAMS AVENUE
VALLEY FORGE, PA 19403
Phone: 610.650.8156
Fax: 610.650.8190
Email: [email protected]
Attn: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.
1801 MARKET STREET, SUITE 2600
PHILADELPHIA, PA 19103
Phone: 215.557.0106
Fax: 215.557.0337
Email: [email protected]
Attn: Mark D. DeCocinis, CEI
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)
www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DIAMOND ST.N. 16
TH S
T.
N. 15
TH S
T.
N
KEYPLAN
B-075c OF 2018/19
B-076c OF 2018/19B-077c OF 2018/19
B-087c OF 2018/19
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.
207 SENATE AVENUE
CAMP HILL, PA 17011
Phone: 717.763.7211
Fax: 717.763.8150
Email: [email protected]
Attn: Brian Seip, PE
SHEET OF
1/8" = 1'-0"
ELECTRICAL POWERBASEMENT NEW WORK PLAN
FJR CJG
EP-10453 58
SCALE: 1/8" = 1'-0"
ELECTRICAL BASEMENT NEW WORK PLAN1
KEYED NEW WORK NOTES
NEW HERMETIC NATURAL GAS BOOSTER PUMP SKID PACKAGE.
NEW DUPLEX DOMESTIC WATER BOOSTER PUMPSET.
NEW WALL-MOUNTED SPLIT SYSTEM HEAT PUMP OUTDOOR UNIT.
PROVIDE NEW RECEPTACLES AND WIRING WITHIN THIS ROOM. REUSE EXISTING CIRCUIT.
NEW FAN COIL UNIT (FCU-1).
PROVIDE NEW QUAD RECEPTACLE ON A DEDICATED CIRCUIT FOR EACH GAS METER.
PROVIDE NEW WP/GFCI DUPLEX RECEPTACLE WITHIN 25' OF HVAC EQUIPMENT.
PROVIDE (1) CAT 6 DATA CABLE DROP AT THIS LOCATION.
PROVIDE (2) CAT 6 DATA CABLE DROP AT THIS LOCATION.
PROVIDE (4) CAT 6 DATA CABLE DROP AT THIS LOCATION.
PROVIDE NEW TAMPER RESISTANT DUPLEX ELECTRICAL OUTLET.
PROVIDE NEW TAMPER RESISTANT QUAD ELECTRICAL OUTLET.
INSTALL NEW EMERGENCY STOP SWITCH FOR THE BOILER, FURNISHEDBY MECHANICAL CONTRACTOR. REFERENCE DETAIL 4/EP-301.
INSTALL NEW EMERGENCY STOP SWITCH FOR THE CHILLER FURNISHED BY MECHANICAL CONTRACTOR.
1
GENERAL NOTES:
1. REFER TO CONCEPTUAL FIRE ALARM LAYOUTS ON DRAWING E-204 FOR ADDITIONAL INFORMATION ON FIRE ALARM DEVICE LOCATIONS AND REQUIRED OPERATION OF THE FIRE ALARM SYSTEM IN CONJUNCTION WITH ELEVATOR OPERATIONS.
2. SEE DRAWING EP-001 FOR SYMBOLS, ABBREVIATIONS AND GENERAL NOTES.
3. INSTALL ALL DISCONNECT SWITCHES FURNISHED BY MECHANICAL CONTRACTOR. PROVIDE WIRING AND CONDUIT THROUGH DISCONNECT SWITCHES TO EQUIPMENT.
4. PERFORM A SHORT CIRCUIT COORDINATION AND ARC FLASH STUDIES. FURNISH REPORT TO OWNER.
2
3
1
2 1
4
4
5
3
3
5
4
4
4
4
4
4 4
4
4
4
4
4
4
4
4 4
44
4
4
4
6
6
7
7
7
4
4
SCALE: 1/8" = 1'-0"
CLASSROOM TECH/ INFRAST. PLAN2
8
8
SCALE: 1/8" = 1'-0"
MUSIC ROOM TECH/ INFRAST. PLAN3
8
9
10
10
9
8
9
10
9
9 10
11
12
11
12 12
12
12
11
12 12
1212
4
4
8
8
8
13
14
13
14
1
1 4-17-2020ADDENDUM 1 ITEMS FROM ANOTHER SHEET1 4-17-2020 ADDENDUM 1 2
ADDENDUM #220 APRIL 2020
KEYED NEW WORK NOTES
NEW HERMETIC NATURAL GAS BOOSTER PUMP SKID PACKAGE.
NEW DUPLEX DOMESTIC WATER BOOSTER PUMPSET.
NEW WALL-MOUNTED SPLIT SYSTEM HEAT PUMP OUTDOOR UNIT.
PROVIDE NEW RECEPTACLES AND WIRING WITHIN THIS ROOM. REUSE EXISTING CIRCUIT.
NEW FAN COIL UNIT (FCU-1).
PROVIDE NEW QUAD RECEPTACLE ON A DEDICATED CIRCUIT FOR EACH GAS METER.
PROVIDE NEW WP/GFCI DUPLEX RECEPTACLE WITHIN 25' OF HVAC EQUIPMENT.
PROVIDE (1) CAT 6 DATA CABLE DROP AT THIS LOCATION.
PROVIDE (2) CAT 6 DATA CABLE DROP AT THIS LOCATION.
PROVIDE (4) CAT 6 DATA CABLE DROP AT THIS LOCATION.
PROVIDE NEW TAMPER RESISTANT DUPLEX ELECTRICAL OUTLET.
PROVIDE NEW TAMPER RESISTANT QUAD ELECTRICAL OUTLET.
INSTALL NEW EMERGENCY STOP SWITCH FOR THE BOILER, FURNISHEDBY MECHANICAL CONTRACTOR. REFERENCE DETAIL 4/EP-301.
INSTALL NEW EMERGENCY STOP SWITCH FOR THE CHILLER FURNISHED BY MECHANICAL CONTRACTOR.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
PROVIDE SIX THOUSAND FIVE HUNDRED (6,500) LINEAR FEET OF CAT6CABLE FOR DATA DROPS. PROVIDE TWO HUNDRED (200) LINEAR FEETOF 1" CONDUIT FOR DATA DROPS. PROVIDE THREE HUNDRED (300)LINEAR FEET OF 2x2x10 CABLE TRAY FOR DATA DROPS. COORDINATETERMINATION OF CAT6 CABLE WITH SDP IT GROUP AND SDPCONSTRUCTION MANAGER.
5.
1
FS
S
F
TFF
TF
FT
PASS. ELEV. MACHINEROOM
PASSENGERELEVATOR
(NON SPRINKLERED HOISTWAY)
125A/3P
KEYED DEMOLITION NOTES:REMOVE EXISTING PIT LIGHT FIXTURES, LIGHT SWITCH, RECEPTACLES AND ASSOCIATED WIRING IN THE IMMEDIATE PIT AREA. ALL EXPOSED CONDUIT SHALL BE REPLACED IN ENTIRETY WITHIN ELEVATOR PITS.
REMOVE EXISTING ELEVATOR MACHINE ROOM DISCONNECT SWITCH
REMOVE EXISTING ELEVATOR MACHINE ROOM RECEPTACLES AND WIRING TO POINT OF ORIGIN.
#
GENERAL DEMOLITION NOTES:1. THE DEMOLITION PLAN IS DIAGRAMATIC IN NATURE AND INTENDED TO
REPRESENT ONLY THE GENERAL SCOPE OF DEMOLITION. THE ELECTRICAL CONTRATOR SHALL REVIEW THE EXISTING FACILITY ALONG WITH THE DEMOLITION PLAN AND SHALL BE RESPONSIBLE TO DETERMINE THE EXACT EXTENT OF THE ELECTRICAL DEMOLITION WORK REQUIRED UNDER THE SCOPE OF THIS PROJECT.
2. EQUIPMENT AND/OR DEVICES SHOWN AS DARKENED AND DASHED ON THE PLANS SHALL BE REMOVED IN ITS ENTIRETY.
3. FOR EQUIPMENT TO BE DEMOLISHED REMOVE ALL WIRING IN CONDUIT BACK TO SOURCE ELECTRICAL PANEL AND UPDATE PANEL SCHEDULE. RECONNECT ANY DISTURBED FACILITIES WHICH ARE TO REMAIN AND PLACE IN OPERATING CONDITION.
4. TRACE OUT ALL EXISTING WIRING TO BE DEMOLISHED FROM THE PROJECT AREA. ALL EXISTING WIRING TO BE DEMOLISHED SHALL BE REMOVED TO ITS POINT OF ORIGIN.
5. RELOCATE OR EXTEND EXISTING CIRCUITS NOT BEING ABANDONED AS REQUIRED TO ACCOMODATE NEW WORK AND MAINTAIN CIRCUIT INTEGRITY.
6. REFERENCE DRAWING EP-401 FOR DEMOLITION ONE-LINE DIAGRAMS .
7. ALL EMPTY AND ABANDONED CONDUIT SHALL BE REMOVED FROM WITHIN THE PROJECT BOUNDARIES. SEVER AND CAP CONDUIT A MINIMUM OF 6" OUTSIDE THE PROJECT BOUNDARIES. INSTALL PULL CORD IN EACH SPARE CONDUIT. PROVIDE CUTTING AND PATCHING OF ALL CEILINGS, FLOORS AND WALLS AS REQUIRED.
8. THE CONTRACTOR SHALL PROVIDE CAPS, COVERS AND PLUGS FOR ALL EXISTING PULL BOXES, JUNCTION BOXES AND PANELS WITHIN THE PROJECT BOUNDARIES.
9. REMOVE ALL ABANDONED RECEPTACLES, JUNCTION BOXES, CONDUIT, WIRING AND ASSOCIATED HANGERS. CIRCUITS TO BE REUSED FOR NEW WORK.
FREIGHT ELEVATOR
FREIGHT ELEVATORMACHINE ROOM
TELECOM ROOM
125A/3P
PASS. ELEV. MACHINEROOM
PASSENGERELEVATOR
(NON SPRINKLERED HOISTWAY)
GFCI
GFCI
GFCI
GFCI
SSIU-2
CKT:PB1-43
CKT:PB1-48
CKT:PB1-48
CKT:PB1-48
CKT:PB1-45
FREIGHT ELEVATOR
FREIGHT ELEVATORMACHINE ROOM
TELECOM ROOM
GFCI
GFCI
GFCI
GFCI
SSIU-1
CKT:PB1-49
CKT:PB1-46
CKT:PB1-49
CKT:PB1-49
CKT:PB1-44
#KEYED NEW WORK NOTES:PROVIDE NEW DUPLEX GFCI RECEPTACLE IN THE ELEVATOR PIT. COORDINATE MOUNTING HEIGHT AND EXACT LOCATION WITH ELEVATOR INSTALLER.
NEW DUCTLESS SPLIT SYSTEM UNIT. INTERCONNECT WITH ASSOCIATED OUTDOOR UNIT PER MANUFACTURERS RECOMMENDATIONS..
PROVIDE NEW ELEVATOR FUSED SHUNT TRIP DISCONNECT SWITCH. REFER TO RISER DIAGRAM EP-402.
PROVIDE NEW 30A, 120V ELEVATOR CAB LIGHTS FUSED DISCONNECT SWITCH.
PROVIDE NEW DUPLEX GFCI RECEPTACLE IN THE ELEVATOR MACHINE ROOM.
PROVIDE TELEPHONE CONNECTION AT ELEVATOR CONTROLLER. COORDINATE EXACT LOCATION WITH ELEVATOR CONTRACTOR.
DATE
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,
PHILADELPHIA, PA 19121
PERMIT SET
25 MARCH 2020
ARCHITECTURAL
GANNETT FLEMING, INC.
ONE PENN PLAZA, SUITE 630
250 WEST 34TH STREET
NEW YORK, NY 10119
Phone: 212.967.9833
Fax: 212.232.5791
Email: [email protected]
Attn: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.
232 CECELIA ACRES DRIVE
IVYLAND, PA 18974
Phone: 215.354.9161
Fax: 215.354.9163
Email: [email protected]
Attn: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.
1010 ADAMS AVENUE
VALLEY FORGE, PA 19403
Phone: 610.650.8156
Fax: 610.650.8190
Email: [email protected]
Attn: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.
1801 MARKET STREET, SUITE 2600
PHILADELPHIA, PA 19103
Phone: 215.557.0106
Fax: 215.557.0337
Email: [email protected]
Attn: Mark D. DeCocinis, CEI
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)
www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DIAMOND ST.N. 16
TH S
T.
N. 15
TH S
T.
N
KEYPLAN
B-075c OF 2018/19
B-076c OF 2018/19B-077c OF 2018/19
B-087c OF 2018/19
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.
207 SENATE AVENUE
CAMP HILL, PA 17011
Phone: 717.763.7211
Fax: 717.763.8150
Email: [email protected]
Attn: Brian Seip, PE
SHEET OF
As indicated
ELECTRICAL PASSENGER &FREIGHT ELEVATORS
FJR CJG
EP-20255 58
SCALE: 1/2" = 1'-0"
PARTIAL PASSENGER ELEVATOR - DEMO PLAN1
1
2
3
SCALE: 1/2" = 1'-0"
PARTIAL FREIGHT ELEVATOR - DEMO PLAN2
SCALE: 1/2" = 1'-0"
PARTIAL PASSENGER ELEVATOR - NEW WORK PLAN3
SCALE: 1/2" = 1'-0"
PARTIAL FREIGHT ELEVATOR - NEW WORK PLAN4
1
2
3
4
5
1
2
1
2
3
3
3
3
1
1
3 4
5
3
4
2
5
5
5
5
5
6
6
2
6
1
1
1
1 4-17-2020ADDENDUM 1 MODIFIED LOCATION OF TELEPHONE CONNECTION1 4-17-2020 ADDENDUM 1 2
ADDENDUM #220 APRIL 2020
CKT. # PB1-41(120VAC)
L
N
2 4
1RL
N
BURNER CONTROL PANEL
BOILER #2
MODCOMB. AIR
DAMPER MTR #1
MODCOMB. AIR
DAMPER MTR #2
2 4
1RL
N
BURNER CONTROL PANEL
BOILER #1
MODCOMB. AIRDAMPER MTR #3
MODCOMB. AIRDAMPER MTR #4
SCHEMATIC WIRING DIAGRAM
NOTES:
1. INTERCONNECT WITH EXHAUST FAN EF-1 (CONTROL RELAY/DAMPER MOTORS 1-4 ENERGIZED WHEN EF-1 IS RUNNNING).
CR
(NOTE 1)
NOTES:
1. EMERGENCY SHUTDOWN (E-STOP) SWITCHES FURNISHED BY MC, INSTALLED AND WIRED BY EC.
2. CONTROL RELAYS 'CRE1 AND 'CRE2' PROVIDED BY EC. LOCATE CONTROL RELAY ADJACENT TO MAIN BOILER CONTROL PANEL.
3. CONNECT E-STOP SWITCHES TO 120VAC CIRCUIT PROVIDING CTRL POWER FOR THE MAIN BOILER CONTROL PANEL
E-STOP #1 E-STOP #2
CRE1
TO BURNER CONTROL PANEL #1 (N.O. E-STOP CONTACT IN CONTROL CKT.)
L
N
SCHEMATIC WIRING DIAGRAM
CRE2TO BURNER CONTROL PANEL #2 (N.O. E-STOP CONTACT IN CONTROL CKT.)
CKT. # PB1-42(120VAC)
E-STOP #3
PANEL DESIGNATION
NEW PANEL 'PB1'
TYPE: BRANCH CIRCUIT LOCATION: BOILER ROOM
NUMBER OF POLES: 72 VOLTAGE: 208Y/120V, 3-PHASE, 4-WIRE
MAIN BUS RATING: 225A PANEL MOUNTING: SURFACE
MAIN RATING: 225A PANEL ENCLOSURE (NEMA): 1
SHORT CIRCUIT: 22kAIC
CIR. No.
CIR. BKR.
DESCRIPTION WIRE GROUND CONDUITLOAD - KVA LOAD - KVA
CONDUIT GROUND WIRE DESCRIPTIONCIR. BKR.
CIR. No.ΦA ΦB ΦC ΦA ΦB ΦC
1
20/3 BOILER BURNER (B-1) #12 #12 3/4"
0.90 0.90
3/4" #12 #12 BOILER BURNER (B-2) 20/3
2
3 0.90 0.90 4
5 0.90 0.90 6
7 20/1 SPARE #12 #12 3/4" 3/4" #12 #12 SPARE 20/1 8
9 20/1 MBCP-1 #12 #12 3/4" 0.50 0.20 3/4" #12 #12 GAS DETECTION PANEL (CGD-1) 20/1 10
11 30/1 GAS UNIT HEATER (GUH-1) #10 #10 3/4# 3.34 1.50 3/4" #12 #12 GAS WATER HEATER (E) WH 20/1 12
13 30/1 JOCKEY PUMP (B-1) #10 #10 3/4" 1.20 1.20 3/4" #10 #10 JOCKEY PUMP (B-2) 30/1 14
15 20/1 FAN COIL UNIT (FCU-1) #12 #12 3/4" 3.34 0.50 3/4" #12 #12 WATER SOFTENER (WS-1) 20/1 16
17
20/3 FUEL OIL PUMP (FOP-1A) #12 #12 3/4"
0.50 1.50
3/4" #12 #12 TEMPORARY WATER HEATER 20/3
18
19 0.50 1.50 20
21 0.50 1.50 22
2320/2 DUCTLESS SPLIT SYSTEM (SSOU-1) #12 #12 3/4"
0.95 0.953/4" #12 #12 DUCTLESS SPLIT SYSTEM (SSOU-2) 20/2
24
25 0.95 0.95 26
27 20/1 BOILER ROOM RECEPTACLES #12 #12 3/4" 0.50 0.50 3/4" #12 #12 CO DETECTION PANEL (CGD-1) 20/1 28
29
20/3 NATURAL GAS BOOSTER PUMP (NGBP-1) #12 #12 3/4"
0.80 0.90
3/4" #12 #12 NATURAL GAS BOOSTER PUMP (NGBP-2) 20/3
30
31 0.80 0.90 32
33 0.80 0.90 34
35 20/1 GAS METER QUAD RECEPTACLE #12 #12 3/4" 0.50 0.95 3/4" #12 #12 EXHAUST FAN (EF-1) 20/1 36
37 20/1 GAS METER QUAD RECEPTACLE #12 #12 3/4" 0.50 0.50 3/4" #12 #12 WATER SOFTENER QUAD RECEPTACLE 20/1 38
39 20/1 REFRIGERANT DETECTION PANEL #12 #12 3/4" 0.50 0.50 3/4" #12 #12 WATER SOFTENER QUAD RECEPTACLE 20/1 40
41 20/1 MOTOR OPERATED DAMPERS (MOD's) #12 #12 3/4" 0.60 0.50 3/4" #12 #12 EMERGENCY SHUTDOWN SWITCHES 20/1 42
43 20/1 PASS 'ELEVATOR PIT LIGHT/ RECEPT #12 #12 3/4" 0.50 0.50 3/4" #12 #12 FREIGHT 'ELEVATOR PIT/LIGHTING 20/1 44
45 20/1 PASS 'ELEVATOR CAB LIGHTING #12 #12 3/4" 0.50 0.50 3/4" #12 #12 ELEVATOR CAB LIGHTING 20/1 46
47 20/1 ELECTRICAL ROOM RECEPTACLES #12 #12 3/4" 0.50 0.50 3/4" #12 #12 EMR RECEPTACLES 20/1 48
49 20/1 EMR RECEPTACLES #12 #12 3/4" 1.00 0.50 3/4" #12 #12 MAIN CONTROL PANEL (MCP-1) 20/1 50
51 20/1 CLASSROOM B-21 RECEPTACLE #12 #12 3/4" 0.50 3/4" #12 #12 MUSIC ROOM B-3 RECEPTACLE 20/1 52
53 20/1 CLASSROOM B-21 RECEPTACLES #12 #12 3/4" 0.80 3/4" #12 #12 MUSIC ROOM B-3 RECEPTACLES 20/1 54
55 20/1 CLASSROOM B-21 RECEPTACLES #12 #12 3/4" 0.80 3/4" #12 #12 MUSIC ROOM B-3 RECEPTACLES 20/1 56
57 20/1 EXTERIOR RECEPTACLES #12 #12 3/4" 3/4" #12 #12 SPARE 20/1 58
59 20/1 SPARE #12 #12 3/4" 3/4" #12 #12 SPARE 20/1 60
61 20/1 SPARE #12 #12 3/4" 3/4" #12 #12 SPARE 20/1 62
63 SPACE SPACE 64
65 SPACE SPACE 66
67 SPACE SPACE 68
69 SPACE SPACE 70
71 SPACE SPACE 72
TOTAL 7.1 8.36 8.9 7.0 5.5 7.7 TOTAL
PANEL CONNECTED LOAD
ΦA 14.1 X SOLID NEUTRAL BUS
ΦB 13.9 X EQUIPMENT GROUND BUS
ΦC 16.6 X INTEGRAL SPD
44.6 KVA CONNECTED TOTAL
0.36
PANEL DESIGNATION
NEW PANEL 'PB2'
TYPE: BRANCH CIRCUIT LOCATION: BOILER ROOM
NUMBER OF POLES: 42 VOLTAGE: 208Y/120V, 3-PHASE, 4-WIRE
MAIN BUS RATING: 600A PANEL MOUNTING: SURFACE
MAIN RATING: 500A PANEL ENCLOSURE (NEMA): 1
SHORT CIRCUIT: 65kAIC
CIR. No.
CIR. BKR.
DESCRIPTION WIRE GROUND CONDUITLOAD - KVA LOAD - KVA
CONDUIT GROUND WIRE DESCRIPTIONCIR. BKR.
CIR. No.ΦA ΦB ΦC ΦA ΦB ΦC
1
20/3 SUMP PUMP (SP-1A) #12 #12 3/4"
0.90 3.00
2" #6 #1 AUTOMATIC TRANSF SWITCH 125/3
2
3 0.90 3.00 4
5 0.90 3.00 6
7
90/3DUAL TEMP WATER PUMP (DTWP-1)
#3 #8 1 1/4"
5.50 5.50
1 1/4" #8 #3DUAL TEMP WATER PUMP (DTWP-2)
90/3
8
9 5.50 5.50 10
11 5.50 5.50 12
13
90/3CONDENSATE WATER PUMP (CWP-1)
#3 #8 1 1/4"
5.50 5.50
1 1/4" #8 #3CONDENSATE WATER PUMP (CWP-2)
90/3
14
15 5.50 5.50 16
17 5.50 5.50 18
19
60/3 HEATING HOT WATER (HHWP-1) #6 #10 1"
3.70 3.70
1" #10 #6 HEATING HOT WATER (HHWP-2) 60/3
20
21 3.70 3.70 22
23 3.70 3.70 24
25
50/3DOM. COLD WATER PUMP (DWP)
#10 #10 3/4"
3.00 3.00
3/4" #10 #10DOM. COLD WATER PUMP (DCWP-1B)
50/3
26
27 3.00 3.00 28
29 3.00 3.00 30
31
40/3 EXISTING EXHAUST FAN (E-20) #8 #10 3/4"
2.00 3/4" #12 #12 SPARE 20/1 32
33 2.00 3/4" #12 #12 SPARE 20/1 34
35 2.00 3/4" #12 #12 SPARE 20/1 36
37 SPACE SPACE 38
39 SPACE SPACE 40
41 SPACE SPACE 42
TOTAL 20.6 20.6 20.6 20.7 20.7 20.7 TOTAL
PANEL CONNECTED LOAD
ΦA 41.3 X SOLID NEUTRAL BUS
ΦB 41.3 X EQUIPMENT GROUND BUS
ΦC 41.3 X INTEGRAL SPD
123.9 KVA CONNECTED TOTAL
L
CR1
N
"DOOR OPEN" TO HOUSE FAN MOTOR CONTROL CIRCUIT. (WIRE IN AS A PERMISSIVE INTERLOCK)
CR1
CONTROL RELAY (BY EC)
DATE
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,
PHILADELPHIA, PA 19121
PERMIT SET
25 MARCH 2020
ARCHITECTURAL
GANNETT FLEMING, INC.
ONE PENN PLAZA, SUITE 630
250 WEST 34TH STREET
NEW YORK, NY 10119
Phone: 212.967.9833
Fax: 212.232.5791
Email: [email protected]
Attn: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.
232 CECELIA ACRES DRIVE
IVYLAND, PA 18974
Phone: 215.354.9161
Fax: 215.354.9163
Email: [email protected]
Attn: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.
1010 ADAMS AVENUE
VALLEY FORGE, PA 19403
Phone: 610.650.8156
Fax: 610.650.8190
Email: [email protected]
Attn: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.
1801 MARKET STREET, SUITE 2600
PHILADELPHIA, PA 19103
Phone: 215.557.0106
Fax: 215.557.0337
Email: [email protected]
Attn: Mark D. DeCocinis, CEI
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)
www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
B-075c OF 2018/19
B-076c OF 2018/19B-077c OF 2018/19
B-087c OF 2018/19
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.
207 SENATE AVENUE
CAMP HILL, PA 17011
Phone: 717.763.7211
Fax: 717.763.8150
Email: [email protected]
Attn: Brian Seip, PE
SHEET OF
12" = 1'-0"
ELECTRICAL WIRE DIAGRAMSAND PANEL SCHEDULES
FJR CJG
EP-30156 58
SCALE: NTS
SCHEMATIC WIRING DIAGRAM - MOTOR OPERATED DAMPERS3
SCALE: NTS
BOILER EMERGENCY SHUT DOWN4
SCALE: NTS
NEW PANEL 'PB1'1
SCALE: NTS
NEW PANEL 'PB2'2
NOTE:REFER TO DRAWING E-104 FOR PANELBOARD FRONT STANDARD DETAIL.
SCALE: 12" = 1'-0"
SCHEMATIC WIRING DIAGRAM - MOTOR OPERATED DAMPER #55
11
1
1 4-17-2020 ADDENDUM 1 2
ADDENDUM #220 APRIL 2020
EXISTPOWERPANEL
'PA'
SUBSTATION 'SA'(SEE ONE-LINE)
PB
BASEMENT
FIRST FLOOR
SA-10
EXISTLTG.
PANEL 'LA'
SA-4
EXISTPOWERPANEL
'PC'
EXISTLTG.
PANEL 'LC'
EXISTPOWERPANEL
'PZ'
SA-9
SECOND FLOOR
EXISTPOWERPANEL
'PK'
EXISTLTG.
PANEL 'LK'
SA-5
SA-11
FUTURE THIRD FLOOR
1 1/4"C
P.E. CO. METER
EXISTLTG.
PANEL 'LE'
SA-6
EXISTLTG.
PANEL 'LF'
EXISTLTG.
PANEL 'LG'
EXISTPOWERPANEL
'PG'
SA-12
EXISTPOWERPANEL
'PB'
EXISTPOWERPANEL
'PM'
SA-14
SA-13
EXISTPOWERPANEL
'PD'
EXISTLTG.
PANEL 'LD'
EXISTLTG.
PANEL 'LH'
EXISTPOWERPANEL
'PL'
EXISTLTG.
PANEL 'LL'
SA-8
SA-15
SA-12
SA-7
EXISTNORM - EM
PANEL 'EN'
SA-17(THRU TRANSFER SWITCH)
DOUBLE PANEL
(DOUBLE PANEL)
BOILER ROOM
SA-2
SA-3ELEVATOR (PASS)
25 H.P 3PH/208V
ELEVATOR (FREIGHT)25 H.P 3PH/208V
250A208/120V3PH, 4W
250A208/120V3PH, 4W
600A208/120V3PH, 4W
250A208/120V3PH, 4W
250A208/120V3PH, 4W
225A208/120V3PH, 4W
225A208/120V3PH, 4W
225A208/120V3PH, 4W
250A208/120V3PH, 4W
250A208/120V3PH, 4W
400A208/120V3PH, 4W
150A208/120V3PH, 4W
150A208/120V3PH, 4W
150A208/120V3PH, 4W
150A208/120V3PH, 4W
300A208/120V3PH, 4W
225A208/120V3PH, 4W
SA-1(SPARE 225A/3)
60/2
500A208/120V3PH, 4W
4 #1/0, 2"C
8 #3/0, 2 - 2 1/2"C
4 #1/0, 2"C
4 #4/0, 3"C
4-250MCM, 3"C
4 #1/0, 2"C
8-350MCM, 2-3 1/2"C
4-250MCM, 3"C
4 #3/0, 2 1/2"C
4-300MCM, 3"C
4 #1/0, 2"C
8 #4/0, 2-3"C
4-250MCM, 3"C
3 #4, 1 1/4"C
3 #3, 1 1/4"C
(2) 5"CSA-16
(SPARE 400A/3)
2-5"C TO MANHOLE #2(SEE ONELINE DIAGRAMON THIS SHEET) (ETR)
(DOUBLE PANEL)
(DOUBLE PANEL)
(DOUBLE PANEL)
(DOUBLE PANEL)
(DOUBLE PANEL)
(DOUBLE PANEL)
15KV PULLBOX (ETR)
1
1
SUBSTATION 'SA'
15KV PULLBOX (ETR)IN ELECTRICAL ROOM
PB
13.2KV FUSED DISCONNECT
P.E.CO. METER
750/1000 KVA TRANSFORMER13.2KV - 3PH - DELTA PRIMARY120/208V - 3PH - Y SECONDARY
225/3
SP
AR
E B
KR
1
100/3
ELE
VA
TO
R (
PA
SS
)25 H
.P
3P
H/2
08V
2
100/3
ELE
VA
TO
R (
FR
EIG
HT
)25 H
.P
3P
H/2
08V
3
250/3
PN
LS
"LA
", "
LC
"3P
H -
4W
-120/2
08V
4
250/3
5
225/3
6
250/3
7
400/3
8
600/3
9
150/3
10
250/3 170/3 300/3 500/3 225/3 400/3 60/3
11 12 13 14 15 16 17
REMAINDER OF CUBICLE TO BE SPACE & BUSSING FOR FUTURE BKRS.
PN
LS
"LK
" &
FU
T.
FLO
OR
3P
H -
4W
-120/2
08V
PN
LS
"LE
, LF
", "
LG
"3P
H -
4W
-120/2
08V
PN
LS
"LD
", "
LH
"3P
H -
4W
-120/2
08V
PN
L "
LL"
& F
UT
. F
LO
OR
3P
H -
4W
-120/2
08V
PN
L "
PZ
"3P
H -
4W
-120/2
08V
PN
LS
"P
A",
"P
C"
3P
H -
4W
-120/2
08V
PN
L "
PK
" &
FU
T.
FLO
OR
3P
H -
4W
-120/2
08V
PN
LS
"P
D",
"P
G"
3P
H -
4W
-120/2
08V
PN
L "
PM
"3P
H -
4W
-120/2
08V
PN
L "
PB
"3P
H -
4W
-120/2
08V
PN
L "
PL"
& F
UT
. F
LO
OR
3P
H -
4W
-120/2
08V
SP
AR
E B
KR
TO
TR
SW
& P
NL "
EN
"
STARTER & FUSED DISCONNECT 1200A, 3PH
CONTROL PANEL
CHILLER
MECHANICAL RM. "MR-1"
MANHOLE #2 (ETR)
HANDHOLE #1(ETR)(AT 18" INSIDE PROPERTY LINE)
2-5"C
3 #1/0 (15KV) TO SUBSTATION (ETR)
CLF
TO FIRE ALARM PANEL
1
1
DATE
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,
PHILADELPHIA, PA 19121
PERMIT SET
25 MARCH 2020
ARCHITECTURAL
GANNETT FLEMING, INC.
ONE PENN PLAZA, SUITE 630
250 WEST 34TH STREET
NEW YORK, NY 10119
Phone: 212.967.9833
Fax: 212.232.5791
Email: [email protected]
Attn: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.
232 CECELIA ACRES DRIVE
IVYLAND, PA 18974
Phone: 215.354.9161
Fax: 215.354.9163
Email: [email protected]
Attn: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.
1010 ADAMS AVENUE
VALLEY FORGE, PA 19403
Phone: 610.650.8156
Fax: 610.650.8190
Email: [email protected]
Attn: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.
1801 MARKET STREET, SUITE 2600
PHILADELPHIA, PA 19103
Phone: 215.557.0106
Fax: 215.557.0337
Email: [email protected]
Attn: Mark D. DeCocinis, CEI
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)
www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
B-075c OF 2018/19
B-076c OF 2018/19B-077c OF 2018/19
B-087c OF 2018/19
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.
207 SENATE AVENUE
CAMP HILL, PA 17011
Phone: 717.763.7211
Fax: 717.763.8150
Email: [email protected]
Attn: Brian Seip, PE
SHEET OF
12" = 1'-0"
ELECTRICAL POWERSCHEMATICS AND DETAILS
Author CJG
EP-40157 58
SCALE: NTS
ELECTRICAL RISER DIAGRAM - EXISTING/DEMOLITION1
SCALE: NTS
ELECTRICAL ONE-LINE DIAGRAM - EXISTING/DEMOLITION2
1 4-17-2020 ADDENDUM 1 1 4-17-2020 ADDENDUM 1 2
ADDENDUM #220 APRIL 2020
EXISTPOWERPANEL
'PA'
NEW SWITCHBOARD 3000A MCB
208/120V, 3PH, 4W
PB
BASEMENT
FIRST FLOOR
EXISTLTG.
PANEL 'LA'
EXISTPOWERPANEL
'PC'
EXISTLTG.
PANEL 'LC'
EXISTPOWERPANEL
'PZ'
SECOND FLOOR
EXISTPOWERPANEL
'PK'
EXISTLTG.
PANEL 'LK'
FUTURE THIRD FLOOR
P.E. CO. METERING
EXISTLTG.
PANEL 'LE'
EXISTLTG.
PANEL 'LF'
EXISTLTG.
PANEL 'LG'
EXISTPOWERPANEL
'PG'
NEWPANEL 'PB1'
EXISTPOWERPANEL
'PM'
EXISTPOWERPANEL
'PD'
EXISTLTG.
PANEL 'LD'
EXISTLTG.
PANEL 'LH'
EXISTPOWERPANEL
'PL'
EXISTLTG.
PANEL 'LL'
BOILER ROOM
250A208/120V3PH, 4W
250A208/120V3PH, 4W
600A208/120V3PH, 4W
250A208/120V3PH, 4W
250A208/120V3PH, 4W
225A208/120V3PH, 4W
225A208/120V3PH, 4W
225A208/120V3PH, 4W
250A208/120V3PH, 4W
250A208/120V3PH, 4W
400A208/120V3PH, 4W
150A208/120V3PH, 4W
150A208/120V3PH, 4W
150A208/120V3PH, 4W
150A208/120V3PH, 4W
430A208/120V3PH, 4W
225A208/120V3PH, 4W
225A208/120V3PH, 4W
EXISTING 2-5"C TO MANHOLE #2 (ETR)
NEWPANEL 'PB2'
500A208/120V3PH, 4W
ELEVATOR (PASS)25 HP
3PH/208V
ELEVATOR (FREIGHT)25 H.P 3PH/208V
NEW SUBSTATION 'SA'
NEW XFMR 750/1000 KVA
13.2KV PRI120/208V SEC
NEWCT
CABINET
NEW13.2KV FUSED DISC
NEW J-BOX
INTERCEPT EXISTING CONDUITS IN NEW OVERHEAD J-BOX(ES), AS REQUIRED USING CARE NOT TO DAMAGE EXISTING CONDUCTORS; EXTEND/RE-ROUTE EXISTING FEEDERS FROM NEW J-BOX(ES) TO NEW SWITCHBOARD. REFER TO SWITCHBOARD SCHEDULE FOR WIRING REQUIREMENTS FOR FEEDER EXTENSIONS.
1
1
3 7
9
11
10
(DOUBLE PANEL)
(DOUBLE PANEL)
(DOUBLE PANEL)
(DOUBLE PANEL)
(DOUBLE PANEL)
(DOUBLE PANEL)
(DOUBLE PANEL)
13TO CHILLER
NORMAL FEED TO EXISTING ATS FOR PANELS "EN"
EXISTING 15KV PULLBOX (ETR)
KEYED NEW WORK NOTES:1. NEW 200A FUSED SHUNT TRIP ELEVATOR
DISCONNECT SWITCH, WITH 110A FUSES.
#
1
1
1
1
1
1
1
1
FEEDER LEGEND:
3 #1 & #1 NEUT. + 1 #8 GRD IN 1 1/2"C.
3 #1/0 & #1/0 NEUT. + 1 #6 GRD IN 1 1/2"C.
3 #4/0 & #4/0 NEUT. + 1 #4 GRD IN 2 1/2"C.
3 #250KCMIL & #250KCMIL NEUT. + 1 #4 GRD IN 2 1/2"C.
3 #350KCMIL & #350KCMIL NEUT. + 1 #4 GRD IN 3"C.
2 SETS OF 3 #3/0 & 1 # 3/0 NEUT. + 1 #3G IN (2) 2"C.
2 SETS OF 3 #250KCMIL & 1 #250KCMIL NEUT. + 1 #2G IN (2) 2 1/2"C.
2 SETS OF 3 #350KCMIL & 1 #350KCMIL NEUT. + 1 #1G IN (2) 3"C.
2 SETS OF 3 #300KCMIL & 1 #300KCMIL NEUT. + 1 #1/0G IN (3) 3"C.
1 1/4" EMPTY CONDUIT FOR PECO METERING CONDUCTORS.
(1) 5' CONDUIT WITH 3 #1/0 (15KV); AND (1) 5" CONDUIT - SPARE.
2 #6 & #6 NEUT. + 1 #10 GRD IN 1"C.
4 SETS OF 3 #350KCMIL & 1 #350KCMIL NEUT. + 1 #3/0G IN (4) 3"C.
1
2
3
4
5
6
7
8
9
10
11
12
13
1
MAIN SWITCHBOARDVOLTAGE: 208Y/120 V, 3-PHASE, 4-WIRE
BUS: 3000A MAIN: 3000/3 MCB (LSI)
SHORT CIRCUIT: 65 kA
ENCLOSURE: NEMA 1, FREE STANDING, FRONT ACCESS ONLY
LOADCOMMENTS
DESCRIPTION AMP/ #P
EXISTING LIGHTING PANEL 'LK' 250/3 FEEDER TYPE 4
EXISTING POWER PANEL 'PK' 250/3 FEEDER TYPE 4
EXISTING LIGHTING PANEL 'LL' 400/3 FEEDER TYPE 6
EXISTING POWER PANEL 'PM' 450/3 FEEDER TYPE 7
EXISTING POWER PANEL 'PL' 225/3 FEEDER TYPE 3
NEW WATER COOLED CHILLER 1200/3 FEEDER TYPE 13
EXISTING POWER PANEL 'PZ' 600/3 FEEDER TYPE 8
EXISTING LIGHTING PANELS 'LE', 'LF' & 'LG' 225/3 FEEDER TYPE 3
EXISTING POWER PANEL 'PG' 150/3 FEEDER TYPE 2
EXISTING ATS / PANEL "EN" (NORMAL FEED) 60/2 FEEDER TYPE 12
EXISTING LIGHTING PANELS 'LD' & 'LH' 250/3 FEEDER TYPE 4
EXISTING POWER PANEL 'PD' 150/3 FEEDER TYPE 2
EXISTING LIGHTING PANELS 'LA' & 'LC' 250/3 FEEDER TYPE 4
EXISTING POWER PANELS 'PA' & 'PC' 150/3 FEEDER TYPE 2
NEW PANEL 'PB1' 225/3 FEEDER TYPE 3
NEW PANEL 'PB2' 500/3 FEEDER TYPE 7
FREIGHT ELEVATOR 110/3 FEEDER TYPE 1
PASSENGER ELEVATOR 110/3 FEEDER TYPE 1
NOTES:
1. ALL SWITCHBOARD CIRCUIT BREAKERS LARGER THAN 100A FRAME SIZE SHALL BE PROVIDED WITH ELECTRONIC ADJUSTABLE TRIP UNITS (ADS. LSI).
2. "EXISTING" FEEDERS TO BE CAPTURED AND EXTENDED/ RECONNECTED TO NEW MAIN SWITCHBOARD. REFER TO FEEDER LEGEND FOR REFERENCED FEEDER TYPES.
1
1
1
DATE
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,
PHILADELPHIA, PA 19121
PERMIT SET
25 MARCH 2020
ARCHITECTURAL
GANNETT FLEMING, INC.
ONE PENN PLAZA, SUITE 630
250 WEST 34TH STREET
NEW YORK, NY 10119
Phone: 212.967.9833
Fax: 212.232.5791
Email: [email protected]
Attn: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.
232 CECELIA ACRES DRIVE
IVYLAND, PA 18974
Phone: 215.354.9161
Fax: 215.354.9163
Email: [email protected]
Attn: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.
1010 ADAMS AVENUE
VALLEY FORGE, PA 19403
Phone: 610.650.8156
Fax: 610.650.8190
Email: [email protected]
Attn: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.
1801 MARKET STREET, SUITE 2600
PHILADELPHIA, PA 19103
Phone: 215.557.0106
Fax: 215.557.0337
Email: [email protected]
Attn: Mark D. DeCocinis, CEI
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)
www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
B-075c OF 2018/19
B-076c OF 2018/19B-077c OF 2018/19
B-087c OF 2018/19
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.
207 SENATE AVENUE
CAMP HILL, PA 17011
Phone: 717.763.7211
Fax: 717.763.8150
Email: [email protected]
Attn: Brian Seip, PE
SHEET OF
12" = 1'-0"
ELECTRICAL POWERSCHEMATICS AND DETAILS
FJR CJG
EP-40258 58
SCALE: NTS
ELECTRICAL RISER DIAGRAM - REVISED/NEW1
SCALE: NTS
MAIN SWITCHBOARD SCHEDULE2
1 4-17-2020 ADDENDUM 11 4-17-2020 ADDENDUM 1 2
ADDENDUM #220 APRIL 2020
E-001
ELECTRICALSYMBOLS AND
ABBREVIATIONS
IN FIELD.
8. EXACT LOCATION AND MOUNTING OF ALL EQUIPMENT SHALL BE VERIFIED
CLOSE AS POSSIBLE.
CIRCUIT NUMBERS MAY VARY. CONTRACTOR SHALL BALANCE PANELS AS
9. CIRCUIT NUMBERS SHOWN ARE FOR IDENTIFICATION ONLY. ACTUAL
FOR CLARIFICATION PRIOR TO STARTING ANY WORK.
SHALL REPORT DISCREPANCIES, IF ANY, TO THE ARCHITECT/ENGINEER
5. THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN FIELD AND
NATIONAL ELECTRICAL CODE.
4. ALL ELECTRICAL EQUIPMENT SHALL BE GROUNDED AS REQUIRED BY THE
OF THIS WORK WITH ALL TRADES.
3. THE CONTRACTOR SHALL COORDINATE THE LOCATION AND INSTALLATION
OTHER GOVERNING AGENCIES HAVING JURISDICTION.
REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, OSHA AND ALL
A MANNER AS POSSIBLE AND SHALL COMPLY WITH THE LATEST
2. ALL WORK SHALL BE NEW AND PERFORMED IN AS NEAT AND AS CLEAN
FIRE ALARM, ELECTRIC DEVICES, AND CIRCUITING SHOWN ON THE DRAWINGS.
1. PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT TO INSTALL LIGHTING,
GENERAL ELECTRICAL NOTES:
6. THE CONTRACTOR SHALL COORDINATE HIS WORK VERY CLOSELY WITH
ELECTRIC COMPANY FOR ELECTRIC SERVICE AND WITH TELEPHONE
COMPANY FOR TELEPHONE SERVICE.
7. THE CONTRACTOR, BEFORE SUBMITTING HIS BID ON THE WORK, MUST
VISIT THE SITE AND FAMILIARIZE HIMSELF WITH ALL VISIBLE EXISTING
CONDITIONS. AS A RESULT OF HAVING VISITED THE PREMISES,
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF
ON THE PART OF THE BIDDER OF HIS VISITATION TO THE SITE.
THE SUBMISSION OF A BID WILL BE CONSIDERED AN ACKNOWLEDGEMENT
THE WORK AS IT RELATES TO SUCH VISIBLE EXISTING CONDITIONS.
EQUIPMENT IDENTITY - MECHANICAL, PLUMBING OR ELECTRICAL.
THERMOSTAT.
TRANSFORMER.
METER, ELECTRIC.
PHASE.
NOTES:
1. SEE LIGHTING FIXTURE SCHEDULE FOR MANUFACTURER TYPES AND MOUNTING.
LIGHTING FIXTURE, RECESSED, SURFACE OR PENDENT MOUNTED.
CAPITAL LETTER INDICATES FIXTURE TYPE (SEE FIXTURE
EXIT LIGHT, CEILING MOUNTED. (ARROWS INDICATE DIRECTION
OF EXIT).
SWITCH, SINGLE POLE, 20A, HEAVY DUTY TOGGLE, BROWN HANDLE, 120-277 VOLT,
20 AMPERE, GROUNDING TYPE.
SWITCH, SAME AS SINGLE POLE, 20A, HEAVY DUTY TOGGLE, EXCEPT THREE POLE.
RECEPTACLE, DUPLEX, 125 VOLT, 20 AMPERE, 2 POLE, 3 WIRE,
GROUNDING TYPE. GFI=GROUND FAULT INTERRUPTER.
DOUBLE DUPLEX RECEPTACLE RECESSED WALL MOUNTED.
2P, 3W, 125 VOLT, 20 AMPERE
DATA OUTLET WITH DEVICE IN PLATE, MOUNTED IN RECESSED
RECEPTACLE, SINGLE, 125 VOLT, 20 AMPERE, 2 POLE, 3 WIRE,
GROUNDING TYPE.
WALL MOUNTED, DOUBLE DUPLEX RECEPT, 2P, 3W, 125 VOLTS,
20 AMPS, MOUNT BOTTOM OF BOX 16" A.F.F. (U.N.O.)
TELEPHONE OUTLET WITH JACK DEVICE IN PLATE, MOUNTED IN
SAFETY SWITCH, NON-FUSED, HEAVY DUTY.
SAFETY SWITCH, FUSED, HEAVY DUTY.
MOTOR STARTER, COMBINATION TYPE WITH DISCONNECT MEANS
(CIRCUIT BREAKER, FUSED SWITCH OR NON-FUSED SWITCH).
REQUIRED.
CONTACT, MAGNETIC.
MOTOR
GROUND POINT.
JUNCTION BOX, RECESSED INSTALLATION UNLESS OTHERWISE
NOTED.
CONDUIT WITH WIRE, EXPOSED TURNING DOWN
CONDUIT WITH WIRE, CONCEALED IN CEILING OR WALLS.
HOMERUN CONDUIT WITH WIRE, TO LIGHTING/POWER PANEL,
NUMERALS INDICATE BREAKER NUMBER.
CONDUIT WITH WIRE, CONCEALED BELOW FLOOR
OF POLES, FUSE SIZE OR
CIRCUIT BREAKER SIZE AS
A
S
3
S
VOLTAGE, SIZE, NUMBER
SPEAKER, CEILING MOUNTED.
SWITCH, FIRE ALARM SYSTEM, (FS) FLOW SWITCH, (PS)
SPRINKLER TAMPER SWITCH, FIRE ALARM SYSTEM.
PUBLIC ADDRESS WALL CONTROL STATION/INTERCOM
DOOR STRIKE, ELECTRIC.
PHOTO CELL.
CLOSED CIRCUIT T.V. CAMERA.
S
P
S
4
POLE, 20A, HEAVY DUTY TOGGLE, PILOT LIGHT, RED NEON, 1/25 W, 125 OR
SWITCH AND PILOT LIGHT COMBINATION, SWITCH SAME AS SINGLE
SWITCH, SAME AS SINGLE POLE, 20A, HEAVY DUTY TOGGLE, EXCEPT FOUR WAY.
277 VOLT, RECESSED WALL MOUNTED.
SWITCH, SAME AS SINGLE POLE, 20A, HEAVY DUTY TOGGLE, EXCEPT KEY OPERATED.
SK
SM
SWITCH-MANUAL MOTOR STARTER WITH THERMAL OVERLOAD.
DIMMER SWITCH, INCANDESCENT 120 VOLT, WATTAGE SIZE AS
NOTED IN SPECIFICATIONS.
ELECTRICAL PANEL.
RECESSED FLOOR BOX & WIRED TO TELEPHONE SYSTEM CABINET.
AMP
ABOVE FINISHED FLOOR
BREAKER
CONDUIT
CIRCUIT BREAKER
DRAWING
EXISTING
GROUND FAULT INTERRUPTER
GROUND
CIRCUIT
A
AFF
BRKR
C
CKT
DWG
CB
EXIST.
GND
10. ALL SPECIAL SYSTEM WIRING REQUIREMENTS SHALL BE AS SPECIFIED
BY THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
480v, 208v, 3 PHASE, 4 WIRES
KEYPAD - ACCESS CONTROL SYSTEM
INTERCOM STATION
PUSHBUTTON STATIONS
GFI
WP WEATHERPROOF
W
S
P
EXIT LIGHT, WALL MOUNTED. (ARROWS INDICATE DIRECTION
OF EXIT).
DRAWINGS.
ABBREVIATIONS
LEGEND
J J
T
T
Ø
SCHEDULES ON DWG. E-XX).
LIGHTING FIXTURE WIRED TO EMERGENCY PANEL OR W/EMERGENCY BALLAST
SAME AS ABOVE EXCEPT MTD. IN RECESSED FLOOR BOX.
FLOOR BOX & WIRED TO DATA SYSTEM.
SAME AS ABOVE EXCEPT WALL MOUNTED 16" AFF TO BOTTOM
P1
1
ULTRASONIC OCCUPANCY SENSOR & POWER PACK ASSEMBLY.
PASSIVE INFRARED LOW TEMPERATURE OCCUPANCY SENSOR &
POWER PACK ASSEMBLY.
CONTROL BOX FOR ELECTRONIC WATER FLUSHING SYSTEM
FURNISHED BY PLUMBING CONTRACTOR
FIRE PROTECTION WATER FLOW RELEASE CONTROL PANEL,
FURNISHED BY PLUMBING CONTRACTOR.
RECEPT
CONV CONVENIENCE
RECEPTACLE
OF BOX WITH STUB TO THE CEILING AND CAT 6 CABLE.
SAME AS ABOVE EXCEPT ISOLATED GROUND.
PRESSURE SWITCH.
SPECIAL PURPOSE OUTLET, NEMA RATING AS INDICATED ON
IG
SD
a
GFI
TV
PC
WIREMOLD RACEWAY 4000 WITH DIVIDER
TV OUTLET
EC ELECTRICAL CONTRACTOR
GENERAL CONSTRUCTION CONTRACTORGC
XFMR
MTD
PECO
NIC
UON UNLESS OTHERWISE NOTED
NOT IN CONTRACT
PHILADELPHIA ELECTRIC COMPANY
MOUNTED
TRANSFORMER
(NOT ALL SYMBOLS MAY BE USED ON DRAWINGS)
DOWNLIGHT FIXTURE
ABOVE DOOR LIGHT FIXTURE
FS
TS
SPEAKER, WALL MOUNTED.S
PA
K
I
11. ALL WIRING AND CONDUIT TO BE CONCEALED IN WALLS AND ABOVE FINISHED
CEILINGS UNLESS OTHERWISE NOTED. THE EC SHALL COORDINATE WORK
WITH THAT OF THE GENERAL CONSTRUCTION CONTRACTOR DURING WALL AND
CEILING CONSTRUCTION. ALL EXPOSED WIRING SHALL RUN IN CONDUIT.
12" ROUND, BATTERY OPERATED WIRELESS ANALOG CLOCK.
TELEPHONE OUTLET WITH JACK DEVICE IN PLATE, WALL
MOUNTED, 16" A.F.F., U.O.N., STUB TO THE CEILING AND WIRED TO
TELEPHONE SYSTEM (CAT 6 CABLE).
SAME AS ABOVE EXCEPT MOUNT 48" TO TOP OF BOX.
EXISTING(E)
NEW(N)
WALL MOUNTED RECESSED RECEPT, 2P, 3W, 125 VOLTS,
20 AMPS, MOUNT BOTTOM OF BOX 16" A.F.F.
COMBINATION TEL/DATA OUTLET WITH JACK DEVICE IN PLATE, WALL
MOUNTED, 16" A.F.F., U.O.N., STUB TO THE CEILING AND WIRED TO
TEL/DATA SYSTEM (CAT 6 CABLE).
SHEET 38 OF 61
N/A
SMOKE DETECTOR, CEILING MOUNTED.
DUCT MOUNTED SMOKE DETECTOR
HEAT DETECTOR, CEILING MOUNTED.
FIRE ALARM PULL STATION, MANUAL, WALL MOUNTED, 48" A.F.F.
FIRE ALARM COMBINATION, AUDIO/VISUAL, WALL MOUNTED
FIRE ALARM CONTROL PANEL, RECESSED WALL MOUNTED.
END OF LINE RESISTOR.
FIRE JACK AND FIRE FIGHTER'S PHONE.
SWITCH, FIRE ALARM SYSTEM, (FS) FLOW SWITCH, (PS)
SPRINKLER TAMPER SWITCH, FIRE ALARM SYSTEM.
F
SD
FACP
FAAP
EOL
FIRE ALARM ANNUNCIATOR PANEL
PRESSURE SWITCH.
DD
HD
FS
TS
FIRE ALARM STROBE, WALL MOUNTED.
FIRE ALARM MINI HORN/STROBE WALL MOUNTED
SD
FIRE ALARM SPEAKER AND STROBE
FPJ
FIRE ALARM SPEAKER
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,PHILADELPHIA, PA 19121
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DATEGRAZYNA S. PLICHTAPA PE045538E 09/30/2019
GSPDGW
ARCHITECTURAL
GANNETT FLEMING, INC.ONE PENN PLAZA, SUITE 630250 WEST 34TH STREETNEW YORK, NY 10119Phone: 212.967.9833Fax: 212.232.5791Email: [email protected]: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.232 CECELIA ACRES DRIVEIVYLAND, PA 18974Phone: 215.354.9161Fax: 215.354.9163Email: [email protected]: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.1010 ADAMS AVENUEVALLEY FORGE, PA 19403Phone: 610.650.8156Fax: 610.650.8190Email: [email protected]: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.1801 MARKET STREET, SUITE 2600PHILADELPHIA, PA 19103Phone: 215.557.0106Fax: 215.557.0337Email: [email protected]: Mark D. DeCocinis, CEI
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.207 SENATE AVENUECAMP HILL, PA 17011Phone: 717.763.7211Fax: 717.763.8150Email: [email protected]: Brian Seip, PE
B-075c OF 2018/19B-076c OF 2018/19B-077c OF 2018/19B-078c OF 2018/19
PERMIT SET25 MARCH 2020
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
GENERAL NOTES
DRAWINGS SHALL BE CONSIDERED DIAGRAMMATIC AND ARE
INTENDED TO INDICATE CAPACITY, SIZE, APPROXIMATE
LOCATION AND GENERAL ARRANGEMENT. WHILE THE DRAWINGS
ARE GENERALLY TO SCALE AND ARE AS ACCURATE AS THE
SCALE WILL PERMIT, DIMENSIONS SHALL BE CONFIRMED IN THE
FIELD.
THE CONTRACTOR SHALL COMPLY WITH THE LAWS,
ORDINANCES, RULES AND REGULATIONS OF LOCAL AND
STATE GOVERNMENTAL AUTHORITIES; OF THE NATIONAL FIRE
PROTECTION ASSOCIATION AS INTERPRETED BY THE
ENFORCING AUTHORITY HAVING JURISDICTION; AND OF
PUBLIC UTILITIES HAVING CONNECTION WITH ANY OF THE
SYSTEMS HEREIN SPECIFIED.
THE CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS
AND INSPECTIONS REQUIRED BY ANY OF THE FOREGOING
AUTHORITIES, AND PAY FOR ALL OTHER COSTS IN CONNECTION
WITH THE WORK. CERTIFICATES SHALL BE IN DUPLICATE AND
SHALL BE DELIVERED TO THE OWNER.
THE SITE, LOCATION, AND ROUTING OF SYSTEMS INDICATED TO
HAVE NEW CONNECTIONS MADE TO THEM ARE SHOWN AS
ACCURATELY AS FIELD CONDITIONS PERMIT. CONTRACTOR
SHALL VISIT THE SITE AND THOROUGHLY EXAMINE THE
CONTRACT DRAWINGS. ALL EXISTING CONDITIONS SHALL BE
EXAMINED AND THEIR EXACT LOCATIONS VERIFIED. THE
CONTRACTOR SHALL REPORT TO THE ENGINEER ANY
CONDITIONS WHICH MIGHT MAKE INSTALLATION OF REQUIRED
EQUIPMENT A PROBLEM. NO CONSIDERATION OR ALLOWANCE
WILL BE GRANTED FOR FAILURE TO INVESTIGATE CONDITIONS OR
MISUNDERSTANDINGS OF THE CONTRACTUAL REQUIREMENTS.
THE CONTRACTOR SHALL INSTALL AND CONNECT EQUIPMENT
AND MATERIALS IN ACCORDANCE WITH THE BEST ENGINEERING
PRACTICE AND, UNLESS OTHERWISE SHOWN OR SPECIFIED,
FOLLOW THE MANUFACTURER'S PRINTED INSTALLATION
REQUIREMENTS AND RECOMMENDATIONS, AND FURNISH AND
INSTALL REQUIRED AUXILIARY ITEMS TO PROVIDE A COMPLETE
INSTALLATION.
THE CONTRACTOR SHALL REPAIR WALLS, CEILING, FLOORS,
ETC., THAT ARE REQUIRED TO BE PENETRATED, OR OTHERWISE
DISTURBED. THE REPAIRS SHALL BE WITH MATERIALS AND
FINISHES TO MATCH EXISTING. FIRE WALL PENETRATIONS
SHALL BE SEALED WITH SUITABLE MATERIALS TO PRESERVE
FIRE WALL INTEGRITY.
THE CONTRACTOR SHALL REMOVE EQUIPMENT NOT INDICATED
TO BE REUSED TO A DESIGNATED LOCATION AT THE PROJECT
SITE. AFTER THE EQUIPMENT HAS BEEN ASSEMBLED FOR THE
OWNER'S INSPECTION AND POSSIBLE RETENTION, ALL
EQUIPMENT NOT TO BE RETAINED BY THE OWNER SHALL BE
REMOVED FROM THE SITE BY THE CONTRACTOR.
BUILDING SYSTEMS SHALL REMAIN IN SERVICE UNLESS
INDICATED OTHERWISE. OUTAGES OR INTERRUPTIONS SHALL
BE KEPT TO A MINIMUM DURATION. NOTIFY THE OWNER 48
HOURS IN ADVANCE OF ANY OUTAGE OR INTERRUPTION. IF
TEMPORARY CONNECTIONS ARE NECESSARY TO ASSURE THIS
CONTINUITY OF SERVICES, THEY SHALL BE FURNISHED BY THE
CONTRACTOR WITHOUT ADDITIONAL CHARGE TO THE OWNER
AND SHALL BE REMOVED WHEN NO LONGER NEEDED.
THE CONTRACTOR SHALL ARRANGE AND EXECUTE HIS WORK
SUCH THAT ANY CONNECTIONS, BOTH TEMPORARY OR
PERMANENT, TO, OR REARRANGEMENT OF, PRESENT
EQUIPMENT, ETC., SHALL BE MADE IN SUCH A MANNER AS TO
ASSURE FULL RESUMPTION OF SERVICE AT THE TIME
DESIGNATED BY THE OWNER.
NOT ALL ABBREVIATIONS, LINE TYPES, OR SYMBOLS MAY APPEAR
ON THESE CONTRACT DOCUMENTS.
COORDINATE WITH OTHER TRADES TO AVOID
INTERFERENCE AMONG MECHANICAL, ELECTRICAL,
ARCHITECTURAL AND STRUCTURAL, PLUMBING, ETC.
OS WATT STOPPER DUAL TECHNOLOY OCCUPANCY SENSOR #DT200 CEILING MTD
OS
PIR
WATT STOPPER PIR OCCUPANCY SENSOR WPIR - SMALL BATHROOMS
WATT STOPPER PIR OCCUPANCY SENSOR #CI-205-1 - VESTIBULE CEILING MTD
OS
US
WATT STOPPER ULTRASONIC OCCUPANCY SENSOR #WT-1105- STALL BATHROOMS
WATT STOPPER ULTRASONIC OCCUPANCY SENSOR #WT-2255-CORRIDORS -
CEILING MOUNTED
OS
W
WATT STOPPER DUAL TECHNOLOGY OCCUPANCY SENSOR - WALL MOUNTED
WATT STOPPER DUAL TECHNOLOGY OCCUPANCY SENSOR - CEILING MTD, 360 DEG
OS
TS WATT STOPPER DIGITAL TIME SWITCH #TS-200
S WATT STOPPER, LOW VOLTAGE OVERRIDE SWITCH FOR LIGHTING CONTROLS
CONTROL MODULE
UP
UP
UP
1
1
1
1
1
1
3
4
2
2
2
2
2
2
1
1
1
1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1
5 6
7
1 2
UP
UP
UP
EXISTINGPNL "LA"
2
2
2
2
2
TOP OF THE STAIR(BY THE ENTRANCE DOOR)
1
2
1
TOP OF THE STAIR(BY THE ENTRANCEDOOR)
TOP OF THE STAIR(BY THE ENTRANCEDOOR)
1
1
ABOVE LANDING
1 2
GENERAL DEMOLITION NOTES
1. ALL EXISTING INTERIOR LIGHT FIXTURES AND SWITCHES IN SUB-BASEMENT AND SOME AREAS OFTHE BASEMENT, SHALL BE REMOVED UNLESS NOTED OTHERWISE.
2. E.C. SHALL VERIFY THE PANEL DESIGNATION AND CIRCUIT NUMBER FOR EACH DEVICE TO BEREMOVED.
3. ALL SYMBOLS SHOWN LIGHTLY SOLID ARE EXISTING ELECTRICAL DEVICES/EQUIPMENT TOREMAIN.
4. ALL WIRING/CONDUIT LEFT UNUSED SHALL BE REMOVED TO ITS POINT OF ORIGIN AND CIRCUITBREAKER TO BECOME SPARE.
5. PANELBOARDS WHICH ARE AFFECTED BY THE DEMOLITION AND NEW WORK SHALL HAVE THEPANEL SCHEDULES REVISED.
6. COORDINATE ALL WORK WITH OTHER TRADES.
7. ELECTRICAL CONTRACTOR SHALL NOT DISCONNECT ANY EQUIPMENT, OR ELECTRICALCIRCUITS IN THE RENOVATED AREA WITHOUT PRIOR NOTIFICATION AND PERMISSION FROMMAINTENANCE AND ENGINEERING DEPARTMENT. EXTREME CARE SHALL BE TAKEN TOMINIMIZE DISTURBANCE TO SURROUNDING AREAS.
8. VERIFY ALL CONDITIONS AT JOB SITE.
DEMOLITION KEY NOTES
1
EXISTING LIGHT FIXTURE TO BE REMOVED. SEE GENERAL DEMOLITION NOTES.
EXISTING SWITCH TO BE REMOVED. SEE GENERAL DEMOLITION NOTES.
EXISTING GENERATOR TO BE REMOVED. SEE GENERAL DEMOLITION NOTES.
EXISTING AUTOMATIC TRANSFER SWITCH TO BE REMOVED. SEE GENERAL DEMOLITION NOTES.
EXISTING FUSED DISCONNECT SWITCH TO BE REMOVED.
EXISTING EMERGENCY SYSTEM JUNCTION/PULL BOX ABOVE ATS TO BE REMOVED.
EXISTING EMERGENCY SYSTEM CONDUIT AND CABLE - REMOVE SECTION EXPOSED TO FLOOD.
2
3
4
5
6
7
1/8" = 1'-0"
E-101
SCALE: 1/8" = 1'-0"
ELECTRICAL SUB-BASEMENT DEMOLITION PLAN - LIGHTING
1
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,PHILADELPHIA, PA 19121
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DATEGRAZYNA S. PLICHTAPA PE045538E 09/30/2019
GSPDGW
ARCHITECTURAL
GANNETT FLEMING, INC.ONE PENN PLAZA, SUITE 630250 WEST 34TH STREETNEW YORK, NY 10119Phone: 212.967.9833Fax: 212.232.5791Email: [email protected]: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.232 CECELIA ACRES DRIVEIVYLAND, PA 18974Phone: 215.354.9161Fax: 215.354.9163Email: [email protected]: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.1010 ADAMS AVENUEVALLEY FORGE, PA 19403Phone: 610.650.8156Fax: 610.650.8190Email: [email protected]: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.1801 MARKET STREET, SUITE 2600PHILADELPHIA, PA 19103Phone: 215.557.0106Fax: 215.557.0337Email: [email protected]: Mark D. DeCocinis, CEI
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.207 SENATE AVENUECAMP HILL, PA 17011Phone: 717.763.7211Fax: 717.763.8150Email: [email protected]: Brian Seip, PE
B-075c OF 2018/19B-076c OF 2018/19B-077c OF 2018/19B-078c OF 2018/19
PERMIT SET25 MARCH 2020
SCALE: 1/8" = 1'-0"
ELECTRICAL BASEMENT DEMOLITION PLAN - LIGHTING
2
DIAMOND ST.N. 1
6TH
ST.
N. 1
5TH
ST.
N
KEYPLAN
ELECTRICAL SUB-BASEMENTAND BASEMENT
DEMOLITION PLANS
SHEET 39 OF 61
UP
UP
UP
BOILER ROOM
SB-01
STAIRWELL
S-00
FREIGHT
ELEVATOR
MACHINE ROOM
SB-03
FREIGHT
ELEVATOR
TELECOM ROOM
SB-02
EX1
EX1
ab
EX1G
F
GF
EM/NL
EM/NL
EM/NL
DEM/NL DIM
3
4
F
EM/NLEM
EM/NL
G
EM/NL
G
A a A a
A b A a A b A a
A a A b A b
A a A b
CDIM
DIM
B
EM
b6
B b
A a
6
DIMC
DIM
DIM
2
LIGHT FIXTURE TO BE CONTROLLED BYOCCUPANCY SENSOR TO DIM 50% IF SPACE ISNOT OCCUPIED (NO AUTOMATIC SHUT-OFF).CIRC. #EM-1 (TYPICAL)
DIM
EM-1
EM-1EM-1
EM-1
EM-1
EM-1
EM-1
EM-1
LIGHT FIXTURE TO BE CONTROLLED BYOCCUPANCY SENSOR TO DIM 50% IF SPACE ISNOT OCCUPIED (NO AUTOMATIC SHUT-OFF).CIRC. #EM-1 (TYPICAL)
REFER TO ENLARGED PLAN3/102 THIS SHEETFOR ADDITIONALWORK IN THIS AREA.
UP
UP
UP
TRANSFORMER
& SWITCH
ROOM
B-16
PASSAGE
B-18
RECEIVING
AREA
B-17
CUSTOD'N
OFFICE
B-15
KITCHEN HELP
LOCKER RM.
B-14
JANITOR
SUPPLIES
B-13
HEUPS
LOCKER RM
B-12
STORAGE
B-11
B-12A
KITCHEN HELP
TOILET RM
B-14A
OFF. TOIL.
B-15B
COMPRESSOR
SPACE
B-17A
ELEV.
MACHINE
ROOM
B-10
UNEXCAVATED
CRAWL
SPACE 'C'
B-9B
UNEXCAVATED
METER ROOM
MR-5
CORRIDOR
NO.1
B-1
ELEV. NO.1
B-12B
UPPER PART
OF
MECHANICAL
EQUIPMENT
ROOM
MR-1
PIPE SPACE
CLO.
B-15C
ELEV NO.2
EXISTINGPNL "LA"
TOP OF THE STAIR(BY THE ENTRANCEDOOR)
a
5
5
GEM/NL
DIM
b
TOP OF THE STAIR(BY THE ENTRANCEDOOR)
a
5
G
EM/NL
DIM
b
LIGHT FIXTURE TO BE CONTROLLED BYOCCUPANCY SENSOR TO DIM 50% IF SPACE ISNOT OCCUPIED (NO AUTOMATIC SHUT-OFF).CIRC. #EM-1(TYPICAL)
F F
2
LIGHT FIXTURE TO BE CONTROLLED BYOCCUPANCY SENSOR TO DIM 50% IF SPACE ISNOT OCCUPIED (NO AUTOMATIC SHUT-OFF).CIRC. #EM-1(TYPICAL)
SEE EP-201 FOR ADDITIONALWORK IN THIS AREA.
REFER TO ENLARGED PLAN3/102 THIS SHEETFOR ADDITIONALWORK IN THIS AREA.
SHEET NOTES
1ELEVATOR PIT LIGHTING - PROVIDE ALL NEW CONDUIT AND WIRING.
2#12 + 1#12 GND - 3/4"C TO EXISTING PANEL "LA", 20/1 CIRCUIT BREAKER AVAILABLE AFTER DEMOLITION IS COMPLETED.FIELD VERIFY CIRCUIT NUMBER.
COORDINATE FINAL LOCATION OF LIGHTING FIXTURES WITH THE EQUIPMENT LAYOUT, PIPING, DUCTS, CONDUIT AND ETC.
LIGHT FIXTURES SHALL BE CHAIN MOUNTED AT THE HEIGHT OF 14' AFF
PROVIDE NEW 3-WAY LIGHTING SWITCH TO CONTROL NEW LIGHTS - LOCATE ON THE TOP OF THE STAIRS (AT THE ENTRANCE.
LIGHTING CIRCUIT SERVING LIGHTS MARKED AS "EM" AND SWITCHED WITH NORMAL LIGHTING SHALL BE CONTROLLED BYEMERGENCY LIGHTING CONTROL UNIT (ELCU). SEE DETAIL 2/104 FOR DETAILS.
CONNECT TO DEDICATED GFI RECEPTACLE CIRCUIT IN THE ELEVATOR PIT (LINE SIDE).
CONNECT TO DEDICATED GFI RECEPTACLE CIRCUIT IN THE ELEVATOR MACHINE ROOM (LINE SIDE).
FUSED DISCONNECT SWITCH FOR ELEVATOR CAR LIGHTS - 30/1/15A, LOCKABLE TYPE. COORDINATE LOCATION WITH ELEV.VENDOR/SHOP DRAWINGS.
PROVIDE NEW PIT LIGHT SWITCH LOCATED AT THE TOP OF PIT ACCESS LADDER.
2
3
4
5
6
7
8
9
10
7
ELEVATOR PIT(TYPICAL)
H
9
EM-5
HH
H
PB-33
EXISTING LIGHTINGTO REMAIN
10
1
1
1
1
FREIGHT
ELEVATOR
MACHINE ROOM
SB-03
FREIGHT
ELEVATOR
F
F
8
H
EM-3
9
7
PB-34
H
H
H
ELEVATOR PIT(TYPICAL)
1
1
1
1
10
PB-38
AS NOTED
E-102
SCALE: 1/8" = 1'-0"
ELECTRICAL SUB-BASEMENT NEW WORK PLAN - LIGHTING
1
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,PHILADELPHIA, PA 19121
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DATEGRAZYNA S. PLICHTAPA PE045538E 09/30/2019
GSPDGW
ARCHITECTURAL
GANNETT FLEMING, INC.ONE PENN PLAZA, SUITE 630250 WEST 34TH STREETNEW YORK, NY 10119Phone: 212.967.9833Fax: 212.232.5791Email: [email protected]: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.232 CECELIA ACRES DRIVEIVYLAND, PA 18974Phone: 215.354.9161Fax: 215.354.9163Email: [email protected]: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.1010 ADAMS AVENUEVALLEY FORGE, PA 19403Phone: 610.650.8156Fax: 610.650.8190Email: [email protected]: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.1801 MARKET STREET, SUITE 2600PHILADELPHIA, PA 19103Phone: 215.557.0106Fax: 215.557.0337Email: [email protected]: Mark D. DeCocinis, CEI
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.207 SENATE AVENUECAMP HILL, PA 17011Phone: 717.763.7211Fax: 717.763.8150Email: [email protected]: Brian Seip, PE
B-075c OF 2018/19B-076c OF 2018/19B-077c OF 2018/19B-078c OF 2018/19
PERMIT SET25 MARCH 2020
SCALE: 1/8" = 1'-0"
ELECTRICAL PARTIAL BASEMENT NEW WORK PLAN - LIGHTING
2
DIAMOND ST.N. 1
6TH
ST.
N. 1
5TH
ST.
N
KEYPLAN
ELECTRICAL SUB-BASEMENTAND BASEMENT LIGHTING
PLANS
LAMP
TYPEPLAN
SYMBOL MANUFACT.TYPE CATALOGNUMBER VOLT
NO.REMARKSMOUNT.
WATT
A 120 1
EX1 EVENLITE TLX-RU - UNIV2LED120
DAY-BRITE LED 58 PENDANT
B
C
4' LINEAR, INDUSTRIAL TYPE FIXTURE; NOTE #1CHAIN MOUNTED IN HIGH CEILING AREAS, SURFACE MOUNTED ON LOW CEILINGS
120 1DAY-BRITE LED 58 PENDANT4' LINEAR, INDUSTRIAL TYPE FIXTURE; CHAIN MOUNTED IN HIGH CEILING AREAS,
SURFACE MOUNTED ON LOW CEILINGS; EMERGENCY CIRCUIT; NOTE #1
120 1DAY-BRITE LED 58 PENDANT4' LINEAR, INDUSTRIAL TYPE FIXTURE; OCCUPANCY SENSOR WITH HI-LO DIMMING (NO AUTO-SHUT OFF); CHAIN
MOUNTED IN HIGH CEILING AREAS, SURFACE MOUNTED ON LOW CEILINGS; EMERGENCY CIRCUIT; NOTE #1
FSI470L835-UNIV-DIM
FSI470L835-UNIV-DIM
FSI470L835-UNIV-DIMLSXR10ADC
D 120 1DAY-BRITE LED 58 WALL4' LINEAR, INDUSTRIAL TYPE FIXTURE; OCCUPANCY SENSOR WITH HI-LO DIMMING (NO AUTO-SHUT OFF);
EMERGENCY CIRCUIT; NOTE #1FSI470L835-UNIV-DIM
LSXR10ADC
EDGE LIT EXIT SIGN; DIRECTIONAL ARROWS AS INDICATED; SINGLE FACE
LIGHTING CONTROLS SEQUENCE OF OPERATION:
1. BOILER ROOM - MANUAL ON/OFF SWITCH FOR LOCAL CONTROL OF GENERAL LIGHTING.
2. EGRESS LIGHTING TRANSFER TO EMERGENCY/LIFE SAFETY POWER SOURCE AND FULL ON WITH LOSS OF NORMAL POWER.
4. EGRESS LIGHTING TO DIM 50% WITHIN 20 MINUTES OF OCCUPANTS LEAVING.
F 120 1DAY-BRITE LED 31 SURFACE 4' LINEAR, INDUSTRIAL TYPE FIXTURE; NOTE #1FSI440L835-UNIV-DIM
G 120 1DAY-BRITE LED 31 SURFACE4' LINEAR, INDUSTRIAL TYPE FIXTURE; OCCUPANCY SENSOR WITH HI-LO DIMMING (NO AUTO-SHUT OFF);
EMERGENCY CIRCUIT; NOTE #1FSI440L835-UNIV-DIM
LSXR10ADC
NOTES:1. PROVIDE WIREGUARD FOR FIXTURES INSTALLED IN THE BOILER ROOM.
H STONCO TW20-NW-G1-8 - WALL20LED120 ELEVATOR PIT LIGHT
SHEET 40 OF 61
SCALE: 1/4" = 1'-0"
PARTIAL SUB-BASEMENT PLAN - LIGHTING
3
SCALE: 1/4" = 1'-0"
PARTIAL BASEMENT PLAN - LIGHTING
4
PNL "PB2"
UP
UP
UP
BOILER ROOM
SB-01
STAIRWELL
S-00
FREIGHT
ELEVATOR
MACHINE ROOM
SB-03
FREIGHT
ELEVATOR
TELECOM ROOM
SB-02
TERMINATE EXISTING EMERGENCYSYSTEM CONDUIT/CABLE AT THE NEWWALL MOUNTED PULL BOX. EXTENDNEW FEEDER AS REQUIRED TO THISPULL BOX.
UP TO NEW PANEL "EM"
3 4
EXISTING EMERGENCY SYSTEMCONDUIT WITH FEEDERCONDUCTORS TERMINATED ATEXISTING NORM-EM PANEL "NE"(FIRST FLOOR - CORRIDOR 101).
NEW AUTOMATICTRANSFER SWITCH
PROPOSEDLOCATIONOF NEW 30KWDIESELEMERGENCYGENERATOR
UP
UP
CREATIVE
ARTS
B-19
CORRIDOR
NO.2
B-1A
TRANSFORMER
& SWITCH
ROOM
B-16
PASSAGE
B-18
PUPIL EQUIP'T
B-19A
RECEIVING
AREA
B-17
CUSTOD'N
OFFICE
B-15
KITCHEN HELP
LOCKER RM.
B-14
JANITOR
SUPPLIES
B-13
HEUPS
LOCKER RM
B-12
STORAGE
B-11
B-12A
KITCHEN HELP
TOILET RM
B-14A
OFF. TOIL.
B-15B
COMPRESSOR
SPACE
B-17A
UNEXCAVATED
CRAWL
SPACE 'C'
B-9B
UNEXCAVATED
METER ROOM
MR-5
CORRIDOR
NO.1
B-1
UPPER PART
OF
MECHANICAL
EQUIPMENT
ROOM
MR-1
PIPE SPACE
CLO.
B-15C
TEACHERS CLOS
B-19C
ELEV NO.2
EXISTINGPNL "LA"
NEW PANEL "EM"
PROTECTIVE BOLLARDS - 5" HEAVY GAUGE,GALVANIZED STEEL PIPE FILLED WITH CONCRETE,SET IN 16" DIAMETER CONCRETE WITH MIN.HEIGHT OF 4' AFG. CONCRETE SHALL BE 5000 PSI,AIR ENTRAINED. THE BOLLARDS SHALL BE PAINTEDBRIGHT YELLOW, WITH FLUORESCENT PAINT ORMARKED WITH FLUORESCENT TAPE SUITABLE FOROUTDOOR USE.GENERAL CONTRACTOR WILL PROVIDEBOLLARDS. (TYPICAL).
PROVIDE WALL MOUNTED NEMA 4XPULL BOX WITH SEPARATECOMPARTMENT FOR LINE AND LOWVOLTAGE SYSTEMS (OR TWO SEPARATEPULL BOXES), COORDINATE IN FIELDLOCATION.
PROVIDE WALL MOUNTED PULL BOXWITH SEPARATE COMPARTMENT FORLINE AND LOW VOLTAGE SYSTEMS (ORTWO SEPARATE PULL BOXES),COORDINATE IN FIELD LOCATION.
1 2A A
3
3
42
4
4
CORE DRILL EXISTING AIRWAYCONCRETE WALL.REFER TO SHEET E-105 FOR DETAILS.
CORE DRILL EXISTING AIRWAYCONCRETE WALL.REFER TO SHEET E-105 FOR DETAILS.
4
4
EXISTINGAIRWAY
PROPOSED LOCATION OFGENERATOR REMOTE ANNUNCIATORPANEL. FINAL LOCATION TO BEAPPROVED BY SDP.
5
5
GENERATOR PAD TO BEPROVIDED BYGENERAL CONTRACTOR.
SHEET NOTES:
PROVIDE UNDERGROUND CONDUIT BANK ENCASED IN CONCRETE ENVELOPE. REFER TO DUCTBANK A-A DETAIL.
PRIOR TO START OF EXCAVATING, E.C. SHALL INVESTIGATE AND LOCATE ALL UNDERGROUNDUTILITIES, CONDUIT RUNS, PIPING AND ETC.
ALL EXPOSED CONDUIT RUNS/STUB-UPS SHALL BE GALVANIZED RIGID STEEL. TYPICAL.
REFER TO SHEET E-105 FOR ADDITIONAL EMERGENCY GENERATOR INSTALLATION DETAILS.
COORDINATE RUN OF CONDUITS WITH LOCATION OF UNDERGROUND FUEL OIL LINES/UST.
1
2
3
4
5 1/8" = 1'-0"
ELECTRICAL SUB-BASEMENTAND BASEMENT NEW WORK
PLANS - POWER
E-103
SCALE: 1/8" = 1'-0"
ELECTRICAL SUB-BASEMENT NEW WORK PLAN - POWER
2
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,PHILADELPHIA, PA 19121
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DATEGRAZYNA S. PLICHTAPA PE045538E 09/30/2019
GSPDGW
ARCHITECTURAL
GANNETT FLEMING, INC.ONE PENN PLAZA, SUITE 630250 WEST 34TH STREETNEW YORK, NY 10119Phone: 212.967.9833Fax: 212.232.5791Email: [email protected]: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.232 CECELIA ACRES DRIVEIVYLAND, PA 18974Phone: 215.354.9161Fax: 215.354.9163Email: [email protected]: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.1010 ADAMS AVENUEVALLEY FORGE, PA 19403Phone: 610.650.8156Fax: 610.650.8190Email: [email protected]: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.1801 MARKET STREET, SUITE 2600PHILADELPHIA, PA 19103Phone: 215.557.0106Fax: 215.557.0337Email: [email protected]: Mark D. DeCocinis, CEI
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.207 SENATE AVENUECAMP HILL, PA 17011Phone: 717.763.7211Fax: 717.763.8150Email: [email protected]: Brian Seip, PE
B-075c OF 2018/19B-076c OF 2018/19B-077c OF 2018/19B-078c OF 2018/19
PERMIT SET25 MARCH 2020
SCALE: 1/8" = 1'-0"
ELECTRICAL BASEMENT NEW WORK PLAN - POWER
1
DIAMOND ST.N. 1
6TH
ST.
N. 1
5TH
ST.
N
KEYPLAN
MINIMUM BURIAL DEPTHS TO TOP OF ELECTRIC DUCTS OR CABLES SHALLBE IN ACCORDANCE WITH THE NEC. MAXIMUM DEPTH TO THE TOPOF ELECTRIC DUCT BANKS SHALL BE 30 INCHES.
BURIAL DEPTHS SHALL BE PERMITTED TO BE INCREASED IN PART(S) OF THEDUCT RUN TO AVOID UNDERGROUND OBSTRUCTIONS WITHOUTDECREASING THE RATED AMPACITY OF THE CONDUCTORS. THE TOTALLENGHT OF PARTS OF THE DUCT RUN INCREASED IN DEPTH TO AVOIDOBSTRUCTION MUST BE LESS THAN 25% OF THE TOTAL RUN LENGTH ORELSE THE CAPACITY REDUCTION FACTOR OF NOTE 4 OF TABLES 310-69THROUGH 310-84 IN THE NEC SHALL BE APPLIED.
ALL DUCT BANKS SHALL BE INSTALLED PER THE NATIONAL ELECTRIC CODE.
NOT TO SCALE
NO. 4 AWG STRANDED COPPER GROUNDCONDUCTOR. CONNECT (CADWELD) TOEXISTING GROUNDING SYSTEM
NUMBER OF CONDUITS, SIZE ANDTYPE, AS INDICATED ON PLANS.
NO. 4 AWG COPPER GROUNDCONDUCTOR
CABLE
EARTH FILL
RED PLASTICMARKER TAPE
STEELREINFORCEDCONCRETE.
TYPICAL INSTALLATION OF CONCRETEENCASED UNDERGROUND CONDUITS
TYPICAL DUCTBANK DETAILSCALE: NONE
PROVIDE ANDINSTALL SPACERSAS REQUIRED.SECURE CONDUIT(S)TO SPACERS.
(4) ENCASEMENT TYPESCHEDULE 40 PVC CONDUITS
EXISTINGGRADE
NOTES:
GENERATOR DUCT BANK DETAIL A-ANOT TO SCALE
1" PVC SCH 40 JACKET HEATERBATTERY CHARGERCONVENIENCE RECEPT.
3/4" PVC SCH. 40 CONDUIT(REMOTE STARTER)
2" PVC SCH 40 CONDUITW/ POWER CONDUCTORS.
NO. 4 AWG STRANDED COPPERGROUND CONDUCTOR.CONNECT (CADWELD) TOEXISTING GROUNDING SYSTEM
3000 PSI CONCRETE ENVELOPE.
1" PVC SCH. 40 CONDUIT(REMOTE ANNUNCIATOR)
1'-0"
45°
AS REQ,D.
GENERATOR PADSCALE: 1/2" = 1'-0"
TYP.
BROOM FINISHED, 8" THICK, 3500 PSI, AT 28 DAYS,AIR ENTRAINED CONCRETE PAD WITH TURN-DOWN REINF.FOOTING ALL SIDES (PITCH 1/4 "/FT)
(2) #5 REBAR, CONTINUOUS TOP AND BOTTOM
CHAMFERED EDGE ALL AROUND
#5 REBAR @ 12" O.C. EA. WAY
COMPACTEDFREE-DRAINING MATERIAL
SHEET 41 OF 61
3
4
5
6
NOTE:1. GENERATOR PAD TO BE PROVIDED BY GENERAL CONTRACTOR.2. ELECTRICAL CONTRACTOR SHALL COORDINATE ALL WORK WITH G.C.
NOTE:1. DUCT BANK CONCRETE ENCASEMENT TO BE PROVIDED BY GENERAL CONTRACTOR.2. ELECTRICAL CONTRACTOR SHALL COORDINATE ALL WORK WITH G.C.3. SEE OTHER DETAILS THIS SHEET FOR ADDITIONAL INFORMATION.
NOTE:1. DUCT BANK CONCRETE ENCASEMENT TO BE PROVIDED BY GENERAL CONTRACTOR.2. ELECTRICAL CONTRACTOR SHALL COORDINATE ALL WORK WITH G.C.3. SEE OTHER DETAILS THIS SHEET FOR ADDITIONAL INFORMATION.
NOTE:1. DUCT BANK CONCRETE ENCASEMENT TO BE PROVIDED BY GENERAL CONTRACTOR.2. ELECTRICAL CONTRACTOR SHALL COORDINATE ALL WORK WITH G.C.3. SEE OTHER DETAILS THIS SHEET FOR ADDITIONAL INFORMATION.
NONE
E-104
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,PHILADELPHIA, PA 19121
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DATEGRAZYNA S. PLICHTAPA PE045538E 09/30/2019
GSPDGW
ARCHITECTURAL
GANNETT FLEMING, INC.ONE PENN PLAZA, SUITE 630250 WEST 34TH STREETNEW YORK, NY 10119Phone: 212.967.9833Fax: 212.232.5791Email: [email protected]: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.232 CECELIA ACRES DRIVEIVYLAND, PA 18974Phone: 215.354.9161Fax: 215.354.9163Email: [email protected]: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.1010 ADAMS AVENUEVALLEY FORGE, PA 19403Phone: 610.650.8156Fax: 610.650.8190Email: [email protected]: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.1801 MARKET STREET, SUITE 2600PHILADELPHIA, PA 19103Phone: 215.557.0106Fax: 215.557.0337Email: [email protected]: Mark D. DeCocinis, CEI
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.207 SENATE AVENUECAMP HILL, PA 17011Phone: 717.763.7211Fax: 717.763.8150Email: [email protected]: Brian Seip, PE
B-075c OF 2018/19B-076c OF 2018/19B-077c OF 2018/19B-078c OF 2018/19
PERMIT SET25 MARCH 2020
ELECTRICALDETAILS
SERVES:
LETTERING SIZE = 10 PT.
CATEGORY I NAMEPLATES
1 3/16"
"SERVES"
LOCATION:
VOLTAGE:
"SERVED BY"
CIRCUIT NO:
2 1/2"
1 3/16"
VOLTAGE:
LOCATION:SERVED BY:CIRCUIT NO:
2 1/2"
ELECTRICAL IDENTIFICATION: PANELBOARD
ARC FLASH WARNING LABEL
2" MIN.
INSIDE FACE OF WALL
FLOOR SEAL
TYPICAL CABLE (CONDUIT)
DRAWINGS
4" OR ASNOTED ON
FINISHED FLOOR
TYPICAL CABLE (CONDUIT)2" MIN.
SCALE: NONE
DUCTILE IRON PIPE SLEEVE ORGALVANIZED STEEL PIPE SLEEVEWITH WATERSTOP WELDED ALLAROUND EACH SIDE
FIRE RATED CAULKING/BARRIERAS REQUIRED TO MATCH FIRERATING OF WALL
DUCTILE IRON PIPE SLEEVE ORSCH. 40 GALVANIZED STEEL PIPEWITH WATERSTOP WELDED ALLAROUND EACH SIDE
FIRE RATED CAULKING/BARRIERAS REQUIRED TO MATCH FIRERATING OF FLOOR
INTERLOCKING SYNTHETIC RUBBERLINK TYPE SLEEVE CLOSURE.(TYPICAL)
CATEGORY I NAMEPLATE"SERVED BY"
EMERGENCY SYSTEMMARKER (IF APPLICABLE)
SCALE: NONE
SCALE: NONE
TYPICAL DETAIL FOR CABLE ORCONDUIT PASSING THROUGH FLOORSLABS OR WALL
PHENOLIC ENGRAVEDPLATE
Receptacle Outlet DetailNOT TO SCALE
+24VDC
Common
Control Output
Control Output
Common
+24VDC
Neutral
Hot
Red
Blk
Pack
Blk
Blu
Wht
Power
Any
Sensor
24VDC
Red
Ceiling/Wall
Sensor
24VDC
Any
Red
ad
oL
MULTIPLE OCCUPANCY SENSORS/SWITCH(S)LIGHTING CONTROL DETAIL
SEQUENCE OF OPERATION1. LIGHTING AUTO ON TO 100% WHEN OCCUPANCY DETECTED.2. MANUAL OFF WITH SWITCH.3. AUTO OFF ALL LIGHTING WITHIN 20 MINUTES OF OCCUPANTS LEAVING.
Local
Off
Switch
Quantity
as
shown
Quantity
as
shown
Quantity
as
shown
CORRIDOR
d
a
L
o
Single Switch
Neutral
Line
Green/Yellow
Green
Black
Ground
Ground
Red
SEQUENCE OF OPERATION1. LIGHTING IS MANUALLY CONTROLLED ON/OFF WITH OCCUPANCY SENSOR SWITCH.2. LIGHTING WILL AUTO OFF WITHIN 20 MINUTES OF OCCUPANTS LEAVING.
WALL SWITCH OCCUPANCY SENSORLIGHTING CONTROL DETAIL
Emergency Lighting
Emergency Line
Emergency Neutral
On/Off Control Device
Relay
Powerpack
Wall Switch
EmergencyPower
Normal Line
Normal Neutral
Normal Lighting
Jumper Wire or Normally Closed Input
Test Switch
Fire Alarm Input
Security Input
Other
"Sensing"
Line
"Switching"
Line
NormalPower
EMERGENCY LIGHTING CONTROL UNIT TYPICAL WIRINGNOT TO SCALE:
ELCU
2
1
5
3
7
4
8
SHEET 42 OF 61
PANELBOARD #CIRCUIT BREAKER #
Receptacle and Light inElevator Pit DetailNOT TO SCALE
9
LB FITTING
LIGHT FIXTURE
CONTINUOUS DUCTBANK
REINFORCING
STEEL CONDUITS (TYP.)
EXISTING FOUNDATION
WALL (EXTERIOR)
2" MIN.
CORE DRILLED (TYP.)
STAINLESS STEEL CONCRETE ANCHOR
SPACING AS REQUIRED
STAINLESS STEEL PIPE SPACER-LENGTH DETERMINED
BY SIZE OF FITTINGS USED AND SPACE REQUIRED FOR
SERVICING CONDUIT SEAL
SEALING LOCKNUT
(TYP.)
TERMINAL BOX
PULL BOX OR
WHERE PVC CONDUIT IS USED IN DUCTLINE, CONVERT TO
STEEL CONDUIT USING AN APPROPRIATE ADAPTER FITTING
EXPANDABLE RUBBER SEAL
LOCKNUT AND
INSULATED
BUSHING (TYP.)
SEALING
NOTE:
REINFORCING
CONTINUOUS DUCTBANK
THREADED DOWELS TO MATCH
CONCRETE ANCHOR (TYP.)
TYPE INTERNALLY THREADED
SELF-DRILLING OR DROP-IN
WITHIN 3'-0" OF WALL.
CONDUIT ENTRANCE SEAL IN EXISTING WALL
STEEL CONDUITS (TYP)
SEE NOTE BELOW
EXISTING EXTERIOR WALL
CORE DRILLED (TYP.)
STAINLESS STEEL CONCRETE
WALL INSERT & BOLT AS REQUIRED
STAINLESS STEEL PIPE SPACER-LENGTH DETERMINED
BY SIZE OF FITTINGS USED AND SPACE REQUIRED FOR
SERVICING CONDUIT SEAL
SEALING LOCKNUT
(TYPICAL)
TERMINAL BOX
PULL BOX OR
WHERE PVC CONDUIT IS USED IN DUCTLINE, CONVERT TO
STEEL CONDUIT USING AN APPROPRIATE ADAPTER FITTING
OZ GEDNEY TYPE
LOCKNUT AND
INSULATED
BUSHING (TYPICAL)
SEALING
NOTE:
WITHIN 3'-0" OF WALL.
CSM OR EQUAL
AIR GAP TO PREVENT
CONDENSATION OR
MOISTURE COLLECTION
SEAL IN EXISTING WALLCONDUIT ENTRANCE AND
TREADED COUPLING, TYPICAL
WATER PROOF SEAL - INDUSTRIAL
GRADE, PERMANENT, NON-HARDENING
SEALANT INJECTED INTO CAVITY.
EXTERIOR SIDE
(UNDERGROUND)
COATED TRANSITION
COUPLING BETWEEN RIGID
CONDUIT AND PVC
UNDERGROUND CONDUIT
RUN.
(TYPICAL).
HYDROLOCK TYPE
TREADED COLLAR (TYPICAL).
COMPRESSION BOLT (TYPICAL).
WASHER (TYPICAL).
COLLAR (TYPICAL).
CONDUIT
WATER-MOISTURE SEAL INSIDE
THE CONDUIT FOLLOWING CABLE
INSTALLATION.
WATER SEAL VACANT, SPARE
CONDUITS AS REQUIRED.
TYPICAL EXTERIOR WALL PENETRATION FOR CONDUIT
BUILDING WALL. SEE ARCHITECTURAL
DRAWINGS FOR TYPES OF WALL
CONSTRUCTION.
NEOPRENE OR SILICON
RUBBER GASKET.
10
11
12
NONE
E-105
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,PHILADELPHIA, PA 19121
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DATEGRAZYNA S. PLICHTAPA PE045538E 09/30/2019
GSPDGW
ARCHITECTURAL
GANNETT FLEMING, INC.ONE PENN PLAZA, SUITE 630250 WEST 34TH STREETNEW YORK, NY 10119Phone: 212.967.9833Fax: 212.232.5791Email: [email protected]: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.232 CECELIA ACRES DRIVEIVYLAND, PA 18974Phone: 215.354.9161Fax: 215.354.9163Email: [email protected]: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.1010 ADAMS AVENUEVALLEY FORGE, PA 19403Phone: 610.650.8156Fax: 610.650.8190Email: [email protected]: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.1801 MARKET STREET, SUITE 2600PHILADELPHIA, PA 19103Phone: 215.557.0106Fax: 215.557.0337Email: [email protected]: Mark D. DeCocinis, CEI
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.207 SENATE AVENUECAMP HILL, PA 17011Phone: 717.763.7211Fax: 717.763.8150Email: [email protected]: Brian Seip, PE
B-075c OF 2018/19B-076c OF 2018/19B-077c OF 2018/19B-078c OF 2018/19
PERMIT SET25 MARCH 2020
ELECTRICALDETAILS
GENERATOR DETAILNOT TO SCALE
NOTES:
1. THIS DETAIL IS SHOWN FOR GENERAL INFORMATION/PRICINGONLY. E.C. SHALL REFER TO GENERATOR SUBMITTAL PACKAGEFOR FINAL ELECTRICAL/CONTROLS REQUIREMENTS PRIOR TOROUGH-IN.
2. REFER TO OTHER PLANS FOR LOCATION, SIZING AND DETAILS.
3. DIFFERENT TYPE CIRCUIT BREAKERS (WITH ELECTRONIC TRIP)ARE ACCEPTABLE AS LONG AS FULL COORDINATION OF ALLPROTECTIVE DEVICES IS ASSURED TO COMPLY WITH NEC CODE.
IN-LINE CIRCUIT BREAKERFURNISHED WITH GENERATOR SET
ENGINE JACKET HEATER (NOTGFCI PROTECTED)
NEW- 6 #10,1"C. TO JACKET HEATER &CONVENIENCE OUTLET & BATTERY CHARGER
COMMERCIALSERVICE FEEDERS
GENERATOR SERVICEFEEDER
NEW GENERATOR - CONTRACTOR SHALLCOORDINATE LOCATIONS OF ALLNECESSARY MOUNTING HARDWARE ANDCONDUIT PENETRATIONS THROUGH SLABWITH MANUFACTURERS INFORMATION.
NEW- 2#14, 3/4"C. TO REMOTE ANNUNCIATOR(SEE MANUF. SUBMITTAL FOR DISTANCES/WIRESIZING)
NEW WIRING TO REMOTE ANNUNCIATOR(SEE MANUF. SUBMITTAL FOR DETAILS)
NEW GFI DUPLEX RECEPTACLELOCATED INSIDE WEATHER PROOFHOUSING (NEMA 3R)
CONCRETE PAD
ATS
ALL ADDITIONAL REMOTEEMERGENCY E-STOPS TO BEWIRED IN SERIES LOOP W/PRIMARY E-STOP ONGENERATOR CONTROLLER.
REMOTE@ ATS
2-#14, 3/4"C. FOR REMOTE START
LOAD SIDE FEEDERS
J J
3
125/3
1
ATS
125A
MAIN LINE CIRCUITBREAKER,LOCKABLE TYPE(FULLY RATED)
E.C. SHALL PROVIDE FINAL ACCEPTANCE OF THE EPSS INACCORDANCE WITH ALL APPLICABLE SECTIONS OF NFPA 1105-13.
30 KW, DIESEL ENGINE GENERATOR, 120/2080V-3Ø, 4W, WITHCRITICAL SILENCER, BATTERIES AND CHARGER, JACKET HEATER,WEATHER PROOF AND SOUND PROOF ENCLOSURE, (1) MAIN LINECIRCUIT BREAKERS.
NFPA 99 REMOTE ANNUNCIATOR. LOCATE IN MAIN OFFICE.
EMERGENCY SYSTEM POWER NOTES:
ALL UNDERGROUND CONDUIT INSTALLATION SHALL BE PVC SCH 40ENCASED IN CONCRETE ENVELOPE. PROVIDE RIGID STEEL CONDUITSFOR ALL EXPOSED INSTALLATION INCLUDING STUB-UPS. SEE OTHER PLANSFOR DETAILS.
125/4P AUTOMATIC TRANSFER SWITCH, 120/208V-3Ø, 4W WITHAUXILIARY CONTACTS, PILOT LIGHTS, TEST SWITCHES AND ADJUSTABLETIME DELAYS FOR TRANSFER, RE-TRANSFER AND COOL DOWN.
60/3
125/3
(E) PNL "EN"1ST FLOOR
CORRIDOR 101
EXISTING60A FEEDER
NEW WALL MOUNTEDPULL BOX INSUB-BASEMENTMECHANICAL ROOM
125/3
PANEL "PB2"120/208V-3PH, 4W
4#1 + 1#6 GND - 2"RSC
4#4 + 1#8 GND - 1-1/4"RSC
3#1 + 1#6 GND - 2" PVC SCH40
UNDERGROUNDENCASED IN CONCRETE
4#1 + 1#6 GND - 2"RSC
4#1 + 1#6 GND - 2"RSC
PNL "EM"ELECTRICAL RM.
NEW, NEMA 4X, WALLMOUNTED PULL BOX INEXISTING AIRWAY
PARTIAL SINGLE LINE DIAGRAM - NEW WORK
ATS
125A
(E) PNL "EN"1ST FLOOR
CORRIDOR 101TO REMAIN
EXISTING60A FEEDERTO REMAIN
EXISTING WALL MOUNTEDPULL BOX INSUB-BASEMENTBOILER ROOMTO BE REMOVED.
MAIN ELECTRICAL SWITCHBOARD120/208V-3PH, 4W
PARTIAL SINGLE LINE DIAGRAM - DEMOLITION
EXISTING 25 KVANG GENERATORIN THE BOILER ROOMSHALL BE REMOVED
EXISTING AUTOMATIC TRANSFERIN THE BOILER ROOMSHALL BE REMOVED
REMOVE
REMOVE
REMOVE
EXISTING 100A FUSEDDISCONNECT SWITCHIN THE BOILER ROOMSHALL BE REMOVED
PHASE CONDUCTORS HAVE BEEN OMITTED FOR CLARITY.
THIS DETAIL INDICATES GENERAL ARRANGEMENT OF GROUNDING REQUIREMENTS ONLY.FOR COMPLETE DISTRIBUTION REFER TO POWER RISER DIAGRAM.
NOTES:
1.
2.
N
LOAD
N GN
GROUNDING DETAILSCALE: NOTE
GND. & GROUNDROD, SIZE PER NEC
BATTERY CHARGER(NOT GFCI)
GROUNDING ELECTRODECONDUCTOR.
EMERGENCY GENERATOR.
EQUIPMENT GROUNDINGCONDUCTOR (TYPICAL).
BUILDING SERVICETRANSFORMER. MAIN SWITCHBOARD.
BUILDING SYSTEMGROUND BUS.
GROUNDINGELECTRODECONDUCTOR.
4-POLEAUTOMATICTRANSFERSWITCH.
GROUNDED CIRCUITCONDUCTOR (NEUTRAL)(TYPICAL).
BONDING JUMPER.
GROUNDING ELECTRODENEARBY.
1
2
3
4
Volts
Wire
Wire
Min. A.I.C.
Phase A
Phase C
Phase B
Total
KVA
AWire B C
Panel
Mounting
Location
25
29
27
23
21
28
30
22
24
26
19
13
17
15
11
9
18
20
16
14
10
12
Directory
Section
MAIN
Ckt
3
7
5
Bkr
1
4
8
6
ABC
2
Ckt
Directory
Bkr
KVA
A B C
Phase
/
2.5 1.5 1.5
30.0
10.9
8.9
10.2
ELECTRICAL ROOM-BASEMENT
SURFACE
EM
125A LUGS
208
4
10,000
120
3
EM LTG - SUB-BASMNT
NEW PANELBOARD
ELEV. LIGHTING
ELEV. LIGHTING
FIRE ALARM PANEL
BATTERY CHARGER
GEN JACKET HEATER
GEN. RECEPT.
SPARE
SPARE
SPACE
SPACE
EXISTING PNL "NE"
.5
.5
20/1*
20/1
#12
#12
#12
#12
INTEGRAL SPD COPPER BUS
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
20/1
20/1*
* - LOCK-ON CIRCUIT BREAKER
SPACE
SPACE
SPACE
SPACE
SPACE
.5
1.0
1.2
1.5
.2
#12
#12
#12
F/A BOOSTER PANEL
F/A BOOSTER PANEL
#12 20/1*
#12 20/1*
1.0
1.0
20/1
20/1
20/1
60
3
#4
#4
#4
7.2
7.2
7.2
8.4 8.7 7.4
SHEET 43 OF 61
CIRC. #PB2-2,4,6
TYPICAL STANDARD MOUNTING HEIGHTS DETAIL
THE ABOVE MOUNTING HEIGHTS SHALL BE ADHERED TO UNLESS SPECIFICALLY NOTED
WALL CONSTRUCTION THE ABOVE MOUNTING HEIGHTS SHALL BE USED FOR REFERENCE
MOUNTING HEIGHTS TO CENTER OUTLETS UNLESS OTHERWISE NOTED. IN MASONRY
TO NEAREST BLOCK OR BRICK COURSING.
OR DETAILED OTHERWISE ON THE DRAWINGS OR SPECIFICATIONS.
NOT TO SCALE:
NOTES:
2.
1.
TELEVISION OUTLET AND SERVICE RECEPTACLE - FOR7'-6"
FINISHED FLOOR
18"
4'-0"
2'-0"
4'-0"
6'-3"
4'-0"
6'-0"
6'-0"
6'-6"
OF FIXTURE
TO THE BOTTOM
6'-8"
WALL MOUNTED ELECTRICAL DEVICE LIGHTING SWITCHES,
MANUAL MOTOR STARTERS, THERMOSTATS, FIRE ALARM
ELECTRICAL RECEPTACLE WITHIN MECHANICAL SPACES,
PULL STATIONS, AND NURSE CALL DEVICES.
ELECTRICAL RECEPTACLE
TELEPHONE OUTLETS
COMPUTER OUTLETS
TELEVISION OUTLETS
WALL MOUNTED WIREMOLD.
ELECTRICAL AND ELEVATOR ROOMS.
SWITCHES, MAGNETIC STARTERS, CONTACTORS.
BED HEAD WALL LIGHTING FIXTURE - DIMENSION TO
WALL MOUNTED TELEPHONES AND PAY STATIONS (3'-6"
TOP OF FLUSH AND SURFACE MOUNTED ELECTRICAL
LIGHTING OR POWER PANELBOARDS AND TELEPHONE
TOP OF HIGHEST ELECTRICAL SAFETY DISCONNECT
TOP OF BACK-MOUNTED WALL EXIT FIXTURES (NOT
MOUNTED ABOVE DOORS)
BOTTOM OF UNIT.
AND HANDICAP LOCATIONS).
WALL SCONCES
SHELF MOUNTED T.V. IN BEDROOMS.
CABINETS.
CENTERED ABOVE
DOOR OR WINDOW
OPENING
10'-0"
FINISH CEILING
9" BELOW
WARNING AND SIGNALING FIXTURES/SIGNS.
WALL-MOUNTED CLOCKS, PROGRAM BELLS
BATTERY LIGHTING UNITS AND REMOTE WALL MOUNTED
(OR AS SHOWN ON ARCHITECTURAL DETAILS).
LIGHT HEADS (OR 1'-0" BELOW FINISHED CEILING TO
TOP OF UNIT).
96" (MAX)
80" (MIN)
WALL MOUNTED FIRE ALARM VISUAL DEVICES
5
F/A BOOSTER PANEL#12 20/1*1.0
GENERAL DEMOLITION NOTES
1. EXISTING FIRE ALARM SYSTEM SHALL BE REMOVED - SEE SHEET NOTES.
2. REMOVE EXISTING FIRE ALARM SYSTEM COMPLETELY, INCLUDING FIRE ALARM CONTROLPANEL, CODED PULL STATIONS, BELLS, FIRE ALARM WIRING AND CONDUIT SYSTEM IN THEIRENTIRETY.
3. THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN OPERATIONAL UNTIL THE NEW FIRE ALARMSYSTEM IS INSTALLED AND CERTIFIED.
4. DEMOLITION OF THE EXISTING FIRE ALARM SYSTEM IS NOT PERMITTED, UNTIL NEW FIRE ALARMSYSTEM IS INSTALLED.
5. VERIFY ALL CONDITIONS AT JOB SITE.
DEMOLITION KEY NOTES
1
EXISTING FIRE ALARM PULL STATION SHALL BE REMOVED.
EXISTING FIRE ALARM BELL SHALL BE REMOVED.
EXISTING FIRE ALARM CONTROL PANEL AND FUSED DISCONNECT SWITCH SHALL BEREMOVED.
EXISTING FIRE ALARM PANELS TO BE REMOVED.
2
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
MUSIC ROOM
B-3
MUSIC
EQUIPMENT
B-2
CREATIVE
ARTS
B-19
TEACHER
STORAGE
B-19B
PRACTICE
ROOM NO.1
B-4
PRACTICE
ROOM NO.2
B-5
MUSIC OFFICE
B-6
INSTRUMENTS
B-7
ENSEMBLE
PRACTICE
B-8
PA
SS
AG
E
B-7A
CORRIDOR
NO.2
B-1A
TRANSFORMER
& SWITCH
ROOM
B-16
PASSAGE
B-18
PUPIL EQUIP'T
B-19A
RECEIVING
AREA
B-17
CUSTOD'N
OFFICE
B-15
KITCHEN HELP
LOCKER RM.
B-14
JANITOR
SUPPLIES
B-13
HEUPS
LOCKER RM
B-12
STORAGE
B-11
B-12A
KITCHEN HELP
TOILET RM
B-14A
OFF. TOIL.
B-15B
COMPRESSOR
SPACE
B-17A
ELEV.
MACHINE
ROOM
B-10
UNEXCAVATED
CRAWL
SPACE 'C'
B-9B
UNEXCAVATED
METER ROOM
MR-5
UNEXCAVATED
CORRIDOR
NO.1
B-1
ELEV. NO.1
B-12B
CRAWL
SPACE 'A'
B-9
CRAWL
SPACE 'B'
B-9A
STAIR NO.3
B-22
STO.
B-20
UPPER PART
OF
MECHANICAL
EQUIPMENT
ROOM
MR-1
PIPE SPACE
CLO.
B-15C
CLOS.
B-3A
TEACHERS CLOS
B-19C
ELEV NO.2
BOILER ROOM
SB-01
STAIRWELL
S-00
FREIGHT
ELEVATOR
MACHINE ROOM
SB-03
FREIGHT
ELEVATOR
TELECOM ROOM
SB-02
3
1
3
2
1
2
UP
UP
UP
UP
UP
UP
UP
2
2 1
2
4
4
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
3/32" = 1'-0"
E-201
FIRE ALARM DEMOLITIONBASEMENT & SUB-BASEMENTFLOOR PLANS
SCALE: 3/32" = 1'-0"
FIRE ALARM DEMOLITION SUB-BASEMENT FLOOR PLAN
2
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,PHILADELPHIA, PA 19121
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DATEGRAZYNA S. PLICHTAPA PE045538E 09/30/2019
GSPDGW
DIAMOND ST.N. 1
6TH
ST.
N. 1
5TH
ST.
N
KEYPLAN
ARCHITECTURAL
GANNETT FLEMING, INC.ONE PENN PLAZA, SUITE 630250 WEST 34TH STREETNEW YORK, NY 10119Phone: 212.967.9833Fax: 212.232.5791Email: [email protected]: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.232 CECELIA ACRES DRIVEIVYLAND, PA 18974Phone: 215.354.9161Fax: 215.354.9163Email: [email protected]: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.1010 ADAMS AVENUEVALLEY FORGE, PA 19403Phone: 610.650.8156Fax: 610.650.8190Email: [email protected]: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.1801 MARKET STREET, SUITE 2600PHILADELPHIA, PA 19103Phone: 215.557.0106Fax: 215.557.0337Email: [email protected]: Mark D. DeCocinis, CEI
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.207 SENATE AVENUECAMP HILL, PA 17011Phone: 717.763.7211Fax: 717.763.8150Email: [email protected]: Brian Seip, PE
B-075c OF 2018/19B-076c OF 2018/19B-077c OF 2018/19B-078c OF 2018/19
PERMIT SET25 MARCH 2020
SCALE: 3/32" = 1'-0"
FIRE ALARM DEMOLITION BASEMENT FLOOR PLAN
1
SHEET 44 OF 61
GENERAL DEMOLITION NOTES
1. EXISTING FIRE ALARM SYSTEM SHALL BE REMOVED - SEE SHEET NOTES.
2. REMOVE EXISTING FIRE ALARM SYSTEM COMPLETELY, INCLUDING FIRE ALARM CONTROLPANEL, CODED PULL STATIONS, BELLS, FIRE ALARM WIRING AND CONDUIT SYSTEM IN THEIRENTIRETY.
3. THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN OPERATIONAL UNTIL THE NEW FIRE ALARMSYSTEM IS INSTALLED AND CERTIFIED.
4. DEMOLITION OF THE EXISTING FIRE ALARM SYSTEM IS NOT PERMITTED, UNTIL NEW FIRE ALARMSYSTEM IS INSTALLED.
5. VERIFY ALL CONDITIONS AT JOB SITE.
DEMOLITION KEY NOTES
1
EXISTING FIRE ALARM PULL STATION SHALL BE REMOVED.
EXISTING FIRE ALARM BELL SHALL BE REMOVED.2
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
UP
UP
UPUP
GROUNDS
STORAGE
ROOM
102
KINDERGARTEN
NO.1
103
OUTDOOR
STORAGE
ROOM
104
KIND NO.1
TOILET
107
PASSAGE
NO.1
108
KIND NO.2
TOILET
112
KINDERGARTEN
NO.2
109
STORAGE
106
KIND NO.2
STORAGE
110
TUTORING
CLASSROOM
195
STAIR NO.3
198
CLOS.
103A
TEACH. CLOS.
103B
BOOK STO.
194
JAN. CL. NO.2
193
TOILET
192
DRY
STORAGE
187
ELEV NO.2
OFFICE
188
CANWASH
190
KINDERGARTEN
NO.3
113
KIND NO.3
TOIL.
117
KIND NO.3
STORAGE
114
KIND NO.1
COAT
ALCOVE
105
KIND NO.2
COAT
ALCOVE
111
TEACH. CLOS.
109A
STORAGE
195A
TEACH. CLOS.
195B
TEACH. CLOS.
113A
KIND NO.3
COAT
ALCOVE
115
BOYS TOILET
174
VEST.
172
CLOS.
173
VEST. 4
174A
JAN. CL. NO.1
176
GIRLS TOILET
166
VEST. 2
169VEST. 3
166A
PIPE SPACE
175
PIPE SPACE
173
GYMNASIUM
159
PIPE SPACE
170
PIPE SPACE
167
STORAGE
168
PL
AT
FO
RM
ST
OR
AG
E
17
9
PL
AT
FO
RM
WA
IT
IN
G
AR
EA
17
7
PASS. 6
163
LOBBY NO.1
164
LOWER PART OF
MECH EQUIP
ROOM
161
CLOS.
162
FIVE
180C
CHAIR
180D
STO.
180C
CLOS.
180B
CLOS.
180A
GYM
STORAGE
160
GYM OFFICE
157
TOILET
158
DRESSING
157A
TOILET
156
CLOS.
157B
BOYS
LOCKER RM
155
SHOWER
155B
GENERAL
STORAGE
154
GIRLS
LOCKER RM
149
TOWEL CLOS.
149F
TOWEL CLOS.
155C
BOYS TOILET
153
MEN FAC
152
PIPE SPACE
153A
PIPE SPACE
152A
SHOWER
149D
DRESS ALCOVE
149E
GIRLS
SHOWER
149A
TOIL.
150
TEAM
SUPPORTING
CL. RM.
145
CLOS.
145A
SHOWER
149C
D.R.
149B
GIRLS TOILET
147
WOMEN FAC
148
TEAM
PLANNING
NO.2
146
PIPE SPACE
147A
CLO.
146A
146B
PASSAGE
NO.5
151
COUNSELLOR
128
CONFERENCE
RM.
129
COUNSELLOR
#1
126
TOILET
131
OFFICE
125
PASSAGE NO.3
127
ASST
PRINCIPAL
121
PRINCIPALS
OFFICE
122
STAIR NO.1
196
TEAM
PLANNING #1
118
MIMEO &
SUPPLY
124
ELEV. NO.1
PASS. 2
120
T. CL.
118A
TOIL.
123
CLO.
126A
CLOS.
128A
CLOS.
122A
CLOS.
121A
CLOS.
122B
STORAGE
119
SUPPLY CLOS.
130C
HEALTH
ROOM
130
CLOS.
130B
DRESSING
130A
STAIR NO.2
197
CLASSROOM
NO.1
132
CLO.
132A
TEA. CLO.
132C
CLOS.
132B
MENS TOILET
183
WOMENS
TOILET
182
PIPE SPACE
182A
PIPE SPACE
183A
TEACHERS
DINING
184
CLOS.
184A
FREEZER
185C
FREEZER
185B
REFRIGERATOR
185A
PASSAGE 8
189
KITCHEN
185
PASSAGE
NO.7
181
AUDITORIUM -
CAFETERIA
180
PLATFORM
178
PASSAGE
186
PASS. 9
191
CLASSROOM
NO.2
133
CLASSROOM
NO.3
134
CLASSROOM
NO.5
144
CLASSROOM
NO.4
143
TEACH. CLOS.
133B
STO.
133A
TEACH. CLOS.
134B
STO.
134A
TEACH. CLOS.
143C
STO.
143A
CLOS.
143B
CLOS.
144B
TEACH. CLO.
144C
CLOS.
144D
CORRIDOR NO.1
101
CLASSROOM
NO.4
143
CLASSROOM
NO.3
134
1
2
12
2
2
2
1 2 12
1 2
2
1
1
2
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
UP
CLASSROOM
CLASSROOM
STAIR NO.4
199
NURSERY
NO.2
141
NURSERY
NO.1
139
VESTIBULE
NO.1
138
TEACH. CLOS.
134B
STO.
134A
OU
TD
OO
R
ST
OR
AG
E
137
GE
NE
RA
L
ST
OR
AG
E
136
PASS. NO.4
135
STOR. NO.2
139B
STOR. NO.1
139A
TOIL. NO.1
139C
TOIL. NO.2
139D
TEACH. CLOS.
139F
GEN. STOR.
140
TEACH. CLOS.
141F
TOIL. NO.2
141D
TOIL. NO.1
141C
STOR. NO.2
141B
STOR. NO.1
141A
COAT ALCOVE
139E
COAT ALCOVE
141E
TEACH. CLOS.
143C
STO.
143A
CLASSROOM
NO.4
143
CLASSROOM
NO.3
134
12
3/32" = 1'-0"
E-202
FIRE ALARM DEMOLITIONFIRST FLOOR PLAN
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,PHILADELPHIA, PA 19121
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DATEGRAZYNA S. PLICHTAPA PE045538E 09/30/2019
GSPDGW
DIAMOND ST.N. 1
6TH
ST.
N. 1
5TH
ST.
N
KEYPLAN
ARCHITECTURAL
GANNETT FLEMING, INC.ONE PENN PLAZA, SUITE 630250 WEST 34TH STREETNEW YORK, NY 10119Phone: 212.967.9833Fax: 212.232.5791Email: [email protected]: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.232 CECELIA ACRES DRIVEIVYLAND, PA 18974Phone: 215.354.9161Fax: 215.354.9163Email: [email protected]: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.1010 ADAMS AVENUEVALLEY FORGE, PA 19403Phone: 610.650.8156Fax: 610.650.8190Email: [email protected]: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.1801 MARKET STREET, SUITE 2600PHILADELPHIA, PA 19103Phone: 215.557.0106Fax: 215.557.0337Email: [email protected]: Mark D. DeCocinis, CEI
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.207 SENATE AVENUECAMP HILL, PA 17011Phone: 717.763.7211Fax: 717.763.8150Email: [email protected]: Brian Seip, PE
B-075c OF 2018/19B-076c OF 2018/19B-077c OF 2018/19B-078c OF 2018/19
PERMIT SET25 MARCH 2020
SCALE: 3/32" = 1'-0"
FIRE ALARM DEMOLITION FIRST FLOOR PLAN
1
SHEET 45 OF 61
GENERAL DEMOLITION NOTES
1. EXISTING FIRE ALARM SYSTEM SHALL BE REMOVED - SEE SHEET NOTES.
2. REMOVE EXISTING FIRE ALARM SYSTEM COMPLETELY, INCLUDING FIRE ALARM CONTROLPANEL, CODED PULL STATIONS, BELLS, FIRE ALARM WIRING AND CONDUIT SYSTEM IN THEIRENTIRETY.
3. THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN OPERATIONAL UNTIL THE NEW FIRE ALARMSYSTEM IS INSTALLED AND CERTIFIED.
4. DEMOLITION OF THE EXISTING FIRE ALARM SYSTEM IS NOT PERMITTED, UNTIL NEW FIRE ALARMSYSTEM IS INSTALLED.
5. VERIFY ALL CONDITIONS AT JOB SITE.
DEMOLITION KEY NOTES
1
EXISTING FIRE ALARM PULL STATION SHALL BE REMOVED.
EXISTING FIRE ALARM BELL SHALL BE REMOVED.2
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
UP
UPUP
CLASSROOM
NO.24
237
TOILET
237B
CLOS.
237A
TEACH. CLOS.
237D
STORAGE
243
CLOS.
202A
SPEECH
CORRECTION
202
TEACH. CLOS.
202B
CLASSROOM
NO.6
203
CLOS.
203A
TEACH. CLOS.
203B
SHOWER
237C
TEAM
SUPPORTING
NO.2
204
TEACH. CLOS.
204A
CLASSROOM
NO.7
205
TEACH. CLOS.
205A
CLASSROOM
NO.8
206
CLOS.
206A
TEACH. CLOS.
206B
CLASSROOM
NO.22
235
CLASSROOM
NO.23
236
STAIR NO.3
240
CLOS.
235A
TEACH. CLO.
235B
TEACH. CLO.
236A
CORRIDOR NO.1
201
CLASSROOM
NO.19
219
CLOS.
219B
CLOS.
219A
CLASSROOM
NO.18
218
TEACH. CLOS.
218B
CLOS.
218A
CLASSROOM
NO.15
213
TEACH. CLOS.
213B
CLO.
213A
CLASSROOM
NO.14
212
TEACH. CLO.
212A
UPPER PART
OF
AUDITORIUM-CAFETERIA
UPPER PART
OF
GYMNASIUM
MECH. EQUIP.
ROOM NO.2
228
MECH.
EQUIPMENT
ROOM NO.1
227
FAN ROOM
226
MATERIALS
PRODUCTION
ROOM
223
AUDIO-VISUAL
221
READING
ROOM
224
GIRLS TOILET
ROOM
229
224A
TEAM
SUPPORTING
NO.3
224B
CLOS.
231C
PIPE SPACE
230
PIP
E S
PA
CE
229A
JA
N. C
LO
S.
231B
PIPE SPACE
233
PASS.
231A
Room
231D
CLASSROOM
NO.21
234
234A
TEACH. CLOS.
234B
CLASSROOM
NO.9
207
TEACH. CLO.
207C
STO. CLO.
207B
STO. RM.
207A
STO. RM.
208A
STAIR NO.1
238
CLASSROOM
NO.10
208
ELEVATOR
TEACH. CLOS.
208B
CLASSROOM
NO.11
209
CLASSROOM
NO.12
210
STAIR NO.2
239
STO. RM.
210A
STO. RM.
211A
CLASSROOM
NO.13
211
STO. CLO.
211B
TEACH. CLO.
211C
TEACH. CLOS.
210B
CLOS.
210C
TEACH. CLOS.
209A
CLASSROOM
NO.18
218
CLASSROOM
NO.15
213
12
1 2 12
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
UP
TEACH. CLOS.
218B
CLOS.
218A
STAIR NO.4
241
STORAGE
242
CLASSROOM
NO.17
217
TOILET
217A
SHOWER
217B
TEACH. CLOS.
217C
TEACHERS
WORKROOM
216
TEACH. CLOS.
216B
CLOS.
216A
CLASSROOM
NO.16
215
TOILET
215A
SHOWER
215B
TOILET
215C
TEAM
PLANNING RM
NO.3
214
214B
CLOS.
214A
CLO.
213A
CLASSROOM
NO.18
218
CLASSROOM
NO.15
213
12
3/32" = 1'-0"
E-203
FIRE ALARM DEMOLITIONSECOND FLOOR PLAN
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,PHILADELPHIA, PA 19121
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DATEGRAZYNA S. PLICHTAPA PE045538E 09/30/2019
GSPDGW
DIAMOND ST.N. 1
6TH
ST.
N. 1
5TH
ST.
N
KEYPLAN
ARCHITECTURAL
GANNETT FLEMING, INC.ONE PENN PLAZA, SUITE 630250 WEST 34TH STREETNEW YORK, NY 10119Phone: 212.967.9833Fax: 212.232.5791Email: [email protected]: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.232 CECELIA ACRES DRIVEIVYLAND, PA 18974Phone: 215.354.9161Fax: 215.354.9163Email: [email protected]: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.1010 ADAMS AVENUEVALLEY FORGE, PA 19403Phone: 610.650.8156Fax: 610.650.8190Email: [email protected]: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.1801 MARKET STREET, SUITE 2600PHILADELPHIA, PA 19103Phone: 215.557.0106Fax: 215.557.0337Email: [email protected]: Mark D. DeCocinis, CEI
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.207 SENATE AVENUECAMP HILL, PA 17011Phone: 717.763.7211Fax: 717.763.8150Email: [email protected]: Brian Seip, PE
B-075c OF 2018/19B-076c OF 2018/19B-077c OF 2018/19B-078c OF 2018/19
PERMIT SET25 MARCH 2020
SCALE: 3/32" = 1'-0"
FIRE ALARM DEMOLITION SECOND FLOOR PLAN
1
SHEET 46 OF 61
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
MUSIC ROOM
B-3
MUSIC
EQUIPMENT
B-2
CREATIVE
ARTS
B-19
TEACHER
STORAGE
B-19B
PRACTICE
ROOM NO.1
B-4
PRACTICE
ROOM NO.2
B-5
MUSIC OFFICE
B-6
INSTRUMENTS
B-7
ENSEMBLE
PRACTICE
B-8
PA
SS
AG
E
B-7A
CORRIDOR
NO.2
B-1A
TRANSFORMER
& SWITCH
ROOM
B-16
PASSAGE
B-18
PUPIL EQUIP'T
B-19A
RECEIVING
AREA
B-17
BUILDING ENGINEER'S
OFFICE
B-15
KITCHEN HELP
LOCKER RM.
B-14
JANITOR
SUPPLIES
B-13
HEUPS
LOCKER RM
B-12
STORAGE
B-11
B-12A
KITCHEN HELP
TOILET RM
B-14A
OFF. TOIL.
B-15B
COMPRESSOR
SPACE
B-17A
ELEV.
MACHINE
ROOM
B-10
UNEXCAVATED
CRAWL
SPACE 'C'
B-9B
UNEXCAVATED
METER ROOM
MR-5
UNEXCAVATED
CORRIDOR
NO.1
B-1
ELEV. NO.1
B-12B
CRAWL
SPACE 'A'
B-9
CRAWL
SPACE 'B'
B-9A
STAIR NO.3
B-22
STO.
B-20
UPPER PART
OF
MECHANICAL
EQUIPMENT
ROOM
MR-1
PIPE SPACE
CLO.
B-15C
CLOS.
B-3A
TEACHERS CLOS
B-19C
ELEV NO.2
BOILER ROOM
SB-01
STAIRWELL
S-00
FREIGHT
ELEVATOR
MACHINE ROOM
SB-03
FREIGHT
ELEVATOR
TELECOM ROOM
SB-02
UP
UP
UP
UP
UP
UP
UP
HD
WP
HD
WP
HD
WP
HD
WP
HD
WP
HD
WP
HD
WP
HD
WP
HD
WP
HD
WP
SD SD SD SD SD SD
SD
SD
SD
SD
SD
SD
HD HD
HD HD
SD
SD
HD
WP
HD
WP
HD
WP
HD
SD
SD
SD
FA
CP
HD
HD
SD
SD
SD
SDSD
FIRE ALARM GENERAL NOTES:
A. FOR ELECTRICAL SYMBOLS, ABBREVIATIONS, REFER TO DRAWING E001.
D. ALL NEW FIRE ALARM DEVICES SHALL BE INSTALLED, TESTED AND ACCEPTED PRIOR TO OCCUPANCY. THE LOCAL AUTHORITY HAVING JURISDICTION SHALLPERFORM ALL FINAL ACCEPTANCES.
E. ALL FIRE ALARM POINTS MUST BE TRANSMITTED TO THE CENTRAL MONITORING STATION. EACH FIRE ALARM POINT MUST SEND THE CENTRAL MONITORINGSTATION A RESTORE CODE FOR EACH POINT.
F. ALL DEVICES CONTAINING END OF LINE RESISTORS SHALL BE LABELED 'EOL'.
G. PROVIDE SIGNAGE AT EACH MANUAL PULL STATION, SIGN MUST BE MOUNTED IMMEDIATELY ADJACENT TO THE MANUAL PULL STATION. THE SIGN SHALLREAD "INCASE OF FIRE: SOUND ALARM AND CALL THE FIRE DEPARTMENT".
H. ALL FIRE ALARM WIRING SHALL BE IN METAL CONDUIT. PROVIDE GALVANIZED RIGID STEEL CONDUIT FOR ALL RISER CONDUITS AND ALL CONDUITS INMECHANICAL, ELECTRICAL AND BOILER ROOMS. PAINT ALL JUNCTION BOXES WITH RED COLOR PAINT AND LABEL AS "FIRE ALARM".
J. ELECTRICAL CONTRACTOR SHALL USE CONDUIT SEALING FITTING WITH APPROVED SEALING COMPOUND ON ALL CONDUITS PASSING FROM INTERIOR TOEXTERIOR OF A BUILDING AND BETWEEN AREAS OF DIFFERENT TEMPERATURES. SEAL ALL CONDUIT PENETRATIONS THOUGH RATED WALLS AND FLOORS TOMAINTAIN FIRE RATING INTEGRITY.
K. WIRING TO BE RUN IN EMT CONDUIT AND COMPLY WITH NEC ARTICLE 760. CONDUIT TO RUN EXPOSED, EXCEPT ABOVE SUSPENDED CEILING (WHEREAPPLICABLE). MINIMUM CONDUIT SIZE TO BE 3/4"C. ALL WIRING TO BE COPPER. ALL RISER CONDUIT AND CONDUIT IN MECHANICAL, ELECTRICAL, ANDBOILER ROOM SHALL BE RIGID STEEL GALVANIZED CONDUIT. ALL CONDUIT AND WIRING ROUTING BETWEEN FLOORS TO BE ROUTED IN RIGID CONDUITWITH SEAL FITTING BELOW THE CEILING BEFORE PENETRATING THE FLOOR SLAB. TYPE 'MC' CABLE IS NOT ACCEPTABLE.
L. HVAC UNIT/AIR HANDILING EQUIPMENT ITEMS:1. PROVIDE ADDRESSABLE DUCT DETECTORS AND PERFORM HVAC UNIT SHUT DOWN LOCALLY.2. PROVIDE HVAC UNIT SHUTDOWN UPON FIRE ALARM SYSTEM ALARM CONDITIONS VIA CONTROL MODULES. WIRE OUTPUTS ON CONTROL MODULE TO
HVAC UNIT STARTER CIRCUIT.3. FIRE ALARM CONTROL PANEL IS TO HAVE A FIREMANS "SHUTOFF" SWITCH FOR EACH HVAC UNIT IN THE BUILDING AND A SINGLE SWITCH TO TURN OFF
ALL HVAC UNITS. SWITCHES TO BE CONNECTED TO FIRE ALARM CONTROL PANEL. CONTROL PANEL TO PERFORM HVAC UNIT SHUTDOWN VIAADDRESSABLE CONTROL MODULE OUTPUT RELAYS LOCATED AT EACH HVAC UNIT.
M. THE QUANTITY OF FIRE ALARM BOOSTER PANELS SHOWN ON THESE DRAWINGS AND THE RISER DIAGRAM ARE FOR SCHEMATIC PURPOSES ONLY. THECONTRACTOR AND FIRE ALARM VENDOR SHALL DETERMINE THE EXACT QUANTITY OF BOOSTER PANELS REQUIRED BASED ON THE MANUFACTURER'SPANEL FUNCTION AND SPECIFICATIONS. THE CONTRACTOR SHALL PROVIDE THE QUANTITY OF BOOSTER PANELS REQUIRED TO SUPPORT THE ENTIRE FIREALARM SYSTEM BASED ON THE QUANTITY OF DEVICES SHOWN ON PLAN, TOTAL POWER NEEDED TO SUPPORT THE DEVICES, VOLTAGE DROPCALCULATIONS FOR EACH CIRCUIT, BATTERY CALCULATIONS, SIZE OF BUILDING, ETC. THE CONTRACTOR SHALL PROVIDE 120V, 20AMP CIRCUITS FOR ALLBOOSTER PANELS THAT ARE INSTALLED BASED ON THE FIRE ALARM VENDOR'S CALCULATIONS AT NO ADDITIONAL COST TO SDP.
1 PROVIDE KEYED RESET PULL STATION WITH BATTERY OPERATED LOCAL ALARM BY STI (ORAPPROVED EQUAL) AND IMPACT RESISTANCE PROTECTIVE COVER
PROVIDE A DUCT MOUNTED SMOKE DETECTOR IN RETURN DUCT AND SUPPLY DUCT OF HVAC UNIT (OVER 2000CFM). EACH DUCT MOUNTED SMOKE DETECTOR SHALL HAVE REMOTE TEST SWITCH AND LED ALARMINDICATORS. WHERE THE CEILING HEIGHT IS HIGHER THAN 10', THE REMOTE TEST SWITCH AND LED ALARMINDICATORS SHALL BE WALL MOUNTED AT 48" A.F.F. ADJACENT HVAC UNIT. PROVIDE AND CONNECT ACONTROL MODULE AT EACH HVAC UNIT EXISTING MOTOR STARTER TO SHUTDOWN HVAC UNIT, FIELD VERIFYEXACT LOCATION. DEVICES TO BE LOCATED WHERE ACCESSIBLE BY QUALIFIED PERSONNEL ONLY. PROVIDE (1)REMOTE TEST STATIONS FOR EACH DUCT MOUNTED SMOKE DETECTORS.
FIELD COORDINATE EXACT LOCATIONS OF HEAT DETECTORS. DEVICES TO BE MOUNTED BELOW ALL DUCTWORK,PIPING, AND CONDUIT. DEVICES SHALL BE CLEAR OF ANY OBSTRUCTIONS. DEVICES SHALL BE MOUNTED TOUNISTRUT FRAMING SECURELY FASTENED TO CEILING.
PROVIDE WEATHER PROOF CONVENTIONAL TYPE FIRE ALARM DEVICES WITHIN BOILER ROOM ANDMECHANICAL SPACES. PROVIDE A REMOTE RELAY MODULE FOR ALL CONVENTIONAL TYPE DEVICES WITHINTHE BOILER ROOM AND MECHANICAL SPACES.
NEW FIRE ALARM CONTROL PANEL. PROVIDE 120V, 20AMP EMERGENCY CIRCUIT FROM PANELBOARD "EM" -2#12 + 1#12 GND IN 3/4" CONDUIT.
EXISTING MAIN TELEPHONE DEMARCATION. INTERCONNECT NEW (2) TELEPHONE LINES OR CAT6 CABLESFOR FIRE ALARM SYSTEM.
PROVIDE (5) CONTROL MODULES IN ELEVATOR MACHINE ROOM FOR ELEVATOR RECALL
PROVIDE A SMOKE DETECTOR AT BOTTOM OF ELEVATOR SHAFT.
SMOKE DETECTOR TO INITIATE ELEVATOR PRIMARY AND ALTERNATE RECALL.
PROVIDE FACP WITH DIGITAL ALARM COMMUNICATOR TRANSMITTER (DACT) FOR OFF-PREMISES MONITORINGOF THE FACP ALARM POINTS. PROVIDE (2) CAT 6 OR (2) COPPER LAND LINE CABLES FROM THE FACP TO THETELEPHONE DEMARCATION STATION (MAIN TELEPHONE SERVICE BOX).
PROVIDE A NEW 120V, 20AMP EMERGENCY POWER CIRCUIT FROM PANELBOARD "EM" IDENTIFIED FOR FACPSYSTEM PRINTER RECEPTACLE. PROVIDE CIRCUIT EM-7 WITH 2#12 +1#12 GND IN 3/4" CONDUIT.
DD
DD
110cd
110cd
110cd
FIRE ALARM SHEET NOTES
1
1
1
WP
WP
WP
WP
2
2
3
4
3 4 3 4
3 4 3 4
1
3 4
WP
5
10
6
6
7
7
ELEV.CONTROLPANEL
C
3 4
3 4 3 4
3 4
3 4
3 4
3 4
3 4 3 4 3 4
7
ELEV.CONTROLPANEL
C
SD
8
8
SD
8
9
9
9
10
5
11
11
PANEL"EM"
8
FAAP
1
15cd
15cd
15cd 15cd 15cd
15cd
15cd
15cd15cd
15cd 15cd 15cd 15cd
15cd
15cd
15cd 15cd
15cd
15cd
15cd
15cd
15cd
75cd
75cd 75cd
15cd
F/A BOOSTERPANELCIRC. #EM-13
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
HD
WP
HD
WP
3 4
3 4
3/32" = 1'-0"
E-204
FIRE ALARM NEW WORKBASEMENT & SUB-BASEMENTFLOOR PLANS
SCALE: 3/32" = 1'-0"
FIRE ALARM NEW WORK SUB-BASEMENT FLOOR PLAN
2
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,PHILADELPHIA, PA 19121
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DATEGRAZYNA S. PLICHTAPA PE045538E 09/30/2019
GSPDGW
DIAMOND ST.N. 1
6TH
ST.
N. 1
5TH
ST.
N
KEYPLAN
ARCHITECTURAL
GANNETT FLEMING, INC.ONE PENN PLAZA, SUITE 630250 WEST 34TH STREETNEW YORK, NY 10119Phone: 212.967.9833Fax: 212.232.5791Email: [email protected]: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.232 CECELIA ACRES DRIVEIVYLAND, PA 18974Phone: 215.354.9161Fax: 215.354.9163Email: [email protected]: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.1010 ADAMS AVENUEVALLEY FORGE, PA 19403Phone: 610.650.8156Fax: 610.650.8190Email: [email protected]: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.1801 MARKET STREET, SUITE 2600PHILADELPHIA, PA 19103Phone: 215.557.0106Fax: 215.557.0337Email: [email protected]: Mark D. DeCocinis, CEI
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.207 SENATE AVENUECAMP HILL, PA 17011Phone: 717.763.7211Fax: 717.763.8150Email: [email protected]: Brian Seip, PE
B-075c OF 2018/19B-076c OF 2018/19B-077c OF 2018/19B-078c OF 2018/19
PERMIT SET25 MARCH 2020
SCALE: 3/32" = 1'-0"
FIRE ALARM NEW WORK BASEMENT FLOOR PLAN
1
SHEET 47 OF 61
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
UP
UP
UPUP
GROUNDS
STORAGE
ROOM
102
KINDERGARTEN
NO.1
103
OUTDOOR
STORAGE
ROOM
104
KIND NO.1
TOILET
107
PASSAGE
NO.1
108
KIND NO.2
TOILET
112
KINDERGARTEN
NO.2
109
STORAGE
106
KIND NO.2
STORAGE
110
TUTORING
CLASSROOM
195
STAIR NO.3
198
CLOS.
103A
TEACH. CLOS.
103B
BOOK STO.
194
JAN. CL. NO.2
193
TOILET
192
DRY
STORAGE
187
ELEV NO.2
OFFICE
188
CANWASH
190
KINDERGARTEN
NO.3
113
KIND NO.3
TOIL.
117
KIND NO.3
STORAGE
114
KIND NO.1
COAT
ALCOVE
105
KIND NO.2
COAT
ALCOVE
111
TEACH. CLOS.
109A
STORAGE
195A
TEACH. CLOS.
195B
TEACH. CLOS.
113A
KIND NO.3
COAT
ALCOVE
115
BOYS TOILET
174
VEST.
172
CLOS.
173
VEST. 4
174A
JAN. CL. NO.1
176
GIRLS TOILET
166
VEST. 2
169VEST. 3
166A
PIPE SPACE
175
PIPE SPACE
173
GYMNASIUM
159
PIPE SPACE
170
PIPE SPACE
167
STORAGE
168
PL
AT
FO
RM
ST
OR
AG
E
17
9
PL
AT
FO
RM
WA
IT
IN
G
AR
EA
17
7
PASS. 6
163
LOBBY NO.1
164
LOWER PART OF
MECH EQUIP
ROOM
161
CLOS.
162
FIVE
180C
CHAIR
180D
STO.
180C
CLOS.
180B
CLOS.
180A
GYM
STORAGE
160
GYM OFFICE
157
TOILET
158
DRESSING
157A
TOILET
156
CLOS.
157B
BOYS
LOCKER RM
155
SHOWER
155B
GENERAL
STORAGE
154
GIRLS
LOCKER RM
149
TOWEL CLOS.
149F
TOWEL CLOS.
155C
BOYS TOILET
153
MEN FAC
152
PIPE SPACE
153A
PIPE SPACE
152A
SHOWER
149D
DRESS ALCOVE
149E
GIRLS
SHOWER
149A
TOIL.
150
TEAM
SUPPORTING
CL. RM.
145
CLOS.
145A
SHOWER
149C
D.R.
149B
GIRLS TOILET
147
WOMEN FAC
148
TEAM
PLANNING
NO.2
146
PIPE SPACE
147A
CLO.
146A
146B
PASSAGE
NO.5
151
COUNSELLOR
128
CONFERENCE
RM.
129
COUNSELLOR
#1
126
TOILET
131
OFFICE
125
PASSAGE NO.3
127
ASST
PRINCIPAL
121
PRINCIPALS
OFFICE
122
STAIR NO.1
196
TEAM
PLANNING #1
118
MIMEO &
SUPPLY
124
ELEV. NO.1
PASS. 2
120
T. CL.
118A
TOIL.
123
CLO.
126A
CLOS.
128A
CLOS.
122A
CLOS.
121A
CLOS.
122B
STORAGE
119
SUPPLY CLOS.
130C
HEALTH
ROOM
130
CLOS.
130B
DRESSING
130A
STAIR NO.2
197
CLASSROOM
NO.1
132
CLO.
132A
TEA. CLO.
132C
CLOS.
132B
MENS TOILET
183
WOMENS
TOILET
182
PIPE SPACE
182A
PIPE SPACE
183A
TEACHERS
DINING
184
CLOS.
184A
FREEZER
185C
FREEZER
185B
REFRIGERATOR
185A
PASSAGE 8
189
KITCHEN
185
PASSAGE
NO.7
181
AUDITORIUM -
CAFETERIA
180
PLATFORM
178
PASSAGE
186
PASS. 9
191
CLASSROOM
NO.2
133
CLASSROOM
NO.3
134
CLASSROOM
NO.5
144
CLASSROOM
NO.4
143
TEACH. CLOS.
133B
STO.
133A
TEACH. CLOS.
134B
STO.
134A
TEACH. CLOS.
143C
STO.
143A
CLOS.
143B
CLOS.
144B
TEACH. CLO.
144C
CLOS.
144D
CORRIDOR NO.1
101
CLASSROOM
NO.4
143
CLASSROOM
NO.3
134
SD SD SD SD SD SD SD SD SD SD
SD
SD
SD
SD
HD
HD
HD
SD
SD
SD
SD
SD
F
SD
F
FAAP
FAAPF
HD
FIRE ALARM GENERAL NOTES:
A. FOR ELECTRICAL SYMBOLS, ABBREVIATIONS, REFER TO DRAWING E001.
D. ALL NEW FIRE ALARM DEVICES SHALL BE INSTALLED, TESTED AND ACCEPTED PRIOR TO OCCUPANCY. THE LOCAL AUTHORITY HAVING JURISDICTION SHALLPERFORM ALL FINAL ACCEPTANCES.
E. ALL FIRE ALARM POINTS MUST BE TRANSMITTED TO THE CENTRAL MONITORING STATION. EACH FIRE ALARM POINT MUST SEND THE CENTRAL MONITORINGSTATION A RESTORE CODE FOR EACH POINT.
F. ALL DEVICES CONTAINING END OF LINE RESISTORS SHALL BE LABELED 'EOL'.
G. PROVIDE SIGNAGE AT EACH MANUAL PULL STATION, SIGN MUST BE MOUNTED IMMEDIATELY ADJACENT TO THE MANUAL PULL STATION. THE SIGN SHALLREAD "INCASE OF FIRE: SOUND ALARM AND CALL THE FIRE DEPARTMENT".
H. ALL FIRE ALARM WIRING SHALL BE IN METAL CONDUIT. PROVIDE GALVANIZED RIGID STEEL CONDUIT FOR ALL RISER CONDUITS AND ALL CONDUITS INMECHANICAL, ELECTRICAL AND BOILER ROOMS. PAINT ALL JUNCTION BOXES WITH RED COLOR PAINT AND LABEL AS "FIRE ALARM".
J. ELECTRICAL CONTRACTOR SHALL USE CONDUIT SEALING FITTING WITH APPROVED SEALING COMPOUND ON ALL CONDUITS PASSING FROM INTERIOR TOEXTERIOR OF A BUILDING AND BETWEEN AREAS OF DIFFERENT TEMPERATURES. SEAL ALL CONDUIT PENETRATIONS THOUGH RATED WALLS AND FLOORS TOMAINTAIN FIRE RATING INTEGRITY.
K. WIRING TO BE RUN IN EMT CONDUIT AND COMPLY WITH NEC ARTICLE 760. CONDUIT TO RUN EXPOSED, EXCEPT ABOVE SUSPENDED CEILING (WHEREAPPLICABLE). MINIMUM CONDUIT SIZE TO BE 3/4"C. ALL WIRING TO BE COPPER. ALL RISER CONDUIT AND CONDUIT IN MECHANICAL, ELECTRICAL, ANDBOILER ROOM SHALL BE RIGID STEEL GALVANIZED CONDUIT. ALL CONDUIT AND WIRING ROUTING BETWEEN FLOORS TO BE ROUTED IN RIGID CONDUITWITH SEAL FITTING BELOW THE CEILING BEFORE PENETRATING THE FLOOR SLAB. TYPE 'MC' CABLE IS NOT ACCEPTABLE.
L. HVAC UNIT/AIR HANDILING EQUIPMENT ITEMS:1. PROVIDE ADDRESSABLE DUCT DETECTORS AND PERFORM HVAC UNIT SHUT DOWN LOCALLY.2. PROVIDE HVAC UNIT SHUTDOWN UPON FIRE ALARM SYSTEM ALARM CONDITIONS VIA CONTROL MODULES. WIRE OUTPUTS ON CONTROL MODULE TO
HVAC UNIT STARTER CIRCUIT.3. FIRE ALARM CONTROL PANEL IS TO HAVE A FIREMANS "SHUTOFF" SWITCH FOR EACH HVAC UNIT IN THE BUILDING AND A SINGLE SWITCH TO TURN OFF
ALL HVAC UNITS. SWITCHES TO BE CONNECTED TO FIRE ALARM CONTROL PANEL. CONTROL PANEL TO PERFORM HVAC UNIT SHUTDOWN VIAADDRESSABLE CONTROL MODULE OUTPUT RELAYS LOCATED AT EACH HVAC UNIT.
M. THE QUANTITY OF FIRE ALARM BOOSTER PANELS SHOWN ON THESE DRAWINGS AND THE RISER DIAGRAM ARE FOR SCHEMATIC PURPOSES ONLY. THECONTRACTOR AND FIRE ALARM VENDOR SHALL DETERMINE THE EXACT QUANTITY OF BOOSTER PANELS REQUIRED BASED ON THE MANUFACTURER'SPANEL FUNCTION AND SPECIFICATIONS. THE CONTRACTOR SHALL PROVIDE THE QUANTITY OF BOOSTER PANELS REQUIRED TO SUPPORT THE ENTIRE FIREALARM SYSTEM BASED ON THE QUANTITY OF DEVICES SHOWN ON PLAN, TOTAL POWER NEEDED TO SUPPORT THE DEVICES, VOLTAGE DROPCALCULATIONS FOR EACH CIRCUIT, BATTERY CALCULATIONS, SIZE OF BUILDING, ETC. THE CONTRACTOR SHALL PROVIDE 120V, 20AMP CIRCUITS FOR ALLBOOSTER PANELS THAT ARE INSTALLED BASED ON THE FIRE ALARM VENDOR'S CALCULATIONS AT NO ADDITIONAL COST TO SDP.
1 PROVIDE KEYED RESET PULL STATION WITH BATTERY OPERATED LOCAL ALARM BY STI (ORAPPROVED EQUAL) AND IMPACT RESISTANCE PROTECTIVE COVER
SMOKE DETECTOR TO INITIATE ELEVATOR PRIMARY AND ALTERNATE RECALL.
FIRE ALARM SHEET NOTES
2
3
1
1
1
3
3
PROVIDE PROTECTIVE WIREGUARD FOR ALL FIRE ALARM DEVICES WITHIN GYM.
WG
110cd 110cd
WG
110cd
WG
110cd
WG2
2
2
2
2
2
2
SD
F/ABOOSTERPANEL#EM-9
NEW FIRE ALARM REMOTE BOOSTER POWER SUPPLY. PROVIDE 120V, 20AMP EMERGENCY POWER CIRCUITFROM PANELBOARD "EM" IDENTIFIED FOR FIRE ALARM REMOTE BOOSTER POWER SUPPLIES -CIRCUIT #EM-9.4
4
5NOT USED
SD
PROVIDE A SMOKE DETECTOR ON THE TOP OF ELEVATOR SHAFT.6
6
DD
3
DD
PROVIDE A DUCT MOUNTED SMOKE DETECTOR IN RETURN DUCT AND SUPPLY DUCT OF HVAC UNIT (OVER 2000CFM). EACH DUCT MOUNTED SMOKE DETECTOR SHALL HAVE REMOTE TEST SWITCH AND LED ALARMINDICATORS. WHERE THE CEILING HEIGHT IS HIGHER THAN 10', THE REMOTE TEST SWITCH AND LED ALARMINDICATORS SHALL BE WALL MOUNTED AT 48" A.F.F. ADJACENT HVAC UNIT. PROVIDE AND CONNECT ACONTROL MODULE AT EACH HVAC UNIT EXISTING MOTOR STARTER TO SHUTDOWN HVAC UNIT, FIELD VERIFYEXACT LOCATION. DEVICES TO BE LOCATED WHERE ACCESSIBLE BY QUALIFIED PERSONNEL ONLY. PROVIDE (1)REMOTE TEST STATIONS FOR EACH DUCT MOUNTED SMOKE DETECTORS.
7
7
15cd
15cd
15cd
15cd 15cd
15cd
15cd
15cd
15cd 15cd 15cd
15cd
15cd
15cd
15cd 15cd
15cd
15cd
15cd
15cd15cd
15cd
15cd
15cd
15cd
15cd
15cd 15cd
15cd
15cd15cd
15cd
15cd
15cd
75cd75cd75cd75cd75cd
15cd15cd
15cd
15cd
15cd
15cd
15cd
15cd
75cd
75cd
75cd
15cd
15cd
110cd
110cd
110cd
15cd
75cd75cd
15cd
75cd75cd
75cd
75cd
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
UP
STAIR NO.4
199
NURSERY
NO.2
141
NURSERY
NO.1
139
VESTIBULE
NO.1
138
STO.
134A
OU
TD
OO
R
ST
OR
AG
E
137
GE
NE
RA
L
ST
OR
AG
E
136
PASS. NO.4
135
STOR. NO.2
139B
STOR. NO.1
139A
TOIL. NO.1
139C
TOIL. NO.2
139D
TEACH. CLOS.
139F
GEN. STOR.
140
TEACH. CLOS.
141F
TOIL. NO.2
141D
TOIL. NO.1
141C
STOR. NO.2
141B
STOR. NO.1
141A
COAT ALCOVE
139E
COAT ALCOVE
141E
TEACH. CLOS.
143C
STO.
143A
CLASSROOM
NO.4
143
CLASSROOM
NO.3
134
SD
SD
15cd
15cd
15cd
15cd
15cd
15cd
75cd
75cd
75cd
3/32" = 1'-0"
E-205
FIRE ALARM DEMOLITIONFIRST FLOOR PLAN
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,PHILADELPHIA, PA 19121
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DATEGRAZYNA S. PLICHTAPA PE045538E 09/30/2019
GSPDGW
DIAMOND ST.N. 1
6TH
ST.
N. 1
5TH
ST.
N
KEYPLAN
ARCHITECTURAL
GANNETT FLEMING, INC.ONE PENN PLAZA, SUITE 630250 WEST 34TH STREETNEW YORK, NY 10119Phone: 212.967.9833Fax: 212.232.5791Email: [email protected]: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.232 CECELIA ACRES DRIVEIVYLAND, PA 18974Phone: 215.354.9161Fax: 215.354.9163Email: [email protected]: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.1010 ADAMS AVENUEVALLEY FORGE, PA 19403Phone: 610.650.8156Fax: 610.650.8190Email: [email protected]: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.1801 MARKET STREET, SUITE 2600PHILADELPHIA, PA 19103Phone: 215.557.0106Fax: 215.557.0337Email: [email protected]: Mark D. DeCocinis, CEI
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.207 SENATE AVENUECAMP HILL, PA 17011Phone: 717.763.7211Fax: 717.763.8150Email: [email protected]: Brian Seip, PE
B-075c OF 2018/19B-076c OF 2018/19B-077c OF 2018/19B-078c OF 2018/19
PERMIT SET25 MARCH 2020
SCALE: 3/32" = 1'-0"
FIRE ALARM NEW WORK FIRST FLOOR PLAN
1
SHEET 48 OF 61
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
UP
UPUP
CLASSROOM
NO.24
237
TOILET
237B
CLOS.
237A
TEACH. CLOS.
237D
STORAGE
243
CLOS.
202A
SPEECH
CORRECTION
202
TEACH. CLOS.
202B
CLASSROOM
NO.6
203
CLOS.
203A
TEACH. CLOS.
203B
SHOWER
237C
TEAM
SUPPORTING
NO.2
204
TEACH. CLOS.
204A
CLASSROOM
NO.7
205
TEACH. CLOS.
205A
CLASSROOM
NO.8
206
CLOS.
206A
TEACH. CLOS.
206B
CLASSROOM
NO.22
235
CLASSROOM
NO.23
236
STAIR NO.3
240
CLOS.
235A
TEACH. CLO.
235B
TEACH. CLO.
236A
CORRIDOR NO.1
201
CLASSROOM
NO.19
219
CLOS.
219B
CLOS.
219A
CLASSROOM
NO.18
218
CLASSROOM
NO.15
213
TEACH. CLOS.
213B
CLASSROOM
NO.14
212
TEACH. CLO.
212A
UPPER PART
OF
AUDITORIUM-CAFETERIA
UPPER PART
OF
GYMNASIUM
MECH. EQUIP.
ROOM NO.2
228
MECH.
EQUIPMENT
ROOM NO.1
227
FAN ROOM
226
MATERIALS
PRODUCTION
ROOM
223
AUDIO-VISUAL
221
READING
ROOM
224
GIRLS TOILET
ROOM
229
224A
TEAM
SUPPORTING
NO.3
224B
CLOS.
231C
PIPE SPACE
230
PIP
E S
PA
CE
229A
JA
N. C
LO
S.
231B
PIPE SPACE
233
PASS.
231A
Room
231D
CLASSROOM
NO.21
234
234A
TEACH. CLOS.
234B
CLASSROOM
NO.9
207
TEACH. CLO.
207C
STO. CLO.
207B
STO. RM.
207A
STO. RM.
208A
STAIR NO.1
238
CLASSROOM
NO.10
208
ELEVATOR
TEACH. CLOS.
208B
CLASSROOM
NO.11
209
CLASSROOM
NO.12
210
STAIR NO.2
239
STO. RM.
210A
STO. RM.
211A
CLASSROOM
NO.13
211
STO. CLO.
211B
TEACH. CLO.
211C
TEACH. CLOS.
210B
CLOS.
210C
TEACH. CLOS.
209A
CLASSROOM
CLASSROOM
SD SD SD SD SD SDSD
SD SD SD
SD
SD
HD
SD
HD
HD
HD
FIRE ALARM GENERAL NOTES:
A. FOR ELECTRICAL SYMBOLS, ABBREVIATIONS, REFER TO DRAWING E001.
D. ALL NEW FIRE ALARM DEVICES SHALL BE INSTALLED, TESTED AND ACCEPTED PRIOR TO OCCUPANCY. THE LOCAL AUTHORITY HAVING JURISDICTION SHALLPERFORM ALL FINAL ACCEPTANCES.
E. ALL FIRE ALARM POINTS MUST BE TRANSMITTED TO THE CENTRAL MONITORING STATION. EACH FIRE ALARM POINT MUST SEND THE CENTRAL MONITORINGSTATION A RESTORE CODE FOR EACH POINT.
F. ALL DEVICES CONTAINING END OF LINE RESISTORS SHALL BE LABELED 'EOL'.
G. PROVIDE SIGNAGE AT EACH MANUAL PULL STATION, SIGN MUST BE MOUNTED IMMEDIATELY ADJACENT TO THE MANUAL PULL STATION. THE SIGN SHALLREAD "INCASE OF FIRE: SOUND ALARM AND CALL THE FIRE DEPARTMENT".
H. ALL FIRE ALARM WIRING SHALL BE IN METAL CONDUIT. PROVIDE GALVANIZED RIGID STEEL CONDUIT FOR ALL RISER CONDUITS AND ALL CONDUITS INMECHANICAL, ELECTRICAL AND BOILER ROOMS. PAINT ALL JUNCTION BOXES WITH RED COLOR PAINT AND LABEL AS "FIRE ALARM".
J. ELECTRICAL CONTRACTOR SHALL USE CONDUIT SEALING FITTING WITH APPROVED SEALING COMPOUND ON ALL CONDUITS PASSING FROM INTERIOR TOEXTERIOR OF A BUILDING AND BETWEEN AREAS OF DIFFERENT TEMPERATURES. SEAL ALL CONDUIT PENETRATIONS THOUGH RATED WALLS AND FLOORS TOMAINTAIN FIRE RATING INTEGRITY.
K. WIRING TO BE RUN IN EMT CONDUIT AND COMPLY WITH NEC ARTICLE 760. CONDUIT TO RUN EXPOSED, EXCEPT ABOVE SUSPENDED CEILING (WHEREAPPLICABLE). MINIMUM CONDUIT SIZE TO BE 3/4"C. ALL WIRING TO BE COPPER. ALL RISER CONDUIT AND CONDUIT IN MECHANICAL, ELECTRICAL, ANDBOILER ROOM SHALL BE RIGID STEEL GALVANIZED CONDUIT. ALL CONDUIT AND WIRING ROUTING BETWEEN FLOORS TO BE ROUTED IN RIGID CONDUITWITH SEAL FITTING BELOW THE CEILING BEFORE PENETRATING THE FLOOR SLAB. TYPE 'MC' CABLE IS NOT ACCEPTABLE.
L. HVAC UNIT/AIR HANDILING EQUIPMENT ITEMS:1. PROVIDE ADDRESSABLE DUCT DETECTORS AND PERFORM HVAC UNIT SHUT DOWN LOCALLY.2. PROVIDE HVAC UNIT SHUTDOWN UPON FIRE ALARM SYSTEM ALARM CONDITIONS VIA CONTROL MODULES. WIRE OUTPUTS ON CONTROL MODULE TO
HVAC UNIT STARTER CIRCUIT.3. FIRE ALARM CONTROL PANEL IS TO HAVE A FIREMANS "SHUTOFF" SWITCH FOR EACH HVAC UNIT IN THE BUILDING AND A SINGLE SWITCH TO TURN OFF
ALL HVAC UNITS. SWITCHES TO BE CONNECTED TO FIRE ALARM CONTROL PANEL. CONTROL PANEL TO PERFORM HVAC UNIT SHUTDOWN VIAADDRESSABLE CONTROL MODULE OUTPUT RELAYS LOCATED AT EACH HVAC UNIT.
M. THE QUANTITY OF FIRE ALARM BOOSTER PANELS SHOWN ON THESE DRAWINGS AND THE RISER DIAGRAM ARE FOR SCHEMATIC PURPOSES ONLY. THECONTRACTOR AND FIRE ALARM VENDOR SHALL DETERMINE THE EXACT QUANTITY OF BOOSTER PANELS REQUIRED BASED ON THE MANUFACTURER'SPANEL FUNCTION AND SPECIFICATIONS. THE CONTRACTOR SHALL PROVIDE THE QUANTITY OF BOOSTER PANELS REQUIRED TO SUPPORT THE ENTIRE FIREALARM SYSTEM BASED ON THE QUANTITY OF DEVICES SHOWN ON PLAN, TOTAL POWER NEEDED TO SUPPORT THE DEVICES, VOLTAGE DROPCALCULATIONS FOR EACH CIRCUIT, BATTERY CALCULATIONS, SIZE OF BUILDING, ETC. THE CONTRACTOR SHALL PROVIDE 120V, 20AMP CIRCUITS FOR ALLBOOSTER PANELS THAT ARE INSTALLED BASED ON THE FIRE ALARM VENDOR'S CALCULATIONS AT NO ADDITIONAL COST TO SDP.
1 SMOKE DETECTOR TO INITIATE ELEVATOR PRIMARY AND ALTERNATE RECALL.
FIRE ALARM SHEET NOTES
2
3
NEW FIRE ALARM REMOTE BOOSTER POWER SUPPLY. PROVIDE 120V, 20AMP EMERGENCY POWER CIRCUITFROM PANELBOARD "EM" IDENTIFIED FOR FIRE ALARM REMOTE BOOSTER POWER SUPPLIES -CIRCUIT #EM-11.
1
PROVIDE A DUCT MOUNTED SMOKE DETECTOR IN RETURN DUCT AND SUPPLY DUCT OF HVAC UNIT (OVER 2000CFM). EACH DUCT MOUNTED SMOKE DETECTOR SHALL HAVE REMOTE TEST SWITCH AND LED ALARMINDICATORS. WHERE THE CEILING HEIGHT IS HIGHER THAN 10', THE REMOTE TEST SWITCH AND LED ALARMINDICATORS SHALL BE WALL MOUNTED AT 48" A.F.F. ADJACENT HVAC UNIT. PROVIDE AND CONNECT ACONTROL MODULE AT EACH HVAC UNIT EXISTING MOTOR STARTER TO SHUTDOWN HVAC UNIT, FIELD VERIFYEXACT LOCATION. DEVICES TO BE LOCATED WHERE ACCESSIBLE BY QUALIFIED PERSONNEL ONLY. PROVIDE (1)REMOTE TEST STATIONS FOR EACH DUCT MOUNTED SMOKE DETECTORS.
4
F/ABOOSTERPANEL#EM-11
2
DD
DD
DD
DD
DD
DD
DD
DD
3 3 3
3
PROVIDE A SMOKE DETECTOR ON THE TOP OF ELEVATOR SHAFT.
4
SD
DD
DD
3
SD
15cd 15cd 15cd
15cd
15cd
15cd
110cd
15cd
110cd
110cd
15cd
15cd
75cd75cd75cd75cd75cd75cd75cd75cd
75cd
75cd
75cd
75cd
15cd75cd
75cd
75cd
75cd
75cd75cd
75cd
15cd
75cd 75cd
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
SE
E P
AR
TIA
L P
LA
N T
HIS
SH
EE
T F
OR
C
ON
TIN
UA
TIO
N
UP
TEACH. CLOS.
218B
CLOS.
218A
STAIR NO.4
241
STORAGE
242
CLASSROOM
NO.17
217
TOILET
217A
SHOWER
217B
TEACH. CLOS.
217C
TEACHERS
WORKROOM
216
TEACH. CLOS.
216B
CLOS.
216A
CLASSROOM
NO.16
215
TOILET
215A
SHOWER
215B
TOILET
215C
TEAM
PLANNING RM
NO.3
214
214B
CLOS.
214A
CLO.
213A
CLASSROOM
NO.18
218
CLASSROOM
NO.15
213
SD
SD
15cd
15cd
15cd
75cd
30cd
75cd
15cd
15cd
75cd
75cd
3/32" = 1'-0"
E-206
FIRE ALARM NEW WORKSECOND FLOOR PLAN
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,PHILADELPHIA, PA 19121
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DATEGRAZYNA S. PLICHTAPA PE045538E 09/30/2019
GSPDGW
DIAMOND ST.N. 1
6TH
ST.
N. 1
5TH
ST.
N
KEYPLAN
ARCHITECTURAL
GANNETT FLEMING, INC.ONE PENN PLAZA, SUITE 630250 WEST 34TH STREETNEW YORK, NY 10119Phone: 212.967.9833Fax: 212.232.5791Email: [email protected]: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.232 CECELIA ACRES DRIVEIVYLAND, PA 18974Phone: 215.354.9161Fax: 215.354.9163Email: [email protected]: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.1010 ADAMS AVENUEVALLEY FORGE, PA 19403Phone: 610.650.8156Fax: 610.650.8190Email: [email protected]: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.1801 MARKET STREET, SUITE 2600PHILADELPHIA, PA 19103Phone: 215.557.0106Fax: 215.557.0337Email: [email protected]: Mark D. DeCocinis, CEI
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.207 SENATE AVENUECAMP HILL, PA 17011Phone: 717.763.7211Fax: 717.763.8150Email: [email protected]: Brian Seip, PE
B-075c OF 2018/19B-076c OF 2018/19B-077c OF 2018/19B-078c OF 2018/19
PERMIT SET25 MARCH 2020
SCALE: 3/32" = 1'-0"
FIRE ALARM NEW WORK SECOND FLOOR PLAN
1
SHEET 49 OF 61
NONE
E-207
FIRE ALARMRISER DIAGRAM
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,PHILADELPHIA, PA 19121
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DATEGRAZYNA S. PLICHTAPA PE045538E 09/30/2019
GSPDGW
ARCHITECTURAL
GANNETT FLEMING, INC.ONE PENN PLAZA, SUITE 630250 WEST 34TH STREETNEW YORK, NY 10119Phone: 212.967.9833Fax: 212.232.5791Email: [email protected]: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.232 CECELIA ACRES DRIVEIVYLAND, PA 18974Phone: 215.354.9161Fax: 215.354.9163Email: [email protected]: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.1010 ADAMS AVENUEVALLEY FORGE, PA 19403Phone: 610.650.8156Fax: 610.650.8190Email: [email protected]: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.1801 MARKET STREET, SUITE 2600PHILADELPHIA, PA 19103Phone: 215.557.0106Fax: 215.557.0337Email: [email protected]: Mark D. DeCocinis, CEI
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.207 SENATE AVENUECAMP HILL, PA 17011Phone: 717.763.7211Fax: 717.763.8150Email: [email protected]: Brian Seip, PE
B-075c OF 2018/19B-076c OF 2018/19B-077c OF 2018/19B-078c OF 2018/19
PERMIT SET25 MARCH 2020
SCALE: NONEADDRESSABLE VOICE FIRE RISER DIAGRAM
1
FIRE ALARM SYSTEM RISER NOTES:
1. THIS RISER DIAGRAM IS BASED ON SIEMENS BUILDING TECHNOLOGIES DESIGO VOICE FIRE ALARM CONTROL PANEL. THIS DIAGRAM IS SCHEMATIC ONLY AND DOES NOT REPRESENT ACTUAL DEVICE QUANTITIESUNLESS OTHERWISE NOTED. IT IS A REPRESENTATION OF THE INTENDED SYSTEM FOR THIS PROJECT. SEE THE FLOOR PLANS FOR EXACT QUANTITIES AND LOCATIONS OF FIELD EQUIPMENT. SEE THE PROJECTSPECIFICATIONS FOR PERFORMANCE AND COMPLIANCE REQUIREMENTS. QUANTITY AND SIZE OF CONDUCTORS TO BE DETERMINED BY SIEMENS.
2. THE SYSTEM SHALL BE UL LISTED FOR FIRE [UL864] AND MASS NOTIFICATION [UL2572] IN ONE (1) FIRE ALARM CONTROL PANEL (FACP). IT SHALL ALSO SUPPORT GAS ALARM EVENTS FOR CO DETECTION, PER NFPA 72.
3. THE SYSTEM SHALL HAVE THE CAPACITY TO NETWORK UP TO 32 FIRE AND VOICE PANELS UTILIZING VOICE-OVER-IP (VOIP) TECHNOLOGY. ALL FIRE AND VOICE SIGNALS SENT OVER THE SAME CONDUCTORS.PEER-TO-PEER NETWORKED PANELS SHALL HAVE THE CAPABILITY OF DISPLAYING LOCAL OR GLOBAL EVENTS. THE NETWORK SHALL ALSO SUPPORT THE ABILITY TO INTERFACE WITH A UL LISTED DESKTOPWORKSTATION.
4. PROVIDE AUXILIARY FIRE ALARM SIGNAL PANEL(S) AND VOICE AMPLIFIERS W/ BATTERY BACKUP AS REQUIRED TO SUPPORT NOTIFICATION APPLIANCE LOADS. THE SYSTEM SHALL HAVE THE CAPABILITY TO SUPPORT ATHREE-CHANNEL MESSAGE PLAYER WITH UPTO 300 MESSAGES.
5. PROVIDE A MANUAL VOICE PAGING SWITCHES FOR 'ALL CALL' FOR SIMULTANEOUSLY PAGING THE ENTIRE FACILITY AND SELECTIVE PAGING FOR EACH FLOOR AND FIRE AREA.
6. ALL WIRING REQUIREMENTS SHALL BE AS PER MANUFACTURER'S RECOMMENDATIONS, BUT NOT LESS THAN INDICATED ON THIS DRAWING.
7. PROVIDE END OF LINE RESISTERS AS NECESSARY.
8. ALL ADDRESSABLE SLC'S SHALL BE NFPA 72 CLASS B, STYLE 4.
9. ALL NOTIFICATION NAC'S SHALL BE NFPA 72 CLASS B, STYLE Y.
10. STROBE CANDELAS MUST BE SIZED PER NFPA 72 REQUIREMENTS BY THE FIRE ALARM VENDOR AND SHOWN ON THE SHOP DRAWINGS.
11. ALL PANEL BATTERY BACKUP (STANDBY & ALARM) SHALL BE SIZED PER NFPA 72 REQUIREMENTS.
12. A COMPLETE SET FOR FIRE ALARM PRODUCT CUT SHEETS, FIRE ALARM SHOP DRAWINGS, AND BATTERY/ VOLTAGE/ LOAD CALCULATIONS MUST BE SUBMITTED AND APPROVED PRIOR TO INSTALLATION.
13. PRIMARY FACP POWER FED VIA BRANCH CIRCUIT(S) DEDICATED FOR THE FIRE ALARM SYSTEM. PROVIDE NORMAL/EMERGENCY POWER CIRCUITS TO THE FIRE ALARM CONTROL PANEL AND ALL REMOTE NAC PANELS(NOT APPLICABLE TO BUILDINGS WHICH DO NOT HAVE EMERGENCY GENERATORS). PROVIDE A 120 VOLT DUPLEX RECEPTACLE AT FIRE ALARM PANEL FOR MAINTENANCE AND PRINTER USE.
14. ALL EARTH GROUND PANEL CONNECTIONS REQUIRED BY THE MANUFACTURER SHALL BE CONNECTED TO THE BUILDING'S GROUND. PANEL NEUTRAL OR GROUNDING TO CONDUIT/ BUILDING STEEL NOTACCEPTABLE.
EARTHGROUND
CONNECT TO 20A/1P CIRCUITBREAKER IN NEAREST 120V PANEL.RUN (2) #12 IN 3 4" CONDUIT.
COORDINATE EXACT LOCATION WITHFIRE MARSHAL PRIOR TO ROUGH-IN.
OFF-SITEIP &
CELLULARNETWORKABLE FIRE
AND VOICE SYSTEMSOVER CAT5 OR
FIBER-OPTIC CABLES
SIZE OF CONDUCTORS, QUANTITY OF NAC'S ANDBOOSTER PANELS TO BE DETERMINED BY SIEMENS.ACTIVE ALARM CAPACITY MUST NOT EXCEED80%. ALL STROBES SHALL HAVE ADA COMPLIANTSYNCHRONIZED FLASHING. VOICE SPEAKERCIRCUITS SIZED PER THE BUILDING'S FIRE ZONES.
REMOTE ANNUNCIATORPOWER & DATA
EARTH GROUND
PROVIDE ADDRESSABLE MONITORING MODULES OR CONTROL MODULES AT THELOCATIONS SHOWN ON THE FLOORPLANS, PER THE FUNCTIONS LISTED BELOW:
SUPPRESSION KITCHEN SUPPRESSION HOOD MONITORINGELEVATOR SIGNAL THE CONTROLLER TO INITIATE PRIMARY, SECONDARY, AND FIRE HAT
FUNCTIONS SIGNAL THE SHUNT TRIP BREAKER TO INITIATE POWER SHUTDOWNSMOKE MANAGEMENT SIGNAL HVAC FAN SHUTDOWN
SIGNAL RELEASE OF MAGNETIC SMOKE DOOR HOLDER SIGNAL SMOKE DAMPER CLOSURESECURITY SIGNAL THE EGRESS DOOR LOCKS TO UNLOCK
STROBE BOOSTER PANELACTIVATION CIRCUIT
ADDRESSABLE SIGNAL LINE CIRCUIT (SLC)
GENERAL FIRE ALARM SYSTEM NOTES
1. THIS SYSTEM HAS BEEN ENGINEERED BASED ON THE PERFORMANCE AND CAPABILITIES OF SIEMENS DESIGO ADDRESSABLE VOICE FIRE ALARM CONTROL PANEL (FACP) WITH DOOR-MOUNTED DISPLAY/CONTROLS, AND INTERNAL BATTERY BACKUP. MANUFACTURES AND MODEL NUMBERS NOTED ON THE CONSTRUCTION DOCUMENTS ARE FOR REFERENCE ONLY AND TO ESTABLISH A BASIS OF DESIGN.PRODUCTS PROVIDED BY ALTERNATIVE MANUFACTURERS SHALL BE ACCEPTABLE PROVIDING THEY MEET THE QUALITY STANDARDS REFERENCED HEREIN. APPROVED ADDITIONAL FIRE ALARM SYSTEMMANUFACTURERS ARE: EDWARDS, NOTIFIER AND GAMEWELL (FCI).
2. THE SELECTED SYSTEM IS MODULAR IN DESIGN. ALL SPECIFIED COMPONENTS MUST HAVE A MINIMUM 20% SPARE EXPANSION CAPACITY TO ACCOMMODATE CONSTRUCTION CHANGES AND FUTURERENOVATIONS. THIS SPARE CAPACITY INCLUDES CABINET EXPANSION SPACE, CAPACITIES ON POWER SUPPLIES/ PANEL CARDS AND NETWORKING CAPABILITY.
3. IT IS THE INTENT THAT THE DRAWINGS AND SPECIFICATIONS SHALL PROVIDE A WORKING INSTALLATION. THE OMISSION OF EXPRESSED REFERENCE IN THE DRAWINGS OR SPECIFICATION TO ANY LABOR ORMATERIAL NECESSARY FOR THE PROPER EXECUTION OF THE WORK IN ACCORDANCE WITH PRESENT GOOD PRACTICE OF THE TRADE SHALL NOT RELIEVE THIS CONTRACTOR FROM PROVIDING, AT NO COST,SUCH ADDITIONAL LABOR AND MATERIAL UNDER THIS CONTRACT.
4. ALL WIRING SHALL COMPLY WITH PROJECT SPECIFICATIONS, NFPA 72, NEC ARTICLE 760, AND THE REQUIREMENTS OF THE AHJ. NO FIRE ALARM POWER-LIMITED WIRING SHALL BE PERMITTED IN THE SAMERACEWAY AS NO POWER-LIMITED UNLESS SEPARATED BY AN APPROVED BARRIER.
5. FOR CONDUIT APPLICATIONS, USE ELECTRICAL METALLIC TUBING (EMT), 3/4" MINIMUM.
6. ALL CONDUITS, CONDUCTORS, RACEWAYS, EQUIPMENT, ETC., SHALL BE SUPPORTED IN AN APPROVED MANNER BY THE BUILDING STRUCTURE, INCLUDING HANGERS AND RESTRAINTS, IN ACCORDANCE WITHALL APPLICABLE CODES AND SEISMIC RESTRAINT REQUIREMENTS.
7. ALL FIRE RATED PENETRATIONS SHALL BE MADE WITH A UL APPROVED FIRE STOP MATERIAL OR METHOD.
8. SEAL ALL PENETRATIONS THROUGH EXTERIOR WALLS, FLOORS, AND ROOFS WITH WATERTIGHT MATERIAL.
9. FURNISH AND INSTALL ACCESS PANELS WHERE REQUIRED FOR ACCESS TO CONCEALED EQUIPMENT WHERE NO OTHER MEANS IS PROVIDED.
10. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING PATCHING AND PAINTING REQUIRED FOR COMPLETE FIRE ALARM SYSTEM INSTALLATION.
11. MOUNTING FOR ALL DEVICES AND APPLIANCES SHALL COMPLY WITH STATE, LOCAL, AND ADAAG.
12. CONTRACTOR SHALL REPAIR/PATCH AND/OR REPAINT TO MATCH ADJACENT AREAS, ANY AREAS DAMAGED (OR WHERE ITEMS WERE REMOVED/ DEMOLISHED) BY WORK OF THIS CONTRACT.
13. THE FIRE ALARM VENDOR MUST CALCULATE THE NOTIFICATION APPLIANCES CANDELA RATINGS AND DESIGNATE THEM ON THE SHOP DRAWINGS. ALL STROBE SETTING MUST COMPLY WITH NFPA 72REQUIREMENTS.
14. EACH AIR HANDLING SYSTEM 2000 CFM OR GREATER SHALL BE EQUIPPED WITH A SUPPLY AND RETURN DUCT DETECTOR.
15. ALL WORK AND SHUTDOWNS ASSOCIATED WITH FIRE ALARM SYSTEM INTERFACES SHALL BE COORDINATED THROUGH THE RESPECTIVE CONTRACTOR, INCLUDING BUT NOT LIMITED TO: SPECIAL HAZARDSUPPRESSION SYSTEM(S), AUTOMATIC SPRINKLER SYSTEM(S), HVAC SYSTEM(S), ELEVATOR SYSTEM(S), AND SECURITY/ ACCESS CONTROL SYSTEM(S).
16. SYSTEM MANUFACTURER SHALL COORDINATE FINAL QUANTITIES AND LOCATIONS OF ALL SYSTEM MONITORS AND CONTROL MODULES WITH THE RESPECTIVE CONTRACTORS FOR INTERFACE. FINAL LOCATIONSTO BE SHOWN ON SHOP DRAWINGS. CHECK AND VERIFY ALL CONDITIONS AT THE SITE WITHIN THE CONTRACT LIMITS. THE INSTALLATION CONTRACTOR IS RESPONSIBLE FOR ALL FIELD MEASUREMENTS ANDVERIFICATION OF FIELD CONDITIONS PRIOR TO COMMENCING WORK. ANY CHANGES IN WORK NECESSITATED BY FAILURE OF THIS CONTRACTOR TO COMPLY WITH THIS PROCEDURE SHALL BE UNDERTAKEN BYTHIS CONTRACTOR AT HIS/ HER OWN EXPENSE.
17. THE INSTALLATION CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE FIRE ALARM SHOP DRAWING SUBMITTAL FOR COMPLETE COMPLIANCE WITH THE FULL SET OF BID DOCUMENTS PRIOR TO SUBMITTING TOTHE ENGINEER FOR APPROVAL.
18. ACCEPTANCE TESTING MUST BE PERFORMED IN ACCORDANCE WITH NFPA 72 AND AHJ REQUIREMENTS.
19. UPON COMPLETION OF FINAL TESTING AND APPROVAL OF THE AHJ, THE SYSTEM VENDOR SHALL SUBMIT RECORD DRAWINGS TO THE OWNER DETAILING AS-BUILT CIRCUITING AS SHOWN ON THE INSTALLER'SRED-LINE MARKUPS. THEY SHALL INCORPORATE ALL FIELD AND DESIGN DIRECTIVES GIVEN THROUGH OUT THE PROJECT.
FIRE CONTROL PANELVOICE
CONNECT TO 20A/1P CIRCUIT BREAKER (PANEL "EM") WITH(2) #12 IN 3 4" CONDUIT. UTILIZE EMERGENCY POWERCIRCUIT AND SIZE THE FACP STANDBY BATTERIES PER NFPA72 REQUIREMENTS.
REMOTE ANNUNCIATOR WITHDISPLAY & CONTROL
FUNCTIONS
4 X 40 BACK LIT LCD SCREENPOWERTROUBLESUPPRE
ALARMALARMSILENCEDALARM
ACKNOWLEDGEALARM SILENCE SYSTEM RESET
MAIN
DESIGO
FACP
CONNECT TO 20A/1P CIRCUITBREAKER IN NEAREST 120V PANEL.RUN (2) #12 IN 3 4" CONDUIT.
EARTH GROUND
STROBE BOOSTER PANELACTIVATION CIRCUIT
A/V NOTE:SPEAKER AND STROBES MAY BE SUPPORTED BY ACOMBINATION OF THE MAIN FIRE ALARM PANELAND/OR BY BOOSTER PANELS. ALL BOOSTER PANELSSHALL BE SUPERVISED BY THE MAIN FACP. PROVIDE ADEDICATED SMOKE DETECTOR FOR THE BOOSTERPANELS IF AREA SMOKE COVERAGE NOT SUPPLIED INTHE BASE DESIGN. PROVIDE A LISTED WIRE GUARD FORAPPLIANCES IN GYMNASIUMS AND LOCKER ROOMS.
PROVIDE FIRE ALARMANNUNCIATORS AT THE MAINFIRE DEPARTMENT ENTRANCE,BUILDING ENGINEER'S OFFICEAND MAIN OFFICE.
PROVIDE A SIGN TO EACHMANUAL PULL STATION. THESIGN SHALL BE MOUNTEDIMMEDIATELY ADJACENT TOTHE MANUAL PULL STATION.THE SIGN SHALL READ “INCASE OF FIRE: SOUNDALARM AND CALL THE FIREDEPARTMENT”.
AUXILIARYSPEAKERBOOSTERPANEL W/BATTERYBACKUP
CONTROLLED& MONITORED
BY FACP
AUXILIARYSTROBE
BOOSTERPANEL W/BATTERYBACKUP
CONTROLLED& MONITORED
BY FACP
MANUAL PULLSTATION WITH
PROTECTIVE COVER
ADDRESSABLEMULTICRITERIA
SMOKEDETECTOR
ADDRESSABLESMOKE
DETECTORW/ RELAY
BASE
ADDRESSABLESMOKE
DETECTOR W/CO
DETECTION
ADDRESSABLEHEAT HEATDETECTOR
ADDRESSABLESMOKE DUCT
DETECTOR
ADDRESSABLEMODULE
SPEAKERAPPLIANCE
STROBEAPPLIANCE
SPEAKER/STROBEAPPLIANCE
PROVIDE OUTSIDEWEATHERPROOF STROBE NEARENTRANCE TO FIRE COMMAND,ACTIVATE ON ANY ALARM
STROBEAPPLIANCE
DIAGRAM IS SCHEMATIC ONLY AND DOES NOT REPRESENTACTUAL DEVICE QUANTITIES UNLESS OTHERWISE NOTED.EVERY DEVICE INDICATED MAY NOT BE UTILIZED FOR THISPROJECT. REFER TO DRAWINGS, AND ALLOWANCES FOREQUIPMENT QUANTITIES. REFER TO SPEC. FOR FURTHERPERFORMANCE INFORMATION.
#EM-7
#EM-9
#EM-11
SHEET 50 OF 61
PROVIDE SEPARATEADDRESSABLE CIRCUITHOMERUNS FOR EACH LEVELAND FOR EACH SEPARATE FIREAREA
PROVIDE WIRING TO STARTERS FORFAN SHUTDOWN OF MECH. AIRHANDING UNITS WITH DUCT SMOKEDETECTORS. USE A SEPARATEADDRESSABLE RELAY MODULE FORFAN SHUTDOWN IF THE STARTER ISREMOTE FROM THE UNIT.
HVAC UNIT
MOTOR
MOTOR STARTER
RETURN OR SUPPLY AIR DUCTWORK
NC
DUCT MOUNTEDSMOKE DETECTOR WITHSHUTDOWN RELAY
REMOTE TEST STATION(WALL MOUNTED)
FA SIGNAL CIRCUIT TO FACPPANEL
NOT TO SCALETYPICAL AHU SHUTDOWN DETAILS
L
NOTE:PROVIDE WIRING TO STARTERS FOR FANSHUTDOWN OF MECHANICAL AIR HANDLINGUNITS WITH DUCT SMOKE DETECTORS. USE ASEPARATE ADDRESSABLE RELAY MODULE FORFAN SHUTDOWN IF THE STARTER IS REMOTEFROM THE UNIT.
FANSHUTDOWN
PROVIDE NAMEPLATEINDICATING AHU NUMBER.
WIRING IN CONDUIT
NAMEPLATEINDICATINGAHU NUMBER
INDICATORLIGHT
REMOTE TESTSWITCH
DUCTDETECTOR
OTHER INDICATORS FOR MULTIPLEDETECTOR LOCATIONS.
RTS/I NOT TO SCALETYPICAL SPEAKER/STROBE WIRING DETAIL
1 PAIR #14 AWG (MIN)
UNSHIELDED
STROBE POWER 24VDC
NOTES:1. ALL WIRING IN CONDUIT.
STROBE SPEAKER/STROBE
STROBESPEAKER
2
3
1 1 PAIR #14 AWG (MIN) UNSHIELDED STROBE POWER 24VDC
2 1 PAIR #16 AWG (MIN) SHIELDED SPEAKER POWER 24VDC
3 1 PAIR #14 AWG SHIELDED ADDRESSABLE DATA LOOP
4 1 PAIR #14 AWG UNSHIELDED 24V POWER
5 (2) CAT 6 DATA CABLES WITH RJ-45 TERMINATION
6 (1) RS-232 PRINTER DATA COMMUNICATIONS CABLE
FIRE ALARM RISER WIRING LEGEND:
PROVIDE STANDALONE DIGITAL ALARM COMMUNICATORTRANSMITTER (DACT) FOR OFF-PREMISES MONITORING OFTHE FACP ALARM POINTS. PROVIDE (2) CAT 6 CABLESFROM THE FACP TO THE TELEPHONE DEMARCATIONSTATION (MAIN TELEPHONE SERVICE BOX).FACP TO COMMUNICATOR CONNECTIONS PERMANUFACTURER, DACT POWERED BY FACP.
1 PAIR #16 AWG (MIN) SHIELDED
SPEAKER POWER 24VDC
34PRINTER
PROVIDE SUPERVISED RELAYING FORELEVATOR RECALL, LOCATE IN ELEVATORMACHINE ROOM, PROVIDE RELAY ANDSUITABLE ENCLOSURE, ALLINTERCONNECTIONS TO ELEVATORCONTROLLER SHALL BE BY ELEVATORCONTRACTOR.
PROVIDE SUPERVISED RELAYING FORELEVATOR ALTERNATE RECALL,LOCATE IN ELEVATOR MACHINEROOM, PROVIDE RELAY AND SUITABLEENCLOSURE, ALL INTERCONNECTIONSTO ELEVATOR CONTROLLER SHALL BEBY ELEVATOR CONTRACTOR.
3/32" = 1'-0"
E-208
FIRE ALARMDETAILS
N/A4460
FLOOD REMEDIATIONPROJECT
DR. TANNER G. DUCKREYELEMENTARY SCHOOL
1501 DIAMOND STREET,PHILADELPHIA, PA 19121
SEAL:
OFFICE OF CAPITAL PROGRAMS
440 NORTH BROAD STREETPHILADELPHIA, PA 19130 - 4015
(215) 400 - 4730 | (215) 400 - 4731 (fax)www.philasd.org
DRAWING NO.
DRAWN BY CHECKED BY
FILE NO.LOCATION NO.
DRAWING TITLE
PROJECT TITLE
NO. DATE REVISION
87654321
A
B
C
D
E
F
DRAWING SCALE
DATEGRAZYNA S. PLICHTAPA PE045538E 09/30/2019
GSPDGW
ARCHITECTURAL
GANNETT FLEMING, INC.ONE PENN PLAZA, SUITE 630250 WEST 34TH STREETNEW YORK, NY 10119Phone: 212.967.9833Fax: 212.232.5791Email: [email protected]: Kayoko Karatsu, AIA
ELECTRICAL LIGHTING AND FIRE ALARM
DGW ELECTRICAL ENGINEERING, INC.232 CECELIA ACRES DRIVEIVYLAND, PA 18974Phone: 215.354.9161Fax: 215.354.9163Email: [email protected]: Grazyna Plichta, PE
MECHANICAL
GANNETT FLEMING, INC.1010 ADAMS AVENUEVALLEY FORGE, PA 19403Phone: 610.650.8156Fax: 610.650.8190Email: [email protected]: Brian M. Weisser, PE
VERTICAL TRANSPORTATION
GANNETT FLEMING, INC.1801 MARKET STREET, SUITE 2600PHILADELPHIA, PA 19103Phone: 215.557.0106Fax: 215.557.0337Email: [email protected]: Mark D. DeCocinis, CEI
ELECTRICAL POWER AND TELECOMMUNICATIONS
GANNETT FLEMING, INC.207 SENATE AVENUECAMP HILL, PA 17011Phone: 717.763.7211Fax: 717.763.8150Email: [email protected]: Brian Seip, PE
B-075c OF 2018/19B-076c OF 2018/19B-077c OF 2018/19B-078c OF 2018/19
PERMIT SET25 MARCH 2020
NOTE: THIS FIGURE IS BASED ON THE THE ACCESSIBILITY GUIDELINESFOR BUILDINGS AND FACILITIES (ADAAG)
REMOTEANNUNCIATOR
SUPE
RVISI
NG ST
ATIO
N
NOTIF
ICAT
ION
SIGNA
LS
OFF
SITE
SIG
NAL S
ENT T
O
ACTIV
ATE
EVAC
UATIO
N
ANNU
NCIA
TE @
FAC
P
TRO
UBLE
SIG
NAL
SYST
EM A
LARM
AREA DETECTOR (SMOKE, HEAT, OR BEAM)
MANUAL PULL STATION
FACP/PB PRIMARY POWER FAILURE
ANNU
NCIA
TE @
RA
SUPE
RVISO
RY SI
GNA
L
FAN
SHUT
DOW
N O
F
ASSO
CIA
TED
HVAC
UNI
T
FACP/PB LOW BATTERY
SLC/NAC OPEN-CIRCUIT
SLC/NAC GROUND-FAULT
SLC/NAC SHORT-CIRCUIT
DUCT SMOKE DETECTOR
FIRE PUMP RUNNING
RELE
ASE
SMO
KE
DOO
R HO
LDER
S
RELE
ASE
EGRE
SS
DOO
R LO
CKS ALARM
TROUBLE
A SIGNAL WHICH INDICATES AN EMERGENCY SITUATION REQUIRING IMMEDIATE
ACTION
A SIGNAL WHICH INDICATES A
FAULT WITH AN APPLIANCE, DEVICE, OR
SYSTEM COMPONENT
SUPERVISORYA SIGNAL WHICH
INDICATES A NON-
EMERGENCY SITUATION REQUIRING IMMEDIATE
ACTION
FIRE ALARM SYSTEM OPERATION NOTES:
1. THIS NFPA 72 OPERATIONAL MATRIX IS BASED ON A SIEMENS DESIGO FIRE ALARM SYSTEM.2. ALL SYSTEM STATUS CONDITIONS SHALL BE MIRRORED AT REMOTE ANNUCIATORS.3. IN ORDER TO INSURE CONTINUED SAFE AND RELIABLE OPERATION OF THE FIRE ALARM SYSTEM, PERIODIC INSPECTION AND TESTING SHOULD BE PERFORMED IN ACCORDANCE
WITH APPLICABLE NFPA 72 STANDARDS.FOR ANY REQUIRED SERVICE, REFER TO THE SYSTEM MANUAL OR CONTACT A FACTORY AUTHORIZED REPRESENTATIVE.4. IN NORMAL STANDBY OPERATION, THE GREEN AC POWER ON LED SHOULD BE ILLUMINATED AND NO OTHER INDICATOR OPERATING. THE DISPLAY WILL SHOW THE SYSTEM NAME,
"SYSTEM NORMAL" ANNOUNCEMENT AND THE CURRENT DATE, DAY, AND TIME.5. THIS SYSTEM IS CAPABLE OF EVERY INITIATION DEVICE AND NOTIFICATION APPLIANCE ACTIVATING SIMULTANEOUSLY.6. SYSTEM OPERATING INSTRUCTIONS ARE PRINTED ON THE INSIDE DOOR OF THE FACP.7. ALL SIEMENS FIRE ALARM CABINET DOORS WITH KEYED LOCKS UTILIZE A T-45 KEY.
TYPICAL FIRE ALARM EQUIPMENT MOUNTING NOTES:
THESE MOUNTING DIMENSIONS COMPLY WITH THE FOLLOWING: NFPA 72 CHAPTER 5 & 7 CABO/ANSI A117.1 IBC 2018, CHAPTER 9 ADA PARAGRAPH 4.2.5 & 4.2.6 THE ADA ACCESSIBILITY GUIDELINES FOR BUILDINGS & FACILITIES (ADAAG)
FOR LOW CEILINGS WHERE THE PRESCRIBED MOUNTING HEIGHTS FOR THE SIGNALINGAPPLIANCES CAN NOT BE MET, INSTALL THE APPLIANCE 6" FROM THE CEILING.
ALL DEVICE & APPLIANCE HEIGHTS SHOULD BE CONSISTENT FOR THE ENTIRE PROJECT.
FOR COMBINATION AUDIO/ VISUAL APPLIANCES, THE STROBE PLACEMENT TAKESPRECEDENCE.
SHEET 51 OF 61
ACCEPTABLEMOUNTING AREA FORMANUAL PULLSTATIONS. MEASUREDFROM THE CENTER OFTHE HANDLE.
5' MAX
MIN. 3 FTCLEARANCE INFRONT OF THEFACP
EXITDOOR6'
MAX
DUCT SMOKEDETECTOR
REMOTE TESTSTATION
TYPICALLY48"
6" MIN.
MIN. 3 FTCLEARANCEIN FRONTOF THE RA
ACCEPTABLE MOUNTING AREA FOR,STROBES, OR AUDIBLE/STROBECOMBINATION APPLIANCES(NONSLEEPING ROOMS ANDCORRIDORS). DISTANCES AREMEASURED SO THAT THE ENTIRE LENSMUST BE WITHIN THE AREA SHOWN.
ACCEPTABLEMOUNTING AREA FORAUDIBLE DEVICEDISTANCES AREMEASURED FROM THETOP OF THEAPPLIANCE.
MIN. 90" MIN. 80"
FIRE ALARM EQUIPMENT MOUNTING HEIGHTS DIMENSIONS
TS
MIN. 42"
5' MAX
SMOKE DETECTORS SPECIFIC LOCATION REQUIREMENTS:
1. NO CLOSER THAN 4" FROM ADJOINING WALL SURFACE.2. NO CLOSER THAN 36" FROM THE BATHROOM DOOR.3. AT LEAST 36" AWAY FROM THE SUPPLY REGISTERS OF THE FORCED AIR HEATING OR COOLING, AND OUTSIDE OF THE DIRECT AIRFLOW FROM THESE REGISTERS.4. AT LEAST 36" AWAY FROM THE TIP OF THE BLADE OF THE CEILING FAN.
NOT TO SCALEFLUSH MOUNTED AUTOMATIC DETECTOR DETAIL
3
ROOF OR FLOORSTRUCTURE
J-BOX
STRUCTUREOR BEAM
BEAM CLAMP OR SUPPORTFOR RACEWAY PER NEC.(TYPICAL)
EMT CONDUIT
FLEX CONDUIT TODETECTOR
EMT CONDUITSUPPORT PERNEC. (TYPICAL)
J-BOXSMOKE OR HEATDETECTORS
PROVIDE J-BOXSUPPORT PER NEC.
SMOKE OR HEATDETECTOR (TYP)
NOTES:BOX TO BE ACCESSIBLE VIA CEILING TILE. BOXTO BE PAINTED RED AND HAVE A COVERLABELED "FIRE ALARM"
3/4" FLEXIBLE CONDUIT TO JCT. BOX
LAY-IN CEILING
PROVIDE T&B CONNECTOR
4" DEEP OCTAGON BOXSUPPORT WITH HANGER
SUSPENDED T-BAR
LAY-IN CEILING
NOT TO SCALEDETECTOR DETAIL4
SURFACE MOUNTED J-BOXSAME SIZE AS DETECTOR BASE
SMOKE OR HEATDETECTOR.(TYPICAL)
STRAP PER NEC.
EMT CONDUIT
EXISTINGWALL
FLOOR
SURFACE MOUNTED AUTOMATIC
NOT TO SCALESTATION DETAIL5
SURFACE MOUNTED PULL
NOT TO SCALEDEVICE DETAIL6
SURFACE NOTIFICATION
DECK OR CONCRETESTRUCTURE
EMT CONDUIT STRAPPER NEC.
EMTCONDUIT
EMT CONDUIT STRAPPER NEC.
SURFACE METALRACEWAY J-BOX
SURFACE MOUNTED PULLSTATION
MOUNTING HEIGHT TOOPERATING HANDLE
42" AFF. (MIN.)48" AFF. (MAX.)
FLOOR
DECK OR CONCRETESTRUCTURE
EMT CONDUIT STRAPPER NEC.
EMTCONDUIT
EMT CONDUIT STRAP PER NEC.
SURFACE METALRACEWAY J-BOX
SURFACE MOUNTEDNOTIFICATIONAPPLIANCE
80" AFF.
FLOOR
EXISTINGWALL
EXISTINGWALL
1
2