Seminar on

DUBAI METRO CONSTRUCTION

Seminar No: 10

By

MUHAMED ALI.P (14C2)

Page 2: DUBAI METRO CONSTRUCTION -  · PDF fileDUBAI METRO CONSTRUCTION 31-12-2010. 2 ... Dubai metro, design, survey, pile, piere, ... Station construction is two type

1

Seminar

www.transformia.info

C E R T I F I C A T E

This is to certify that Mr. ________________________________________________ has

conducted a seminar on: ________________________________________ ____

_________________________________________________________________ __ by

learning the subject from various sources. Overall rating of the seminar preparation, data

collection, documentation and presentation is _______________

Director

Dt:

Very Good

MUHAMED ALI. P

DUBAI METRO CONSTRUCTION

31-12-2010

Page 3: DUBAI METRO CONSTRUCTION -  · PDF fileDUBAI METRO CONSTRUCTION 31-12-2010. 2 ... Dubai metro, design, survey, pile, piere, ... Station construction is two type

2

Seminar

www.transformia.info

Contents

No. Description Page

1. Abstract………………………………………………………………. 03

2. Dubai Metro. ………………………………………………………… 04

3. Preliminary work. …………………………………………………… 05

4. Traffic Diversion. …………………………………………………… 06

5. Utility Diversion. …………………………………………………… 05

6. Pile and pier works. ………………………………………………… 07

7. Pier cap construction. ……………………………………………… 07

8. Segment errection. ………………………………………………… 08

9. Stations construction………………………………………………… 09

10. Entrance pod construction. ………………………………………… 10

11. Facilities and future plans. ………………………………………… 11

12. References. ………………………………………………………… 15

Page 4: DUBAI METRO CONSTRUCTION -  · PDF fileDUBAI METRO CONSTRUCTION 31-12-2010. 2 ... Dubai metro, design, survey, pile, piere, ... Station construction is two type

3

Seminar

www.transformia.info

Abstract Key words: Dubai metro, design, survey, pile, piere, sigmennt, viadut

Transportaion:- to move the things or persons from here to there is known as transporataion. The human being began to travel by walk. Step by step they were introduced new methords like by using animal, then animals with triangular shape tyre then it modified to rectangular and circular type. Fainally the human being reached to self engine motivated vehicles. At the present human being the humen being is used different type of transportations such as ground transporataion, water transportation and air transportation.

I hope this report will be usefull for any one to get some idea about Dubai metro project.

Muhamed Ali. P (14C2)

Page 5: DUBAI METRO CONSTRUCTION -  · PDF fileDUBAI METRO CONSTRUCTION 31-12-2010. 2 ... Dubai metro, design, survey, pile, piere, ... Station construction is two type

4

Seminar

www.transformia.info

World metro

A rapid transit, metro, subway, underground, or elevated railway system is an electric

passenger railway in an urban area with high capacity and frequency, and which is grade

separated from other traffic. Rapid transit systems are typically either in underground

tunnels or elevated above street level. Outside urban centers, rapid transit lines

sometimes run grade separated at ground level. Some systems use different types in

different areas. Service on rapid transit systems is provided on designated lines between

stations using electric multiple units on rails, although some systems use rubber tires.

They are typically integrated with other public transport and often operated by the same

public transit authorities. Rapid transit is faster and has a higher capacity than trams or

light rail, but is not as fast or as far-reaching as commuter rail. It is unchallenged in its

ability to transport large numbers of people quickly over short distances with little land

use. Variations of rapid transit include monorails, people movers, small-scale light metro

and the commuter rail hybrid S-Bahn. The first rapid transit system was the London

Underground, which opened in 1863. The technology quickly spread to other cities in

Europe and then to the United States, where a number of elevated systems were built.

Since then the largest growth has been in Asia, especially China, and with driverless

systems. More than 160 cities have rapid transit systems, totaling more than 8,000

kilometers (5,000 mi) of track and 7,000 stations. Twenty-five cities have systems under

construction.

Dubai metro

Dubai metro is dream project of Dubai. It was started since 2005. Which is included two

phase (Green line& Red line). The purpose the Dubai metro is “Safe and smooth

travelling for all”. Dubai metro construction works is started since 2006 and propose to be

finished on 2011 August.

Phase 1 (Red line)

The Dubai metro red line, it is started from Rashidiya to Jabal Ali. It has been started for

travel since 09/August 2009. It is having 29 stations (24 Elevated, 4 underground 1 at

ground level). The length of the Dubai metro red line is 52.1 Km including 4.7 Km

underground (Dubai creek also). Initially 29 trains in service and proposed to service for

travel 51 train by 2010. Expected time for one way trip travel 1hour 12 minutes. Expected

round trip are 2 hour 23 mints. It was the completed phase passing through parallel to the

Shaik Zaid road over and under interchanges of the road.

Page 6: DUBAI METRO CONSTRUCTION -  · PDF fileDUBAI METRO CONSTRUCTION 31-12-2010. 2 ... Dubai metro, design, survey, pile, piere, ... Station construction is two type

5

Seminar

www.transformia.info

Phase 2(Green line)

Phase 2 known as green line, it is started from Qusise 2 to Jadaf 2. It is under

construction. It has 22.5 km including long having 12 elevated stations and 8 -

underground stations. As per latest information by GULF NEWS the green line will be

open for public on 2011 August. Initially they expect 16 trains in service. Expected time

for round trip is 1hour 23 minutes.

Depot for maintenance There will be three main train depots to park and does maintenance work on trains. The

Red Line will have a main depot in Rashidiya and one auxiliary depot at Jebel Ali Free

Zone.

On the Green Line, the main depot for train parking and maintenance will be in Al Qusais

area.

2. Preliminary Works.

Preliminary work is to do some activities like surveying, site visiting, and accessibility of

site, investigation of soil and all arrangement of site for construction are known as

preliminary works. Before start any projects have to do the preliminary work. In the case

of Dubai metro surveying and site investigation is the main preliminary work. It was done

since 2006-2007.

Survey works.

Page 7: DUBAI METRO CONSTRUCTION -  · PDF fileDUBAI METRO CONSTRUCTION 31-12-2010. 2 ... Dubai metro, design, survey, pile, piere, ... Station construction is two type

6

Seminar

www.transformia.info

3. Traffic diversion.

Mainly Dubai metro is through parallel to major roads in Dubai. So before starts the

constructions have to get lot of space to start this project due to this reason need to be

diverting the traffic flow right or left side depends upon the road structure.

For this project pile and pier construction work mainly service roads are diverted. For

stations constructions work, need to get lot of space than other construction to store

material and construction purpose.

Traffic diversion

3.1 Utility Diversion.

Utility is the underground services such as electrical cables, water supply, sewage,

drainage, telecommunication cables and military services. So before start construction

works such as piling columns footing or major excavations need to be divert to the

underground service. Otherwise it will damage during the construction/ piling works. As

per Dubai rules and regulations the authorities, the damages of underground services

during the period the contractor will get punishment to pay huge amount as like

compensation.

4. Pile and Pier

Pile is the main part of structure such as bridges and highrised building etc.

Page 8: DUBAI METRO CONSTRUCTION -  · PDF fileDUBAI METRO CONSTRUCTION 31-12-2010. 2 ... Dubai metro, design, survey, pile, piere, ... Station construction is two type

7

Seminar

www.transformia.info

4.1 Pile.

The process of piling is doing by heavy equipment like rig machine which is drilling the

ground up to reach hard soil of the earth. From hard soil put structural steel like rebar and

poured by concrete up to the ground level. In this project 2.6 meter dia and the length are

varying depths depends upon the soil structure. In the Dubai metro project length is

varying 10 – 13 meter long (depth).

4.1 Pier.

It is continues part of the pile which is support the main body of project structure. Top of

the pier cap the main structure. Basically dia and height of the pier is less than pile. In this

project (1.75 – 2) meter dia and (3-15) meter height varying. In Dubai metro project all

pile and pier casted in construction site.

Pier construction

6. Pier cap construction.

It is the third type of construction in this project. It is constructed by pre-cast castern

method. Pier cap was constructed at Jabal Ali casting yard and transported by heavy

tailor to the site. When it was reached in the site use heavy equipment like mobile crane

is using to erect the pier cap on the top of pier.

A small amount of concrete used to cast pier cap top on the pier to make permanent

structure.

Page 9: DUBAI METRO CONSTRUCTION -  · PDF fileDUBAI METRO CONSTRUCTION 31-12-2010. 2 ... Dubai metro, design, survey, pile, piere, ... Station construction is two type

8

Seminar

www.transformia.info

Pier cap errection

7. Segment errection.

Segment errection is the main part of the project. It is piece by piece erected by electro

metric errection method using lunching girduder equipment. In this project after segment

errection it is knows as viaduct. Viaduct is base of the rail include both way track.

Segment errection.

7.1 Construction of viaducts for elevated tracks

A viaduct is a bridge, which is placed over piers to make a track for the train. The

construction of viaduct spans for the Dubai Metro has started on Shaikh Zayed Road near

Interchange 5.5 near Ibn Battuta Mall.

Each of these viaduct spans is being made up with a minimum of eight pre-cast viaduct

deck segments, which are manufactured and transported from Jebel Ali casting yard.

Each segment of viaduct, 10 meters wide and four meters in length, is being assembled

Page 10: DUBAI METRO CONSTRUCTION -  · PDF fileDUBAI METRO CONSTRUCTION 31-12-2010. 2 ... Dubai metro, design, survey, pile, piere, ... Station construction is two type

9

Seminar

www.transformia.info

with other similar sized segments individually to form a complete viaduct span bridging

across two supporting piers.

Different spans together when assembled will form the bridge deck upon which the trains

will travel. There will be 11,400 pre-cast concrete viaduct deck segments to be used for

the Red Line. Each viaduct weighs about 50 tonnes.

8. Station Construction.

Stations are main part of the project. It is used for public people departure and arrival on

the destination. The train stops only in these stations. Station construction is two type

main structure and steel construction.

Station

8.1 Construction method (Main structure)

Main structure is known as spine beam concours slab and flat form; it is used by huge

amount rebar and concrete.

8.2 Steel structure.

It is the second part of the stations constructions; it is mainly using the roofing structure. It

having primary rib, secondary rib and brazles. The steel structure is erected by heavy

equipment like mobile crane, tower crane and chely picker. After steel errections water

proofing and finishing work like cladding, it is used to make beauty of structure.

Page 11: DUBAI METRO CONSTRUCTION -  · PDF fileDUBAI METRO CONSTRUCTION 31-12-2010. 2 ... Dubai metro, design, survey, pile, piere, ... Station construction is two type

www.t

The le

secon

1.

2.

3.

9. En

Entran

bridge

condit

finishi

the sta

transformia.i

ength of the

nd one is ove

At grade s

elevated a

Elevated

category.

Undergrou

one has tw

ntrance p

nce pod is m

e. Each stati

tions. It is m

ng material

ations for pu

nfo

station is 12

er grade and

stations: - it’s

and undergro

stations: -

It is owel sha

und stations

wo levels. Ba

pod Cons

main axis of

ion has mini

mainly const

like, claddin

ublic peoples

20 meter. T

d third one is

s constructe

ound station

constructed

ape.

: - construct

asement one

struction.

f the each s

imum two po

tructed by c

ng. Entranc

s such as sta

En

here are thr

s undergroun

d at ground

s like parkin

at above

ted having w

e and two. T

station, whic

ods and ma

concrete str

ce pod is th

air, escalate

trance pod

ree types of

nd station.

level, it’s ha

ng etc.

the pier, m

with minimum

The train is c

ch’s connect

aximum four

ucture and

hree type’s f

ed and eleva

stations. On

aving mores

more station

m two entran

come at base

ted by the o

entrance po

supported b

facilities ava

tor.

1

Semi

ne is at grad

facilities tha

s are in th

nce pod. Th

ement two.

overhead foo

od as per sit

by steel. An

ailable acces

10

nar

de

an

is

his

ot

te

nd

ss

Page 12: DUBAI METRO CONSTRUCTION -  · PDF fileDUBAI METRO CONSTRUCTION 31-12-2010. 2 ... Dubai metro, design, survey, pile, piere, ... Station construction is two type

11

Seminar

www.transformia.info

10. Facilities and future plans.

10.1Extension of lines

Extension of Dubai Metro's Red Line is currently under design. It will be extended from

Jebel Ali Free Zone to Dubai-Abu Dhabi border an additional 12 km. The RTA is

reviewing a plan to extend the Red Line from Jebel Ali to the under construction Jebel Ali

Airport, but is still not finalized.

Extension plans on the Green Line have already been approved and it has already been

extended by about 4.9 km from Healthcare City to Al Jaddaf. The Green Line was initially

designed for 17.6 km, but now it is 22.5-km long

10.2 Car parking for rail users

Car parking facility will be provided to metro users on the concept of "park and ride".

There will be two major parking lots on Red Line — one at Rashidiya Station for 3,000

cars and at Jumeirah Islands Station for another 3,000 cars. The biggest parking lot will

be built at Al Qusais Station with a capacity of 6,000 cars. It will cater to users coming

from Sharjah.

There will be small parking spaces at each station while each station will be linked to

other mode of transportation, including taxis, buses and at some stations water transport.

10.3 Adjacent bus and taxi stations

All main metro stations will have adjacent bus stations as part of the integrated transport

system which will include buses, taxis as well as water transport links at stations near the

creek. The RTA is planning to introduce an integrated card system, the Smart Card that

will enable passengers to travel on trains, buses and water transport, as well as use the

parking areas.

Page 13: DUBAI METRO CONSTRUCTION -  · PDF fileDUBAI METRO CONSTRUCTION 31-12-2010. 2 ... Dubai metro, design, survey, pile, piere, ... Station construction is two type

12

Seminar

www.transformia.info

10.4 Luxurious interior

The interior of the trains is based on a water and air theme and every train will have five

compartments. Every train will have three classes – The Golden Class (VIP), the Women

and Children's Class and the Silver Class (economy).

The Golden Class will have a luxurious interior with leather seating. The Women and

Children's compartments will have plenty of space for strollers and bags to ensure a safe

and comfortable journey.

The Silver Class has been finished in a combination of blues and greens. Seating is

arranged in a variety of ways giving passengers the choice between admiring views

through windows and chatting with friends.

All compartments will have reserved wheelchair spaces for special needs people. There

will be a policy of priority seating for elderly, injured; special needs people and pregnant

women.

The compartments will be equipped with audio visual devices. Visual and audio

announcement facilities will be available to serve people, especially those with special

needs.

Station interior

Page 14: DUBAI METRO CONSTRUCTION -  · PDF fileDUBAI METRO CONSTRUCTION 31-12-2010. 2 ... Dubai metro, design, survey, pile, piere, ... Station construction is two type

13

Seminar

www.transformia.info

10.5 Emergency button.

In case of fire, emergency situation in the train can stop anyone to push the emergency

button. The trine will be stop immediately and all doors will be open automatically to

escape travelers. If any person presses this button without any reason/ special needs, he

will get AED 2500/- as fine as per the rule.