Wolf Creek Dam Wolf Creek Dam DSAC I Classification Karst foundation seepage DSAC I Classification - Karst foundation seepage $594M Cost, $572M Obligated, 93% Complete Barrier Wall Completed March 2013 Total Project Completion Estimated Summer 2014 Gallery Grouting Complete Grouting $70M Completed Oct 2008 Contractor: ACT Barrier Wall $420M Award Jul 2008 – 95% Complete Contractor: Treviicos & Soletanche S it h d W ll Barrier Wall Complete Gallery Grouting $11.0M Completed July 2012 Contractor: Judy Company SwitchyardWall 15% Complete ) Halcomb’s Landing Complete Halcomb’s Landing $9.5M Completed Oct 2007 Contractor: VCIDoyon JV Rock Foundation Beneath CA 1 as of 4 Nov 13 1

DSAC I ClassificationDSAC I Classification Karst ... Creek Updat… · Wolf Creek Dam DSAC I ClassificationDSAC I Classification -Karst foundation seepageKarst foundation seepage

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DSAC I ClassificationDSAC I Classification Karst ... Creek Updat… · Wolf Creek Dam DSAC I ClassificationDSAC I Classification -Karst foundation seepageKarst foundation seepage

Wolf Creek DamWolf Creek DamDSAC I Classification Karst foundation seepageDSAC I Classification - Karst foundation seepage $594M Cost, $572M Obligated, 93% CompleteBarrier Wall Completed March 2013Total Project Completion Estimated Summer 2014

Gallery GroutingComplete

j p

Grouting ‐ $70MCompleted Oct 2008Contractor: ACT

Barrier Wall ‐ $420MAward Jul 2008 – 95% CompleteContractor: Treviicos & Soletanche

S it h d W ll

Barrier WallComplete

Gallery Grouting ‐ $11.0MCompleted July 2012Contractor: Judy Company

Switchyard Wall15% Complete

p

)

Halcomb’s LandingComplete

Halcomb’s Landing ‐ $9.5M Completed Oct 2007Contractor: VCI‐Doyon JV

Rock Foundation Beneath CA 1

as of 4 Nov 13 1

Page 2: DSAC I ClassificationDSAC I Classification Karst ... Creek Updat… · Wolf Creek Dam DSAC I ClassificationDSAC I Classification -Karst foundation seepageKarst foundation seepage

Wolf Creek Dam Safety Project UpdateB i W ll C l t d• Barrier Wall Completed March 2013

• Interim Lake Raise April th h A t 2013through August 2013 was successful

• Downstream switchyard ll d itwall and site

stabilization construction ongoing now complete bynow, complete by September 2014

• Goal is to return Lake Cumberland toCumberland to historical operations by Spring 2014

2